WATTS BAR NUCLEAR PLANT SURVEILLANCE INSTRUCTION SI-4.0.5.67.p ESSENTIAL RAW COOLING WATER PUMPS UNITS 1 AND-2 "REVISION 0 OF-THIS PROCEDURE WAS ', ORIGINALLY ISSUED AS SI-4.0.5.6" Prepared By W. E. Webb. Jr. PORC Review - '- Approved By Date Approved Supervisor 5, - / 2-1 Date t-Superintendent .... 1,-, 7, 0 IC Plant Master File Superintendent Assistant Superintendent Maintenance Supervisor IC Results Supervisor iC Operations Supervisor IC Quality Assurance Supervisor iC Health Physicist Administrative Supervisor Chemical Laboratory Instrument Shop IC Shift Engineer's Office 2C Unit Control Room Health Physics Laboratory Chief Storekeeper IC Mechanical Engineer Reactor Engineer Chemical Engineer Instrument Engineer 3u Chief, Nuclear Generation Bran 1 - Assistant Maintenance Supervisor DPP Central Office File iC P PROn TNnining rennr IU, NRC ' 2C Industrial Engineer Rev. No. Date Revised Pages 0 5/23/78 All 1 10/10/78 All The last page of this instruction is number 14 E111090395 811ios . 'DR ADOCK 0500390 M 11030p MC-DR . .. .. I I

Transcript of 'Surveillance Instruction - Essential Raw Cooling Water Pumps.' · 2012. 11. 30. · Operable Pumps...

Page 1: 'Surveillance Instruction - Essential Raw Cooling Water Pumps.' · 2012. 11. 30. · Operable Pumps Flow Rate from App. B (gpm) A-A B-A C-A D-A Total Flow Rate * SI-4.0.5.67.p Appendix

WATTS BAR NUCLEAR PLANT

SURVEILLANCE INSTRUCTION

SI-4.0.5.67.p

ESSENTIAL RAW COOLINGWATER PUMPS

UNITS 1 AND-2

"REVISION 0 OF-THIS PROCEDURE WAS ',

ORIGINALLY ISSUED AS SI-4.0.5.6"

Prepared By W. E. Webb. Jr.

PORC Review - '-

Approved By

Date Approved

Supervisor5, - / 2-1

Date

t-Superintendent

....1,-, 7,

0

IC Plant Master FileSuperintendentAssistant SuperintendentMaintenance Supervisor

IC Results SupervisoriC Operations SupervisorIC Quality Assurance Supervisor

iC Health PhysicistAdministrative SupervisorChemical LaboratoryInstrument Shop

IC Shift Engineer's Office

2C Unit Control RoomHealth Physics LaboratoryChief Storekeeper

IC Mechanical EngineerReactor EngineerChemical EngineerInstrument Engineer

3u Chief, Nuclear Generation Bran1 - Assistant Maintenance Supervisor

DPP Central Office FileiC P PROn TNnining rennrIU, NRC '2C Industrial Engineer

Rev. No. Date Revised Pages

0 5/23/78 All

1 10/10/78 All

The last page of this instruction isnumber 14

E111090395 811ios .'DR ADOCK 0500390 M

11030p MC-DR. .. .. I I

Page 2: 'Surveillance Instruction - Essential Raw Cooling Water Pumps.' · 2012. 11. 30. · Operable Pumps Flow Rate from App. B (gpm) A-A B-A C-A D-A Total Flow Rate * SI-4.0.5.67.p Appendix

WSI-4,,0.5.67.p

Puiwh List

Page 1 of 1Revision 1WBNP

Punch List

i. WBNP Draft Technical Specifications

2. The tolerence on acceptance criteria to be determined later.

3. ASME Section XI, IWP compliance and exceptions to be approved by NRC.

Specific Edition and Addenda to be specified in license. Test is written

to 1974 Edition.

4. Pump Curve in Appendix B to be verified by TVA-18. Bands denoting

acceptable and alert criteria tobe added later by results.

5. Relief will have to be requested from vibration testing ofASME Section XI program.

Signature

ERCW pump in

Da e

- ~. .

.......- .. ~ I.

