System Specifications - · PDF fileSystem Specifications •...

20
System Specifications Environmental Specifications, page 1 Cabling the C1-Tetration Cluster Devices, page 1 Cabling the C1-Tetration-M Cluster Devices, page 13 Power Specifications, page 20 Environmental Specifications The following table lists the environmental specifications required for installing the Cisco Tetration Analyzer Cluster. Specification Environment 41 to 95° F (40 to 65° C) with derating the maximum temperature by 1° C for every 1000 feet (305 m) above sea level Operating Temperature 40 to 149° F (40 to 65° C) Storage 10 to 80 percent relative humidity with a humidity gradation of 10 percent per hour Operating Humidity 5 to 93 percent relative humidity Storage 0 to 10,000 feet (0 to 3050 m) Operating Altitude 0 to 40,000 feet (12,200 m) Storage Cabling the C1-Tetration Cluster Devices The following figure shows how the C1-Tetration rack devices are interconnected. For a detailed listing of the connections, see the tables following that figure. Cisco Tetration Analytics Cluster Hardware Deployment Guide 1

Transcript of System Specifications - · PDF fileSystem Specifications •...

System Specifications

• Environmental Specifications, page 1

• Cabling the C1-Tetration Cluster Devices, page 1

• Cabling the C1-Tetration-M Cluster Devices, page 13

• Power Specifications, page 20

Environmental SpecificationsThe following table lists the environmental specifications required for installing the Cisco Tetration AnalyzerCluster.

SpecificationEnvironment

41 to 95° F (–40 to 65° C) with derating the maximum temperature by1° C for every 1000 feet (305 m) above sea level

OperatingTemperature

–40 to 149° F (–40 to 65° C)Storage

10 to 80 percent relative humidity with a humidity gradation of 10percent per hour

OperatingHumidity

5 to 93 percent relative humidityStorage

0 to 10,000 feet (0 to 3050 m)OperatingAltitude

0 to 40,000 feet (12,200 m)Storage

Cabling the C1-Tetration Cluster DevicesThe following figure shows how the C1-Tetration rack devices are interconnected. For a detailed listing ofthe connections, see the tables following that figure.

Cisco Tetration Analytics Cluster Hardware Deployment Guide 1

The CIMC/PXE switch is connected to the Management (Mgmt) port on each of the three switches andto the eth0 port on each of the 36 Compute, Cache, and Base server hosts.

Note

Cisco Tetration Analytics Cluster Hardware Deployment Guide2

System SpecificationsCabling the C1-Tetration Cluster Devices

Table 1: Spine Switch (RU 42) Connections

ConnectionConnection TypeSpinePort

PortRU inDualRack

RU inSingleRack

Device

eth0Rack 1RU 17

RU 36UCS server host 1 (Compute server 1)CIMC/PXE VLAN (1Gigabit)

1

eth0Rack 1RU 16

RU 35UCS server host 2 (Compute server 2)CIMC/PXE VLAN (1Gigabit)

2

eth0Rack 1RU 15

RU 34UCS server host 3 (Compute server 3)CIMC/PXE VLAN (1Gigabit)

3

eth0Rack 1RU 14

RU 33UCS server host 4 (Compute server 4)CIMC/PXE VLAN (1Gigabit)

4

eth0Rack 1RU 13

RU 32UCS server host 5 (Compute server 5)CIMC/PXE VLAN (1Gigabit)

5

eth0Rack 1RU 12

RU 31UCS server host 6 (Compute server 6)CIMC/PXE VLAN (1Gigabit)

6

eth0Rack 1RU 11

RU 30UCS server host 7 (Compute server 7)CIMC/PXE VLAN (1Gigabit)

7

eth0Rack 1RU 10

RU 29UCS server host 8 (Compute server 8)CIMC/PXE VLAN (1Gigabit)

8

eth0Rack 1RU 8

RU 28UCS server host 9 (Compute server 9)CIMC/PXE VLAN (1Gigabit)

9

eth0Rack 1RU 7

RU 27UCS server host 10 (Compute server 10)CIMC/PXE VLAN (1Gigabit)

10

eth0Rack 1RU 6

RU 26UCS server host 11 (Compute server 11)CIMC/PXE VLAN (1Gigabit)

