T ransmission I mprovement For the Red River Valley & West Central Minnesota
description
Transcript of T ransmission I mprovement For the Red River Valley & West Central Minnesota
![Page 1: T ransmission I mprovement For the Red River Valley & West Central Minnesota](https://reader036.fdocuments.us/reader036/viewer/2022081520/56815300550346895dc11db9/html5/thumbnails/1.jpg)
Transmission Improvement
For the Red River Valley & West Central Minnesota
![Page 2: T ransmission I mprovement For the Red River Valley & West Central Minnesota](https://reader036.fdocuments.us/reader036/viewer/2022081520/56815300550346895dc11db9/html5/thumbnails/2.jpg)
Red River Valley Area
Fargo-Moorhead.
![Page 3: T ransmission I mprovement For the Red River Valley & West Central Minnesota](https://reader036.fdocuments.us/reader036/viewer/2022081520/56815300550346895dc11db9/html5/thumbnails/3.jpg)
Red River Valley
![Page 4: T ransmission I mprovement For the Red River Valley & West Central Minnesota](https://reader036.fdocuments.us/reader036/viewer/2022081520/56815300550346895dc11db9/html5/thumbnails/4.jpg)
Red River Valley
![Page 5: T ransmission I mprovement For the Red River Valley & West Central Minnesota](https://reader036.fdocuments.us/reader036/viewer/2022081520/56815300550346895dc11db9/html5/thumbnails/5.jpg)
Red River ValleyLoad
2004: 1029 MW2011: 1223 MW2016: 1315 MW
![Page 6: T ransmission I mprovement For the Red River Valley & West Central Minnesota](https://reader036.fdocuments.us/reader036/viewer/2022081520/56815300550346895dc11db9/html5/thumbnails/6.jpg)
Red River Valley
![Page 7: T ransmission I mprovement For the Red River Valley & West Central Minnesota](https://reader036.fdocuments.us/reader036/viewer/2022081520/56815300550346895dc11db9/html5/thumbnails/7.jpg)
Studies Identified Several Critical Contingencies
Loss of Bulk Lines• Center-Jamestown-Maple River
• Dorsey-Forbes
Local load-serving benefits• Alexandria
• St. Cloud
• Loss Reduction of approximately 100 MW Real-time• Installation of Bemidji – Grand Rapids 230 kV Line
shows delay of project need by approximately 4 years• Projected need in Fargo area in 2018
![Page 8: T ransmission I mprovement For the Red River Valley & West Central Minnesota](https://reader036.fdocuments.us/reader036/viewer/2022081520/56815300550346895dc11db9/html5/thumbnails/8.jpg)
Alexandria Area
Loss of Grant County – Elbow Lake Line causes low voltages Breaker and capacitor addition postpones local-area need
until 2013 or 2014 Loss of Elmo – Inman or Verndale – Wing River also causes
problems when combined with Grant County line
![Page 9: T ransmission I mprovement For the Red River Valley & West Central Minnesota](https://reader036.fdocuments.us/reader036/viewer/2022081520/56815300550346895dc11db9/html5/thumbnails/9.jpg)
St. Cloud Area
Loss of Benton County – Granite City 115 kV DCTL causes low voltages and severe overloads
St. Regis load dropped automatically Cannot reconfigure Granite City without new area source to
provide support