SUPPORTING PLANNING 2013/14 FOR CLINICAL COMMISSIONING...

20
SUPPORTING PLANNING 2013/14 FOR CLINICAL COMMISSIONING GROUPs December 2012

Transcript of SUPPORTING PLANNING 2013/14 FOR CLINICAL COMMISSIONING...

Page 1: SUPPORTING PLANNING 2013/14 FOR CLINICAL COMMISSIONING GROUPsjambarinformation.co.uk/1314/everyonecounts/SupportPlanningCCG.… · 2013/14 for clinical commissioning groups (CCGs).

SUPPORTING PLANNING

2013/14 FOR CLINICAL

COMMISSIONING GROUPs

December 2012

Page 2: SUPPORTING PLANNING 2013/14 FOR CLINICAL COMMISSIONING GROUPsjambarinformation.co.uk/1314/everyonecounts/SupportPlanningCCG.… · 2013/14 for clinical commissioning groups (CCGs).

2

SUPPORTING PLANNING 2013/14 FOR CLINICAL COMMISSIONING GROUPS

First published: 21 December 2012

Page 3: SUPPORTING PLANNING 2013/14 FOR CLINICAL COMMISSIONING GROUPsjambarinformation.co.uk/1314/everyonecounts/SupportPlanningCCG.… · 2013/14 for clinical commissioning groups (CCGs).

3

Contents

1. INTRODUCTION ....................................................................................................... 4

PART A – THE FORMAL REQUIREMENT OF ALL CCGS ............................................ 5

2. CONTEXT ................................................................................................................. 5

3. OPERATIONAL ARRANGEMENTS – THE 18-MONTH CYCLE ............................. 5

4. PLANNING TIMETABLE .......................................................................................... 6

5. CONTENT OF THE SUBMISSION ........................................................................... 7

6. ASSURANCE ............................................................................................................ 8

7. CONTRACTING ........................................................................................................ 8

PART B – FOR CCGs WHERE THERE IS A NEED FOR GREATER SCRUTINY ......... 8

8. ADDITIONAL REQUIREMENTS ............................................................................... 8

ANNEX A NHS OUTCOMES FRAMEWORK MEASURES .......................................... 10

ANNEX B Expected rights and pledges from the NHS Constitution 2013/14 ......... 12

ANNEX C Plan on a Page Examples ........................................................................... 14

ANNEX D FULL LIST OF ACTIVITY MEASURES ...................................................... 16

ANNEX E CRITERIA TO SUPPORT ASSURANCE FOR CCGS WHERE MORE DETAILEDASSURANCE IS REQUIRED ...................................................................... 17

The following documents are also part of the Supporting Planning 2013/14 for Clinical commissioning groups suite of documents :

Everyone Counts: Planning for Patients 2013/14 - Technical Definitions

Clinical commissioning groups planning template for 2013/14

Clinical commissioning group and Provider Objectives for Reduction in CDifficile: 2013/14

Page 4: SUPPORTING PLANNING 2013/14 FOR CLINICAL COMMISSIONING GROUPsjambarinformation.co.uk/1314/everyonecounts/SupportPlanningCCG.… · 2013/14 for clinical commissioning groups (CCGs).

4

1. INTRODUCTION This document describes the processes that will be used to support planning for 2013/14 for clinical commissioning groups (CCGs). It provides further information to Everyone Counts Planning for Patients 2013/14, published on 18 December 2012. Supporting Planning 2013/14 for CCGs is the document referred to in Everyone Counts as “supporting information”. A parallel document, focusing on the assurance of direct commissioning plans, is in preparation and will be available early in 2013. The approach for direct commissioning will mirror that for CCGs and will be based on the priorities and single operating model outlined in the publications entitled Securing Excellence :

Primary Care published in July 2012

Specialised Commissioning published with commissioning intentions in November 2012

Military Health and Offender Health issued to area teams in draft in November 2012 due for publication in January 2013

