SW101 Municipal Separate Storm Sewer Systems (MS4s)

42
SW101 Municipal Separate Storm Sewer Systems (MS4s)

Transcript of SW101 Municipal Separate Storm Sewer Systems (MS4s)

Page 1: SW101 Municipal Separate Storm Sewer Systems (MS4s)

SW101

Municipal Separate Storm Sewer Systems (MS4s)

                                 

                        

Page 2: SW101 Municipal Separate Storm Sewer Systems (MS4s)

What is an MS4?A municipal separate storm sewer system (MS4) is:

A conveyance or system of conveyances... owned by a State, city, town, federal agency*, or other public entity that discharges to waters of the U.S. and is:– designed or used for collecting or conveying storm water– not a combined sewer– not part of a Publicly Owned Treatment Works (POTW)

*only Phase II Small MS4s

Page 3: SW101 Municipal Separate Storm Sewer Systems (MS4s)

Types of MS4s• Phase I: based population within city or

unincorporated part of county– Large MS4 250,000 or greater pop. – Medium MS4 100,000 – 250,000 pop.– Designated

• Phase II: based primarily on Census Bureau Urbanized Areas and not political boundary– Regulated Small MS4 in UA– Designated outside UA– Unregulated

Page 4: SW101 Municipal Separate Storm Sewer Systems (MS4s)

Small MS4 Coverage Urbanized Area Definition

A central place (or places) and the adjacent densely settled surrounding territory that together have a minimum residential population of 50,000 people and a minimum average density of 1,000 people/square mile.

Page 5: SW101 Municipal Separate Storm Sewer Systems (MS4s)

Small MS4 Coverage Determining Location in a UA

• Appendix 6 to the preamble

• Link on Region 6 MS4 Web page via

www.epa.gov/region6/sws

• State Data Centers

Page 6: SW101 Municipal Separate Storm Sewer Systems (MS4s)

Small MS4 Coverage Designation by the PA

• The PA must develop and apply designation criteria to small MS4s, located outside of a UA, serving a jurisdiction with >10,000 population and >1,000/sq. mile population density

Page 7: SW101 Municipal Separate Storm Sewer Systems (MS4s)

Designation by the PADesignation Criteria

• Discharge to sensitive waters• High growth or growth potential• High population density• Contiguity to an urbanized area• Significant contributor of pollutants to

waters of the U.S.• Ineffective protection of water quality by

other programs

Page 8: SW101 Municipal Separate Storm Sewer Systems (MS4s)

Designation by the PA

• The PA must also designate any small MS4 that is substantially contributing pollutants to a physically interconnected regulated MS4

• Anyone may petition PA to designate any MS4

Page 9: SW101 Municipal Separate Storm Sewer Systems (MS4s)

Regulated Small MS4 WaiversWaiver Option 1

Available where…

– The regulated small MS4 serves a population of less than 1,000 within the UA

– The regulated small MS4 is not contributing to the pollutant loadings of a physically interconnected regulated MS4

– If the regulated small MS4 is discharging to an impaired water body, storm water controls are not needed based on a TMDL that addresses the pollutants of concern

Page 10: SW101 Municipal Separate Storm Sewer Systems (MS4s)

Regulated Small MS4 WaiversWaiver Option 2

Available where…

– The regulated small MS4 serves a population of less than 10,000

– The PA has evaluated all waters that receive a discharge from the regulated small MS4

– The PA has determined that storm water controls are not needed based on a TMDL or equivalent analysis that addresses the pollutants of concern

– The PA has determined that future discharges will not impact water quality.

Page 11: SW101 Municipal Separate Storm Sewer Systems (MS4s)

Regulated MS4 Permit Requirements

• Required to develop, implement and enforce a program to reduce the discharge of pollutants to the Maximum Extent Practicable (MEP) and effectively prohibit discharge of non-storm water into MS4

• Program must include:– Comprehensive program (Large MS4s)– Six minimum control measures (Small MS4s)– Evaluation/assessment efforts & recordkeeping

Page 12: SW101 Municipal Separate Storm Sewer Systems (MS4s)

Six Minimum Control Measures

• Public Education and Outreach• Public Involvement/Participation• Illicit Discharge Detection and Elimination• Construction Site Runoff Control• Post-Construction Storm Water

