Switchboard Bus Bar Duct Installation Quality Control and Inspection Report Form

3

Click here to load reader

Transcript of Switchboard Bus Bar Duct Installation Quality Control and Inspection Report Form

Page 1: Switchboard Bus Bar Duct Installation Quality Control and Inspection Report Form

8/12/2019 Switchboard Bus Bar Duct Installation Quality Control and Inspection Report Form

http://slidepdf.com/reader/full/switchboard-bus-bar-duct-installation-quality-control-and-inspection-report 1/3

ITP No.:

Inspection Gr.

Report No.FFIIEELLDD IINNSSPPEECCTTIIOONN R R EEPPOOR R TT

Date

WORK No.

UNIT NO.

ITEM No.

LOCATION

II N NSSPPEECCTTIIOO N N TTYYPPEE

SWITCHBOARD/ BUS-BAR/ DUCT

INSTALLATION AND CONTINUITY TEST

Inc. INCOMING/ SECTIONALIZER UNIT DATE/NAMES/SIGNATURE

II N NSSPPEECCTTIIOO N N N NOOTTIICCEE N NOO..:: COMPANYCONTRACT

ORSUBCONTR

DRAWING NO(S): / / / / / /

MANUFACTURER:

SYSTEM VOLTAGE:

SIZE / RATING:

TEST EQUIPMENT:

1. INSTALLATION

NO ITEM TO CHECK RESULT REMARKS

1. Check nameplate and rating with specification and drawing.

2. Check proper alignment of total board.

3. Inspect assembly, tightness, levels, etc.

4. Inspect all bus-bars and bolted electrical connection.

5. All braces and supports adequate to handle of bus duct.

6. Wall opening covered properly with fire resistance materials.

7. Inspect all safety features.

8. Remove blocking and blinding materials.

9. Check Control voltage.

10. Check draw out mechanism, if any.

11. Check circuit number and color code.

12. Check mimic diagram (if any)

13. Check control fuse rating and gauge range.

14. Check instrument and signaling lamps visually.

15. Check signal circuit terminations.

16. Check leveling and fixation of panels to the foundation. (visually)

17. Inspect cables and glands. (Visually)

18. Check CT’s and PT’s. (Visually)

19. Check Protection relays. (Visually)

20. Check damages and cleanness of Busbars, Switchgears and Terminals, etc.

LLeeggeenndd N NAA..:: N Noott AA p p p plliiccaa b bllee

www Inspection for Industry com

Quality Control Form

Page 2: Switchboard Bus Bar Duct Installation Quality Control and Inspection Report Form

8/12/2019 Switchboard Bus Bar Duct Installation Quality Control and Inspection Report Form

http://slidepdf.com/reader/full/switchboard-bus-bar-duct-installation-quality-control-and-inspection-report 2/3

ITP No.:

Inspection Gr.

Report No.FFIIEELLDD IINNSSPPEECCTTIIOONN R R EEPPOOR R TT

Date

WORK No.

UNIT NO.

ITEM No.

LOCATION

II N NSSPPEECCTTIIOO N N TTYYPPEE

SWITCHBOARD/ BUS-BAR/ DUCT

INSTALLATION AND CONTINUITY TEST

Inc. INCOMING/ SECTIONALIZER UNIT DATE/NAMES/SIGNATURE

II N NSSPPEECCTTIIOO N N N NOOTTIICCEE N NOO..:: COMPANYCONTRACT

ORSUBCONTR

DRAWING NO(S): / / / / / /

MANUFACTURER:

SYSTEM VOLTAGE:

SIZE / RATING:

TEST EQUIPMENT:

2. ASSEMBLY (splicing, Tightness, Conductivity): Bus-BarBolt size & Grade: ______

Bus-DuctTorque Value (NM):________

Circuit Designation (Feeder) Contact Resistance (µΩ)

From To L1 L2 L3 N E

Ducter

Number

((!!)) CCoonndduuccttiivviittyy tteessttss sshhaallll b bee ccaar r r r iieedd oouutt b beettwweeeenn aadd j jaacceenntt oouutt ggooeer r ss oor r aadd j jaacceenntt oouutt ggooeer r ss aanndd iinnccoommeer r ss iinn oor r ddeer r ttoo vveer r iif f yy tthhee eennttiir r ee b buuss-- b baar r p paatthh iinncclluuddiinngg ““ddr r ii p p p peer r ss aanndd r r iisseer r ss””.. ((22)) FFoor r iiddeennttiiccaall ccoonnnneeccttiioonnss tthhee mmeeaassuur r eedd vvaalluueess sshhaallll nnoott ddiif f f f eer r b byy mmoor r ee tthhaann 2200%% f f r r oomm eeaacchh ootthheer r ..

LLeeggeenndd N NAA..:: N Noott AA p p p plliiccaa b bllee

www Inspection for Industry com

Page 3: Switchboard Bus Bar Duct Installation Quality Control and Inspection Report Form

8/12/2019 Switchboard Bus Bar Duct Installation Quality Control and Inspection Report Form

http://slidepdf.com/reader/full/switchboard-bus-bar-duct-installation-quality-control-and-inspection-report 3/3

ITP No.:

Inspection Gr.

Report No.FFIIEELLDD IINNSSPPEECCTTIIOONN R R EEPPOOR R TT

Date

WORK No.

UNIT NO.

ITEM No.

LOCATION

II N NSSPPEECCTTIIOO N N TTYYPPEE

SWITCHBOARD/ BUS-BAR/ DUCT

INSTALLATION AND CONTINUITY TEST

Inc. INCOMING/ SECTIONALIZER UNIT DATE/NAMES/SIGNATURE

II N NSSPPEECCTTIIOO N N N NOOTTIICCEE N NOO..:: COMPANYCONTRACT

ORSUBCONTR

DRAWING NO(S): / / / / / /

MANUFACTURER:

SYSTEM VOLTAGE:

SIZE / RATING:

TEST EQUIPMENT:

3. I.R TEST

Bus-barTest

VoltageTime Test Applied Between (µΩ. GΩ)

Phase toEarth

L1-E: L2-E: L3-E: N-E:

L1-L2: L2-L3: L3-L1:APhase to

Phase N-L1: N-L2: N-L3:

Phase toEarth

L1-E: L2-E: L3-E: N-E:

L1-L2: L2-L3: L3-L1:BPhase to

Phase N-L1: N-L2: N-L3:

4. H.V PRESSURE TEST

Leakage Current (µA)Bus-bar/

Duct No.

Test

VoltageTime

L1 L2 L3Remarks

Remarks and Deviations:

LLeeggeenndd N NAA..:: N Noott AA p p p plliiccaa b bllee