SynapSense ROI Brochure - Panduit · 2016-08-16 · 3 units o Pressure 5:45 PM all units back on to...

8

Transcript of SynapSense ROI Brochure - Panduit · 2016-08-16 · 3 units o Pressure 5:45 PM all units back on to...

Page 1: SynapSense ROI Brochure - Panduit · 2016-08-16 · 3 units o Pressure 5:45 PM all units back on to demonstrate much more e•cient air distribution and the amount of excessive pressure
Page 2: SynapSense ROI Brochure - Panduit · 2016-08-16 · 3 units o Pressure 5:45 PM all units back on to demonstrate much more e•cient air distribution and the amount of excessive pressure
Page 3: SynapSense ROI Brochure - Panduit · 2016-08-16 · 3 units o Pressure 5:45 PM all units back on to demonstrate much more e•cient air distribution and the amount of excessive pressure

EnvironmentalMonitoring,

LiveImaging™

VFDRetrofits

EnergyBaseline

Air FlowBalancing &Remediation

Control & PUEImplementation

M&V forGovernment/Utility Rebate

Turnkey Approach to Energy Savings

TURNKEYSOLUTION

SynapSense OptimizationPlatform: A turnkey solution

Page 4: SynapSense ROI Brochure - Panduit · 2016-08-16 · 3 units o Pressure 5:45 PM all units back on to demonstrate much more e•cient air distribution and the amount of excessive pressure

C A S E S T U D Y : Fortune 50 Company

SYNAPSENSE SOLUTION DEPLOYED:

Monitoring, Optimization Services, SynapSense Active Control™

• 100,000 sq ft

• 3,674 sense points

• Project cost: $695K

• Annual energy savings• $766K • 8,244MWh

• $530K paid utility incentive

• Net customer cost: $165K

• Annual carbon abatement: 2,555,840 lbs CO2

LiveImaging™ at the Top of the Racks

C A S E S T U D Y : Fortune 50 Company

SYNAPSENSE SOLUTION DEPLOYED:

Monitoring, Optimization Services, SynapSense Active Control™

• 100,000 sq ft

• 3,674 sense points

• Project cost: $695K

• Annual energy savings• $766K • 8,244MWh

• $530K paid utility incentive

• Net customer cost: $165K

• Annual carbon abatement: 2,555,840 lbs CO2

LiveImaging™ at the Top of the Racks

Page 5: SynapSense ROI Brochure - Panduit · 2016-08-16 · 3 units o Pressure 5:45 PM all units back on to demonstrate much more e•cient air distribution and the amount of excessive pressure

C A S E S T U D Y : Wall Street Investment Bank

SYNAPSENSE SOLUTION DEPLOYED:

Environmental Monitoring and Optimization Services

5X higher pressure than before floor rebalancing using SynapSense System.

Savings and Payback Exceed Preliminary Estimate!

Projected Savings & ROI Analysis Projected Actual

Annual Energy Savings (MWh) 258 302Fan Energy (MWh) 168 209Chiller Energy (MWh) 90 93

Carbon Abatement (Metric Tons) 135 158.1

PUE Baseline (1.65) 1.57 1.56

Project Cost $70,500 $70,500

Annual Energy Savings $28,412 $33,263

Maximum NYSERDA Incentive $36,161 $48,382

Capped NYSERDA Incentive $35,268 $35,268

Simple Payback (Months) 14.9 12.7

Pressure 8:00AM Pressure 11:30AMBalance the floor

Pressure 12:15PM3 units o�

Pressure 5:45 PM all units back on to demonstrate much more e�cient air distribution and the amount of excessive pressure

0 0.03 0.06 0.09 0.12 0.15

C A S E S T U D Y : Wall Street Investment Bank

SYNAPSENSE SOLUTION DEPLOYED:

Environmental Monitoring and Optimization Services

5X higher pressure than before floor rebalancing using SynapSense System.

Savings and Payback Exceed Preliminary Estimate!

Projected Savings & ROI Analysis Projected Actual

Annual Energy Savings (MWh) 258 302Fan Energy (MWh) 168 209Chiller Energy (MWh) 90 93

Carbon Abatement (Metric Tons) 135 158.1

PUE Baseline (1.65) 1.57 1.56

Project Cost $70,500 $70,500

Annual Energy Savings $28,412 $33,263

Maximum NYSERDA Incentive $36,161 $48,382

Capped NYSERDA Incentive $35,268 $35,268

Simple Payback (Months) 14.9 12.7

Pressure 8:00AM Pressure 11:30AMBalance the floor

Pressure 12:15PM3 units o�

Pressure 5:45 PM all units back on to demonstrate much more e�cient air distribution and the amount of excessive pressure

0 0.03 0.06 0.09 0.12 0.15C A S E S T U D Y : Wall Street Investment Bank

SYNAPSENSE SOLUTION DEPLOYED:

Environmental Monitoring and Optimization Services

5X higher pressure than before floor rebalancing using SynapSense System.

Savings and Payback Exceed Preliminary Estimate!

