System development lifecycle – waterfall model - · PDF fileSystem development lifecycle...
Transcript of System development lifecycle – waterfall model - · PDF fileSystem development lifecycle...
![Page 1: System development lifecycle – waterfall model - · PDF fileSystem development lifecycle – waterfall model ... Project Management for Information Systems, ... system’ (business](https://reader030.fdocuments.us/reader030/viewer/2022021418/5ab3bc667f8b9a00728e6ecb/html5/thumbnails/1.jpg)
Cadle and Yeates, Project Management for Information Systems, 5th Edition, © Pearson Education Limited 2008
Slide 6.1
System development lifecycle – waterfall model
Figure 6.1 The waterfall model of system development lifecycle
![Page 2: System development lifecycle – waterfall model - · PDF fileSystem development lifecycle – waterfall model ... Project Management for Information Systems, ... system’ (business](https://reader030.fdocuments.us/reader030/viewer/2022021418/5ab3bc667f8b9a00728e6ecb/html5/thumbnails/2.jpg)
Cadle and Yeates, Project Management for Information Systems, 5th Edition, © Pearson Education Limited 2008
Slide 6.2
The ‘b’ model
Figure 6.2 The ‘b’ model Source: N D Birrell and M A Ould, A Practical Handbook for Software Development, Cambridge University Press, 1985
![Page 3: System development lifecycle – waterfall model - · PDF fileSystem development lifecycle – waterfall model ... Project Management for Information Systems, ... system’ (business](https://reader030.fdocuments.us/reader030/viewer/2022021418/5ab3bc667f8b9a00728e6ecb/html5/thumbnails/3.jpg)
Cadle and Yeates, Project Management for Information Systems, 5th Edition, © Pearson Education Limited 2008
Slide 6.3
The ‘V’ model
Figure 6.3 The ‘V’ model Source: Reproduced with permission of the National Computing Centre Limited from the STARTS Guide, 1987, which was supported by the Department of Trade and Industry
![Page 4: System development lifecycle – waterfall model - · PDF fileSystem development lifecycle – waterfall model ... Project Management for Information Systems, ... system’ (business](https://reader030.fdocuments.us/reader030/viewer/2022021418/5ab3bc667f8b9a00728e6ecb/html5/thumbnails/4.jpg)
Cadle and Yeates, Project Management for Information Systems, 5th Edition, © Pearson Education Limited 2008
Slide 6.4
The incremental approach
Figure 6.4 The incremental model
![Page 5: System development lifecycle – waterfall model - · PDF fileSystem development lifecycle – waterfall model ... Project Management for Information Systems, ... system’ (business](https://reader030.fdocuments.us/reader030/viewer/2022021418/5ab3bc667f8b9a00728e6ecb/html5/thumbnails/5.jpg)
Cadle and Yeates, Project Management for Information Systems, 5th Edition, © Pearson Education Limited 2008
Slide 6.5
The spiral model – evolutionary development
Figure 6.5 Boehm’s spiral model Source: © 1988 IEEE
![Page 6: System development lifecycle – waterfall model - · PDF fileSystem development lifecycle – waterfall model ... Project Management for Information Systems, ... system’ (business](https://reader030.fdocuments.us/reader030/viewer/2022021418/5ab3bc667f8b9a00728e6ecb/html5/thumbnails/6.jpg)
Cadle and Yeates, Project Management for Information Systems, 5th Edition, © Pearson Education Limited 2008
Slide 6.6
Structured systems development
Greater user involvement at all stages; driven by users
Agreed physical
description Analyse current physical system
Derive logical description Agreed logical
description Produce logical design Agreed logical
design Produce physical design
Draft physical design
Provide data and review
analysis results
Assist/agree in preparing
logical design
To programme specification, coding etc.
