Sw 3.3% - Microsoft · 13.erosion control blanketing is to be used on slopes steeper than 3:1....

5

Transcript of Sw 3.3% - Microsoft · 13.erosion control blanketing is to be used on slopes steeper than 3:1....

Page 1: Sw 3.3% - Microsoft · 13.erosion control blanketing is to be used on slopes steeper than 3:1. 14.building, construction, excavation, or other waste materials shall not be temporarily
Page 2: Sw 3.3% - Microsoft · 13.erosion control blanketing is to be used on slopes steeper than 3:1. 14.building, construction, excavation, or other waste materials shall not be temporarily

S

S

S

S

S

w

w

w

w

GLE

NE

AG

LE

D

R.

10"

1

2

"

R

E

U

S

E

L

I

N

E

6" R

AW

W

AT

ER

LIN

E

w

S

w

S

S

S

S

S

S

S

w

w

w

w

w

w

w

26,970

25,640

25,720

28,040

26,060

28,060

25,440

24,790

6

12

18,470

6

4

3

2

1

5

8

7

9

10

11

19,240

20,160

21,460

21,890

WATER WELL

EASEMENT BK. 5954,

PG. 778

WELL NO. 6DA

RIM-6820'

INV IN-6802.9'

INV OUT-6802.8'

PROP WL

RIM-6814'

INV IN-6800.68

45° BEND

WATER MH

PROP HYD

PROP WL 689 LF 8"

PVC WATERLINE

EXISTING GOLF COURSE

STRUCTURE TO REMAIN

INSTALL WATER VALVE

PROP

SWALE

'L'

PROP

SWALE 'J'

EXIST 6" RAW WATER LINE

C

W

3.6%

3.3

%

3.3%

4

%

0

.

5

%

6800

2

.

5

%

1

+

0

0

3

9

1

.

3

7

L

F

@

1

%

7

+

8

3

.

6

4

PROP MH

RIM-6813.16'

INV IN 6803.74

INV OUT 6803.64

PROP MH

RIM 6816.20

INV OUT 6806.03

PROP SAN SEW

400 LF 8" PVC @0.6%

PROP MH

RIM-6816'

INV IN-6802.40'

INV IN NW 6802.40

INV OUT-6802.35'

PROP SAN SEW

246 LF 8" PVC @0.5%

PROP SWALE

'K'

BEGIN CURB AND GUTTER

MATCH EXISTING

PROP EASEMENT

PROP PROPERTY

LINE

7

+

0

0

6

+

0

0

5

+

0

0

4

+

0

0

3

+

0

0

2

+

0

0

2

6

3

.

1

7

L

F

@

1

.

1

8

%

WE

ST

CH

ES

TE

R D

RIV

E

STA 3+85.79, 12' LT

TYPE D-16 INLET

RIM=6812.36

INV IN=6806.88

INV OUT=6806.84

(SEE SHEET 4)

STA 3+85.79, 12' RT

TYPE D-16 INLET

RIM=6812.36

INV IN=6807.13

INV OUT=6807.09

(SEE SHEET 4)

INV 24" 6806.50

INV 24" 6807.50

EXIST

ACCESS

ROAD

℄ 12' GRAVEL

ACCESS

ROAD

A

2

6

8

1

4

6

8

1

4

6

8

1

4

6

8

1

2

6

8

1

2

6

8

0

8

6

8

0

6

6

8

1

6

6816

6

8

1

2

6816

6

8

0

2

6

8

1

4

6

8

0

6

6808

6

8

1

8

6

8

1

4

6

8

1

4

6

8

1

8

6

8

1

6

6

8

1

8

6

8

1

6

6

8

1

4

6814

6812

6

8

1

2

6812

6816

6796

6802

68

00

6798

68

02

6800

300 LF - SILT FENCE

266 LF - SILT FENCE

SF

DET BASIN B

Q100 IN=188.7 CFS

Q100 OUT=20.4 CFS

VOL=4.07 AF

TRACT B

3.97 AC

TRACT F

0.01 AC

SF

600 LF - SILT FENCE

SBB

SBB

SBB

DRAINAGE

EASEMENT

AREA

3.6%

3.3

%

3.3%

4

%

0

.

5

%

2

.

5

%

BEGIN CURB AND GUTTER

MATCH EXISTING

G

L

E

N

E

A

G

L

E

D

R

.

