Q2020 Systems VisionBen Keitch
Q2020 – Top level System• Nodes need 1x0.6x0.6m volume• Need to be close together (photonic entanglement ~1m) • Either 20x 0.7m high units or 7x full-height racks:
TECHNOLOGY SUBSYSTEMS1. Optical X-Connect2. Optical Power
Supply3. Beam delivery4. Ion trap module5. Control System
Q2020 – Single node : 1, 3, 4 & 5Ion trap, vacuum, RF driver, magnetics, and optics on 2-level bread boardAmps and drivers
DDS and local control
Forced-air cooling
Laser Power bus : 2
Diode lasers (ECDL) boughtTiSaph and pulsed laser boughtStabilisation and control in placeEnough power available for 20 units (?)– Can amplify with injected slaves– Microwaves might reduce requirements
Q2020 – Trap and Optics : 1, 3 & 4
1: Collection optics and X-connect3: Beam delivery and AO switches4: RF Drive, vacuum and trap19 inch format: 29 x 29cm 5U high
Q2020 – Node electronics : 2DDS waveformsDAC motional controlAO drive ampsProcessorRF DriveDetectionX-Switch DriveMagnetic field control
19 inch rack 6U high+
3U for amps+
1U cooling
Trap Technology Summary : 4
Machined Wafer SurfaceTechnology Machined metal and
ceramicsMetal plated substrate. Laser machined or etched
MEMS or microfabrication
Size 50mm 5mm 0.5mm
Ion Lifetime hours - days hours minutes
Shuttle Speed ms ms-us us
Reliability high high medium
Cost high medium medium/low
Manufactubility low low high
Zones 1-4 5-10 many
Supplier In-house In-house/MEMS partner? Sussex, NPL, Sandia, GTRI
Demonstrator timelines
1st Half
2nd Half
1st Half
2nd Half
1st Half
2nd Half
1st Half
2nd Half
1st Half
WP0 Demonstrator
WP1 Ion trap module development
WP3 Optical Cross Connect
WP1,3,9 Optical power supply
WP1,3,9 Beam Delivery
M20 Bipartite interconnect (BI) between two ion traps
(ITs)
M25 BI between two
multi-ion traps (MITs)
M30 Star interconnect (SI) between
five MITs
M40 Engineered
MIT
M46 Engineered SI between
five MITs
M52 Engineered lattice of 20 MITs each
with SI
2015 2016 2017
WP9 Control
2018 2019
Q2020 - Trap
1st Half
2nd Half
1st Half
2nd Half
1st Half
2nd Half
1st Half
2nd Half
1st Half
Microwave Trap
Blade trap
Wafer Trap
Surface Trap
M20 Bipartite interconnect (BI) between two ion traps
(ITs)
M25 BI between two
multi-ion traps (MITs)
M30 Star interconnect (SI) between
five MITs
M40 Engineered
MIT
M46 Engineered SI between
five MITs
M52 Engineered lattice of 20 MITs each
with SI
2015 2016 2017 2018 2019
Industry Projects
M20 Bipartite
interconnect (BI) between
two ion traps (ITs)
M25 BI between
two multi-ion
traps (MITs)
M30 Star interconnec
t (SI) between five MITs
M40 Engineered
MIT
M46 Engineere
d SI between five MITs