THIS IS 2016: THE BANKS PROJECT YEAR IN REVIEW

Transcript of T B Y Rview - The Banksthebankspublicpartnership.com/wp-content/uploads/TBPP-2016Annu… ·...

Page 1: T B Y Rview - The Banksthebankspublicpartnership.com/wp-content/uploads/TBPP-2016Annu… · throughout 2016. The Public Parties project work remained within budget every month throughout

T H I S I S 2 0 1 6 : T H E B A N K S P R O J E C T Y E A R I N R E V I E W

Page 2: T B Y Rview - The Banksthebankspublicpartnership.com/wp-content/uploads/TBPP-2016Annu… · throughout 2016. The Public Parties project work remained within budget every month throughout

2THIS IS 2016: The Banks Year in Review

THIS IS 2016: THE BANKS PROJECT YEAR IN REVIEW The Banks team delivered the 2016 Project year’s work safely, on time, within budget, and

inclusive of small and disadvantaged businesses. Public Parties construction concluded all

its work on Phase IIIA public infrastructure and marked the occasion with a ribbon-cutting

in September. Construction progressed on the 171-room AC Hotel to anchor the corner of

Freedom Way and Joe Nuxhall/Main Street. The developer’s team cut the ribbon on the

Radius apartment building and completed the GE Global Operations Center. Cincinnati

Parks promoted events, visitor experiences, and Carol Ann’s Carousel rides to the delight

of Smale Riverfront Park patrons. CB Connector streetcar route opened for business,

with Stop #1 located at The Banks, Second Street between Walnut and Main. Media were

regularly kept informed of progress and included project milestones in their print, broadcast

and digital coverage. In all, The Banks made significant progress in 2016, contributing to

the vision of Cincinnati’s riverfront as a vibrant live-work-play neighborhood.

Page 3: T B Y Rview - The Banksthebankspublicpartnership.com/wp-content/uploads/TBPP-2016Annu… · throughout 2016. The Public Parties project work remained within budget every month throughout

3THIS IS 2016: The Banks Year in Review

PUBLIC PARTIES CONSTRUCTION

CB Connector departs from Stop #1 at The Banks.Phase IIIA was completed and opened to the public in 2016. Lot 23 design has been completed. In addition, design for the Variable Message Signage (Phase 1) was started in December.

One block of Race Street and 700 parking spaces were completed in September.

Phase IIIA

Lot 23

Page 4: T B Y Rview - The Banksthebankspublicpartnership.com/wp-content/uploads/TBPP-2016Annu… · throughout 2016. The Public Parties project work remained within budget every month throughout

4THIS IS 2016: The Banks Year in Review

ECONOMIC INCLUSION: PHASE IIIA

Economic Inclusion information is available here: http://thebankspublicpartnership.com/wp-content/uploads/economic-inclusion-dec2016.pdf

Goal

Actual28.6%

7.9%

30%

10%

85.6%

paid to SBE contractors

5,155,532

Minority workforce participation is 14.89% including minority female hours

Total female participation is

0.44%

SBE Participation

SBE Professional

Services Participation

26-countyConsolidated Metropolitan

Statistical Area employee

residency

Page 5: T B Y Rview - The Banksthebankspublicpartnership.com/wp-content/uploads/TBPP-2016Annu… · throughout 2016. The Public Parties project work remained within budget every month throughout

5THIS IS 2016: The Banks Year in Review

DEVELOPERThe 171-room AC Hotel construction is expected to be complete in 2017.

The Radius Apartments and the GE Global Operations Center (part of the Developer’s Phase IIA) were completed in 2016. Phase IIIA infrastructure project is in the foreground.

Page 6: T B Y Rview - The Banksthebankspublicpartnership.com/wp-content/uploads/TBPP-2016Annu… · throughout 2016. The Public Parties project work remained within budget every month throughout

6THIS IS 2016: The Banks Year in Review

SAFETY

SCHEDULE

BUDGET

All Public Parties work remained on schedule throughout 2016.

The Public Parties project work remained within budget every month throughout 2016.

Phase IIIA budget expended totaled 82.5% of the $29.3 million total at the conclusion of 2016.

Since the Project’s inception in 2008 through December 31, 2016, The Banks Public Parties construction crews recorded 697,756 work-hours without a lost-time incident.

Developer’s Phase IIA construction crews worked a total of 879,460 hours without a lost-time incident from April 28, 2015 through December 31, 2016.

AC Hotel construction logged a total of 39,315 hours without a lost-time incident in 2016.

Public Parties’ Phase IIIA construction crews recorded a total of 104,711 work-hours without a lost-time incident from July 1, 2015 through December 31, 2016.

Budget information is available here: http://thebankspublicpartnership.com/wp-content/uploads/budget-dec2016.pdf

Page 7: T B Y Rview - The Banksthebankspublicpartnership.com/wp-content/uploads/TBPP-2016Annu… · throughout 2016. The Public Parties project work remained within budget every month throughout

7THIS IS 2016: The Banks Year in Review

PARKSCongress authorized the US Army Corps of Engineers to construct up to $30 million in improvements to Smale Riverfront Park.

Cincinnati Park Board was awarded $1.5 million from the Federal Boating Infrastructure Grant Program and initiated construction manager selection for the Cincinnati Riverfront Transient Boat Dock which will be constructed in 2017.

Page 8: T B Y Rview - The Banksthebankspublicpartnership.com/wp-content/uploads/TBPP-2016Annu… · throughout 2016. The Public Parties project work remained within budget every month throughout

8THIS IS 2016: The Banks Year in Review

COMMUNICATIONS

Visitors

www.TheBanksPublicPartnership.com

4,659

8,564

1:52 1,100

1,359

2,520

PageViews

Avg Time

Media Mentions

TwitterFollowers

@IBackTheBanks

Mobile Parking

Page Uses

Over 75% of respondents agreed that The Banks has been a good investment, has improved quality of life, and helped revitalize downtown Cincinnati.

—— 912 Development

—— 188 Infrastructure

Media information is available here: http://thebankspublicpartnership.com/wp-content/uploads/media-summary-dec2016.pdf

>75% Ohio Omnibus Survey

Page 9: T B Y Rview - The Banksthebankspublicpartnership.com/wp-content/uploads/TBPP-2016Annu… · throughout 2016. The Public Parties project work remained within budget every month throughout

9THIS IS 2016: The Banks Year in Review

WHAT’S NEXT

The entire City/County team, together with the Joint Banks Steering Committee, Cincinnati Park Board, and Carter USA will continue collaborating on all development and construction aspects, ensuring that on-time, on-strategy and within budget performance remain the hallmarks of The Banks project.

For more information: Phil Beck The Banks Project Executive (513) 946-4434 www.thebankspublicpartnership.com Updated 1/20/17