S

T

O

N

E

E

A

G

L

E

P

L

ELEV = 6797.25

ELEV = 6797.25

CO

NC

T

RIC

KL

E C

HA

NN

EL

@

0.5

%

INV 24" = 6806.50

SBB

SBB

15' DRAINAGE EASEMENT

PROP OVERFLOW

'SPILLWAY

PROP SWALE

'M'

0+

00

1+00

2

+

0

0

3

+

0

0

4

+

0

0

5

+

0

0

6

+

0

0

7+

007+

19

IP

RS

TYP

VTC

0+00

1+00

2

+

0

0

3

+

0

0

4

+

0

0

5

+

0

0

6

+

0

0

7+

00

7+

19

1+501+00

6805

6820

6810

2+00

6815

6800

ST

A 1

+4

1.0

0 T

YP

E D

-1

6 IN

LE

T

RIM

=6

81

2.3

6

IN

V E

LE

V=

6

80

6.8

8

IN

V O

UT

=6

80

6.8

2

ST

A 2

+0

6.0

0

IN

V E

LE

V 6

80

7.5

0

100 YR

HGL

41 LF - 24" R

CP @

0.89% W

/ FES (P

UBLIC)

6795

ST

ON

E

EA

GL

E

ELEV - 6812.60

PROP 8"

SAN SEW

ST

A 1

+6

5.0

0 T

YP

E D

-1

6 IN

LE

T

RIM

=6

81

2.3

6

IN

V E

LE

V=

6

80

7.1

3

IN

V O

UT

=6

80

7.0

9

41 LF - 24" RCP @

0.89% W/ FES (PUBLIC)

24 LF - 24" RCP

@ 0.89% (PUBLIC)

0+500+00

6790

6805

6795

6800

6785

100 YR HGL

58 LF - 24" HDPE

(PRIVATE) @1.0%

6810

1+00

ST

A: 0

+0

0 T

YP

E C

IN

LE

T

RIM

E

LE

V =

6

79

9.0

0

IN

V 2

4" N

=

6

79

5.9

2

IN

V2

4" E

=

6

79

5.9

2

IN

V 2

4" W

=

6

79

5.8

2

ELEV = 6797.90

ELEV = 6796.50

1.5'

1.5'

2'

2'

3

:

1

SWALE 'J'

TYP SEC

EROSION

CONTROL

MAT

3

:

1

SWALE 'L'

TYP SEC

EROSION

CONTROL

MAT

DETENTION BASIN 'C' OUTLET PIPE PROFILE (PRIVATE)

SCALE: HOR, 1" = 20' - VERT, 1" = 5'

STONE EAGLE CULVERT PROFILE (PUBLIC)

SCALE: HOR, 1" = 20' - VERT, 1" = 5'

4

:

1

SWALE 'K'

EROSION

CONTROL

MAT

MA

B

HJG

MA

B

2/1

9/2

01

9

PROJ NO. 03524

DWG NM. 03524-Dev-Fil2

KEY MAP N.T.S.

DET BASIN C

Q100 IN=28.9 CFS

Q100 OUT=6.8 CFS

VOL=0.817 AF

3

:1

13 '

2'

OVERFLOW SPILWAY'

TYP SEC

9" RIPRAP

18" THICK W/

FILTER FABRIC

2

.5

:1

2 '

2'

SWALE 'N'

TYP SEC

9" RIPRAP

18" THICK W/

FILTER FABRIC

3

:1

6 '

2'

SWALE 'M'

TYP SEC

9" RIPRAP

18" THICK W/

FILTER FABRIC

TYP OUTLET STR OS-2

TOP EL 6799.17

INV EL 6796.50

PERM POOL EL 6794.00

105 SF FOREBAY

12" DEEP

138.0 LF 24" HDPE @ 1.5%

96.8 LF 24" HDPE @ 2.6%

20 LF 24" HDPE @ 6.5%

58 LF 24" HDPE @ 1.0%

178.38 LF 24" HDPE @ 2.6%

Know what's below.before you dig.Call

R

SHEET

DRAWING NUMBER:

