T-76.115 Project Review
RoadRunners[IM3] Iteration
18.03.2004
2
T-76.115 Project ReviewT-76.115 Project Review
Agenda
Project status (15 min) Planned goals Planned deliveries Project metrics Risks
Used work practices (5 min) Completed work (15 min)
Demo Peer testing
Plans for the next iteration (5 min)
3
T-76.115 Project ReviewT-76.115 Project Review
Status of project
Group members, who are mainly responsible for implementation have reached their hour quota. Because of that, all features cannot be implemented in this project:
FR-O-001: Change layer order
4
T-76.115 Project ReviewT-76.115 Project Review
Status of planned goals of the iteration
Goals 1: All major bugs are fixed N/A
Goals 2: User manual is ready Ok
Goals 3: System delivered to peer group for testing Ok
Goals 4: System delivered to customer for testing Ok
5
T-76.115 Project ReviewT-76.115 Project Review
Status of planned deliverables of the iteration Deliverables:
Updated project plan Ok
Updated requirements document Ok
Updated technical specification Ok
Updated User interface specification Ok
Updated test plan Ok
Updated test cases Ok
Updated user's manual Ok
Test log Ok
Test reports for I2 & I3 All ok
Peer test plans Ok
Peer test reports Ok
Progress report Ok
6
T-76.115 Project ReviewT-76.115 Project Review
Realization of the tasks Update User interface spec: -18,5
Only minor changes has been made, rest will be done in next phase.
Some hours might be reported wrong, see below.
Use Case User Interface: +13,5 Some of the hours should have been
marked to the User interface specification.
Bug fixing: +43,0 Some integration problem, which causes
new bugs. Personal SE practice –17,0
This will be done in next phase Prepare unit testing: -4,0
No new unit testing done in this phase
7
T-76.115 Project ReviewT-76.115 Project Review
Working hours by person
Too much hours for some group members
Bug fixing took more time than expected. (integration problem)
Realized hours in this iteration Plan in the beginning of this iteration
Latest plan
8
T-76.115 Project ReviewT-76.115 Project Review
Quality metrics
I1 I2 I3 Peer DE TotalReported 15 38 20 73Closed 14 31 6 51Open 1 7 14 22
Blockers Critical Major Minor Trivial Enhancement TotalTotal open 4 7 1 1 13This iteration reported 8 15 12 1 2 38
9
T-76.115 Project ReviewT-76.115 Project Review
Quality assessment
Legend
Coverage:
0 = nothing
1 = we looked at it
2 = we checked all functions
3 = it’s tested
Quality:
= quality is good
= not sure
= quality is bad
Functional area Coverage Quality Comments
Installation and running the program 3Basic functionality of RMTWorking with layerWorking with activityWorking with eventTimescaleWorking with noteWorking with dependencyExportation of roadmap
3333
3333
10
T-76.115 Project ReviewT-76.115 Project Review
Software size in Lines of Code (LOC)
11
T-76.115 Project ReviewT-76.115 Project Review
Changes to the project
No changes in project
12
T-76.115 Project ReviewT-76.115 Project Review
Risks
The current situation regarding the risks: Following risks has been realized:
Hour quota has been reached: all features cannot be implemented Some members have still lack of hours: workload grows Customer uses different environment: implementation has been done in
windows –environment.
Identified risks: Hour quota has been reached Some members have still lack of hours New bugs in peer testing. Customer has not computer to test application. Customer uses different environment. Course www -page holds too much information. Trapoli www -page often down. Bugzilla www -page often down. Course www -page often down.
13
T-76.115 Project ReviewT-76.115 Project Review
Work practices In this phase following practices are
used: Time reporting Version control Personal SE assignments
Test driven development Communication practices Meeting practices Design patterns Documentation practices Configuration management Architectural design
Iteration planning Documenting and document delivery Project review Use cases Risk management Coding convention Bugzilla
14
T-76.115 Project ReviewT-76.115 Project Review
Status of PSEAs
Test driven development Metrics of unit test used in project has been gathered
Communication practices All communication practices have been observed and
actively used. Meeting practices
Meeting minutes has been written in every meeting. Agenda has been done beforehand and it has been also
followed. Design patterns
Metrics of design pattern's usage in this project has been gathered
Documentation practices Configuration management
Directory structure updates Ant-tool removed, experiences and metrics updated Delivery chapter updated
Architectural design Document has been updated with Ratioanal Rose's reverse
engineer
15
T-76.115 Project ReviewT-76.115 Project Review
Results of the iteration
Updated project plan Next phase tasks and risks
Updated requirements document Use cases updated
Updated architecture design Class diagrams has been updated Class diagram of Storage has been added.
Updated test cases Test cases are updated and added.
Updated user interface specifications Dialogs are updated.
Updated test plan Descriptions of features are updated.
Test log Testing has been started
User's manual Draft
16
T-76.115 Project ReviewT-76.115 Project Review
Test reports
17
T-76.115 Project ReviewT-76.115 Project Review
PEER TESTING
Peer tool: IPSS modelling tool Peer group: XtremeIT
RoadRunners: -Katajala Jussi -Noponen Petri
18
T-76.115 Project ReviewT-76.115 Project Review
19
T-76.115 Project ReviewT-76.115 Project Review
PEER TESTING
Capabilities under test:
Drawing (PN1,PN2 2:30) -Resize not succesfull : Initial and final state -Copying of connector not possible -Loading and saving diagram not provided
Printing and editing (PN1 2:45) -Printing diagram twice: portrait and landscape -Only the size of original screen printed
Core functionality (JK1 1:15) -Opera: DIAGRAM not printed -Insert text into CONDITION-object not possible -Drawing CONNECTION from object to object over screen not possible
20
T-76.115 Project ReviewT-76.115 Project Review
PEER TESTING Test environment: Java 1.4.2
Test platforms: JK1: Win98, desktop Intel Pentium 4 (2,38 Ghz) -Explorer 5 -Opera 7.23
PN1: Win98 , HP laptop Intel Pentium (133 MHz) + HP 565C inkjet printer -Explorer 6 -Netscape 7.02 -NOT: Mozilla 1.6 conflict with Java 1.4.2
PN2: Win XP Pro , desktop AMD Athlon 2700 (2 Ghz) -Explorer 6 -Mozilla 1.6
21
T-76.115 Project ReviewT-76.115 Project Review
Demo
Jussi will now present Roadmap tool
22
T-76.115 Project ReviewT-76.115 Project Review
Plan for the next iteration 1(2) Goals
All major and critical bugs are fixed
System delivered to customer Deliverables
Final report Updated project plan Updated requirements
document Updated technical
specification Updated User interface
specification Updated test plan Updated test cases Updated user's manual Test log Peer test plans Peer test reports Progress report
23
T-76.115 Project ReviewT-76.115 Project Review
Plan for the next iteration 2(2)