TECHNICAL DOCUMENTATIONTechnical, Vol II of II, Rev. 0

S.No. Document / Drawing No. Rev. No. Pages Page No.

I VOLUME I OF II 0 138 1

II VOLUME II OF II

1 P.013702 D 11031 058 0 3 1

2 MR P.013702 D11071 008 0 8 4

3

3.1 PTS P.013702 D11077 030 0 21 12

4

4.1 QCT P.013702 D 11013 008 0 2 33

5

5.1 P.013702 D 11040 003 0 6 35

ODORISING UNIT

TABLE OF CONTENTS FOR

ODORISING UNIT

COMMERCIAL

RECOMMENDED VENDOR LIST

Odorisation Unit

P.013702D 11031

058

Description

QUALITY CONTROL TABLES

PARTICULAR TECHNICAL SPECIFICATION

TECHNICAL

Material Requisition

Introduction

ODORISING UNIT

Odorisation Unit for City Gas Distribution Project Page 1 of 1

INTRODUCTION

P.013702 D 11031

058

HINDUSTAN PETROLEUM CORPORATION LIMITED (HPCL)

CITY GAS DISTRIBUTION PROJECT

INTRODUCTION

0 14.08.2019 Issued for Procurement Mukesh Agrawal Debasis Samantray Amitabh Ranjan

Rev. Date Description Prepared By Checked By Approved By

Page 1 of 40

INTRODUCTION

P.013702 D 11031

058

Rev. 0 Odorisation Unit for City Gas Distribution Project

TABLE OF CONTENTS

1. INTRODUCTION ...................................................................................................................... 1

2. TECHNICAL SPECIFICATIONS ................................................................................................ 1

Page 2 of 40

INTRODUCTION P.013702 D 11031

058

Rev. 0 Odorisation Unit for City Gas Distribution Project

1. INTRODUCTION

Hindustan Petroleum Corporation Limited (HPCL), (hereinafter referred as Owner), has been authorised by PNGRB for setting up infrastructure and operation of City Gas Distribution Network for the GA of Sonipat (except areas already authorized) & Jind), districts of Haryana. Natural gas will be transported to residential, commercial, industrial (PNG) and automobile consumers (CNG) in the city.

Tractebel Engineering pvt. ltd. (TE), a subsidiary of Tractebel Engineering S.A. has been appointed as Project Management Consultant (hereinafter referred as PMC), by HPCL for providing Design, Engineering & PMC services for a mentioned project

Odorant mixed in natural gas is important for identifying leakages in the associated equipment during transportation of piped gas in the operational CGD area.

Tractebel Engineering pvt. ltd. is now inviting tenders for procurement of “ODORISATION UNIT”, Supply, installation, commissioning and 5 (five) years CMC (Comprehensive Maintenance Contract) for this project.

The present document covers the technical specifications for the enquiry.

2. TECHNICAL SPECIFICATIONS

The technical specifications for this present enquiry are as listed in Material Requisition (Ref. No. P.013702 D11071 008).

Page 3 of 40

MATERIAL REQUISITION FOR ODORISING UNIT

P.013702 D 11071

008

HINDUSTAN PETROLEUM CORPERATION LIMITED (HPCL)

CITY GAS DISTRIBUTION PROJECT

MR FOR ODORISATION UNIT

0 14.08.2019 Issue for Procurement Mukesh Agrawal Debasis Samantray Amitabh Ranjan

Rev. Date Subject of revision Author Checked Approved

Page 4 of 40

MATERIAL REQUISITION FOR ODORISING UNIT

P.013702 D 11071

008

Rev. 0 Odorisation Unit for City Gas Distribution Project

TABLE OF CONTENTS

A. DESCRIPTION OF GOODS AND/OR SERVICES .......................................................................... 2

B. REMARKS / COMMENTS ............................................................................................................. 4

1. GENERAL NOTES ...................................................................................................................... 4

2. COMPLIANCE WITH SPECIFICATION .......................................................................................... 4

3. VENDOR'S SCOPE ..................................................................................................................... 4

4. INSPECTION ............................................................................................................................ 4

5. APPLICABLE DOCUMENTS ......................................................................................................... 4

6. VENDOR'S DOCUMENTS ............................................................................................................ 4

C. LIST OF ATTACHMENTS ............................................................................................................. 5

D. DOCUMENTS & DATA REQUIREMENTS ...................................................................................... 6