Dental services due for publication in February 2013 This document is set out in two parts and the focus is on the assurance of CCG plans. Part A describes the formal submission that every CCG will make to the NHS Commissioning Board to support this. There are some CCGs where Area Teams (ATs) and regions will need to exercise greater scrutiny, such as where there are conditions of authorisation on planning and/or finances. Part B describes the more detailed submission that CCGs will make where this is the case. The aim is to support CCGs in ensuring that every plan is as strong as it can be by designing an approach that aims to strike a balance between local determination of priorities and the NHS CB responsibility for oversight to ensure that statutory requirements around improving quality and financial duties are being met. Area Teams will work with CCGs to understand the local improvement identified by CCGs against the measures set out in the planning framework so that together, the NHS CB and CCGs, can be jointly satisfied that the statutory duties to deliver the mandate and make sufficient contribution to quality improvement within allocated resources are being delivered. CCGs and ATs will share data and planning assumptions on a transparent basis so that both can be satisfied that their plans secure the best possible outcomes for patients within available resources. The assurance process for local plans, CCG plans, AT plans for direct commissioning and system-wide plans, will build on the authorisation process, which requires CCG to develop clear and credible plans. This will provide a strong base from which to develop 2013/14 plans. In the spirit of assumed liberty, the assurance of plans will be mainly intelligence and discussion based, with a minimal requirement for formal submission to the NHS CB.

Page 5: SUPPORTING PLANNING 2013/14 FOR CLINICAL COMMISSIONING GROUPsjambarinformation.co.uk/1314/everyonecounts/SupportPlanningCCG.… · 2013/14 for clinical commissioning groups (CCGs).

5

PART A – THE FORMAL REQUIREMENT OF ALL CCGS

2. CONTEXT Rather than imposing targets, the NHS CB expects CCGs to develop their own local priorities through their input into the Joint Health and Wellbeing Strategy. However, with assumed liberty comes public responsibility and CCGs are expected to set out real ambition in their plans. Everyone Counts Planning for Patients 2013/14 asks each CCG to identify three local priorities against which it will make progress during the year. These priorities will be taken into account when determining if the CCG should be rewarded through the Quality Premium. Plans should be built on the assumption that no indicator contained within the national NHS Outcomes Framework or the CCG Outcome Indicator Set deteriorates. The focus of planning should lie on maximising health gain for the population. For each of the five domains, we have identified the measures from the NHS Outcomes Framework best placed to provide assurance in planning and delivery, where CCG data exists and a baseline can be determined for 2013/14. These are set out in Annex A and will be used to inform CCGs and the NHS CB on whether progress is being made through the CCG assurance framework. Annex A also shows which measures will be used in-year as well as annually and which measures will be used in the Quality Premium. The national requirements, in terms of operational standards expected from the NHS Constitution, are shown in Annex B, including the additional measures as specified by the NHS CB for 2013/14 in Everyone Counts Planning for Patients 2013/14. The technical definitions for each of the measures are described in Everyone Counts: Planning for Patients 2013/14 - Technical Definitions.

3. OPERATIONAL ARRANGEMENTS – THE 18-MONTH CYCLE

Preparing plans for the year ahead is the first phase of an 18-month cycle. CCG assurance will match this 18-month cycle. The cycle starts with planning for the year ahead, and assurance of those plans. Alongside this runs the second phase on contracting. The third phase is in-year delivery and the final phase is year-end assurance and accountability. This takes place after the end of the year, once performance and delivery for the relevant year is known. This document relates to the first and second phases – planning and contracting. There will be further guidance, to be agreed before the start of 2013/14, which is currently work in progress, involving Area Directors and CCGs, to describe CCG assurance and covering in-year monitoring and assurance, recovery and support and intervention and escalation.

Page 6: SUPPORTING PLANNING 2013/14 FOR CLINICAL COMMISSIONING GROUPsjambarinformation.co.uk/1314/everyonecounts/SupportPlanningCCG.… · 2013/14 for clinical commissioning groups (CCGs).