REVISION

STAMP

RE

SP

EC

72

0 S

C

OL

OR

AD

O B

LV

D

SU

IT

E 4

10

S

DE

NV

ER

, C

O 8

02

46

PH

ON

E (3

03

) 7

57

-3

65

5

DE

SIG

NE

D

DR

AW

N

CH

EC

KE

D

DA

TE

VR-18-018

GL

EN

EA

GL

E

SU

BD

IV

IS

IO

N F

IL

#

2

DR

AIN

AG

E, G

RA

DIN

G &

ER

OS

IO

N C

ON

TR

OL

PL

AN

C

2

CO

LO

RA

DO

S

PR

IN

GS

, C

O 8

09

03

73

1 N

. W

EB

ER

S

T., S

UIT

E 1

0

GU

MA

N &

A

SS

OC

IA

TE

S, L

LC

NA

ME

: Z

:\C

OL

OR

AD

O S

PR

IN

GS

O

FF

IC

E\0

35

42

_G

LE

NE

AG

LE

\C

AD

\S

HE

ET

S\0

35

24

-S

-G

RA

D.D

WG

PL

OT

D

AT

E: M

ay 2

2, 2

01

9 1

0:5

4 A

M, B

Y: C

HR

IS

M

EE

KS

TRACT A

76.53 AC

11.4 LF 24" HDPE @ 1.5%

33.6 LF 24" HDPE @ 2.6%

TYPE S HEADWALL

TOW EL 6782.05

BOW EL 6781.05

BOF EL 6780.55

Page 3: Sw 3.3% - Microsoft · 13.erosion control blanketing is to be used on slopes steeper than 3:1. 14.building, construction, excavation, or other waste materials shall not be temporarily

MA

B

HJG

MA

B

2/1

9/2

01

9

PROJ NO. 03524

DWG NM. 03524-Dev-Fil2

STANDARD NOTES FOR EL PASO COUNTY GRADING AND EROSION

CONTROL PLANS

1. CONSTRUCTION MAY NOT COMMENCE UNTIL A CONSTRUCTION PERMIT IS OBTAINED FROM

DEVELOPMENT SERVICES AND A PRE-CONSTRUCTION CONFERENCE IS HELD WITH PLANNING AND

COMMUNITY DEVELOPMENT

2. STORM-WATER DISCHARGES FROM CONSTRUCTION SITES SHALL NOT CAUSE OR THREATEN TO

CAUSE POLLUTION, CONTAMINATION, OR DEGRADATION OF STATE WATERS. ALL WORK AND

EARTH DISTURBANCE SHALL BE DONE IN A MANNER THAT MINIMIZES POLLUTION OF ANY ON-SITE

OR OFF SITE WATERS, INCLUDING WETLANDS.

3. NOTWITHSTANDING ANYTHING DEPICTED IN THESE PLANS IN WORDS OR GRAPHIC

REPRESENTATION, ALL DESIGN AND CONSTRUCTION RELATED TO ROADS, STORM DRAINAGE AND

EROSION CONTROL SHALL CONFORM TO THE STANDARDS AND REQUIREMENTS OF THE MOST

RECENT VERSION OF THE RELEVANT ADOPTED EL PASO COUNTY STANDARDS, INCLUDING THE

LAND DEVELOPMENT CODE, THE ENGINEERING CRITERIA MANUAL, THE DRAINAGE CRITERIA

MANUAL, AND THE DRAINAGE CRITERIA MANUAL VOLUME 2. ANY DEVIATIONS TO REGULATIONS

AND STANDARDS MUST BE REQUESTED, AND APPROVED, IN WRITING.

4. A SEPARATE STORM-WATER MANAGEMENT PLAN (SMWP) FOR THIS PROJECT SHALL BE

COMPLETED AND AN EROSION AND STORM-WATER QUALITY CONTROL PERMIT (ESQCP) ISSUED

PRIOR TO COMMENCING CONSTRUCTION. DURING CONSTRUCTION THE SWMP IS THE

RESPONSIBILITY OF THE DESIGNATED STORM-WATER MANAGER, SHALL BE LOCATED ON SITE AT

ALL TIMES AND SHALL BE KEPT UP TO DATE WITH WORK PROGRESS AND CHANGES IN THE FIELD.

5. ONCE THE ESQCP HAS BEEN ISSUED, THE CONTRACTOR MAY INSTALL THE INITIAL STAGE

EROSION AND SEDIMENT CONTROL BMPS AS INDICATED ON THE GEC. A PRE-CONSTRUCTION

MEETING BETWEEN THE CONTRACTOR, ENGINEER, AND EL PASO COUNTY WILL BE HELD PRIOR

TO ANY CONSTRUCTION. IT IS THE RESPONSIBILITY OF THE APPLICANT TO COORDINATE THE

MEETING TIME AND PLACE WITH COUNTY PCD INSPECTIONS STAFF.

