K-Tower Onshore With standardized tubular products toward the new onshore tower age An effective approach to greater hub heights

Transcript of SZAG WindEnergy K-Tower A4 EN 20180702

Page 1: SZAG WindEnergy K-Tower A4 EN 20180702

K-Tower OnshoreWith standardized tubular products toward the new onshore tower age

An effective approach to greater hub heights

Page 2: SZAG WindEnergy K-Tower A4 EN 20180702

Scope of delivery

D1 FoundationK-JacketTransition pieceTubular tower

Turbine 2.0 to 4.5 MWHub height 90 - 150 m and more

Tubular tower Ø = 2.5 to 4.3 m

Transition pieceK-Jacket 4 legs Ø = 610 to 813 mm

Braces: UPE sections ≤ 360 mm or tubes with Ø = 273 to 382 mmJacket weight up to 250 t

Foundation 4 footings

The concept has been developed together with Peter Kelemen (Salzgitter) and W2E Wind to Energy GmbH (Rostock) and JBO (Hamburg)

Interface

Tubu

lar t

ower

Exte

rnal

del

iver

y

Various foundation levels possible

TP

Deliv

ery

by S

alzg

itter

140

130

120

110

100

90

80

70

60

50

40

30

20

10

K-Ja

cket

(4 le

gs)

Deliv

ery

by S

alzg

itter

Page 3: SZAG WindEnergy K-Tower A4 EN 20180702

Transition piece K-node

Secondary SteelAccording to the customer’s demand: ladder, hoist, cable tray etc. All common systems are available.

K-Jacket with tubular tower K-Jacket with lattice towerAction 1 3 8 10 12 15 16 18 20 22 23 day 1 3 8 10 12 15 18 20 22 23 24 26 27 28

Site preparation

Excavation

Precast found. parts

Cast found. parts

Backfi lling

Assembly K-Jacket

Preparation TP

Assembly lattice tower

Erection

Finish

Site clean up

Final check

Comparison of K-Tower concept to market products

Main structural details

The concept has been developed together with Peter Kelemen (Salzgitter) and W2E Wind to Energy GmbH (Rostock)

Comparison of K-Tower weight with market products and publications (Vindforsk Project (Sweden) and WindPACT (NREL USA))

Construction time on sitefastest possible performance under optimal conditions

B

B

B-B

B

B

B-B

05.0E+050.0E+00 1.0E+06 1.5E+06 2.0E+06

200

400

600

800

Tow

er m

ass

[tons

]

Hub height x swept area [m3]

K-Tower

Vindforsk project (Conv.)

Vindforsk project (Segment)

WindPACT baseline design

WindPACT fi nal design

Page 4: SZAG WindEnergy K-Tower A4 EN 20180702

Footing system

Each jacket leg has its own single footing

Soil replacementSuffi cient bearing capacity about 1 to 1.5 m below footing bottom

Pile foundationSoil conditions allow the pile foundation

Raft footingSuffi cient bearing capacity

Section 1-1

Vibro (if possible)Suffi cient bearing capacity about 1.5 to 7 m below footing bottom

The concept has been developed together with Peter Kelemen (Salzgitter)

Plan

Single footings

Dimension limits (depends on external impacts / effects)

16 to 21 m

5 · 5 to 7 · 7 m

Jacket leg

Brace

1 1

K-Ja

cket

Vibr

o co

lum

n

Sand / gravel

Subsoil

Appr

ox. 2

.5 m

Prefab piles

Pile capBackfi ll

Backfi ll

Jacket leg Brace

Shaft

Slab

Page 5: SZAG WindEnergy K-Tower A4 EN 20180702

The concept has been developed together with Peter Kelemen (Salzgitter) and W2E Wind to Energy GmbH (Rostock)

Features

• No enormously large concrete foundations required, as each jacket leg has its own footing.

• The tower can also be installed in soils with lower bearing capacity. Simple soil tests are suffi cient.

• The jacket design is optimally adapted to the (mainly axial) forces acting on it. All jacket parts are prefabricated.

• The jacket structure is made up of standard sections and tubes in steel grade S355.

• All the jacket components can be transported by standard trucks.

• Easy on-site assembly (bolted connections) allows for a high level of local content.

• The use of lock bolts means there is no need for checking/

maintenance of the connections during the operating period.

• Dismantling at the end of the tower’s service life is just as easy. Even the footings can be completely removed.

Cost comparision of common hybrid towers and K-Towers (hub height > 110 m)

Cost reduction

Hybr

id

norm

al s

ubso

il

poor

sub

soil

com

plet

e in

stal

latio

nno

rmal

sub

soil

com

plet

e in

stal

latio

npo

or s

ubso

il

com

plet

e in

stal

latio

nan

d di

sman

tling

K-To

wer

100 %

25 %

33 %

40 %

0 %

The main cost-saving factors are the simple foundation, the material-saving design, easy transportation and quick assembly / dismantling.

Dismantling

Transportation Assembly

Fabrication

Foundation

Page 6: SZAG WindEnergy K-Tower A4 EN 20180702

SZ /

K-To

wer

Ons

hore

/ E

/ pdf

/ 07

2018

he

sels

vom

berg

.de

Salzgitter AGEisenhüttenstraße 9938239 SalzgitterGermany

Salzgitter AGSalzgitter Mannesmann RenewablesBeisenstraße 5345964 GladbeckPhone: +49 2043 407-914Fax: +49 2043 407-990

[email protected]