6

4. PLANNING TIMETABLE

Date Activity

CCG Plans

18 Dec 12 Allocations published Planning guidance published

21 Dec 12 Supporting information published Draft NHS Standard Contract published

w/c 7 January 2013

UNIFY21 Data collection available

25 Jan 13 CCGs to share first draft of plans with Area Team Directors to include: “Plan on a Page” including key elements of transformational change; Template covering o Self certification of delivery of the NHS Constitution, Mandate and

Clostridium difficile objective; o Self certification of assurance of provider CIPs; o Trajectory for Dementia and IAPT; o Trajectories for locally selected priorities; o Activity trajectories for 4 key measures – elective FFCEs, non-elective

FFCEs, first outpatient attendances, A&E attendances; Financial information

By 8 Feb 13 Area Directors to provide feedback to CCGs

End Feb Re-submission of Finance Templates and update on contractual negotiations

11 Feb to 29 Mar 13

Discussions to support Area Team Director assurance of plans

31 Mar 13 CCG and NHS Commissioning Board contracts signed off

5 Apr 13 Final CCG plans shared with Area Team Director

8 Apr to 19 Apr 13

Board analyses CCG plans and plans for direct commissioning with a view to identifying risks to delivery

22 Apr to 10 May 13

Board confirms that plans add up to a position that delivers the mandate and improves patient outcomes within allocated resources

By 31 May 2013

Each CCG publishes its prospectus for its local population

1 Unify2 is an online data collection portal used by the NHS to collect and share

performance information, aggregate data and statutory returns.

Page 7: SUPPORTING PLANNING 2013/14 FOR CLINICAL COMMISSIONING GROUPsjambarinformation.co.uk/1314/everyonecounts/SupportPlanningCCG.… · 2013/14 for clinical commissioning groups (CCGs).

7

5. CONTENT OF THE SUBMISSION

To support assurance of CCG plans, every CCG will make a formal submission to the NHS CB, by sharing with their Area Team, covering :

o “Plan on a Page” including key elements of transformational change; o Template covering :

Self certification of commitment to delivery of the rights and pledges of the NHS Constitution, Mandate and Clostridium difficile objective;

Self certification of assurance that provider cost improvement plans are deliverable without impacting on the quality and safety of patient care;

Trajectory for dementia diagnosis rates and Improving Access to Psychological Therapies (IAPT) - proportion of people entering treatment;

Trajectories for locally selected priorities; Activity trajectories for 4 key measures – elective finished first

consultant episodes(FFCEs), non-elective FFCEs, first outpatient attendances, A&E attendances;

o Financial information, including a brief overview of financial position, underlying assumptions and associated risks.

Examples of „Plan on a Page‟ are included at Annex C. The template covering the remaining content (excluding finance) is available in Clinical commissioning groups planning template for 2013/14. This template will be submitted via UNIFY2. CCGs will need a Unify2 account to submit this data and colleagues in regional and area teams will also need accounts to facilitate CCG account creation and view uploaded data. To request an account please go to: http://nww.unify2.dh.nhs.uk/unify/interface/homepage.aspx and click 'Request a Unify account'.

The Clostridium difficile objectives for each organisation in 2013/14 are available in Clinical commissioning group and Provider Objectives for Reduction in CDifficile: 2013/14. The template requires CCGs to self certify that they will continue to reduce the incidence of Clostridium difficile so that the number of infections in 2013/14 will be equal to or less than their objective.

In addition, CCGs are required to populate a financial planning template, including income and expenditure assumptions, QIPP plans and associated risks. These will be consolidated with the NHS CB financial plans to ensure that our combined financial duties are met. The NHS CB will not be collecting QIPP milestones or monitoring milestones centrally. The NHS CB will use a set of system sustainability measures, of which the activity trajectories listed above are a subset, to track progress in-year.

Page 8: SUPPORTING PLANNING 2013/14 FOR CLINICAL COMMISSIONING GROUPsjambarinformation.co.uk/1314/everyonecounts/SupportPlanningCCG.… · 2013/14 for clinical commissioning groups (CCGs).