TORs, information Users
Developers
Assist/agree in producing logical view
Review physical design
Revise physical design
Agreed physical design
Questions Questions
Information Questions,
suggestions
Information, decisions
Suggested design
Review responses
![Page 7: System development lifecycle – waterfall model - · PDF fileSystem development lifecycle – waterfall model ... Project Management for Information Systems, ... system’ (business](https://reader030.fdocuments.us/reader030/viewer/2022021418/5ab3bc667f8b9a00728e6ecb/html5/thumbnails/7.jpg)
Cadle and Yeates, Project Management for Information Systems, 5th Edition, © Pearson Education Limited 2008
Slide 6.7
Agile approaches – origins
• Addresses long-windedness of other approaches • Prototyping used to:
– assist users define requirements by demonstrating possibilities
– investigate novel methods of working – test performance implications – assist in considering work practices
![Page 8: System development lifecycle – waterfall model - · PDF fileSystem development lifecycle – waterfall model ... Project Management for Information Systems, ... system’ (business](https://reader030.fdocuments.us/reader030/viewer/2022021418/5ab3bc667f8b9a00728e6ecb/html5/thumbnails/8.jpg)
Cadle and Yeates, Project Management for Information Systems, 5th Edition, © Pearson Education Limited 2008
Slide 6.8
Agile approaches – features
• Success dependent on empowerment of users and developers
• Deliverables reviewed for business fitness • Testing integral to iterative lifecycle • All changes reversible • Incremental/partial delivery acceptable • ‘Timeboxing’ used to control timescale (and budget) • Workshops widely used
![Page 9: System development lifecycle – waterfall model - · PDF fileSystem development lifecycle – waterfall model ... Project Management for Information Systems, ... system’ (business](https://reader030.fdocuments.us/reader030/viewer/2022021418/5ab3bc667f8b9a00728e6ecb/html5/thumbnails/9.jpg)
Cadle and Yeates, Project Management for Information Systems, 5th Edition, © Pearson Education Limited 2008
Slide 6.9
Agile methods 1 – Scrum
• Scrum. • Origins in USA. • Scrum is daily meeting to review progress and reset
priorities. • Development done in 30-day ‘Sprints’. • Every aspect of the project time-boxed. • Project manager is ‘ScrumMaster’ – different from
the usual PM role – teams self-governing.
![Page 10: System development lifecycle – waterfall model - · PDF fileSystem development lifecycle – waterfall model ... Project Management for Information Systems, ... system’ (business](https://reader030.fdocuments.us/reader030/viewer/2022021418/5ab3bc667f8b9a00728e6ecb/html5/thumbnails/10.jpg)
Cadle and Yeates, Project Management for Information Systems, 5th Edition, © Pearson Education Limited 2008
Slide 6.10
Agile methods 2 - DSDM
• Eight principles: 1 Focus on business need. 2 Deliver on time. 3 Collaborate. 4 Never compromise quality. 5 Develop solution iteratively. 6 Build incrementally from firm foundations. 7 Communicate continuously and clearly. 8 Demonstrate control.
![Page 11: System development lifecycle – waterfall model - · PDF fileSystem development lifecycle – waterfall model ... Project Management for Information Systems, ... system’ (business](https://reader030.fdocuments.us/reader030/viewer/2022021418/5ab3bc667f8b9a00728e6ecb/html5/thumbnails/11.jpg)
Cadle and Yeates, Project Management for Information Systems, 5th Edition, © Pearson Education Limited 2008
Slide 6.11
Object-oriented development
• Object is a package of software containing: – ‘variables’ (data). – ‘methods’ (processes)
• Objects communicate via messages. • System is built up from intercommunicating objects. • Deals with problem of integration of large systems.
![Page 12: System development lifecycle – waterfall model - · PDF fileSystem development lifecycle – waterfall model ... Project Management for Information Systems, ... system’ (business](https://reader030.fdocuments.us/reader030/viewer/2022021418/5ab3bc667f8b9a00728e6ecb/html5/thumbnails/12.jpg)
Cadle and Yeates, Project Management for Information Systems, 5th Edition, © Pearson Education Limited 2008
Slide 6.12
UML and Unified Process
• Unified Modeling Language provides visual language for OO projects.
