SWAMPSCOTT PIER PROJECT
HARBOR & WATERFRONT ADVISORY COMMITTEE
OCTOBER 28, 2021
![Page 2: SWAMPSCOTT PIER PROJECT](https://reader035.fdocuments.us/reader035/viewer/2022062918/62ba6d0fdc5d1b526d213296/html5/thumbnails/2.jpg)
AGENDA
• Introductions
• History & Current Status of Pier
• Scope of Work• Project Goals• Milestones• Timeline• Design Approach
• Q & A• Scope of Work • Discussion & Feedback on
Project Goals
![Page 3: SWAMPSCOTT PIER PROJECT](https://reader035.fdocuments.us/reader035/viewer/2022062918/62ba6d0fdc5d1b526d213296/html5/thumbnails/3.jpg)
PROJECT TEAM
• Engineering Consultant:• McAllister Marine Engineering, LLC
• Lead Committee:• Harbor & Waterfront Advisory
Committee (HAWC)
• Town Staff:• Molly O'Connell, Senior Planner
• Stakeholders:• Select Board
• Conservation Commission
• Planning Board
• HDC / Historical Commission
• OSRPC
• Yacht Club
• Fishermen
• DPW
• Facilities
![Page 4: SWAMPSCOTT PIER PROJECT](https://reader035.fdocuments.us/reader035/viewer/2022062918/62ba6d0fdc5d1b526d213296/html5/thumbnails/4.jpg)
HISTORY
• Passed by TM in 1941
• Construction completed in 1961
• Named Williams Town Pier in honor of Tech. Sgt. Albert J. Williams who was killed in WWII
• Brother of Louis "Lucky" John Williams, legendary Swampscott fisherman
"If you go out, you never know what you'll catch; if you don't go out, you know exactly what you'll catch." - Lucky Williams
![Page 5: SWAMPSCOTT PIER PROJECT](https://reader035.fdocuments.us/reader035/viewer/2022062918/62ba6d0fdc5d1b526d213296/html5/thumbnails/5.jpg)
CURRENT STATUS
• Not wide enough to serve all users• Fishermen, boaters, walkers, kayakers should
all be able to use the pier
• Easier access is needed for emergency services
• Past life-span
• Not prepared for projected storm surge• Needs to be raised and strengthened
![Page 6: SWAMPSCOTT PIER PROJECT](https://reader035.fdocuments.us/reader035/viewer/2022062918/62ba6d0fdc5d1b526d213296/html5/thumbnails/6.jpg)
SCOPE OF WORK
![Page 7: SWAMPSCOTT PIER PROJECT](https://reader035.fdocuments.us/reader035/viewer/2022062918/62ba6d0fdc5d1b526d213296/html5/thumbnails/7.jpg)
PROJECT GOALS
RESILIENCE
• Raise the pier to address future storm surge projections
• Build in resiliency measures for the historic Fish House
COMMUNITY
• Ensure new Pier serves all users: fishermen, general public, boat owners
• Widen the Pier to allow for emergency access
![Page 8: SWAMPSCOTT PIER PROJECT](https://reader035.fdocuments.us/reader035/viewer/2022062918/62ba6d0fdc5d1b526d213296/html5/thumbnails/8.jpg)
PROJECT GOALS
ECONOMY• Ensure new pier serves the needs
of Swampscott's commercial fishermen
• Strengthen the Pier to allow for potential future options, such as fingers piers and additional slips
TOURISM• Promote Town's tourism goals and support
Humphrey Street small businesses
SUSTAINABILITY• Secure and ensure future funding
opportunities
![Page 9: SWAMPSCOTT PIER PROJECT](https://reader035.fdocuments.us/reader035/viewer/2022062918/62ba6d0fdc5d1b526d213296/html5/thumbnails/9.jpg)
MILESTONES/SECTIONS
• Existing Condition Documentation – Site Survey and Bathymetry, Sediment and Soil Sampling
• Preliminary Engineering
• Feasibility Analysis – Basis of Design
• Review Permit Program for Future Timeline
• 4 Public Meetings throughout the Process
• Report to Seaport Economic Council
![Page 10: SWAMPSCOTT PIER PROJECT](https://reader035.fdocuments.us/reader035/viewer/2022062918/62ba6d0fdc5d1b526d213296/html5/thumbnails/10.jpg)
TIMELINE
![Page 11: SWAMPSCOTT PIER PROJECT](https://reader035.fdocuments.us/reader035/viewer/2022062918/62ba6d0fdc5d1b526d213296/html5/thumbnails/11.jpg)
DESIGN APPROACH
BASELINE CONDITIONS• Understanding what’s out there
• Surrounding topography and bathymetry
• Soil conditions
• Site Access
FEASIBILITY• Given the existing conditions, what are
the options• Design options, size, layout, materials, etc.
• Restriction and limitations – codes, regulations, natural resources, etc.
![Page 12: SWAMPSCOTT PIER PROJECT](https://reader035.fdocuments.us/reader035/viewer/2022062918/62ba6d0fdc5d1b526d213296/html5/thumbnails/12.jpg)
DESIGN APPROACH
ENGINEERING APPROACH• Design Calculations
• Data Analysis Gap
• Cost/Benefit Of Options
PERMITTING APPROACH• Review Timing And Scope
• Certain Permits Take Longer
• Certain Order To Follow
• Preliminary Review And Discussion With Regulators
• Encorporate Mitigation, Plan Design Accordingly With Respect To Resources
![Page 13: SWAMPSCOTT PIER PROJECT](https://reader035.fdocuments.us/reader035/viewer/2022062918/62ba6d0fdc5d1b526d213296/html5/thumbnails/13.jpg)
Q & A
Feedback & Questions on Project Goals
Feedback and Questions on Scope of Work
![Page 14: SWAMPSCOTT PIER PROJECT](https://reader035.fdocuments.us/reader035/viewer/2022062918/62ba6d0fdc5d1b526d213296/html5/thumbnails/14.jpg)
NEXT STEPS
• NEXT MEETING – JANUARY 2022DELIVERABLES FOR MEETING 2
• Site Survey
• Soil Borings
• Project Goal Features
• FOR 3RD MEETING – MARCH 2022• ADVANCE FEASIBILITY
• CONDUCT PRELIMINARY ENGINEERING