6. SOIL EROSION CONTROL MEASURES FOR ALL SLOPES, CHANNELS, DITCHES, OR ANY DISTURBED

LAND AREA SHALL BE COMPLETED WITHIN 21 CALENDAR DAYS AFTER FINAL GRADING, OR FINAL

EARTH DISTURBANCE, HAS BEEN COMPLETED. DISTURBED AREAS AND STOCKPILES WHICH ARE

NOT AT FINAL GRADE BUT WILL REMAIN DORMANT FOR LONGER THAN 30 DAYS SHALL ALSO BE

MULCHED WITHIN 21 DAYS AFTER INTERIM GRADING. AN AREA THAT IS GOING TO REMAIN IN AN

INTERIM STATE FOR MORE THAN 60 DAYS SHALL ALSO BE SEEDED. ALL TEMPORARY SOIL

EROSION CONTROL MEASURES AND BMPS SHALL BE MAINTAINED UNTIL PERMANENT SOIL

EROSION CONTROL MEASURES ARE IMPLEMENTED AND ESTABLISHED.

7. TEMPORARY SOIL EROSION CONTROL FACILITIES SHALL BE REMOVED AND EARTH DISTURBANCE

AREAS GRADED AND STABILIZED WITH PERMANENT SOIL EROSION CONTROL MEASURES

PURSUANT TO STANDARDS AND SPECIFICATION PRESCRIBED IN THE DCM VOLUME II AND THE

ENGINEERING CRITERIA MANUAL (ECM) APPENDIX I.

8. ALL PERSONS ENGAGED IN EARTH DISTURBANCE SHALL IMPLEMENT AND MAINTAIN ACCEPTABLE

SOIL EROSION AND SEDIMENT CONTROL MEASURES INCLUDING BMPS IN CONFORMANCE WITH

THE EROSION CONTROL TECHNICAL STANDARDS OF THE DRAINAGE CRITERIA MANUAL (DCM)

VOLUME II AND IN ACCORDANCE WITH THE STORM-WATER MANAGEMENT PLAN (SWMP).

9. ALL TEMPORARY EROSION CONTROL FACILITIES INCLUDING BMPS AND ALL PERMANENT

FACILITIES INTENDED TO CONTROL EROSION OF ANY EARTH DISTURBANCE OPERATIONS, SHALL

BE INSTALLED AS DEFINED IN THE APPROVED PLANS, THE SWMP AND THE DCM VOLUME II AND

MAINTAINED THROUGHOUT THE DURATION OF THE EARTH DISTURBANCE OPERATION.

10. ANY EARTH DISTURBANCE SHALL BE CONDUCTED IN SUCH A MANNER SO AS TO EFFECTIVELY

REDUCE ACCELERATED SOIL EROSION AND RESULTING SEDIMENTATION. ALL DISTURBANCES

SHALL BE DESIGNED, CONSTRUCTED, AND COMPLETED SO THAT THE EXPOSED AREA OF ANY

DISTURBED LAND SHALL BE LIMITED TO THE SHORTEST PRACTICAL PERIOD OF TIME.

11. ANY TEMPORARY OR PERMANENT FACILITY DESIGNED AND CONSTRUCTED FOR THE

CONVEYANCE OF STORM-WATER AROUND, THROUGH, OR FROM THE EARTH DISTURBANCE AREA

SHALL BE DESIGNED TO LIMIT THE DISCHARGE TO A NON-EROSIVE VELOCITY.

12. CONCRETE WASH WATER SHALL BE CONTAINED AND DISPOSED OF IN ACCORDANCE WITH THE

SWMP. NO WASH WATER SHALL BE DISCHARGED TO OR ALLOWED TO RUNOFF TO STATE WATERS,

INCLUDING ANY SURFACE OR SUBSURFACE STORM DRAINAGE SYSTEM OR FACILITIES.