Page 3: 'Surveillance Instruction - Essential Raw Cooling Water Pumps.' · 2012. 11. 30. · Operable Pumps Flow Rate from App. B (gpm) A-A B-A C-A D-A Total Flow Rate * SI-4.0.5.67.p Appendix

WBNPSI-4.0.5.6

7 .p

Page 1 of 3

Revision 1

0

1.0 STATEMENT OF APPLICABILITY

1.1 The purpose of this instruction is to demonstrate that the

essential raw cooling water pumps are OPERABLE. Their operability

is determined by verifying that the sum of the flow rates obtained

from the measured pump differential pressure and the verified

pump curve in Appendix A is equal to the sum of the flow rates in

the headers being used.

1.2 For operation in Modes 1, 2, 3, 4, 5, and 6 each essential raw

-cooling water pump shall be demonstrated operable once per month

in accordance with Surveillance Requirement 4.0.5 and the ASME

Boiler and Pressure Vessel Code, Section XI, Edition and Addenda

later.

This instruction satisfies Surveillance Requirement 4.0.5 for these

pumps.

NOTE: For operation in modes 1, 2,

shall be operable. In modes

NEEDED for the heat load are

2.0 REFERENCES

3, or 4 two5 or 6 onlyrequired to

independent ERCW loopsthe number of pumpsbe operable.

TVA Drawings 47W845-1 R547W610-67-1 R247W611-67-1 R2

3.0 PREREQUISITES AND TEST EQUIPMENT

3.1 Prerequisites

3.1.1 None

3.2 Test Equipment

3.2.1 None

4.0 PRECAUTIONS

4.1 Appendix A of this instruction is for

pump to service following maintenanceperformance.

use only when returning awhich could affect pump

1-

Page 4: 'Surveillance Instruction - Essential Raw Cooling Water Pumps.' · 2012. 11. 30. · Operable Pumps Flow Rate from App. B (gpm) A-A B-A C-A D-A Total Flow Rate * SI-4.0.5.67.p Appendix

WBNP

SI-4.0.5.67.pPage 2 of 3

týevision 1

5.0 INSTRUCTIONS

NOTE: This procedure is written for testing any number of pumpsoperating on the same train.

5.1 Note on the data sheet the ERCW pumps that are running and supplying

the same train by crossing out the identification letters of thepump (s) not running.

5.2 Verify on data sheet that the diesel generator heat exchanger

valves are closed.

5.3 Record the flow rate of each discharge header being supplied

by the pumps on data sheet.

5.4 Add the header discharge flow rates and record on data sheet.

5.5 Obtain the latest river level from Watts Bar Hydro 365-6300 orPax 217-2111.and record on-data sheet.

5.6 Calculate the ERCW pump suction pressure on data sheet.

5.7 Record the discharge pressure of each pump being tested on datasheet.

5.8 Compute the differential pressure across each pump and record on

data sheet.

5.9 Using the differential pressure from Step 5.8 and the curve inAppendix B for each specific pump, find the flow rate in gpm andrecord on data sheet.

5.10 Add the pump flow rates from 5.9.

5.11 Determine the difference between the pump flow rates in step 5.4

Step 5.10.

5.12 Verify on data sheet that the difference in the pump flow rates meet

the acceptance criteria of 6.0. I5.13 If pumps other than those running are to be tested, transfer the

running pump (s) with those not running per SOI-67. Insure that therequired number of pumps for the heat load are operating at alltimes. Repeat Steps 5.1 through 5.12 for the remaining pumps in'the train until all have been tested. Record the values for each

tested configuration on a separate data sheet.

5.14 If any value is not within the acceptable range specified in Section0'- re check-caic u Iations -then notify the shift'enginar. .

-2-

Page 5: 'Surveillance Instruction - Essential Raw Cooling Water Pumps.' · 2012. 11. 30. · Operable Pumps Flow Rate from App. B (gpm) A-A B-A C-A D-A Total Flow Rate * SI-4.0.5.67.p Appendix

0SI-4.0.5.67.pPage 3 of 3Revision 1WBNP

6.0 ACCEPTANCE CRITERIA

6.1 If the value obtained from the intersection of the pump differential

pressure and the pump flow rate falls within the "alert band" on the

curve in Appendix B, the frequency of testing will be increased to

twice a month until the cause of deviation is determined and corrected

and either the existing reference values verified or a new set established.