Projected Savings & ROI Analysis Projected Actual

Annual Energy Savings (MWh) 258 302Fan Energy (MWh) 168 209Chiller Energy (MWh) 90 93

Carbon Abatement (Metric Tons) 135 158.1

PUE Baseline (1.65) 1.57 1.56

Project Cost $70,500 $70,500

Annual Energy Savings $28,412 $33,263

Maximum NYSERDA Incentive $36,161 $48,382

Capped NYSERDA Incentive $35,268 $35,268

Simple Payback (Months) 14.9 12.7

Pressure 8:00AM Pressure 11:30AMBalance the floor

Pressure 12:15PM3 units o�

Pressure 5:45 PM all units back on to demonstrate much more e�cient air distribution and the amount of excessive pressure

0 0.03 0.06 0.09 0.12 0.15

Page 6: SynapSense ROI Brochure - Panduit · 2016-08-16 · 3 units o Pressure 5:45 PM all units back on to demonstrate much more e•cient air distribution and the amount of excessive pressure

Rack/Cabinet Monitoring with subfloor reference temperature

Pressure Monitoring (Static Pressure Di�erential)

LiveImaging™ Thermanode

SynapSense Gateway Device

SynapSense Modbus Gateway Device

Energy Monitoring – Power Meter

Single CRAC/CRAH Monitoring (Temp. & RH) – one node with two external thermistors

C A S E S T U D Y : Communications Company

SYNAPSENSE SOLUTION DEPLOYED:

Monitoring, Optimization with PUEand SynapSense Active Control™

• 60,000 sq ft

• 4,300 sense points

• Project Cost: $630,000

• Annual Energy Savings: $186K• Reduced Cooling Energy by 23%

• Received Oncor Rebate of $75K

• Simple payback (months): 26 monthsRack/Cabinet Monitoring with subfloor reference temperature

Pressure Monitoring (Static Pressure Di�erential)

LiveImaging™ Thermanode

SynapSense Gateway Device

SynapSense Modbus Gateway Device

Energy Monitoring – Power Meter

Single CRAC/CRAH Monitoring (Temp. & RH) – one node with two external thermistors

C A S E S T U D Y : Communications Company

SYNAPSENSE SOLUTION DEPLOYED:

Monitoring, Optimization with PUEand SynapSense Active Control™

• 60,000 sq ft

• 4,300 sense points

• Project Cost: $630,000

• Annual Energy Savings: $186K• Reduced Cooling Energy by 23%

• Received Oncor Rebate of $75K

• Simple payback (months): 26 months

Page 7: SynapSense ROI Brochure - Panduit · 2016-08-16 · 3 units o Pressure 5:45 PM all units back on to demonstrate much more e•cient air distribution and the amount of excessive pressure

CRAH fan energy reduced from 8kW to <1kW

Corresponding increase in CRAH delta Tof 10° to 16°

C A S E S T U D Y : Colocation Project

First Data Center

SYNAPSENSE SOLUTION DEPLOYED:

Monitoring, Optimization Services, SynapSense Active Control™

• >75K sq ft; 3,119 sense points

• Installed VFD’s on 54 CRAH units

Second Data Center

SYNAPSENSE SOLUTION DEPLOYED:

Monitoring, Optimization Services, SynapSense Active Control™

• Project Cost: $1.5M

• 55,000 sq ft data center

• Total Project cost: $1.1M

• Annual kWh savings: 3.5M kWh

• Total Energy Savings: $597K; 11.5%

• Utility Incentive: $600K

• Simple payback (months): <1 year

• Energy Savings 4.9M kWh

• Utility Incentive: $669,000

CRAH fan energy reduced from 8kW to <1kW

Corresponding increase in CRAH delta Tof 10° to 16°

C A S E S T U D Y : Colocation Project

First Data Center

SYNAPSENSE SOLUTION DEPLOYED:

Monitoring, Optimization Services, SynapSense Active Control™

• >75K sq ft; 3,119 sense points

• Installed VFD’s on 54 CRAH units

Second Data Center

SYNAPSENSE SOLUTION DEPLOYED:

Monitoring, Optimization Services, SynapSense Active Control™

• Project Cost: $1.5M

• 55,000 sq ft data center

• Total Project cost: $1.1M

• Annual kWh savings: 3.5M kWh

• Total Energy Savings: $597K; 11.5%

• Utility Incentive: $600K

• Simple payback (months): <1 year

• Energy Savings 4.9M kWh

• Utility Incentive: $669,000

CRAH fan energy reduced from 8kW to <1kW

Corresponding increase in CRAH delta Tof 10° to 16°

C A S E S T U D Y : Colocation Project

First Data Center

SYNAPSENSE SOLUTION DEPLOYED:

Monitoring, Optimization Services, SynapSense Active Control™

• >75K sq ft; 3,119 sense points

• Installed VFD’s on 54 CRAH units

Second Data Center

SYNAPSENSE SOLUTION DEPLOYED:

Monitoring, Optimization Services, SynapSense Active Control™

• Project Cost: $1.5M

• 55,000 sq ft data center

• Total Project cost: $1.1M

• Annual kWh savings: 3.5M kWh

• Total Energy Savings: $597K; 11.5%

• Utility Incentive: $600K

• Simple payback (months): <1 year

• Energy Savings 4.9M kWh

• Utility Incentive: $669,000