System Support Dept. Williams Wu

18
System Support System Support Dept. Dept. Williams Wu Williams Wu 29/01/2010 29/01/2010

description

IT Division. System Support Dept. Williams Wu 29/01/2010. ENGAGED PROJECT THIS MONTH. System Support. System Development. Data Center of N’orch. Develop the BCS > Budget System > POS System > Premium Collection - PowerPoint PPT Presentation

Transcript of System Support Dept. Williams Wu

Page 1: System Support Dept.         Williams Wu

System Support Dept.System Support Dept. Williams WuWilliams Wu 29/01/201029/01/2010

Page 2: System Support Dept.         Williams Wu

ENGAGED PROJECT THIS MONTH

System Support System Development

- Develop the BCS

> Budget System > POS System

> Premium Collection

> FYC method

- Data Center of N’orch

- Data Center of DaNang

- Data Center of DongNai

- Data Center of TWC

Page 3: System Support Dept.         Williams Wu

Data Center of N’orch

Sign the IBM AIX MA Contract for year 2010.A

Sign the PCMA with Tien My Company for year 2010. B

Clean the pipes of chiller machine for DC air conditioner.C

Page 4: System Support Dept.         Williams Wu

Clean the pipes of chiller machine for DC air conditioner

Page 5: System Support Dept.         Williams Wu

Clean the pipes of chiller machine for DC air conditioner (Cont.)

Page 6: System Support Dept.         Williams Wu

Data Center of DaNang

Support to move all IT devices (Network device. PBX system) to new building.

A

Support to change the leased line to new building.B

Page 7: System Support Dept.         Williams Wu

Data Center of DongNai

Finish the approval report and send back the quotations to suppliers.

A

Sign the contracts of all devices for DongNai.B

Deploy the MPLS fiber cable for N’orch building.C

Page 8: System Support Dept.         Williams Wu

Data Center of TWC

Fix the fiber cable of backup link from 8F to 6F and 7F.A

Page 9: System Support Dept.         Williams Wu

Develop the BCS system

AS attaining Quota(%)

BFinish the six statistics reports for POS:

• Suspend Data Enquiry• Surrender Data Enquiry• Monthly Surrender Enquiry• No-Taken Data Enquiry• Monthly Not-Taken Enquiry• Not-Taken Analysis Report Enquiry

Complete the second phase of Budget System.

A

Page 10: System Support Dept.         Williams Wu

Develop the BCS system (Cont.)

CProcess to modify FYC method:1. Finish FYC target of daily report into system.2. Finish FYC rate of new products into system.3. Finish SPEC documents and test for agent performance

salary.4. Finish the agent performance of 200913 in testing

system and pass these data to AA and Planning dep. to confirm.

5. The remainder performance scores for agent salary are already paid in one time at 200913.

Page 11: System Support Dept.         Williams Wu

Develop the BCS system (Cont.)

Install function for Premium Collection:1. The reasons for non-receipt of premium.2. Habits that policy owners pay the premium.

D

Support to test Bancassurance product in BCS system.E

Page 12: System Support Dept.         Williams Wu

Complete the second phase of Budget System

Page 13: System Support Dept.         Williams Wu

Complete the second phase of Budget System (Cont.)

Page 14: System Support Dept.         Williams Wu

Finish the six statistics reports for POS

AS attaining Quota(%)

Page 15: System Support Dept.         Williams Wu

The reasons for non-receipt of premium

AS attaining Quota(%)

Page 16: System Support Dept.         Williams Wu

Habits that policy owners pay the premium

Page 17: System Support Dept.         Williams Wu

PLANNING PROJECT FOR NEXT MONTH

Continue to trace the DongNai CS schedule.A

Finish to modify FYC method and Install the FYC daily report to BCS system.

B

Maintain BCS and B2E system.C

Page 18: System Support Dept.         Williams Wu

AS attaining Quota(%)