• Unified Process provides process model. • Approach ‘open’ (non-proprietary) but Rational
Corporation offers Rational Unified Process. • Four phases to process:
– Inception – Elaboration – Construction – Transition.
![Page 13: System development lifecycle – waterfall model - · PDF fileSystem development lifecycle – waterfall model ... Project Management for Information Systems, ... system’ (business](https://reader030.fdocuments.us/reader030/viewer/2022021418/5ab3bc667f8b9a00728e6ecb/html5/thumbnails/13.jpg)
Cadle and Yeates, Project Management for Information Systems, 5th Edition, © Pearson Education Limited 2008
Slide 6.13
Component-based development
• Development of reusable components • Aim – to create libraries of components that can be
combined to build new systems • Long-term benefits – reduce development costs and
produce more reliable systems • Short-term costs often higher – because of need to
consider wider usage of components
![Page 14: System development lifecycle – waterfall model - · PDF fileSystem development lifecycle – waterfall model ... Project Management for Information Systems, ... system’ (business](https://reader030.fdocuments.us/reader030/viewer/2022021418/5ab3bc667f8b9a00728e6ecb/html5/thumbnails/14.jpg)
Cadle and Yeates, Project Management for Information Systems, 5th Edition, © Pearson Education Limited 2008
Slide 6.14
Extreme programming
• Created to deal with rapidly changing requirements • Works best on relatively small projects • Or on enhancements to existing systems • Developers work in pairs • Testing – integral part of process • Emphasis on frequent releases of small-scale
packages of software
![Page 15: System development lifecycle – waterfall model - · PDF fileSystem development lifecycle – waterfall model ... Project Management for Information Systems, ... system’ (business](https://reader030.fdocuments.us/reader030/viewer/2022021418/5ab3bc667f8b9a00728e6ecb/html5/thumbnails/15.jpg)
Cadle and Yeates, Project Management for Information Systems, 5th Edition, © Pearson Education Limited 2008
Slide 6.15
Package-based IS projects
• Quicker and cheaper to buy commercial off-the-shelf (COTS) solution than build from scratch.
• Two main types of project: – Package-constrained – users adapt to what package
can do. – Package-based – package tailored to users’ exact
needs. • Extensive tailoring probably more expensive than
bespoke development.
![Page 16: System development lifecycle – waterfall model - · PDF fileSystem development lifecycle – waterfall model ... Project Management for Information Systems, ... system’ (business](https://reader030.fdocuments.us/reader030/viewer/2022021418/5ab3bc667f8b9a00728e6ecb/html5/thumbnails/16.jpg)
Cadle and Yeates, Project Management for Information Systems, 5th Edition, © Pearson Education Limited 2008
Slide 6.16
Soft systems and the Socio-Technical Approach
• Not really an IT development method • But does consider a wider ‘human activity
system’ (business system) of which IT is a part • Recognizes that real-world problems rarely black
and white
![Page 17: System development lifecycle – waterfall model - · PDF fileSystem development lifecycle – waterfall model ... Project Management for Information Systems, ... system’ (business](https://reader030.fdocuments.us/reader030/viewer/2022021418/5ab3bc667f8b9a00728e6ecb/html5/thumbnails/17.jpg)
Cadle and Yeates, Project Management for Information Systems, 5th Edition, © Pearson Education Limited 2008
Slide 6.17
Business process re-engineering
• Originated by US consultants Michael Hammer and James Champy.
• Involves going back to first principles and re-designing optimal business systems.
• Leads to radical changes to organizations and fundamental changes to processes.
• High reward – but high risk also.