6.2 If the value at the intersection of the values is in the "Required

Action" range, the pump shall be declared inoperative and not

returned to service until the condition has been corrected.

-3-" " -- ' . 2 .i , ÷-

V

Page 6: 'Surveillance Instruction - Essential Raw Cooling Water Pumps.' · 2012. 11. 30. · Operable Pumps Flow Rate from App. B (gpm) A-A B-A C-A D-A Total Flow Rate * SI-4.0.5.67.p Appendix

* WBNPSI-4.0.5.67.pAppendix AP- age 1 of 2Revision 1

APPENDIX A

I. PURPOSE

I.1 The purpose of this appendix is to establish a procedure forverifying a point on the pump curve for an inoperable pumpfollowing maintenance which would affect pump performance.Since the pump cannot be tested individually, the test isperformed by obtaining the flow rate of the operable pump (s)from the pump curve and subtracting it from the total measuredflow rate of the headers. The resulting flow rate for theinoperable pump is used to deuermine the differential pressurefrom the pump curve. The measured differential pressure ofthe ihoperable pump is then compaired to the value from the pumpcurve to determine whether the pump performance is now satisfactory.

II. PROCEDURE

II.1 Determine from QA records that the pump (s) chosen to be testedwith the inoperable pimp is operable per Surveillance Instruction4.0.5.67.p. Verify on Data Sheet A.

11.2 Verify on Data Sheet A that the diesel generator heat exchangervalves are closed.

11.3 Transfer one running pump with the inoperable pump per SOI 67.Insure that the required number of pumps for the loop are

operating at all times.

11.4 Record the flow rate of each discharge header being supplied bythe pumps on Data Sheet A.

11.5 Add the header discharge flow rates and record on Data Sheet A.

11.6- Obtain the latest river level from Watts Bar Hydro 365-6300 orPax 217-2111 and record on Data Sheet A.

11.7 Calculate the ERCW pump suction pressure on Data Sheet A.

11.8 Record the discharge pressure of each pump being tested onData Sheet A.

11.9 Compute the differential pressure across the operable pump (s)and record on Data Sheet A.

II.I0_ Using the differential pressure from Ste 11.9 and the curve inAppendix B, find the flow rate in gpm -for. the operable pump (s)

and record on Data Sheet A.

- -4-

Page 7: 'Surveillance Instruction - Essential Raw Cooling Water Pumps.' · 2012. 11. 30. · Operable Pumps Flow Rate from App. B (gpm) A-A B-A C-A D-A Total Flow Rate * SI-4.0.5.67.p Appendix

SI-4.0.5.67.pAppendix A

Page 2 of 2Revision 1WBNP

II. PROCEDURE (Continued)

II.11 Add the flow rates obtained in Step II.10 and record on Data

Sheet A.

11.12 Subtract the total flow rate (Step II.11) from the total header

discharge flow rate (Step 11.5) and record on Data Sheet A.

11.13 Using the flow rate from Step 11.12 and the curve in Appendix B

find the differential pressure and record on Data Sheet A.

11.14 Compute the differential pressure across the inoperable pump

from Steps 11.7 and 11.8.

11.15 Determine the difference between the inoperable pump differential

pressures from Step 11.13 and 11.14.

11.16 Verify that the pump meets the Acceptance Criteria of III and is

now operable.

11.17 If the pump does not meet the acceptance criteria, recheck

calculations then notify the shift engineer.

III. ACCEPTANCE CRITERIA

III.1 The actual pump differential pressure and the differential

pressure determined from the curve in Appendix B shall be

equal + (later).

[

*1

Page 8: 'Surveillance Instruction - Essential Raw Cooling Water Pumps.' · 2012. 11. 30. · Operable Pumps Flow Rate from App. B (gpm) A-A B-A C-A D-A Total Flow Rate * SI-4.0.5.67.p Appendix

SI-4.0.5. 6 7.p

Data PackageA •m Page 1 of 2

Revision IWBNP

DATA PACKAGE COVER SHEET

APPENDIX A

ESSENTIAL RAW COOLING WATER PUMP POST MAINTENANCE TEST - TRAIN A

Performed By DateResults Engineering Aide

Was the acceptance criteria satisfied? Yes No

If criteria were n6t satisfied, notify the shift engineer who completes thefollowing:

Was a limiting condition for operation violated?