11

eth0Rack 1RU 5

RU 25UCS server host 12 (Compute server 12)CIMC/PXE VLAN (1Gigabit)

12

eth0Rack 1RU 4

RU 24UCS server host 13 (Compute server 13)CIMC/PXE VLAN (1Gigabit)

13

eth0Rack 1RU 3

RU 23UCS server host 14 (Compute server 14)CIMC/PXE VLAN (1Gigabit)

14

Cisco Tetration Analytics Cluster Hardware Deployment Guide 3

System SpecificationsCabling the C1-Tetration Cluster Devices

ConnectionConnection TypeSpinePort

PortRU inDualRack

RU inSingleRack

Device

eth0Rack 1RU 2

RU 22UCS server host 15 (Compute server 15)CIMC/PXE VLAN (1Gigabit)

15

eth0Rack 1RU 1

RU 21UCS server host 16 (Compute server 16)CIMC/PXE VLAN (1Gigabit)

16

eth0Rack 2RU 21

RU 20UCS server host 17 (Cache server 1)CIMC/PXE VLAN (1Gigabit)

17

eth0Rack 2RU 20

RU 19UCS server host 18 (Cache server 2)CIMC/PXE VLAN (1Gigabit)

18

eth0Rack 2RU 19

RU 18UCS server host 19 (Cache server 3)CIMC/PXE VLAN (1Gigabit)

19

eth0Rack 2RU 18

RU 17UCS server host 20 (Cache server 4)CIMC/PXE VLAN (1Gigabit)

20

eth0Rack 2RU 17

RU 16UCS server host 21 (Cache server 5)CIMC/PXE VLAN (1Gigabit)

21

eth0Rack 2RU 16

RU 15UCS server host 22 (Cache server 6)CIMC/PXE VLAN (1Gigabit)

22

eth0Rack 2RU 15

RU 14UCS server host 23 (Cache server 7)CIMC/PXE VLAN (1Gigabit)

23

eth0Rack 2RU 14

RU 13UCS server host 24 (Cache server 8)CIMC/PXE VLAN (1Gigabit)

24

eth0Rack 2RU 12

RU 12UCS server host 25 (Base server 1)CIMC/PXE VLAN (1Gigabit)

25

eth0Rack 2RU 11

RU 11UCS server host 26 (Base server 2)CIMC/PXE VLAN (1Gigabit)

26

eth0Rack 2RU 10

RU 10UCS server host 27 (Base server 3)CIMC/PXE VLAN (1Gigabit)

27

eth0Rack 2RU 9

RU 9UCS server host 28 (Base server 4)CIMC/PXE VLAN (1Gigabit)

28

eth0Rack 2RU 8

RU 8UCS server host 29 (Base server 5)CIMC/PXE VLAN (1Gigabit)

29

Cisco Tetration Analytics Cluster Hardware Deployment Guide4

System SpecificationsCabling the C1-Tetration Cluster Devices

ConnectionConnection TypeSpinePort

PortRU inDualRack

RU inSingleRack

Device

eth0Rack 2RU 7

RU 7UCS server host 30 (Base server 6)CIMC/PXE VLAN (1Gigabit)

30

eth0Rack 2RU 6

RU 6UCS server host 31 (Base server 7)CIMC/PXE VLAN (1Gigabit)

31

eth0Rack 2RU 5

RU 5UCS server host 32 (Base server 8)CIMC/PXE VLAN (1Gigabit)

32

eth0Rack 2RU 4

RU 4UCS server host 33 (Base server 9)CIMC/PXE VLAN (1Gigabit)

33

eth0Rack 2RU 3

RU 3UCS server host 34 (Base server 10)CIMC/PXE VLAN (1Gigabit)

34

eth0Rack 2RU 2

RU 2UCS server host 35 (Base server 11)CIMC/PXE VLAN (1Gigabit)

35

eth0Rack 2RU 1

RU 1UCS server host 36 (Base server 12)CIMC/PXE VLAN (1Gigabit)

36

49Rack 1RU 40

RU 40Leaf switch 1 (RU 41 in single rack orRU 40 in rack 1 of dual rack)

Internal VLAN (40Gigabit)