13. EROSION CONTROL BLANKETING IS TO BE USED ON SLOPES STEEPER THAN 3:1.

14. BUILDING, CONSTRUCTION, EXCAVATION, OR OTHER WASTE MATERIALS SHALL NOT BE

TEMPORARILY PLACED OR STORED IN THE STREET, ALLEY, OR OTHER PUBLIC WAY, UNLESS IN

ACCORDANCE WITH AN APPROVED TRAFFIC CONTROL PLAN. BMP'S MAY BE REQUIRED BY EL

PASO COUNTY ENGINEERING IF DEEMED NECESSARY, BASED ON SPECIFIC CONDITIONS AND

CIRCUMSTANCES.

15. VEHICLE TRACKING OF SOILS AND CONSTRUCTION DEBRIS OFF-SITE SHALL BE MINIMIZED.

MATERIALS TRACKED OFFSITE SHALL BE CLEANED UP AND PROPERLY DISPOSED OF

IMMEDIATELY.

16. CONTRACTOR SHALL BE RESPONSIBLE FOR THE REMOVAL OF ALL WASTES FROM THE

CONSTRUCTION SITE FOR DISPOSAL IN ACCORDANCE WITH LOCAL AND STATE REGULATORY

REQUIREMENTS. NO CONSTRUCTION DEBRIS, TREE SLASH, BUILDING MATERIAL WASTES OR

UNUSED BUILDING MATERIALS SHALL BE BURIED, DUMPED, OR DISCHARGED AT THE SITE.

17. THE OWNER, SITE DEVELOPER, CONTRACTOR, AND/OR THEIR AUTHORIZED AGENTS SHALL BE

RESPONSIBLE FOR THE REMOVAL OF ALL CONSTRUCTION DEBRIS, DIRT, TRASH, ROCK, SEDIMENT,

AND SAND THAT MAY ACCUMULATE IN THE STORM SEWER OR OTHER DRAINAGE CONVEYANCE

SYSTEM AND STORM-WATER APPURTENANCES AS A RESULT OF SITE DEVELOPMENT.

18. THE QUANTITY OF MATERIALS STORED ON THE PROJECT SITE SHALL BE LIMITED, AS MUCH AS

PRACTICAL, TO THAT QUANTITY REQUIRED TO PERFORM THE WORK IN AN ORDERLY SEQUENCE.

ALL MATERIALS STORED ON-SITE SHALL BE STORED IN A NEAT, ORDERLY MANNER, IN THEIR

ORIGINAL CONTAINERS, WITH ORIGINAL MANUFACTURER'S LABELS.

19. NO CHEMICALS ARE TO BE USED BY THE CONTRACTOR, WHICH HAVE THE POTENTIAL TO BE

RELEASED IN STORM-WATER UNLESS PERMISSION FOR THE USE OF A SPECIFIC CHEMICAL IS

GRANTED IN WRITING BY THE ECM ADMINISTRATOR. IN GRANTING THE USE OF SUCH CHEMICALS,

SPECIAL CONDITIONS AND MONITORING MAY BE REQUIRED.

20. BULK STORAGE STRUCTURES FOR PETROLEUM PRODUCTS AND OTHER CHEMICALS SHALL HAVE

ADEQUATE PROTECTION SO AS TO CONTAIN ALL SPILLS AND PREVENT ANY SPILLED MATERIAL

FROM ENTERING STATE WATERS, INCLUDING ANY SURFACE OR SUBSURFACE STORM DRAINAGE

SYSTEM OR FACILITIES.

21. NO PERSON SHALL CAUSE THE IMPEDIMENT OF STORM-WATER FLOW IN THE FLOW LINE OF THE

CURB AND GUTTER OR IN THE DITCH-LINE.

22. INDIVIDUALS SHALL COMPLY WITH THE “COLORADO WATER QUALITY CONTROL ACT” (TITLE 25,

ARTICLE 8, CRS), AND THE “CLEAN WATER ACT” (33 USC 1344), IN ADDITION TO THE

REQUIREMENTS INCLUDED IN THE DCM VOLUME II AND THE ECM APPENDIX I. ALL APPROPRIATE

PERMITS MUST BE OBTAINED BY THE CONTRACTOR PRIOR TO CONSTRUCTION (NPDES,

FLOODPLAIN, 404, FUGITIVE DUST, ETC.). IN THE EVENT OF CONFLICTS BETWEEN THESE

REQUIREMENTS AND LAWS, RULES, OR REGULATIONS OF OTHER FEDERAL, STATE, OR COUNTY

AGENCIES, THE MORE RESTRICTIVE LAWS, RULES, OR REGULATIONS SHALL APPLY.