8

6. ASSURANCE

Based on the assumed liberty principle, assurance for the majority of CCGs should be a minimal process, focused on a face-to-face discussion, supported by intelligence on current delivery and trends, and with additional interactions mainly being in relation to queries of clarification. It is recognised that across the country different approaches are being developed that bring together CCGs and ATs to consider commissioning and it is for local determination about the best way to operate this, however, it is recommended that there is at least one face to face meeting. This meeting would have the objective of sharing plans, how as co-commissioners, ATs and CCGs can work together to deliver integrated care and the health and well-being strategy, and also to discuss system risks and mitigation.

7. CONTRACTING As part of robust business processes it will be essential that plans and assumptions are underpinned by signed contracts for clinical services. The expectation remains that all contracts are signed by 31 March 2013. Area Teams will be responsible for tracking progress on the negotiation of contracts for CCG-commissioned services and regional offices will have oversight of contracts for the NHS CB‟s directly commissioned services. CCGs will be asked to confirm the status of their contract negotiations at the end of February, with area teams providing support where appropriate during the course of March. Parallel processes will apply to contracts held by the NHS CB. It is expected that disputes will be exceptional. Where they do occur the process for resolution is set out clearly in the standard contract. The NHS CB will work closely with Monitor and the NHS Trust Development Authority to ensure that consistent messages on contracting are received by commissioners and providers.

PART B – FOR CCGs WHERE THERE IS A NEED FOR GREATER SCRUTINY

8. ADDITIONAL REQUIREMENTS

There are some CCGs where ATs and regions will need to exercise greater scrutiny : i) where there are conditions of authorisation on planning and or finances ii) there are significant financial or quality problems iii) there is to be a major service reconfiguration that requires multi-commissioner commitment iv) CCGs volunteer - say because they are not confident of producing a plan that resolves all the issues they face. It is recommended that, where this is the case, CCGs and ATs consider whether here are other elements of planning process and documentation that would be helpful to prepare for the 2013/14 planning round:

Page 9: SUPPORTING PLANNING 2013/14 FOR CLINICAL COMMISSIONING GROUPsjambarinformation.co.uk/1314/everyonecounts/SupportPlanningCCG.… · 2013/14 for clinical commissioning groups (CCGs).

9

Narrative based on clear and credible plans Larger suite of activity measures and trajectories (as shown in Annex

D) QIPP transformational milestones Quality indicators based on national dashboard On-going quality assurance of provider CIPs Other indicators including workforce Patient, public insight and experience

9. ADDITIONAL ASSURANCE

For these CCGs there will be a more detailed assurance process. ATs will work with CCGs to assure the CCG plan and assurance will be based on updated criteria from the clear and credible plan domain of the CCG Authorisation framework. These are described in Annex E. Where an Area Team has concerns about a CCG‟s plan the Area Team will initially discuss those concerns with the CCG. A more formal meeting may be convened if the CCG and AT cannot agree next steps to resolve the issue. This may be brokered where appropriate by the relevant regional team. In the majority of cases these discussions will resolve issues and provide assurance that the plans are appropriate or will be revised. If concerns persist to the extent that the NHSCB believes that a CCG in agreeing the plan is at risk of failure to discharge, or discharge appropriately, its statutory functions, the NHS CB may formally request additional information from the CCG under the terms of sections 14Z17 and 14Z18 of the NHS Act 2006 (as amended). This section also allows the NHS CB to request such information from a CCG if it considers that the CCG in discharging its plan would be at risk of failing to deliver in the interests of the health service. At the point this request is made the NHS CB will define what information or documents will be required. The NHS CB may also use section 14Z19 of the same Act to require a written or oral explanation.

Page 10: SUPPORTING PLANNING 2013/14 FOR CLINICAL COMMISSIONING GROUPsjambarinformation.co.uk/1314/everyonecounts/SupportPlanningCCG.… · 2013/14 for clinical commissioning groups (CCGs).

10

ANNEX A

NHS Outcomes Framework measures which the NHS Commissioning Board and Clinical Commissioning Groups will use to track progress (ie data can be generated at clinical commissioning group level and a baseline can be determined against which progress can be considered).

