Supporting Project Management with AMF
description
Transcript of Supporting Project Management with AMF
![Page 1: Supporting Project Management with AMF](https://reader036.fdocuments.us/reader036/viewer/2022062323/56815757550346895dc5023a/html5/thumbnails/1.jpg)
IV&V Program
AMF
Supporting Project Management with AMF
Jeremy FienholdDon Kranz
![Page 2: Supporting Project Management with AMF](https://reader036.fdocuments.us/reader036/viewer/2022062323/56815757550346895dc5023a/html5/thumbnails/2.jpg)
IV&V Program
AMF
Introductions
• Don Kranz– Lead Architect for AMF & AWB
• Jeremy Fienhold– Lead Analyst on a project using AWB
2
![Page 3: Supporting Project Management with AMF](https://reader036.fdocuments.us/reader036/viewer/2022062323/56815757550346895dc5023a/html5/thumbnails/3.jpg)
IV&V Program
AMF
Analysis & Management Framework
• Provides a high level assurance based ontology that allows information to be shared between IV&V tools.
• Too much decomposition reduces flexibility, modularity and portability of design.
• At the simplest level we deal with:– Projects– Participants
3
– Artifacts– Assessments– Actions
![Page 4: Supporting Project Management with AMF](https://reader036.fdocuments.us/reader036/viewer/2022062323/56815757550346895dc5023a/html5/thumbnails/4.jpg)
IV&V Program
AMF
IVV 09-1 Manage Responsibilities
• “A continual review of the IV&V effort• Revision of the IPEP as necessary based upon updated Mission
Project schedules and development status• Coordination of the IV&V results with the developer and other
appropriate management groups• Promotion of technical exchange between IV&V and the
developer (to improve technical knowledge transfer and increase IV&V effectiveness)
• Identification of process improvement opportunities in the conduct of IV&V”
4
![Page 5: Supporting Project Management with AMF](https://reader036.fdocuments.us/reader036/viewer/2022062323/56815757550346895dc5023a/html5/thumbnails/5.jpg)
IV&V Program
AMF
Project Organization
5
![Page 6: Supporting Project Management with AMF](https://reader036.fdocuments.us/reader036/viewer/2022062323/56815757550346895dc5023a/html5/thumbnails/6.jpg)
IV&V Program
AMF
Superior Tracing
Any Artifact
Any ActionAny Assessment
6
![Page 7: Supporting Project Management with AMF](https://reader036.fdocuments.us/reader036/viewer/2022062323/56815757550346895dc5023a/html5/thumbnails/7.jpg)
IV&V Program
AMF
Scoping
7
Behaviors
Scoping Modules
![Page 8: Supporting Project Management with AMF](https://reader036.fdocuments.us/reader036/viewer/2022062323/56815757550346895dc5023a/html5/thumbnails/8.jpg)
IV&V Program
AMF
Scoping
8
![Page 9: Supporting Project Management with AMF](https://reader036.fdocuments.us/reader036/viewer/2022062323/56815757550346895dc5023a/html5/thumbnails/9.jpg)
IV&V Program
AMF
Coverage
9
![Page 10: Supporting Project Management with AMF](https://reader036.fdocuments.us/reader036/viewer/2022062323/56815757550346895dc5023a/html5/thumbnails/10.jpg)
IV&V Program
AMF
Assessing Completion
10
![Page 11: Supporting Project Management with AMF](https://reader036.fdocuments.us/reader036/viewer/2022062323/56815757550346895dc5023a/html5/thumbnails/11.jpg)
IV&V Program
AMF
Change Impact
11
Modified Artifact(s)
Previous Assessment(s)
![Page 12: Supporting Project Management with AMF](https://reader036.fdocuments.us/reader036/viewer/2022062323/56815757550346895dc5023a/html5/thumbnails/12.jpg)
IV&V Program
AMF
Tasking ground work
12
![Page 13: Supporting Project Management with AMF](https://reader036.fdocuments.us/reader036/viewer/2022062323/56815757550346895dc5023a/html5/thumbnails/13.jpg)
IV&V Program
AMF
Future of Architecture
13
![Page 14: Supporting Project Management with AMF](https://reader036.fdocuments.us/reader036/viewer/2022062323/56815757550346895dc5023a/html5/thumbnails/14.jpg)
IV&V Program
AMF
Future Functionality
• Improve ORBIT integration• Add reporting capabilities• Add Admin UI for project configuration• Improve support of EBA & TR• Integration with COMPASS
14
![Page 15: Supporting Project Management with AMF](https://reader036.fdocuments.us/reader036/viewer/2022062323/56815757550346895dc5023a/html5/thumbnails/15.jpg)
IV&V Program
AMF 15
Thank You
![Page 16: Supporting Project Management with AMF](https://reader036.fdocuments.us/reader036/viewer/2022062323/56815757550346895dc5023a/html5/thumbnails/16.jpg)
IV&V Program
AMF
References
• IVV 09-1 Version O: Independent Verification and Validation Technical Framework, June 06, 2012
• IVV 09-4 Version AF: Project Management, May 2, 2013
• T2103 Version D: Project Execution Plan (IPEP) Template, May 15, 2013
• S3106 Version D: PBRA and RBA Process, October 4, 2012
• AWB User’s Guide• AMF Architecture & Design document
16