23. ALL CONSTRUCTION TRAFFIC MUST ENTER/EXIT THE SITE AT APPROVED CONSTRUCTION ACCESS

POINTS.

24. PRIOR TO ACTUAL CONSTRUCTION THE PERMITEE SHALL VERIFY THE LOCATION OF EXISTING

UTILITIES.

25. A WATER SOURCE SHALL BE AVAILABLE ON SITE DURING EARTHWORK OPERATIONS AND UTILIZED

AS REQUIRED TO MINIMIZE DUST FROM EARTHWORK EQUIPMENT AND WIND.

26. THE SOILS REPORT FOR THIS SITE HAS BEEN PREPARED BY RMG INC AND SHALL BE CONSIDERED

A PART OF THESE PLANS.

27. AT LEAST TEN DAYS PRIOR TO THE ANTICIPATED START OF CONSTRUCTION, FOR PROJECTS THAT

WILL DISTURB 1 ACRE OR MORE, THE OWNER OR OPERATOR OF CONSTRUCTION ACTIVITY SHALL

SUBMIT A PERMIT APPLICATION FOR STORM-WATER DISCHARGE TO THE COLORADO

DEPARTMENT OF PUBLIC HEALTH AND ENVIRONMENT, WATER QUALITY DIVISION. THE

APPLICATION CONTAINS CERTIFICATION OF COMPLETION OF A STORM-WATER MANAGEMENT

PLAN (SWMP), OF WHICH THIS GRADING AND EROSION CONTROL PLAN MAY BE A PART. FOR

INFORMATION OR APPLICATION MATERIALS CONTACT: CDPHE, 4300 CHERRY CREEK DR.

S.,DENVER, CO 80246-1530, PH: 303-692-3500

1. ALL CONSTRUCTION AND MATERIALS SHALL BE IN ACCORDANCE WITH THE EL PASO COUNTY

ENGINEERING SPECIFICATIONS.

2. THE CONTRACTOR SHALL NOTIFY COLORADO STATE UTILITIES CENTRAL LOCATING

(1-800-922-1987 AT LEAST 48 HOURS PRIOR TO ANY EXCAVATION SO THAT THEY MAY LOCATE

THEIR FACILITIES. THE LOCATION OF FACILITIES SHOWN ON THE DRAWINGS IS FROM

AVAILABLE RECORDS AND IS APPROXIMATE.

3. ALL EXISTING UTILITY LOCATIONS SHOWN ON THE DRAWINGS REFLECT THE AVAILABLE

INFORMATION AND DO NOT NECESSARILY INDICATE THE ACTUAL LOCATIONS. PRIOR TO ANY

CONSTRUCTION THE CONTRACTOR SHALL VERIFY THE HORIZONTAL AND VERTICAL LOCATIONS

OF ALL UTILITIES THAT MAY CONFLICT WITH OR OBSTRUCT THE NEW CONSTRUCTION. ANY

REQUIRED RELOCATIONS THAT ARE NOT SPECIFICALLY SHOWN ON THE DRAWINGS SHALL BE

COORDINATED WITH AND HAVE PRIOR APPROVAL OF EL PASO COUNTY UTILITIES.

4. ALL DIMENSIONS ARE TO FACE OF CURB, EDGE OF ASPHALT & FLOWLINE OF PAN.

5. ALL ELEVATIONS ARE TO TOP/ASPHALT & FLOWLINE/CURB UNLESS OTHERWISE NOTED.

ALL STORM SEWER PIPE AND SANITARY SEWER PIPE LENGTHS AND SLOPES ARE SHOWN

FROM CENTER OF STRUCTURE TO CENTER OF STRUCTURE

10 '

CONC FOREBAY DETAIL

12" FORBAY WALL

105 CF FORBAY

6" RIPRAP

12" THICK W/

FILTER FABRIC

2 '

6"

4"

CONCRETE

CONCRETE TRICKLE CHANNEL

CONCRETE

TRICKLE

CHANNEL

6"

NOT TO SCALE

NOT TO SCALE

SAFETY GRATE WITH 5"