Yes (explain in remarks) No (explain in remarks)

Verified By __Date

Shift Engineer

Reason for test:

___ R~quired by schedule

Maintenance complete -on ..... .... ...

____Another system ( ) inoperable

- Plant condition (explain) "_ __._ _

_Other (explain)

---- -- -- -- -- -- -- -- ---- -- -- -- -- -- -- ---- -- ------

Review of Test Results

Asst. Shift Engineer Date.1

Review and Approval of Test Results

Alert Scheduling Required Yes No

Cognizant Engineer - - Date_ _

(Mechanical Results).... Rescheduled

QA S ta ff . ..... . .. .. ... .. .. .... . .... . -.. .. D a te

Remarks.

-6-

Page 9: 'Surveillance Instruction - Essential Raw Cooling Water Pumps.' · 2012. 11. 30. · Operable Pumps Flow Rate from App. B (gpm) A-A B-A C-A D-A Total Flow Rate * SI-4.0.5.67.p Appendix

Initials

11.2 Diesel generator heat exchanger valves closed. (1-FCV-67-66,2-FCV-67-66, l-FCV-67-67, 2-FCV-67-67)

11.4 Discharge header flow rate

11.5 Total header flow rate

11.6 River level

11.7 Pump suction pressure (river level - 653.33) x (0.43) =

psig

11.8

11.9

I1.10

II.11

)-653.33] x [0.4-P

Note: Cross out- inoperable _..... Operable Pump(s)pump or pumps not running A-A B-A C-A D-AInstrument Number PI 67-37A PI 67-41A PI 67-33A PI 67-29ADischarge PressureSuction Pressure (from 11.7)Differential Pressure

II

.I

11.12 Total header flow rate - total pump flow rate =( ) - ( ) = psig

11.13 Inoperable pump differential pressure from Appendix.B =_ psig

11.14 Discharge pressure - Suction pressure (Step 11.7)=.( )- ( .) psig

11.15 Differential pressure (Step 11.14) -/Differential pressure

. . (Step II.13)=

11.16 Pump is now operable

.... -7- -.. I

Header Inst. No. Flow Rate (gpm)IA I-FI 67-61

1B 1-FI 67-622A 2-FI 67-61

2B 2-FI 67-62

Operable Pumps Flow Rate from App. B (gpm)A-A

B-A

C-A

D-ATotal Flow Rate

* SI-4.0.5.67.pAppendix APage 2 of 2Revision 1WBNP

Data Sheet A Date

ESSENTIAL RAW COOLING WATER PUMP POST MAINTENANCE TEST - TRAIN A

Step

II.1 Pumps to be tested with inoperable pump

psig

Page 10: 'Surveillance Instruction - Essential Raw Cooling Water Pumps.' · 2012. 11. 30. · Operable Pumps Flow Rate from App. B (gpm) A-A B-A C-A D-A Total Flow Rate * SI-4.0.5.67.p Appendix

SI-4.O.5. 67.p

Data PackagePage 1 of 2Revision1WBNP

DATA PACKAGE COVER SHEET

APPENDIX A

ESSENTIAL RAW COOLING WATER PUMP POST MAINTENANCE TEST -TRAIN B.

Performed By _________________Date ________

Results Engineering Aide

Was the acceptance criteria satisfied? _____Yes ____No

If criteria were not satisfied, notify the shift engineer who completes the

following:

Was a limiting condition for operation violated?