Management in New and Redevelopment• Pollution Prevention/Good Housekeeping

for Municipal Operations

Page 13: SW101 Municipal Separate Storm Sewer Systems (MS4s)

Regulated Small MS4 Permit Requirements

• Must submit an NOI or individual permit application and identify the following elements for each minimum control measure:– Best management practices– Measurable goals– Timing and frequency of the actions– Responsible persons

Page 14: SW101 Municipal Separate Storm Sewer Systems (MS4s)
Page 15: SW101 Municipal Separate Storm Sewer Systems (MS4s)
Page 16: SW101 Municipal Separate Storm Sewer Systems (MS4s)

WHEN YOU'RE WASHING YOUR CAR IN THE DRIVEWAY, REMEMBER YOU'RE NOT JUST WASHING YOUR CAR IN THE DRIVEWAY. 

WHEN YOUR CAR'S LEAKING OIL ON THE STREET, REMEMBER IT'S NOT JUST LEAKING OIL ON THE STREET.

WHEN YOU'RE FERTILIZING THE LAWN, REMEMBER YOU'RE NOT JUST FERTILIZING THE LAWN.

WHEN YOUR PET GOES ON THE LAWN, REMEMBER IT DOESN'T JUST GO ON THE LAWN.

Page 17: SW101 Municipal Separate Storm Sewer Systems (MS4s)

The Interaction of Federal and Municipal Construction

Programs• NPDES Storm Water Construction Program

– Administered by the NPDES PA– Requires the construction operator to obtain an NPDES storm

water permit– Nationwide coverage– Qualifying Local Programs (QLPs) can be referenced in permit

• NPDES-regulated MS4 Construction Programs– Administered by the MS4 operator – Requirements vary between MS4s

Page 18: SW101 Municipal Separate Storm Sewer Systems (MS4s)

Deadlines for Small MS4 Compliance

• “Automatically” designated small MS4s:– Permit coverage by March 10, 2003 – If PA has approved schedule for phasing coverage

for MS4s <10,000 - coverage by March 8, 2007

• Full implementation of MS4’s program:– Within 5 years of permit issuance

Page 19: SW101 Municipal Separate Storm Sewer Systems (MS4s)
Page 20: SW101 Municipal Separate Storm Sewer Systems (MS4s)

SW101

Examples of Municipal BMPs and Measurable

Goals

Page 21: SW101 Municipal Separate Storm Sewer Systems (MS4s)

Public Education and OutreachWhat Are Some BMPs for Implementing

This Measure?

• Develop and distribute brochures or fact sheets for general public and specific audiences

• Develop and distribute recreational guides to educate groups such as golfers, hikers, paddlers, climbers, fishermen, and campers

• Develop alternative information sources, such as web sites, bumper stickers, refrigerator magnets, posters for bus and subway stops, and restaurant placemats

Page 22: SW101 Municipal Separate Storm Sewer Systems (MS4s)

Public Education and OutreachWhat Are Some BMPs for Implementing

This Measure?

• Establish a library of educational materials for community and school groups

• Encourage volunteer citizen educators to staff a public education task force

• Participate with educational displays at home shows and community festivals

• Develop educational programs for school-age children

Page 23: SW101 Municipal Separate Storm Sewer Systems (MS4s)

Public Education and OutreachWhat Are Some BMPs for Implementing

This Measure?

• Develop program for storm drain stenciling of storm drains with messages such as “Do Not Dump - Drains Directly to Lake”

• Set up storm water hotlines for information and for citizen reporting of polluters

• Provide economic incentives to citizens and businesses (e.g., rebates to homeowners purchasing mulching lawnmowers or biodegradable lawn products)

Page 24: SW101 Municipal Separate Storm Sewer Systems (MS4s)

Public Education and OutreachWhat Are Appropriate Measurable

Goals?Target Activity

1 year Brochures developed and distributed in water utility bills; a storm water hotline in place; volunteer educators trained.

2 years A web site created; school curricula developed; storm drains stenciled.

3 years A certain percentage of restaurants no longer dumping grease and other pollutants down storm sewer drains.

4 years A certain percentage reduction in litter or animal waste detected in discharges.

Page 25: SW101 Municipal Separate Storm Sewer Systems (MS4s)

Public ParticipationWhat Are Some BMPs for Implementing

This Measure?