49

49Rack 2RU 40

RU 41Leaf switch 2 (RU 40 in single rack orRU 40 of rack 2 in dual rack) port 49

Internal VLAN (40Gigabit)

50

Table 2: Leaf Switch 2 (RU 41 in Single-Rack Installations or RU 40 in Dual-Rack Installations) Connections

ConnectionConnection TypeLeaf 2Port

PortRU inSingleRack

RU inSingleRack

Device

eth5Rack 1RU 17

RU 36UCS server host 1 (Compute server 1)Internal VLAN (10Gigabit)

1

eth5Rack 1RU 16

RU 35UCS server host 2 (Compute server 2)Internal VLAN (10Gigabit)

2

eth5Rack 1RU 15

RU 34UCS server host 3 (Compute server 3)Internal VLAN (10Gigabit)

3

Cisco Tetration Analytics Cluster Hardware Deployment Guide 5

System SpecificationsCabling the C1-Tetration Cluster Devices

ConnectionConnection TypeLeaf 2Port

PortRU inSingleRack

RU inSingleRack

Device

eth5Rack 1RU 14

RU 33UCS server host 4 (Compute server 4)Internal VLAN (10Gigabit)

4

eth5Rack 1RU 13

RU 32UCS server host 5 (Compute server 5)Internal VLAN (10Gigabit)

5

eth5Rack 1RU 12

RU 31UCS server host 6 (Compute server 6)Internal VLAN (10Gigabit)

6

eth5Rack 1RU 11

RU 30UCS server host 7 (Compute server 7)Internal VLAN (10Gigabit)

7

eth5Rack 1RU 10

RU 29UCS server host 8 (Compute server 8)Internal VLAN (10Gigabit)

8

eth5Rack 1RU 8

RU 28UCS server host 9 (Compute server 9)Internal VLAN (10Gigabit)

9

eth5Rack 1RU 7

RU 27UCS server host 10 (Compute server 10)Internal VLAN (10Gigabit)

10

eth5Rack 1RU 6

RU 26UCS server host 11 (Compute server 11)Internal VLAN (10Gigabit)

11

eth5Rack 1RU 5

RU 25UCS server host 12 (Compute server 12)Internal VLAN (10Gigabit)

12

eth5Rack 1RU 4

RU 24UCS server host 13 (Compute server 13)Internal VLAN (10Gigabit)

13

eth5Rack 1RU 3

RU 23UCS server host 14 (Compute server 14)Internal VLAN (10Gigabit)

14

eth5Rack 1RU 2

RU 22UCS server host 15 (Compute server 15)Internal VLAN (10Gigabit)

15

eth5Rack 1RU 1

RU 21UCS server host 16 (Compute server 16)Internal VLAN (10Gigabit)

16

eth5Rack 2RU 21

RU 20UCS server host 17 (Cache server 1)Internal VLAN (10Gigabit)

17

eth5Rack 2RU 20

RU 19UCS server host 18 (Cache server 2)Internal VLAN (10Gigabit)

18

Cisco Tetration Analytics Cluster Hardware Deployment Guide6

System SpecificationsCabling the C1-Tetration Cluster Devices

ConnectionConnection TypeLeaf 2Port

PortRU inSingleRack

RU inSingleRack

Device

eth5Rack 2RU 19

RU 18UCS server host 19 (Cache server 3)Internal VLAN (10Gigabit)

19

eth5Rack 2RU 18

RU 17UCS server host 20 (Cache server 4)Internal VLAN (10Gigabit)

20

eth5Rack 2RU 17

RU 16UCS server host 21 (Cache server 5)Internal VLAN (10Gigabit)

21

eth5Rack 2RU 16

RU 15UCS server host 22 (Cache server 6)Internal VLAN (10Gigabit)

22

eth5Rack 2RU 15

RU 14UCS server host 23 (Cache server 7)Internal VLAN (10Gigabit)

23

eth5Rack 2RU 14

RU 13UCS server host 24 (Cache server 8)Internal VLAN (10Gigabit)

24

eth5Rack 2RU 12

RU 12UCS server host 25 (Base server 1)Internal VLAN (10Gigabit)

25

eth5Rack 2RU 11

RU 11UCS server host 26 (Base server 2)Internal VLAN (10Gigabit)