Domain Measures that are suitable for both in year and annual assessment

Measures that are suitable for annual assessment only

In Quality Premium

Preventing people from dying prematurely

None Potential years of life lost (PYLL) from causes considered amenable to healthcare

Under 75 mortality rate from cardiovascular disease

Under 75 mortality rate from respiratory disease

Under 75 mortality rate from liver disease

Under 75 mortality rate from cancer

Potential years of life lost (PYLL) from causes considered amenable to healthcare

Enhancing quality of life for people with long term conditions

Combined measure of

Unplanned hospitalisation for chronic ambulatory care sensitive conditions (adults)

Unplanned hospitalisation for asthma, diabetes and epilepsy in under 19s and 2 measures from domain 3.

Proportion of people feeling supported to manage their condition

Health-related quality of life for people with long-term conditions

Dementia Diagnosis Rates

Combined measure of

Unplanned hospitalisation for chronic ambulatory care sensitive conditions (adults)

Unplanned hospitalisation for asthma, diabetes and epilepsy in under 19s

Emergency admissions for acute conditions that should not Helping people to Combined measure as above Patient Reported Outcomes

Page 11: SUPPORTING PLANNING 2013/14 FOR CLINICAL COMMISSIONING GROUPsjambarinformation.co.uk/1314/everyonecounts/SupportPlanningCCG.… · 2013/14 for clinical commissioning groups (CCGs).

11

Domain Measures that are suitable for both in year and annual assessment

Measures that are suitable for annual assessment only

In Quality Premium

recover from episodes of ill health or following injury

with

Emergency admissions for acute conditions that should not usually require hospital admission

Emergency admissions for children with LRTI

Emergency readmissions within 30 days of discharge from hospital

Measures (PROMs) for elective procedures: i)Hip replacement, ii)Knee replacement, iii)Groin hernia, iv)Varicose Veins

usually require hospital admission

Emergency admissions for children with lower respiratory tract infections (LRTI)

Ensuring that people have a positive experience of care

Patient experience of i GP Services ii GP Out of Hours services

Friends and family test

Patient experience of hospital care (needs attribution to CCG )

Patient experience measure

Treating and caring for people in a safe environment and protecting them from avoidable harm

Incidence of healthcare associated infection: MRSA

Incidence of healthcare associated infection: Clostridium difficile

None Incidence of healthcare associated infection: MRSA and Clostridium difficile

Page 12: SUPPORTING PLANNING 2013/14 FOR CLINICAL COMMISSIONING GROUPsjambarinformation.co.uk/1314/everyonecounts/SupportPlanningCCG.… · 2013/14 for clinical commissioning groups (CCGs).

12

ANNEX B Expected rights and pledges from the NHS Constitution 2013/14 (subject to current consultation) including

the thresholds the NHS Commissioning Board will take when assessing organisational delivery

Referral To Treatment waiting times for non-urgent consultant-led treatment

Admitted patients to start treatment within a maximum of 18 weeks from referral – 90%

Non-admitted patients to start treatment within a maximum of 18 weeks from referral – 95%

Patients on incomplete non-emergency pathways (yet to start treatment) should have been waiting no more than 18 weeks from referral – 92%

Diagnostic test waiting times

Patients waiting for a diagnostic test should have been waiting no more than 6 weeks from referral – 99%

A&E waits

Patients should be admitted, transferred or discharged within 4hours of their arrival at an A&E department – 95%

Cancer waits – 2week wait

Maximum two-week wait for first outpatient appointment for patients referred urgently with suspected cancer by a GP – 93%

Maximum two-week wait for first outpatient appointment for patients referred urgently with breast symptoms (where cancer was not initially suspected) – 93%

Cancer waits – 31 days

Maximum one month (31-day) wait from diagnosis to first definitive treatment for all cancers – 96%

Maximum 31-day wait for subsequent treatment where that treatment is surgery – 94%

Maximum 31-day wait for subsequent treatment where that treatment is an anti-cancer drug regimen – 98%

Maximum 31-day wait for subsequent treatment where the treatment is a course of radiotherapy – 94%