• Set up public meetings/citizen panels to allow citizens to discuss various viewpoints and provide input concerning appropriate storm water management policies and BMPs

• Establish volunteer water quality monitoring program to give citizens first-hand knowledge of the quality of local water bodies and provide a cost-effective means of collecting water quality data

Page 26: SW101 Municipal Separate Storm Sewer Systems (MS4s)

Public ParticipationWhat Are Some BMPs for Implementing

This Measure?

• Develop group of volunteer educators/speakers who can conduct workshops, encourage public participation, and staff special events

• Encourage storm drain stenciling by concerned citizens and students

• Encourage community clean-ups along local waterways, beaches, and around storm drains

Page 27: SW101 Municipal Separate Storm Sewer Systems (MS4s)

Public ParticipationWhat Are Some BMPs for Implementing

This Measure?

• Support citizen watch groups to aid local enforcement authorities in the identification of polluters

• Develop “Adopt A Storm Drain” programs to encourage individuals or groups to keep storm drains free of debris and to monitor what is entering local waterways through storm drains

Page 28: SW101 Municipal Separate Storm Sewer Systems (MS4s)

Public ParticipationWhat Are Appropriate Measurable

Goals?Target Activity1 year Notice of a public meeting in different print

media and bilingual flyers; citizen panel established; volunteers organized to locateoutfalls/illicit discharges and stencil drains.

2 years Final recommendations of citizen panel; radio spots promoting program and participation.

3 years A certain percentage of the community participating in community clean-ups.

4 years Citizen watch groups established in a certain percentage of neighborhoods; outreach to allpopulation sectors completed.

Page 29: SW101 Municipal Separate Storm Sewer Systems (MS4s)

Illicit Discharge Detection & EliminationWhat Are Some BMPs for Implementing This

Measure?

• Collect all existing information on outfall locations (e.g., city records, drainage maps, storm drain maps), and then conduct field surveys to verify locations;

• Develop storm water ordinance to prohibit illicit discharges;

• Locate problem areas for detailed screening using methods such as public complaints; visual screening; water sampling from manholes and outfalls during dry weather; and infrared and thermal photography.

• Coordinate volunteers for locating outfalls or stenciling storm drains.

Page 30: SW101 Municipal Separate Storm Sewer Systems (MS4s)

Illicit Discharge Detection & EliminationWhat Are Some BMPs for Implementing This

Measure?

• Determine the source of the problems using methods such as: dye-testing buildings in problem areas; dye- or smoke-testing buildings at the time of sale; tracing the discharge upstream in the storm sewer; employing a certification program that shows that buildings have been checked for illicit connections; implementing an inspection program of existing septic systems; and using video to inspect the storm sewers.

• Educate and work with dischargers found to be sources of illicit connections.

Page 31: SW101 Municipal Separate Storm Sewer Systems (MS4s)

Illicit Discharge Detection & EliminationWhat Are Some BMPs for Implementing This

Measure?

• Document the number of outfalls screened; any complaints received and corrected; the number of discharges and quantities of flow eliminated; and the number of dye or smoke tests conducted.

• Develop informative brochures, and guidances for specific audiences and school curricula.

• Design a program to publicize and facilitate public reporting of illicit discharges.

• Initiate recycling programs for commonly dumped wastes, such as motor oil, antifreeze, and pesticides.

Page 32: SW101 Municipal Separate Storm Sewer Systems (MS4s)

Illicit Discharge Detection & Elimination What Are Appropriate Measurable Goals?

Target Activity1 year Sewer system map completed; recycling

program for household hazardous waste in place.2 years Ordinance in place; training for public employees

completed; a certain percentage of sources of illicit discharges determined.

3 years A certain percentage of: illicit dischargesdetected; illicit discharges eliminated; and households participating in quarterly household hazardous waste special collection days.

4 years Most illicit discharge sources detected andeliminated.

Page 33: SW101 Municipal Separate Storm Sewer Systems (MS4s)

Construction Site Runoff ControlWhat Are Some BMPs for Implementing

This Measure?

• Develop an ordinance that requires controls for polluted runoff from construction sites that disturb more than one acre;

• Develop procedures for site plan reviews and inspections;

• Develop procedures for the receipt and consideration of public inquiries, concerns, and information submitted regarding local construction activities.