26

eth5Rack 2RU 10

RU 10UCS server host 27 (Base server 3)Internal VLAN (10Gigabit)

27

eth5Rack 2RU 9

RU 9UCS server host 28 (Base server 4)Internal VLAN (10Gigabit)

28

eth5Rack 2RU 8

RU 8UCS server host 29 (Base server 5)Internal VLAN (10Gigabit)

29

eth5Rack 2RU 7

RU 7UCS server host 30 (Base server 6)Internal VLAN (10Gigabit)

30

eth5Rack 2RU 6

RU 6UCS server host 31 (Base server 7)Internal VLAN (10Gigabit)

31

eth5Rack 2RU 5

RU 5UCS server host 32 (Base server 8)Internal VLAN (10Gigabit)

32

eth5Rack 2RU 4

RU 4UCS server host 33 (Base server 9)Internal VLAN (10Gigabit)

33

Cisco Tetration Analytics Cluster Hardware Deployment Guide 7

System SpecificationsCabling the C1-Tetration Cluster Devices

ConnectionConnection TypeLeaf 2Port

PortRU inSingleRack

RU inSingleRack

Device

eth5Rack 2RU 3

RU 3UCS server host 34 (Base server 10)Internal VLAN (10Gigabit)

34

eth5Rack 2RU 2

RU 2UCS server host 35 (Base server 11)Internal VLAN (10Gigabit)

35

eth5Rack 2RU 1

RU 1UCS server host 36 (Base server 12)Internal VLAN (10Gigabit)

36

eth2Rack 2RU 3

RU 3UCS server host 34 (Base server 10)Public VLAN (10Gigabit)

37

eth2Rack 2RU 1

RU 1UCS server host 36 (Base server 12)Public VLAN (10Gigabit)

38

–––Customer router 1Internal VLAN (10Gigabit)

39

40Rack 1RU 40

RU 40Leaf switch 1Internal VLAN (10Gigabit)

40

eth2Rack 1RU 16

RU 35UCS server host 2 (Compute server 2)Public VLAN (10Gigabit)

41

eth2Rack 1RU 14

RU 33UCS server host 4 (Compute server 4)Public VLAN (10Gigabit)

42

eth2Rack 1RU 12

RU 31UCS server host 6 (Compute server 6)Public VLAN (10Gigabit)

43

eth2Rack 1RU 10

RU 29UCS server host 8 (Compute server 8)Public VLAN (10Gigabit)

44

eth2Rack 1RU 8

RU 27UCS server host 10 (Compute server 10)Public VLAN (10Gigabit)

45

eth2Rack 1RU 6

RU 25UCS server host 12 (Compute server 12)Public VLAN (10Gigabit)

46

eth2Rack 1RU 4

RU 23UCS server host 14 (Compute server 14)Public VLAN (10Gigabit)

47

eth2Rack 1RU 2

RU 21UCS server host 14 (Compute server 14)Public VLAN (10Gigabit)

48

Cisco Tetration Analytics Cluster Hardware Deployment Guide8

System SpecificationsCabling the C1-Tetration Cluster Devices

ConnectionConnection TypeLeaf 2Port

PortRU inSingleRack

RU inSingleRack

Device

50Rack 1RU 42

RU 42Spine switchInternal VLAN (40Gigabit)

49

–––––50

–––––51

–––––52

53Rack 1RU 40

RU 40Leaf switch 1Internal VLAN (40Gigabit)

53

54Rack 1RU 40

RU 40Leaf switch 1Internal VLAN (40Gigabit)

54

Table 3: Leaf 1 Switch (RU 40 in Single- and Dual-Rack Installations) Connections

ConnectionConnection TypeLeaf 1Port

PortRU inDualRack

RU inSingleRack

Device

eth3Rack 1RU 17

RU 36UCS server host 1 (Compute server 1)Internal VLAN (10Gigabit)

1

eth3Rack 1RU 16

RU 35UCS server host 2 (Compute server 2)Internal VLAN (10Gigabit)

2

eth3Rack 1RU 15

RU 34UCS server host 3 (Compute server 3)Internal VLAN (10Gigabit)

3

eth3Rack 1RU 14

RU 33UCS server host 4 (Compute server 4)Internal VLAN (10Gigabit)