Cancer waits – 62 days

Maximum two month (62-day) wait from urgent GP referral to first definitive treatment for cancer – 85%

Maximum 62-day wait from referral from an NHS screening service to first definitive treatment for all cancers – 90%

Maximum 62-day wait for first definitive treatment following a consultant‟s decision to upgrade the priority of the patient (all cancers) – no operational standard set

Category A ambulance calls

Category A calls resulting in an emergency response arriving within 8minutes – 75% (standard to be met for both Red 1 and Red 2 calls separately)

Category A calls resulting in an ambulance arriving at the scene within 19 minutes – 95%

Mixed Sex Accommodation Breaches

Minimise breaches

Page 13: SUPPORTING PLANNING 2013/14 FOR CLINICAL COMMISSIONING GROUPsjambarinformation.co.uk/1314/everyonecounts/SupportPlanningCCG.… · 2013/14 for clinical commissioning groups (CCGs).

13

Cancelled Operations

All patients who have operations cancelled, on or after the day of admission (including the day of surgery), for non-clinical reasons to be offered another binding date within 28 days, or the patient‟s treatment to be funded at the time and hospital of the patient‟s choice.

Mental health

Care Programme Approach (CPA): The proportion of people under adult mental illness specialties on CPA who were followed up within 7 days of discharge from psychiatric in-patient care during the period – 95%.

Additional measures NHS Commissioning Board has specified for 2013/14.

Referral To Treatment waiting times for non-urgent consultant-led treatment

Zero tolerance of over 52 week waiters

A&E waits

No waits from decision to admit to admission (trolley waits) over 12 hours

Cancelled Operations

No urgent operation to be cancelled for a 2nd time

Ambulance Handovers

All handovers between ambulance and A & E must take place within 15 minutes and crews should be ready to accept new calls within a further 15 minutes. Financial penalties, in both cases, for delays over 30 minutes and over an hour.

Page 14: SUPPORTING PLANNING 2013/14 FOR CLINICAL COMMISSIONING GROUPsjambarinformation.co.uk/1314/everyonecounts/SupportPlanningCCG.… · 2013/14 for clinical commissioning groups (CCGs).

14

ANNEX C Plan on a Page Examples

Page 15: SUPPORTING PLANNING 2013/14 FOR CLINICAL COMMISSIONING GROUPsjambarinformation.co.uk/1314/everyonecounts/SupportPlanningCCG.… · 2013/14 for clinical commissioning groups (CCGs).

15

Page 16: SUPPORTING PLANNING 2013/14 FOR CLINICAL COMMISSIONING GROUPsjambarinformation.co.uk/1314/everyonecounts/SupportPlanningCCG.… · 2013/14 for clinical commissioning groups (CCGs).

16

ANNEX D FULL LIST OF ACTIVITY MEASURES

Measure Definition Frequency of Plan/Forecast

Non elective FFCEs Non-elective FFCEs Monthly

GP written referrals to hospital No of GP written referrals Monthly

Other referrals for a first outpatient appointment

No of other referrals Monthly

First outpatient attendances following GP referral

No 1st outpatient attendances after GP referral Monthly

All first outpatient attendances No of first outpatient attendances Monthly

Elective FFCEs No of elective FFCEs (ordinary adms & separately daycases) Monthly

A&E attendances Number of attendances at A&E departments in a month (total and type 1) Monthly

Ambulance Urgent & Emergency Journeys

Number of urgent and emergency journeys via ambulance, monthly Monthly

Diagnostic Activity 4 x Endoscopy-based tests Monthly

Diagnostic Activity 11 x Non-endoscopy based tests Monthly

Numbers waiting on an incomplete Referral to Treatment pathway

Total numbers waiting at the end of the month on an incomplete RTT pathway

Monthly

Page 17: SUPPORTING PLANNING 2013/14 FOR CLINICAL COMMISSIONING GROUPsjambarinformation.co.uk/1314/everyonecounts/SupportPlanningCCG.… · 2013/14 for clinical commissioning groups (CCGs).