Page 5 of 40

MATERIAL REQUISITION FOR ODORISING UNIT

P.013702 D 11071

008

Rev. 0 Odorisation Unit for City Gas Distribution Project

A. DESCRIPTION OF GOODS AND/OR SERVICES

Item Quantity Description

Identification Number

1 System Design, Detail Engineering, Manufacturing, Procurement, factory testing, TPI inspection, supply of Natural Gas odorising system including First fill, packaging, insurance, transportation, handling and loading / unloading at HPCL sites/ designated store,calibration, testing, erection, commissioning and installation of odorizing Unit providing suitable shed for complete odorising unit (fabricated as per ASME – section – VIII, Latest) & field panel (if any), hook-up with tap-off point of main pipeline including fittings & valves, site acceptance testing (SAT), integration, field unit interface with main control unit (located in control room), supply of signal & power cables, trial run, commissioning and assistance & documentation required for necessary PESO approval, First filling Odorant in storage container, and all work for Odorising System including performance test at site, as per scope of work defined in the MR and Technical Specification Documents each locations for flow capacity 500-13500 SCMH

Comprehensive maintenance of Odorising system including any electrical work, Training, Erection & commissioning spares of Odorising system for Natural Gas Complete in all respect for Client CGD project on Comprehensive Maintenance Charges (CMC) basis and as per this Material Requisition.

Rate of CMC (Comprehensive maintenance charges) per visit basis during period of 4 years, after completion of warrantee period i.e min one year from the date of installation of odorisation skid.

A Supply as per above scope of work:

1 01 No. Supply of Odorising system with Steel storage containers of capacity 500 water litres with all instrumentation required for safe operations, including controller, odorant tank with all instruments (PT, LT, TT, LSH (High &Low), Level gauge etc.) for safe operation, Automatic Dosing System with pump (1Working +1Standby) and Injection probe assembly(1W+1SB) with all accessories including Erection Hardware, impulse piping, tubes, piping, Cabling, fittings, root valves, isolation valves, injection point with all required valve/equipment assembly, junction boxes, cables from field Instruments to Field JB, Field JB to controller, Controller to client system for Flow signal, power cable, Cable lugs, cable trays, cable glands, Steel for foundation / supports of equipment, suitable shade, Quick coupling arrangement for tank filling, Protective & safety equipment such as Face shield mask, Rubber hand Gloves (2 set), O-sent (2 litre) with dispenser, Earthing etc.

Erection & commissioning spares (list to be furnished with the Bid)

2 10 Kg Suitable Odorant absorber (ABSORBENT 10 or equivalent) with necessary handling accessories in suitable storing unit (10 kg in a suitable storage for each Set of Odorising Unit

3 500 Kg Refilling of odorant in Main tank all inclusive rate including connector / Hose & other equipment for safe refilling, necessary nitrogen Blanketing system or Pumping to avoid leakage of odorant to atmospheres, for five years period, except first fill.

Odorant for Natural Gas (75-80 % TBM (Tert-Butyl Mercaptan) +

Page 6 of 40

MATERIAL REQUISITION FOR ODORISING UNIT

P.013702 D 11071

008

Rev. 0 Odorisation Unit for City Gas Distribution Project

Item Quantity Description

Identification Number

20-25 % MES (Methyl Ethyl Sulphide)) to be first filled in Main Storage Tank (as per requirement). (All the necessary arrangement & statutory requirements for the supply & filling is bidder’s responsibility.

4 01 No. A suitable portable odorant concentration-measuring device with necessary attachment for measuring concentration of odorant in Natural gas at various pipeline locations. The hand-held instrument shall be equipped with electro chemical sensor suitable for measuring TBM in Natural gas in mg/m3, with range of 0 – 50 mg/m3 and resolution of digital display of 0.1 mg/m3 along with Calibration gas, ATEX approval, and internal storage of minimum 5000 measurement data (One for each location).

5 As Per SOR

CMC (Comprehensive Maintenance Charges) as per Particular Technical Specification for Complete Supplied and installation, maintenance of system & service based on periodic & on demand visit for four years, after completion of warrantee period i.e minimum one year from the date of installation of odorisation skid.

Page 7 of 40

MATERIAL REQUISITION FOR ODORISING UNIT

P.013702 D 11071

008

Rev. 0 Odorisation Unit for City Gas Distribution Project

B. REMARKS / COMMENTS

1. GENERAL NOTES

VENDOR's compliance

Vendor shall submit his bid in full compliance with the requirements of this MR and attachments.

Vendor must include the following statement in his bid:

We certify that our bid is fully complying with your enquiry dated……………,and referenced…………………..

Compliance with this material requisition in any instance shall not relieve the Vendor of his responsibility to meet the specified performance.

2. COMPLIANCE WITH SPECIFICATION

The VENDOR shall be completely responsible for the design, fabrication, testing, inspection, preparation for shipment and transport of the item strictly in accordance with the Material Requisition and all attachments thereto.

3. VENDOR'S SCOPE

Vendor's scope of work includes all the items with its internals and accessories as shown on the data sheets,

specifications and all unmentioned parts necessary for a satisfactory operation.

4. INSPECTION

The Owner shall appoint Third Party Inspection Agency for carrying out the inspection at bidder’s works as

per approved ITP/QAP/QCT and TPIA charges shall be borne by the Owner.

5. APPLICABLE DOCUMENTS

General prescriptions, requirements and information are listed in annex C of this Material Requisition.

