Sustainable Water and Energy Policyin Indonesia
Directorate General of Water ResourcesMinistry of Public Works
Directorate General of Water ResourcesMinistry of Public Works
RIVER BASIN TERRITORY IN INDONESIAPRESIDENTIAL DECREE NO. 12 YEAR 2012MINISTERIAL REGULATION OF PUBLIC WORKS NO. 11.A YEAR 2006
Main Concern on Strategic Plan and Implementation Plan
Water Security
Indeks Pemakaian AirKebutuhan air / Ketersediaan air
besar dari 40% (19)20% - 40% (12)10% - 20% (17)kecil dari 40% (83) 15 M m3
203 buah
6,5 M m3.190 buah
2,3 M m3.28 buah
Terbangun Potensi On GoingDeveloped
From 3,9 trillion m3 potential water in Indonesia,only ± 15 billion m3 or 63,5 m3 per capita ismanaged through the reservoir.
By finishing the construction of the on goingreservoir (2017), will provide additional volumeof 2,3 milyar m3, bringing the total storage to17,4 billion m3 (± 73,42 m3 / capita) andirrigation area = 960.000 ha
DRAFT STRATEGICPLAN(2015-2019)
Construct 50 Reservoir(Increase storage volume from17,4 billion m3 to 20 billionm3)
Construct 2500 small dams Revitalize critical lakes and
dams Pond Revitalization
3,624,56
6,74
4,33
1,86
5,437,07
Flow Height in Indonesia Island(in mm/day)
63,5Water Availability in Indonesia
Potential
Unit Vol (million m3)1 Sumatera 40 2122.362 Jawa 81 1403.543 Kalimantan 9 100.004 Bali & NT 16 170.275 Sulawesi 44 2711.006 Maluku & Papua
Total 190 6507.17
IslandPotential (SID)
ShortageWater StressEnough
15 B m3
203 Unit
6,5 B m3
190 Unit2,3B m3
28 Unit
Raw Water ManagementSERVICED AREAS OF WATER SUPPLY (URBAN ANDRURAL) AIR BAKU PULAU TERDEPAN
Providing raw water for drinking water Increase of raw-water supply from 56 m3/s to 58,5 m3/s Lowering the amount of “idle capacity” Providing raw-water for outer islands
STRATEGIC PLAN (2015-2019)
85%
100%
Existing ConditionsOperation and Maintenance Cost of Energy
No.
IPP PLTA Price /Kwh
1. Asahan I 2x45 MW $ 4.9 cents
2. Poso 3x65 MW $ 6.75 cents
3. Semangka 2x28 MW $ 8.36 cents
4. Rajamandala 47 MW $ 8.66 cents
5. Hydro-Power of PJT I & PJTII
$ 1.50 cents
Sumber: Statistik PLN 2012
156
810
3.169
2.363
1.121
1.002
0 500 1.000 1.500 2.000 2.500 3.000 3.500
PLTA
PLTU
PLTD
PLTG
PLTP
PLTGU
Average Selling Price Rp 725/Kwh
AverageProduction CostRp 1.217/Kwh
subsidies
Existing Reservoirs
284 Reservoir all overIndonesia
(12.973.118.000 m3)
261 ReservoirMinistry Of Public
Works
Sumatera : 9Jawa : 161Bali dan Nusa Tenggara : 80Kalimantan : 5Sulawesi dan Maluku : 622 reservoir have Hydro Power plant
12 ReservoirPLN
Sumatera : 3Jawa : 7Kalimantan : 1Sulawesi dan Maluku : 1
11 ReservoirPrivate
Sumatera : 4Jawa : 2Kalimantan : 3Sulawesi dan Maluku : 2
Existing potential reservoirwhich can be use for
Hydropower
Existing potential reservoirwhich can be use for
Hydropower
Sedimentation Problems
0
50.000
100.000
150.000
200.000
250.000
300.000
350.000
400.000
450.000
500.000
Batu
tegi
Won
orej
oSa
lom
eko
Kalo
laM
eran
cang
Peng
gaTi
u Ku
litGe
mbo
ngKl
ego
Seng
guru
hW
adas
linta
ngGo
ngda
ngKe
tro
Sam
pean
Bar
uBa
tuja
iBe
ning
Won
ogiri
Lodo
yoW
ay Je
para
Sam
boja
Wlin
giLa
hor
Kara
ngka
tes
Selo
rejo
Lem
pake
Jatil
uhur
Sem
por
Darm
aCa
caba
nKr
isak
Mal
ahay
uPe
njal
inCe
ngkl
ikPl
umbo
nPa
cal
Cipa
ncuh
Gren
eng
Kedu
ng U
ling
Tem
pura
nN
glan
gon
Sang
geh
Sim
o
500.000
1.000.000
1.500.000
2.000.000
2.500.000
3.000.000
Design Capacity (MCM)
Sisa Volume Eksisting 2013 (MCM)
10-20 yrs 21-30 yrs 31-40 yrs 41-50 yrs51-80 yrs
81-90 yrs 91-100 yr> 100 yrs
Acceleration Program for Development ofHydro-power Plants
2.Re-vitalize of De-
rating ExistingPlants via Dredgingand Refurbishment
1.Breakthrough forConstruction of
Power PlantKarangkates IV & V,
Kesamben danLodoyo
3.Rapid assessment
for potencies in theexisting reservoirs
of Ministry OfPublic Works
4.Streamliningpermits and
licenses for ongoing plan of hydro-
power plant
Building with NatureReclaiming Land in Sea and Water in the new Land