MAX. CLEAR BETWEEN

BARS

PROVIDE CONTINUOUS

NEOPRENE GASKET BETWEEN

ORIFICE PLATE AND STRUCTURE

STAINLESS STEEL

ORIFICE PLATE

FIGURE 0S-2 TYPICAL OUTLET STRUCTURE

FOR FULL SPECTRUM DETENTION

OVERFLOW OUTLET

W/TRASH RACK

EMERGENCY SPILLWAY

ELEV 6799.20

FINISHED GRADE

OVERTOPPING PROTECTION

(DESIGNED FOR 100-YR

DISCHARGE OR GREATER)

24" HDPE

OUTLET PIPE

NOT TO SCALE

HEADWALL

6"

18"

18"

6"

18" OUTLET PIPE

(SEE SECTION A)

24" X 2'-6" X

1

4

" PLATE

GALVANIZED W/1/2" X 2"

LDT ANCHORS AT 9" O.C.

0.19' NOTCH

IN CONC CURB

105 CF 12" CONC SLAB W/

6x6 - W/ 4.0 WWF

6" CONC CURB (TYP)

12" CONCRETE

TRICKLE CHANNEL

10

.0

0'

RIPRAP

SWALE

0.19'

12" CURB

6" CONC SLAB

B

B

GL

EN

EA

GL

E

SU

BD

IV

IS

IO

N F

IL

#

2

DR

AIN

AG

E, G

RA

DIN

G &

ER

OS

IO

N D

ET

AIL

S

C

3

CO

LO

RA

DO

S

PR

IN

GS

, C

O 8

09

03

73

1 N

. W

EB

ER

S

T., S

UIT

E 1

0

GU

MA

N &

A

SS

OC

IA

TE

S, L

LC

NA

ME

: Z

:\C

OL

OR

AD

O S

PR

IN

GS

O

FF

IC

E\0

35

42

_G

LE

NE

AG

LE

\C

AD

\S

HE

ET

S\0

35

24

-S

-G

RA

D.D

WG

PL

OT

D

AT

E: M

ay 2

2, 2

01

9 1

0:5

4 A

M, B

Y: C

HR

IS

M

EE

KS

Know what's below.before you dig.Call

R

SHEET

DRAWING NUMBER:

REVISION

STAMP

RE

SP

EC

72

0 S

C

OL

OR

AD

O B

LV

D

SU

IT

E 4

10

S

DE

NV

ER

, C

O 8

02

46

PH

ON

E (3

03

) 7

57

-3

65

5

DE

SIG

NE

D

DR

AW

N

CH

EC

KE

D

DA

TE

VR-18-018

8" 4' 8"

8"

4'

8"

5.6'

2' TRICKLE CHANNEL

4'8'

Page 4: Sw 3.3% - Microsoft · 13.erosion control blanketing is to be used on slopes steeper than 3:1. 14.building, construction, excavation, or other waste materials shall not be temporarily

MA

B

HJG

MA

B

2/1

9/2

01

9

PROJ NO. 03524

DWG NM. 03524-Dev-Fil2

INLET PROTECTION - NOT TO SCALE

Know what's below.before you dig.Call

R

SHEET

DRAWING NUMBER:

REVISION

STAMP

RE

SP

EC

72

0 S

C

OL

OR

AD

O B

LV

D

SU

IT

E 4

10

S

DE

NV

ER

, C

O 8

02

46

PH

ON

E (3

03

) 7

57

-3

65

5

DE

SIG

NE

D

DR

AW

N

CH

EC

KE

D

DA

TE

VR-18-018

GL

EN

EA

GL

E

SU

BD

IV

IS

IO

N F

IL

#

2

DR

AIN

AG

E, G

RA

DIN

G &

ER

OS

IO

N D

ET

AIL

S

C

4

CO

LO

RA

DO

S

PR

IN

GS

, C

O 8

09

03

73

1 N

. W

EB

ER

S

T., S

UIT

E 1

0

GU

MA

N &

A

SS

OC

IA

TE

S, L

LC

NA

ME

: Z

:\C

OL

OR

AD

O S

PR

IN

GS

O

FF

IC

E\0

35

42

_G

LE

NE

AG

LE

\C

AD

\S

HE

ET

S\0

35

24

-S

-G

RA

D.D

WG

PL

OT

D

AT

E: M

ay 2

2, 2

01

9 1

0:5

4 A

M, B

Y: C

HR

IS

M

EE

KS

Page 5: Sw 3.3% - Microsoft · 13.erosion control blanketing is to be used on slopes steeper than 3:1. 14.building, construction, excavation, or other waste materials shall not be temporarily

