Sustrans matt winfield presentation at nla 2016 cycling under sadiq khan

17
Matt Winfield Deputy Director - London [email protected] @mattwinfield2 Quietways

Transcript of Sustrans matt winfield presentation at nla 2016 cycling under sadiq khan

Page 1: Sustrans matt winfield presentation at nla 2016   cycling under sadiq khan

Matt WinfieldDeputy Director - London

[email protected]@mattwinfield2

Quietways

Page 2: Sustrans matt winfield presentation at nla 2016   cycling under sadiq khan

TfL Greenways

East London Green Grid

Olympic Walking & Cycling Route Enhancements (OWCRE)

Page 3: Sustrans matt winfield presentation at nla 2016   cycling under sadiq khan

• £117 million/10 years• London wide (outside Grid)• A network that caters for all• Direct, convenient• Consistent quality & experience

Network for All

Page 4: Sustrans matt winfield presentation at nla 2016   cycling under sadiq khan

Feb 2014

May 2016

Page 5: Sustrans matt winfield presentation at nla 2016   cycling under sadiq khan

Aug 2014

May 2016

Page 6: Sustrans matt winfield presentation at nla 2016   cycling under sadiq khan

Feb 2014 May 2016

Page 7: Sustrans matt winfield presentation at nla 2016   cycling under sadiq khan

Feb 2014

May 2016

Page 8: Sustrans matt winfield presentation at nla 2016   cycling under sadiq khan
Page 9: Sustrans matt winfield presentation at nla 2016   cycling under sadiq khan

Delivery

• Phase 1 7 routes • Construction in progress or complete for 22.4km of

79.7km

• Phase 2 22 more routes

Page 10: Sustrans matt winfield presentation at nla 2016   cycling under sadiq khan

Text

Page 11: Sustrans matt winfield presentation at nla 2016   cycling under sadiq khan
Page 12: Sustrans matt winfield presentation at nla 2016   cycling under sadiq khan

Partners

BoroughsManaging authoritiesCommunitiesTfL (TLRN, Buses etc)NR & other major landownersInterest groupsBusinesses

Page 13: Sustrans matt winfield presentation at nla 2016   cycling under sadiq khan

Change can be challenging

Traffic volume 66%Speeding traffic 18% to 11%

26 collisions in previous 5 years.

German Dector-Vega
Love this slide
Page 14: Sustrans matt winfield presentation at nla 2016   cycling under sadiq khan
Page 15: Sustrans matt winfield presentation at nla 2016   cycling under sadiq khan

Leading positive change

German Dector-Vega
Lovely slide
Page 16: Sustrans matt winfield presentation at nla 2016   cycling under sadiq khan

OpportunitiesHealthy St - link ‘quiet’ areas with Quietways AQCommunity ledWide appealFlexibleDelivery

Page 17: Sustrans matt winfield presentation at nla 2016   cycling under sadiq khan

What more is needed? Sustrans’ view

Mind your languageWider benefits (esp peds)Speed deliveryPerseveranceMeasure economic benefits DevelopersTime, Cost, QualityCrowd sourced alignment