4

eth3Rack 1RU 13

RU 32UCS server host 5 (Compute server 5)Internal VLAN (10Gigabit)

5

eth3Rack 1RU 12

RU 31UCS server host 6 (Compute server 6)Internal VLAN (10Gigabit)

6

eth3Rack 1RU 11

RU 30UCS server host 7 (Compute server 7)Internal VLAN (10Gigabit)

7

Cisco Tetration Analytics Cluster Hardware Deployment Guide 9

System SpecificationsCabling the C1-Tetration Cluster Devices

ConnectionConnection TypeLeaf 1Port

PortRU inDualRack

RU inSingleRack

Device

eth3Rack 1RU 10

RU 29UCS server host 8 (Compute server 8)Internal VLAN (10Gigabit)

8

eth3Rack 1RU 8

RU 28UCS server host 9 (Compute server 9)Internal VLAN (10Gigabit)

9

eth3Rack 1RU 7

RU 27UCS server host 10 (Compute server 10)Internal VLAN (10Gigabit)

10

eth3Rack 1RU 6

RU 26UCS server host 11 (Compute server 11)Internal VLAN (10Gigabit)

11

eth3Rack 1RU 5

RU 25UCS server host 12 (Compute server 12)Internal VLAN (10Gigabit)

12

eth3Rack 1RU 4

RU 24UCS server host 13 (Compute server 13)Internal VLAN (10Gigabit)

13

eth3Rack 1RU 3

RU 23UCS server host 14 (Compute server 14)Internal VLAN (10Gigabit)

14

eth3Rack 1RU 2

RU 22UCS server host 15 (Compute server 15)Internal VLAN (10Gigabit)

15

eth3Rack 1RU 1

RU 21UCS server host 16 (Compute server 16)Internal VLAN (10Gigabit)

16

eth3Rack 2RU 21

RU 20UCS server host 17 (Cache server 1)Internal VLAN (10Gigabit)

17

eth3Rack 2RU 20

RU 19UCS server host 18 (Cache server 2)Internal VLAN (10Gigabit)

18

eth3Rack 2RU 19

RU 18UCS server host 19 (Cache server 3)Internal VLAN (10Gigabit)

19

eth3Rack 2RU 18

RU 17UCS server host 20 (Cache server 4)Internal VLAN (10Gigabit)

20

eth3Rack 2RU 17

RU 16UCS server host 21 (Cache server 5)Internal VLAN (10Gigabit)

21

eth3Rack 2RU 16

RU 15UCS server host 22 (Cache server 6)Internal VLAN (10Gigabit)

22

Cisco Tetration Analytics Cluster Hardware Deployment Guide10

System SpecificationsCabling the C1-Tetration Cluster Devices

ConnectionConnection TypeLeaf 1Port

PortRU inDualRack

RU inSingleRack

Device

eth3Rack 2RU 15

RU 14UCS server host 23 (Cache server 7)Internal VLAN (10Gigabit)

23

eth3Rack 2RU 14

RU 13UCS server host 24 (Cache server 8)Internal VLAN (10Gigabit)

24

eth3Rack 2RU 12

RU 12UCS server host 25 (Base server 1)Internal VLAN (10Gigabit)

25

eth3Rack 2RU 11

RU 11UCS server host 26 (Base server 2)Internal VLAN (10Gigabit)

26

eth3Rack 2RU 10

RU 10UCS server host 27 (Base server 3)Internal VLAN (10Gigabit)

27

eth3Rack 2RU 9

RU 9UCS server host 28 (Base server 4)Internal VLAN (10Gigabit)

28

eth3Rack 2RU 8

RU 8UCS server host 29 (Base server 5)Internal VLAN (10Gigabit)

29

eth3Rack 2RU 7

RU 7UCS server host 30 (Base server 6)Internal VLAN (10Gigabit)

30

eth3Rack 2RU 6

6UCS server host 31 (Base server 7)Internal VLAN (10Gigabit)

31

eth3Rack 2RU 5

RU 5UCS server host 32 (Base server 8)Internal VLAN (10Gigabit)

32

eth3Rack 2RU 4

RU 4UCS server host 33 (Base server 9)Internal VLAN (10Gigabit)