Page 34: SW101 Municipal Separate Storm Sewer Systems (MS4s)

Construction Site Runoff ControlWhat Are Appropriate Measurable Goals?

Target Activity1 year Ordinance or other regulatory mechanism in

place; procedures for information submitted by the public in place.

2 years Procedures for site inspections implemented; a certain percentage rate of compliance achieved by construction operators.

3 years Maximum compliance with ordinance; improved clarity and reduced sedimentation of localwaterbodies.

4 years Increased numbers of sensitive aquatic organisms in local waterbodies.

Page 35: SW101 Municipal Separate Storm Sewer Systems (MS4s)

Post-Construction/ New Development/ Redevelopment

What Are Some Non-Structural BMPs for Implementing This Measure?

• Develop master plans, comprehensive plans, or zoning ordinances to guide the growth of your community away from sensitive areas and restrict certain types of growth to areas that can support it without compromising water quality.

• Establish site-based local controls such as buffer strip and riparian zone preservation, minimization of disturbance and imperviousness, and maximization of open space.

Page 36: SW101 Municipal Separate Storm Sewer Systems (MS4s)

Post-Construction/ New Development/ Redevelopment

What Are Some Structural BMPs for Implementing This Measure?

• Incorporate storm water storage into your system by gathering runoff in wet ponds, dry basins, or multichamber catch basins and slowly releasing it to receiving waters or drainage systems.

• Build infiltration systems such as infiltration basins/trenches, dry wells, and porous pavement, to facilitate the percolation of runoff through the soil to ground water, and, thereby reduce storm water quantity and mobilization of pollutants.

Page 37: SW101 Municipal Separate Storm Sewer Systems (MS4s)

Post-Construction/ New Development/ Redevelopment

What Are Some Structural BMPs for Implementing This Measure?

• Incorporate vegetative practices such as grassy swales, filter strips, artificial wetlands, and rain gardens to enhance pollutant removal, maintain/improve natural site hydrology, promote healthier habitats, and increase aesthetic appeal.

Page 38: SW101 Municipal Separate Storm Sewer Systems (MS4s)

Post-Construction/ New Development/ Redevelopment

What Are Appropriate Measurable Goals?

Target Activity

1 year Strategies developed that include structural and/or non-structural BMPs.

2 years Strategies codified by use of ordinance or other regulatory mechanism.

3 years Reduced percent of new impervious surfaces associated with new development projects.

4 years Improved clarity and reduced sedimentation of local waterbodies.

Page 39: SW101 Municipal Separate Storm Sewer Systems (MS4s)

Pollution Prevention/ Good Housekeeping for Municipal Operations

What Are Some BMPs for Implementing This Measure?

• Establish maintenance activities, maintenance schedules, and long-term inspection procedures for structural and non-structural controls to reduce floatables and other pollutants discharged from the separate storm sewers.

• Establish procedures for the proper disposal of waste removed from the separate storm sewer systems, including dredge spoil, accumulated sediments, floatables, and other debris.

Page 40: SW101 Municipal Separate Storm Sewer Systems (MS4s)

Pollution Prevention/ Good Housekeeping for Municipal Operations

What Are Some BMPs for Implementing This Measure?

• Develop programs that promote recycling, minimize pesticide use, and ensure the proper disposal of animal waste to reduce or eliminate the discharge of pollutants from areas such as roads and parking lots, maintenance and storage yards, and waste transfer stations;

• Coordinate with flood control managers to ensure that new flood management projects assess the impacts on water quality and examine existing projects for incorporation of additional water quality protection devices or practices.

Page 41: SW101 Municipal Separate Storm Sewer Systems (MS4s)

Pollution Prevention/ Good Housekeeping for Municipal Operations

What Are Appropriate Measurable Goals?Target Activity1 year Pollution prevention plan completed; employee

training materials developed; procedures in place for catch basin cleaning and street sweeping.

2 years Training for appropriate employees completed; recycling program fully implemented.

3 years Some pollution prevention BMPs incorporated into master plan; a certain percentage reduction in pesticide and sand/salt use; maintenance schedule for BMPs established.

4 years A certain percentage reduction in floatables discharged; a certain compliance rate withmaintenance schedules for BMPs; controls inplace for all areas of concern.

Page 42: SW101 Municipal Separate Storm Sewer Systems (MS4s)