MA

B

HJG

MA

B

2/1

9/2

01

9

PROJ NO. 03524

DWG NM. 03524-Dev-Fil2

City of Colorado Springs

Stormwater Quality

NTS

VEHICLE TRACKING

PA

VE

D R

OA

D

MIN

EXISTING

PAVEMENT

Figure VT-2

Vehicle Tracking

Application Examples

INSTALLATION REQUIREMENTS

MAINTENANCE REQUIREMENTS

VEHICLE TRACKING NOTES

1. REGULAR INSPECTIONS ARE TO BE MADE OF ALL

STABILIZED AREAS, ESPECIALLY AFTER STORM

EVENTS.

2. STONES ARE TO BE REAPPLIED PERIODICALLY AND

WHEN REPAIR IS NECESSARY.

3. SEDIMENT TRACKED ONTO PAVED ROADS IS TO BE

REMOVED DAILY BY SHOVELING OR SWEEPING.

SEDIMENT IS NOT TO BE WASHED DOWN STORM

SEWER DRAINS.

4. STORM SEWER INLET PROTECTION IS TO BE IN

PLACE, INSPECTED, AND CLEANED IF NECESSARY.

5. OTHER ASSOCIATED SEDIMENT CONTROL MEASURES

ARE TO BE INSPECTED TO ENSURE GOOD WORKING

CONDITION.

PLAN

3" MIN OF COURSE AGGREGATE ON ALL

CONSTRUCTION ROADS, PARKING AREAS,

STAGING AREA, LOADING/UNLOADING AREAS,

AND STORAGE AREAS.

SECTION

1. ALL ENTRANCES TO THE CONSTRUCTION SITE ARE

TO BE STABILIZED PRIOR TO CONSTRUCTION

BEGINNING.

2. CONSTRUCTION ENTRANCES ARE TO BE BUILT WITH

AN APRON TO ALLOW FOR TURNING TRAFFIC, BUT

SHOULD NOT BE BUILT OVER EXISTING PAVEMENT

EXCEPT FOR A SLIGHT OVERLAP.

3. AREAS TO BE STABILIZED ARE TO BE PROPERLY

GRADED AND COMPACTED PRIOR TO LAYING DOWN

GEOTEXTILE AND STONE.

4. CONSTRUCTION ROADS, PARKING AREAS,

LOADING/UNLOADING ZONES, STORAGE AREAS, AND

STAGING AREAS ARE TO BE STABILIZED.

5. CONSTRUCTION ROADS ARE TO BE BUILT TO

CONFORM TO SITE GRADES, BUT SHOULD NOT HAVE

SIDE SLOPES OR ROAD GRADES THAT ARE

EXCESSIVELY STEEP.

MIN

IM

UM

COARSE AGGREGATE

3 INCHES (D )

75'-0' MIN

15

' O

R W

ID

TH

O

F E

NT

RA

NC

E

9"

3"

GEOTEXTILE (MATERIAL REQUIREMENTS IN APPENDIX B, TABLE MT-3)

50

Know what's below.before you dig.Call

R

SHEET

DRAWING NUMBER:

REVISION

STAMP

RE

SP

EC

72

0 S

C

OL

OR

AD

O B

LV

D

SU

IT

E 4

10

S

DE

NV

ER

, C

O 8

02

46

PH

ON

E (3

03

) 7

57

-3

65

5

DE

SIG

NE

D

DR

AW

N

CH

EC

KE

D

DA

TE

VR-18-018

GL

EN

EA

GL

E

SU

BD

IV

IS

IO

N F

IL

#

2

DR

AIN

AG

E, G

RA

DIN

G &

ER

OS

IO

N D

ET

AIL

S

C

5

CO

LO

RA

DO

S

PR

IN

GS

, C

O 8

09

03

73

1 N

. W

EB

ER

S

T., S

UIT

E 1

0

GU

MA

N &

A

SS

OC

IA

TE

S, L

LC

NA

ME

: Z

:\C

OL

OR

AD

O S

PR

IN

GS

O

FF

IC

E\0

35

42

_G

LE

NE

AG

LE

\C

AD

\S

HE

ET

S\0

35

24

-S

-G

RA

D.D

WG

PL

OT

D

AT

E: M

ay 2

2, 2

01

9 1

0:5

4 A

M, B

Y: C

HR

IS

M

EE

KS