17

ANNEX E CRITERIA TO SUPPORT ASSURANCE FOR CCGS WHERE MORE DETAILEDASSURANCE IS REQUIRED

Overarching

1. Is the plan clear on how the system will achieve sustainable service and financial performance alongside quality and productivity improvements ?

2. Does the plan provide sufficient linkages between finance and activity, is there a clear link between commissioner and provider activity changes and financial planning and do these align with the planned transformational changes in 2013/14 and 2014/15?

3. Does the plan provide sufficient linkages between organisations within the health economy, e.g. TFA actions are consistent with other areas of the plan?

4. Are high level risks identified that represent the most significant threats to the system that would prevent successful delivery of the plan?

5. Does the plan give due regard to the public sector Equality Duty (PSED), and are equality objectives integrated into the plan?

Clear and credible plans1 that set out how CCCGs will take responsibility for service transformation

6. The plan includes a detailed financial plan that delivers financial balance, sets out how it will manage within its management allowance, and any other requirements set by the NHSCB and is integrated with the commissioning plan.

7. The plan sets out how savings and efficiencies will be delivered whilst improving quality and this is integral to the plan. There is a clear explanation of any changes to existing QIPP plans.

8. The plan supports delivery of JHWS and integrated commissioning, depending on local timeframe.

9. The plan sets out how it aligns with national frameworks and strategies, including the NHS Outcomes Framework. 1.

Clear & credible plans :1. Does the plan clearly identify how the health system will be transformed and improved in 2014-15 from that in 2012-13? And is the plan clear on how the system will achieve this? 2. Does the plan articulate how the CCG will quantify, measure and monitor delivery of their share of the national savings challenge? 3. Are plans for savings appropriately phased and articulated for each year until 2014-15 (i.e. not too heavily front- or back- loaded) and do plans provide headroom (e.g. the savings for reinvestment are greater than the investment and challenge identified)?

Page 18: SUPPORTING PLANNING 2013/14 FOR CLINICAL COMMISSIONING GROUPsjambarinformation.co.uk/1314/everyonecounts/SupportPlanningCCG.… · 2013/14 for clinical commissioning groups (CCGs).

18

Plan is understood by CCGs, members etc

10. The CCG can demonstrate that the process for developing its plans and priorities was inclusive and transparent.

11. The plan clearly demonstrates where and how the CCG is working with other CCGs to meet QIPP and other challenges.

12. The CCG can demonstrate that stakeholders are aware of and understand CCG priorities.

13. The CCG can demonstrate that member practices understand at least at a high level their local plan and priorities.

14. Member practices receive timely information to inform their involvement in CCG planning and monitoring delivery of those plans.

Plan is evidence based and rooted in needs of population

15. The plan reflects JSNA and stakeholder engagement. 16. The plan makes good use of evidence and analysis to determine needs and priorities.

The CCG can articulate the likely inherited issues and operating environment and set out a plan for resolution

17. Declaration that the inheritance from PCT is quantified, identified, understood and robust transition arrangements in place. 18. Where the area covered by the CCG is not on track to meet the plan for 2013-14, there is a clear and time-limited resolution path to recover.

Contracts in place to secure future delivery

19. 2013-14 contracts with main providers agreed and signed off. 20. CCG has arrangements in place to manage all contracts. 21. CCG has systems in place to track performance of main providers. 22. CCG has arrangements in place to collaborate with neighbouring CCGs in areas such as lead commissioning where there is more than one CCG

contracting with a provider.

Page 19: SUPPORTING PLANNING 2013/14 FOR CLINICAL COMMISSIONING GROUPsjambarinformation.co.uk/1314/everyonecounts/SupportPlanningCCG.… · 2013/14 for clinical commissioning groups (CCGs).

19

Page 20: SUPPORTING PLANNING 2013/14 FOR CLINICAL COMMISSIONING GROUPsjambarinformation.co.uk/1314/everyonecounts/SupportPlanningCCG.… · 2013/14 for clinical commissioning groups (CCGs).

20

© Crown copyright Year 2012

First published 21 December 2012

Published to Name, in electronic format only.