![Page 18: System development lifecycle – waterfall model - · PDF fileSystem development lifecycle – waterfall model ... Project Management for Information Systems, ... system’ (business](https://reader030.fdocuments.us/reader030/viewer/2022021418/5ab3bc667f8b9a00728e6ecb/html5/thumbnails/18.jpg)
Cadle and Yeates, Project Management for Information Systems, 5th Edition, © Pearson Education Limited 2008
Slide 6.18
Functional organization
Figure 4.1 Functional organization structure
![Page 19: System development lifecycle – waterfall model - · PDF fileSystem development lifecycle – waterfall model ... Project Management for Information Systems, ... system’ (business](https://reader030.fdocuments.us/reader030/viewer/2022021418/5ab3bc667f8b9a00728e6ecb/html5/thumbnails/19.jpg)
Cadle and Yeates, Project Management for Information Systems, 5th Edition, © Pearson Education Limited 2008
Slide 6.19
‘Pure’ project structure
Figure 4.2 ‘Pure’ project structure
![Page 20: System development lifecycle – waterfall model - · PDF fileSystem development lifecycle – waterfall model ... Project Management for Information Systems, ... system’ (business](https://reader030.fdocuments.us/reader030/viewer/2022021418/5ab3bc667f8b9a00728e6ecb/html5/thumbnails/20.jpg)
Cadle and Yeates, Project Management for Information Systems, 5th Edition, © Pearson Education Limited 2008
Slide 6.20
Matrix structure
Figure 4.3 Matrix structure
![Page 21: System development lifecycle – waterfall model - · PDF fileSystem development lifecycle – waterfall model ... Project Management for Information Systems, ... system’ (business](https://reader030.fdocuments.us/reader030/viewer/2022021418/5ab3bc667f8b9a00728e6ecb/html5/thumbnails/21.jpg)
Cadle and Yeates, Project Management for Information Systems, 5th Edition, © Pearson Education Limited 2008
Slide 6.21
Generic project organization
Figure 4.4 Generic project organization and roles
![Page 22: System development lifecycle – waterfall model - · PDF fileSystem development lifecycle – waterfall model ... Project Management for Information Systems, ... system’ (business](https://reader030.fdocuments.us/reader030/viewer/2022021418/5ab3bc667f8b9a00728e6ecb/html5/thumbnails/22.jpg)
Cadle and Yeates, Project Management for Information Systems, 5th Edition, © Pearson Education Limited 2008
Slide 6.22
Programme and portfolio management
Figure 4.5 Programme and portfolio management
![Page 23: System development lifecycle – waterfall model - · PDF fileSystem development lifecycle – waterfall model ... Project Management for Information Systems, ... system’ (business](https://reader030.fdocuments.us/reader030/viewer/2022021418/5ab3bc667f8b9a00728e6ecb/html5/thumbnails/23.jpg)
Cadle and Yeates, Project Management for Information Systems, 5th Edition, © Pearson Education Limited 2008
Slide 6.23
PRINCE2® organization structure
Figure 4.6 PRINCE2® organization structure
![Page 24: System development lifecycle – waterfall model - · PDF fileSystem development lifecycle – waterfall model ... Project Management for Information Systems, ... system’ (business](https://reader030.fdocuments.us/reader030/viewer/2022021418/5ab3bc667f8b9a00728e6ecb/html5/thumbnails/24.jpg)
Cadle and Yeates, Project Management for Information Systems, 5th Edition, © Pearson Education Limited 2008
Slide 6.24
Scheduling effort and elapsed time
• Effort = total volume of work. • Elapsed time depends on effort and also:
– How many resources are available. – What proportion of their time is available to the project. – Delays outside the team’s control (eg lead times for
hardware). – Dependencies on others.