33

eth3Rack 2RU 3

RU 3UCS server host 34 (Base server 10)Internal VLAN (10Gigabit)

34

eth3Rack 2RU 2

RU 2UCS server host 35 (Base server 11)Internal VLAN (10Gigabit)

35

eth3Rack 2RU 1

RU 1UCS server host 36 (Base server 12)Internal VLAN (10Gigabit)

36

eth2Rack 2RU 8

RU 4UCS server host 33 (Base server 9)Public VLAN (10Gigabit)

37

Cisco Tetration Analytics Cluster Hardware Deployment Guide 11

System SpecificationsCabling the C1-Tetration Cluster Devices

ConnectionConnection TypeLeaf 1Port

PortRU inDualRack

RU inSingleRack

Device

eth2Rack 2RU 6

RU 2UCS server host 35 (Base server 11)Public VLAN (10Gigabit)

38

–––Customer router 1Internal VLAN (10Gigabit)

39

40Rack 2RU 40

RU 41Leaf switch 2Internal VLAN (10Gigabit)

40

eth2Rack 1RU 17

RU 36UCS server host 1 (Compute server 1)Public VLAN (10Gigabit)

41

eth2Rack 1RU 15

RU 34UCS server host 3 (Compute server3)Public VLAN (10Gigabit)

42

eth2Rack 1RU 13

RU 32UCS server host 5 (Compute server 5)Public VLAN (10Gigabit)

43

eth2Rack 1RU 11

RU 30UCS server host 7 (Compute server 7)Public VLAN (10Gigabit)

44

eth2Rack 1RU 9

RU 28UCS server host 9 (Compute server 9)Public VLAN (10Gigabit)

45

eth2Rack 1RU 7

RU 26UCS server host 11 (Compute server 11)Public VLAN (10Gigabit)

46

eth2Rack 1RU 5

RU 24UCS server host 13 (Compute server 13)Public VLAN (10Gigabit)

47

eth2Rack 1RU 3

RU 22UCS server host 15 (Compute server 15)Public VLAN (10Gigabit)

48

49Rack 1RU 42

RU 42Spine switchInternal VLAN (40Gigabit)

49

–––––50

–––––51

–––––52

53Rack 1RU 40

RU 40Leaf 1 switchInternal VLAN (40Gigabit)

53

Cisco Tetration Analytics Cluster Hardware Deployment Guide12

System SpecificationsCabling the C1-Tetration Cluster Devices

ConnectionConnection TypeLeaf 1Port

PortRU inDualRack

RU inSingleRack

Device

54Rack 2RU 40

RU 41Leaf 2 switchInternal VLAN (40Gigabit)

54

Cabling the C1-Tetration-M Cluster DevicesThe following figure shows how the C1-Tetration-M Cluster rack devices are interconnected. For a detailedlisting of the connections, see the tables following that figure.

The CIMC/PXE switch is connected to the Management (Mgmt) port on each of the three switches andto the eth0 port on each of the 36 Compute, Cache, and Base server hosts.

Note

Cisco Tetration Analytics Cluster Hardware Deployment Guide 13

System SpecificationsCabling the C1-Tetration-M Cluster Devices

Table 4: Leaf Switch 1 (RU 12) Connections

ConnectionConnection TypeSpinePort

PortRU inSingleRack

Device

eth39Server 1Internal VLAN (10 Gb)1

eth38Server 2Internal VLAN (10 Gb)2

Cisco Tetration Analytics Cluster Hardware Deployment Guide14

System SpecificationsCabling the C1-Tetration-M Cluster Devices

ConnectionConnection TypeSpinePort

PortRU inSingleRack

Device

eth36Server 3Internal VLAN (10 Gb)3

eth35Server 4Internal VLAN (10 Gb)4

eth33Server 5Internal VLAN (10 Gb)5

eth32Server 6Internal VLAN (10 Gb)6

––––7

––––8

––––9

––––10

––––11

––––12

––––13

––––14

––––15

––––16

––––17

––––18

eth29Server 1External VLAN (10 Gb)19

eth28Server 2External VLAN (10 Gb)20

eth26Server 3External VLAN (10 Gb)21

eth25Server 4External VLAN (10 Gb)22

eth23Server 5External VLAN (10 Gb)23

eth22Server 6External VLAN (10 Gb)24

––––25

Cisco Tetration Analytics Cluster Hardware Deployment Guide 15

System SpecificationsCabling the C1-Tetration-M Cluster Devices

ConnectionConnection TypeSpinePort

PortRU inSingleRack

Device

––––26

––––27

––––28

––––29

––––30

––––31

––––32

––––33

––––34

––––35

––––36

eth09Server 1Management VLAN (1Gb)

