System Development Project A project is a series of activities directed towards accomplishment of a...
-
Upload
aiden-fowler -
Category
Documents
-
view
215 -
download
1
Transcript of System Development Project A project is a series of activities directed towards accomplishment of a...
![Page 1: System Development Project A project is a series of activities directed towards accomplishment of a desired objective. A project is a temporary endeavour.](https://reader035.fdocuments.us/reader035/viewer/2022062511/55142e39550346d8488b5e4c/html5/thumbnails/1.jpg)
![Page 2: System Development Project A project is a series of activities directed towards accomplishment of a desired objective. A project is a temporary endeavour.](https://reader035.fdocuments.us/reader035/viewer/2022062511/55142e39550346d8488b5e4c/html5/thumbnails/2.jpg)
System Development Project“A project is a series of activities directed towards
accomplishment of a desired objective.”
“A project is a temporary endeavour undertaken to create a "unique product or service”
![Page 3: System Development Project A project is a series of activities directed towards accomplishment of a desired objective. A project is a temporary endeavour.](https://reader035.fdocuments.us/reader035/viewer/2022062511/55142e39550346d8488b5e4c/html5/thumbnails/3.jpg)
Network analysis
Network analysis is the general name given to certain specific techniques, which can be used for the planning, management and control of projects.
CPM, PERT are the two most used techniques.
Plan your work first…..then work your plan
![Page 4: System Development Project A project is a series of activities directed towards accomplishment of a desired objective. A project is a temporary endeavour.](https://reader035.fdocuments.us/reader035/viewer/2022062511/55142e39550346d8488b5e4c/html5/thumbnails/4.jpg)
History
PERT was developed by the US Navy for the planning and control of the Polaris missile program and the emphasis was on completing the program in the shortest possible time. In addition PERT had the ability to cope with uncertain activity completion times (e.g. for a particular activity the most likely completion time is 4 weeks but it could be anywhere between 3 weeks and 8 weeks).
CPM was developed by Du Pont and the emphasis was on the trade-off between the cost of the project and its overall completion time (e.g. for certain activities it may be possible to decrease their completion times by spending more money - how does this affect the overall completion time of the project?)
![Page 5: System Development Project A project is a series of activities directed towards accomplishment of a desired objective. A project is a temporary endeavour.](https://reader035.fdocuments.us/reader035/viewer/2022062511/55142e39550346d8488b5e4c/html5/thumbnails/5.jpg)
CPM - Critical Path Method Uses Deterministic activity times
used in: Production management - for the jobs that are of repetitive nature , where the activity time estimates can be predicted with considerable certainty due to the existence of past experience.
PERT - Project Evaluation & Review TechniquesUses Probabilistic activity times
used in : Project management - for non-repetitive jobs (information system development work), where the time and cost estimates tend to be quite uncertain. This technique uses probabilistic time estimates.
![Page 6: System Development Project A project is a series of activities directed towards accomplishment of a desired objective. A project is a temporary endeavour.](https://reader035.fdocuments.us/reader035/viewer/2022062511/55142e39550346d8488b5e4c/html5/thumbnails/6.jpg)
CPM/PERT
o Use networks, that contain nodes and activities
o Over time CPM and PERT became one technique
o Networks indicate precedence relationships
o Can be used effectively in case of large projects
![Page 7: System Development Project A project is a series of activities directed towards accomplishment of a desired objective. A project is a temporary endeavour.](https://reader035.fdocuments.us/reader035/viewer/2022062511/55142e39550346d8488b5e4c/html5/thumbnails/7.jpg)
![Page 8: System Development Project A project is a series of activities directed towards accomplishment of a desired objective. A project is a temporary endeavour.](https://reader035.fdocuments.us/reader035/viewer/2022062511/55142e39550346d8488b5e4c/html5/thumbnails/8.jpg)
The Project Network
Use of nodes and arrows
Arrows Indicate ACTIVITY, a time consuming effort that is required to
perform a part of the work. An arrow leads from tail to head directionally
Nodes A node is represented by a circle
- Indicate EVENT or STATE , a point in time where one or more activities start and/or finish.
![Page 9: System Development Project A project is a series of activities directed towards accomplishment of a desired objective. A project is a temporary endeavour.](https://reader035.fdocuments.us/reader035/viewer/2022062511/55142e39550346d8488b5e4c/html5/thumbnails/9.jpg)
PERT/ CPMActivityTime(week) activity time1-2 4 5-6 41- 3 1 5 -7 82- 4 1 6- 8 13- 4 1 7- 8 23- 5 6 8- 9 14 -9 5 8- 10 8
9- 10 7
![Page 10: System Development Project A project is a series of activities directed towards accomplishment of a desired objective. A project is a temporary endeavour.](https://reader035.fdocuments.us/reader035/viewer/2022062511/55142e39550346d8488b5e4c/html5/thumbnails/10.jpg)
PERT/ CPMPERT network
1
2
3
4
1
4
5
6 8
7
9
10
1
111
11
11
61
4
1111
21
81
81
71
E1=0
E2=4
E3=1
E4=5
E5=7
E6=11
E7=15
E8=17
E9=18
E10=25
L10LL10 =25
L9 =18
L8=17
L7 =15
L6=16
L5= 7
L4 = 13
L3=1
L2 =12
L1 =0
![Page 11: System Development Project A project is a series of activities directed towards accomplishment of a desired objective. A project is a temporary endeavour.](https://reader035.fdocuments.us/reader035/viewer/2022062511/55142e39550346d8488b5e4c/html5/thumbnails/11.jpg)
PERT /CPMActivitytime (week) activity time1-2 2 4- 7 41- 3 2 5- 8 21- 4 2 6- 8 42- 5 4 7- 9 53- 6 5 8- 9 33- 7 8 9 -10 4
![Page 12: System Development Project A project is a series of activities directed towards accomplishment of a desired objective. A project is a temporary endeavour.](https://reader035.fdocuments.us/reader035/viewer/2022062511/55142e39550346d8488b5e4c/html5/thumbnails/12.jpg)
Network
1
2
3
5
6
4
8
7
9 10
2
5
42 34
8
5
2
2
4
4
![Page 13: System Development Project A project is a series of activities directed towards accomplishment of a desired objective. A project is a temporary endeavour.](https://reader035.fdocuments.us/reader035/viewer/2022062511/55142e39550346d8488b5e4c/html5/thumbnails/13.jpg)
PERT/ CPMActv 1-2 1-3 1-4 2-5 2-6 3-6 4-7 5-7 6-7
T(o) 5 18 26 16 15 6 7 7 3T(p) 10 22 40 20 25 12 12 9 5T(m) 8 20 33 18 20 9 10 8 4
Times are in days T(o)= Optimistic timeT(p)= pessimistic timeT(m) = most likely time
Expected time T(e)={T(o)+4T(m)+T(p)}/ 6
T(e)= 7.8 20 33 18 20 9 9.8 8 4