Yes (explain in remarks) ___No (explain in remarks)N

Verified By ________________Date________

Shift Engineer

Reason for test:

______ R~quired by schedule

Maintenance complete on

Another system ()inoperable

_______Plant condition (explain)______________________

______Other (explain) -

Review of Test Results"

Asst. Shift Engineer Date _______

Review and Approval of Test Results

Alert Scheduling Required -______Yes _____No

Cognizant Engineer _____________________ Date______

~.~,.~.(Mechanical Results)

Rescheduled

Remarks-

Page 11: 'Surveillance Instruction - Essential Raw Cooling Water Pumps.' · 2012. 11. 30. · Operable Pumps Flow Rate from App. B (gpm) A-A B-A C-A D-A Total Flow Rate * SI-4.0.5.67.p Appendix

0 SI-4.0.5.67.pAppendix APag". 2 of 2Revision 1WBNP

Data Sheet A Date

ESSENTIAL RAW COOLING WATER PUMP POST MAINTENANCE TEST - TRAIN B

Step

II.1 Pumps to be tested with inoperable pump

Initials

11.2 Diesel generator heat exchanger valves closed. (1-FCV-67-66,2-FCV-67-66, 1-FCV-67-67, 2-FCV-67-67)

11.4 Discharge header flow rate

11.5 Total header flow rate

11.6 River level ft

11.7 Pump suction pressure = (river level - 653.33) x (0.43) =

psig

11.8

11.9

653.33] x [0.43

II110 Operable PumpsE-9

11.11 Total Flow Rate

Flow Rate from App. B (pm)

LL.L2 Total header flow rate.- total pump flow rate = ( ) - ( ) = psig

11.13 Inoperable pump differential pressure from Appendix B = . psig

11.14 Discharge pressure -Suction pressure (Step 11.7) = ( ) - ( )= _-

_-

_ psig

11.15 Differential pressure (Step 11.14) - Differential pressure .. -" .... . ....... . ...... ...... (Step HI.13)= ... . . . .psig.i

11.16 Pump is now operable

---------------------. .| ,

Header Inst. No. Flow Rate (gpm)IA I-FI 67-61IB I -F I 6 7 -6 2 .. . ... ...2A 2-FI 67-61 _

2B 2-FI 67-62

Note: Cross out inoperable Operable Pump(s)pump or pumps not running E-B F-B G-B H-BInstrument Number PI 67-60A PI 67-56A PI 67-48A PI 67-52ADischarge Pressure

Suction Pressure (from 11.7)Differential Pressure

Page 12: 'Surveillance Instruction - Essential Raw Cooling Water Pumps.' · 2012. 11. 30. · Operable Pumps Flow Rate from App. B (gpm) A-A B-A C-A D-A Total Flow Rate * SI-4.0.5.67.p Appendix

EM

0

Page 13: 'Surveillance Instruction - Essential Raw Cooling Water Pumps.' · 2012. 11. 30. · Operable Pumps Flow Rate from App. B (gpm) A-A B-A C-A D-A Total Flow Rate * SI-4.0.5.67.p Appendix

* SI-4.0.5.6 7 .pWData Package

P-'ge 1 of 2

Revision 1WBNP

DATA PACKAGE COVER SHEET

ESSENTIAL RAW COOLING WATER PUMP - TRAIN A

Performed By Date

Unit Operator

Was the acceptance criteria satisfied? Yes No "

If criteria were not satisfied, notify the shift engineer who completes thefollowing:

Was a limiting condition for operation violated?

Yes (explain in remarks) No (explain in remarks)

Verified By DateShift Engineer

Reason for test:

___ R~quired by schedule

_ _ Maintenance complete on

____Another system ( ) inoperable

__________ Plant condition (explain) ....... ............. . .. _.

Other (explain)

Review of Test Results

Asst. Shift Engineer Date

Review and Approval of Test Results

Alert Scheduling Required -Yes No

" Cogniai EngiDate~___________(Mechanical Results)

Rescheduled"-

QA Staff Date

Remarks

.-".. ... .,•: < ' i• -• ... .. : . . . .• -, • . •: •. . .. 1. 71.._ . . . •. .. ,• . .- . . . .. . . _ . , -

Page 14: 'Surveillance Instruction - Essential Raw Cooling Water Pumps.' · 2012. 11. 30. · Operable Pumps Flow Rate from App. B (gpm) A-A B-A C-A D-A Total Flow Rate * SI-4.0.5.67.p Appendix