37

eth08Server 2Management VLAN (1Gb)

38

eth06Server 3Management VLAN (1Gb)

39

eth05Server 4Management VLAN (1Gb)

40

eth03Server 5Management VLAN (1Gb)

41

eth02Server 6Management VLAN (1Gb)

42

––––43

––––44

––––45

Cisco Tetration Analytics Cluster Hardware Deployment Guide16

System SpecificationsCabling the C1-Tetration-M Cluster Devices

ConnectionConnection TypeSpinePort

PortRU inSingleRack

Device

4511Leaf 2 switchInternal VLAN (10 Gb)46

––Customer routerExternal VLAN (10 Gb)47

––––48

4911Leaf 2 switchInternal VLAN (40 Gb)49

5011Leaf 2 switchInternal VLAN (40 Gb)50

––––51

––––52

––––53

––––54

Table 5: Leaf Switch 2 (RU 11) Connections

ConnectionConnection TypeSpinePort

PortRU inSingleRack

Device

eth49Server 1Internal VLAN (10 Gb)1

eth48Server 2Internal VLAN (10 Gb)2

eth46Server 3Internal VLAN (10 Gb)3

eth45Server 4Internal VLAN (10 Gb)4

eth43Server 5Internal VLAN (10 Gb)5

eth42Server 6Internal VLAN (10 Gb)6

––––7

––––8

––––9

Cisco Tetration Analytics Cluster Hardware Deployment Guide 17

System SpecificationsCabling the C1-Tetration-M Cluster Devices

ConnectionConnection TypeSpinePort

PortRU inSingleRack

Device

––––10

––––11

––––12

––––13

––––14

––––15

––––16

––––17

––––18

eth59Server 1External VLAN (10 Gb)19

eth58Server 2External VLAN (10 Gb)20

eth56Server 3External VLAN (10 Gb)21

eth55Server 4External VLAN (10 Gb)22

eth53Server 5External VLAN (10 Gb)23

eth52Server 6External VLAN (10 Gb)24

––––25

––––26

––––27

––––28

––––29

––––30

––––31

Cisco Tetration Analytics Cluster Hardware Deployment Guide18

System SpecificationsCabling the C1-Tetration-M Cluster Devices

ConnectionConnection TypeSpinePort

PortRU inSingleRack

Device

––––32

––––33

––––34

––––35

––––36

eth09Server 1Management VLAN (1Gb)

37

eth08Server 2Management VLAN (1Gb)

38

eth06Server 3Management VLAN (1Gb)

39

eth05Server 4Management VLAN (1Gb)

40

eth03Server 5Management VLAN (1Gb)

41

eth02Server 6Management VLAN (1Gb)

42

––––43

––––44

4512Leaf 1 switchInternal VLAN (10 Gb)45

––––46

––Customer routerExternal VLAN (10 Gb)47

––––48

4912Leaf 1 switchInternal VLAN (40 Gb)49

5012Leaf 1 switchInternal VLAN (40 Gb)50

––––51

Cisco Tetration Analytics Cluster Hardware Deployment Guide 19

System SpecificationsCabling the C1-Tetration-M Cluster Devices

ConnectionConnection TypeSpinePort

PortRU inSingleRack

Device

––––52

––––53

––––54

Power SpecificationsYou must provide two dedicated AC power sources that meet at least the following specifications:

Specification

22,500 WMaximum Wattage (39-RU single rack platform)

11,250 W (22,500 W total for two racks)Maximum Wattage (each rack in a 39-RU dual rackplatform)

5,500 WMaximum Wattage (8-RU platform)

Cisco Tetration Analytics Cluster Hardware Deployment Guide20

System SpecificationsPower Specifications