![Page 25: System development lifecycle – waterfall model - · PDF fileSystem development lifecycle – waterfall model ... Project Management for Information Systems, ... system’ (business](https://reader030.fdocuments.us/reader030/viewer/2022021418/5ab3bc667f8b9a00728e6ecb/html5/thumbnails/25.jpg)
Cadle and Yeates, Project Management for Information Systems, 5th Edition, © Pearson Education Limited 2008
Slide 6.25
Network diagram
Figure 10.1 Dependency network with activity durations
![Page 26: System development lifecycle – waterfall model - · PDF fileSystem development lifecycle – waterfall model ... Project Management for Information Systems, ... system’ (business](https://reader030.fdocuments.us/reader030/viewer/2022021418/5ab3bc667f8b9a00728e6ecb/html5/thumbnails/26.jpg)
Cadle and Yeates, Project Management for Information Systems, 5th Edition, © Pearson Education Limited 2008
Slide 6.26
Bar chart
Figure 10.3 Schedule for two-person team showing parallel activities
![Page 27: System development lifecycle – waterfall model - · PDF fileSystem development lifecycle – waterfall model ... Project Management for Information Systems, ... system’ (business](https://reader030.fdocuments.us/reader030/viewer/2022021418/5ab3bc667f8b9a00728e6ecb/html5/thumbnails/27.jpg)
Cadle and Yeates, Project Management for Information Systems, 5th Edition, © Pearson Education Limited 2008
Slide 6.27
Bar chart with milestones added
Figure 10.6 Bar chart showing project milestones
![Page 28: System development lifecycle – waterfall model - · PDF fileSystem development lifecycle – waterfall model ... Project Management for Information Systems, ... system’ (business](https://reader030.fdocuments.us/reader030/viewer/2022021418/5ab3bc667f8b9a00728e6ecb/html5/thumbnails/28.jpg)
Cadle and Yeates, Project Management for Information Systems, 5th Edition, © Pearson Education Limited 2008
Slide 6.28
Bar chart with ‘overhead’ task added
Figure 10.7 Bar chart showing project management as continuous activity over project
![Page 29: System development lifecycle – waterfall model - · PDF fileSystem development lifecycle – waterfall model ... Project Management for Information Systems, ... system’ (business](https://reader030.fdocuments.us/reader030/viewer/2022021418/5ab3bc667f8b9a00728e6ecb/html5/thumbnails/29.jpg)
Cadle and Yeates, Project Management for Information Systems, 5th Edition, © Pearson Education Limited 2008
Slide 6.29
Bar chart and resource histogram
Figure 10.8 Bar chart with resource histogram
![Page 30: System development lifecycle – waterfall model - · PDF fileSystem development lifecycle – waterfall model ... Project Management for Information Systems, ... system’ (business](https://reader030.fdocuments.us/reader030/viewer/2022021418/5ab3bc667f8b9a00728e6ecb/html5/thumbnails/30.jpg)
Cadle and Yeates, Project Management for Information Systems, 5th Edition, © Pearson Education Limited 2008
Slide 6.30
The project and other plans
One document ortwo?
QUALITY PLAN
How
PROJECT PLAN
Why? What? When?Where? Who?
QUALITY PLAN
How?
RISK MANAGEMENTPLAN
Why not?
One plan orthree?
![Page 31: System development lifecycle – waterfall model - · PDF fileSystem development lifecycle – waterfall model ... Project Management for Information Systems, ... system’ (business](https://reader030.fdocuments.us/reader030/viewer/2022021418/5ab3bc667f8b9a00728e6ecb/html5/thumbnails/31.jpg)
Cadle and Yeates, Project Management for Information Systems, 5th Edition, © Pearson Education Limited 2008
Slide 6.31
PRINCE2® plans
Figure 10.10 PRINCE2® plans
![Page 32: System development lifecycle – waterfall model - · PDF fileSystem development lifecycle – waterfall model ... Project Management for Information Systems, ... system’ (business](https://reader030.fdocuments.us/reader030/viewer/2022021418/5ab3bc667f8b9a00728e6ecb/html5/thumbnails/32.jpg)
Cadle and Yeates, Project Management for Information Systems, 5th Edition, © Pearson Education Limited 2008
Slide 6.32
Contents of PRINCE2® project/stage plan
Figure 10.11 Contents of PRINCE2® project and stage plans
![Page 33: System development lifecycle – waterfall model - · PDF fileSystem development lifecycle – waterfall model ... Project Management for Information Systems, ... system’ (business](https://reader030.fdocuments.us/reader030/viewer/2022021418/5ab3bc667f8b9a00728e6ecb/html5/thumbnails/33.jpg)
Cadle and Yeates, Project Management for Information Systems, 5th Edition, © Pearson Education Limited 2008
Slide 6.33
Project budget
Figure 10.13 Example budget for an IT project