0 SI-4.0.5.67.pData PackagePage 2 of 2Revision IWBNP Unit

Mode

Date

ESSENTIAL RAW COOLING WATER PUMPS - TRAIN A

Step

5.1 Cross out pump(s) not running A-A B-A C-A D-A

Initials

5.2 Diesel generator heat exchanger

2-FCV-67-66, I-FCV-67-67, 2FCV-,

5.3 Discharge header flow rate

5.4 Total header flow rate

5.5 River level ft

closed . (1-FCV-67-66,

Header Inst. No. Flow Rate (gpm)

IA I-FI 67-61lB 1-FI 67-62

2A 2-FI 67-612B 2-FI 67-62

5.6 Pump suction pressure = (river level - 653.33) x (0.43) = [ )- 653.33] x.['4

psig

~PumpA-A B uA C-A D-A

Instrument Number PI 67-37A PI 67-41A PI 67-33A PI 67-29A

Discharge Pressure

Suction Pressure (from 5.6).

[Differential Pressure j

Pump Flow Rate from Graph (gpm)A-AB-AC-AD-A

Total flow

5.11 Step 5.4 - Step 5.10 = ( gpm,

5.12 Pump flow rate meets the acceptance criteria of 6.0

REMARKS: ............. .

- q2, - -. "I' I" ,

5.7

5.8

5.9

5.10

Page 15: 'Surveillance Instruction - Essential Raw Cooling Water Pumps.' · 2012. 11. 30. · Operable Pumps Flow Rate from App. B (gpm) A-A B-A C-A D-A Total Flow Rate * SI-4.0.5.67.p Appendix

* SI-4.0.5.6 7.pW •Data Package

Page 1 of 2Revision 1WBNP

DATA PACKAGE COVER SHEET

ESSENTIAL RAW COOLING WATER PUMP - TRAIN B

Performed By Date

Unit Operator

Was the acceptance criteria satisfied? Yes No

If criteria were not satisfied, notify the shift engineer who completes thefollowing.:

- Was a limiting condition for operation violated?

__Yes (explain in remarks) No (explain in remarks)

Verified By Date

Shift Engineer

Reason for test:

Required by schedule

Maintenance complete on

Another system ( ) inoperable

Plant condition (explain) ....... ... ... .... ..... . .. .... _-

Other (explain) _,

-----------------------------------------

Review of Test Results'

Asst. Shift Engineer Date

Review and Approval of Test Results

Alert Scheduling Required _ _ Yes No'-Cognizant Engineer.

Date*. (Mechanical Results)

Q A S t a f f -. D a te.. . . . . .. . . . . .. .Date

R e m a r k s " " . " ... - -

- 2 -

Page 16: 'Surveillance Instruction - Essential Raw Cooling Water Pumps.' · 2012. 11. 30. · Operable Pumps Flow Rate from App. B (gpm) A-A B-A C-A D-A Total Flow Rate * SI-4.0.5.67.p Appendix

SI-4.0.5.67.p

Datp PackagePage 2 of 2Revision 1WBNP

Mode

Date

ESSENTIAL RAW COOLING WATER PUMPS - TRAIN B-

Step

5.1 Cross out pump(s) not running E-B F-B" G-B H-B

Initials

5.2 Diesel generator heat exchanger valves closed.2-FCV-67-66, *1-FCV-67-67, 2-FCV-67-67)

5.3 Discharge header flow rate

5.4 Total header flow rate

5.5 River level ft

(1-FCV-67-66,

5.6 Pump suction pressure = (river level - 653.33) x (0.43) ) - 653.33] x[0.4j,

psig

Pum_ Flow Rate from Graph (gpm)

5.9 _-_

F-oG-B

5.10 Total flow

5.11 Step 5.4 - Step 5.10 = ( gpm-*

,5.12 _*Pump. flow rate meets the acceptance criteria of 6.0

REMARKS:

-14-

U

Header Inst. No. Flow Rate (gpm)

IA I-FI 67-61

lB I-FI 67-622A 2-F1 67-61

2B 2-FI 67-62

Pump

E-B F-8 H-B

Instrument Number PI 67-60A PI 67-56A PI 67-48A PT 67-52A

Discharge Pressure

Suction Pressure (from 5.6),

Differential Pressure

Unit