6. VENDOR'S DOCUMENTS

Vendor shall supply the documentation as listed under point D of this Material Requisition.

All documents shall be supplied in English language.

Page 8 of 40

MATERIAL REQUISITION FOR ODORISING UNIT

P.013702 D 11071

008

Rev. 0 Odorisation Unit for City Gas Distribution Project

C. LIST OF ATTACHMENTS

The table here below lists the documents which are integral part of this Material Requisition. The applicable revision index of each document is mentioned in the column below the current Material Requisition revision index.

Material Requisition revision

When the Material Requisition revision index is "A" or "1", all listed documents are attached. For other Material Requisition revision index, only modified or new documents are attached.

A B C 0 1 2 3

Documents Revision of documents

Technical Specification – Odorisation unit A 0

QAP- Odorization System A 0

Page 9 of 40

MATERIAL REQUISITION FOR ODORISING UNIT

P.013702 D 11071

008

Rev. 0 Odorisation Unit for City Gas Distribution Project

D. DOCUMENTS & DATA REQUIREMENTS

The table hereunder specifies the quantities and the nature of the documents to be submitted by the CONTRACTOR to the ENGINEER. The documents required at the inquiry stage and to be included in the bid are listed under column A. The documents required after award of the AGREEMENT and subject to the written approval of the ENGINEER are listed under column B. The final and certified documents are listed under column C. Any document, even when preliminary, shall be binding and therefore duly identified and signed by the CONTRACTOR. It shall bear the ENGINEER's Project reference, the Material Requisition number and the identification number. THE DOCUMENTS ARE FULLY PART OF THE SUPPLY WHICH SHALL BE COMPLETE ONLY IF AND WHEN THE DOCUMENTS COMPLYING FULLY WITH THE MATERIAL REQUISITION REQUIREMENTS ARE RECEIVED BY THE ENGINEER.

Documents and Data

A B C

Number of

copies

Number of

copies

Required date

Number of

copies

Required date

Field instruments documentation : Field Instruments Specifications, controller specification, cable schedule, JB wiring, loop drawings, Instrument index, Hook up drawings, Sizing Calculation etc

- 3 2 weeks 4 2 Weeks

Power Consumption Requirement of all electronic instruments, etc.

3 3 2 weeks 4 2 Weeks

Bill of Material/list of all the equipment with make and model number.

3 3 2 weeks 4 2 Weeks

Overall data sheet which include storage tank, pump, Valves, NRVs, PSVs etc. material & design parameters etc.

3 3 2 weeks 4 2 weeks

Minimum documentation such as Instrument index, Input output list, panel wiring & GAD, P&ID, skid GAD, power consumption details, cable schedule, termination details, control philosophy.

- 3 2 weeks 4 2 Weeks

Control and operational Philosophy - 3 2 weeks 4 2 Weeks

Mandatory Spare List - 3 2 weeks 4 2weeks

Installation manuals, catalogues, statutory approvals / certificates etc. as applicable

- 3 2 weeks 4 2 weeks

Operation & Maintenance manuals - 3 2 weeks + monthly

4 2 weeks

Quality Assurance Plan 3 3 2 weeks + monthly

- -

List of all Bought out Items with supplier’s Name, Model No etc.

3 - - With final tech. file

Page 10 of 40

MATERIAL REQUISITION FOR ODORISING UNIT

P.013702 D 11071

008

Rev. 0 Odorisation Unit for City Gas Distribution Project

NOTES

1) FAT procedure document must include clause wise reference of tender specification for its compliance. This document shall be prepared in consultation with owner/ owner’s representative.

2) Durations in column B (Required date) are weeks after Purchase Order date. Durations in column C (Required date) are weeks before final despatch.

3) Final technical document file shall be supplied in hard copy as indicated, and in electronic format (.pdf Acrobat files) on two (2 Nos.) CD-ROMs.

4) Categories marked with * will be approved for fabrication by owner/owners representative.

Page 11 of 40

             

TECHNICAL SPECIFICATION – ODORISING UNIT

P.013702 D 11077

030

 

 

 

HINDUSTAN PETROLEUM CORPERATION LIMITED (HPCL)

CITY GAS DISTRIBUTION PROJECT

TECHNICAL SPECIFICATION – ODORISATION UNIT

0 14.08.2019 Issued for Procurement Mukesh Agrawal Debasis Samantray Amitabh Ranjan

Rev. Date Description Prepared By Checked By Approved By

Page 12 of 40

             

TECHNICAL SPECIFICATION – ODORISING UNIT

P.013702 D 11077

030

Rev.0 Odorisation Unit for City Gas Distribution Project

TABLE OF CONTENTS

1. GENERAL ................................................................................................................................. 2 2. STANDARDS AND CODES ........................................................................................................ 2 3. SCOPE ..................................................................................................................................... 3 4. CLIENT/OWNER SCOPE OF SUPPLY ....................................................................................... 7 5. OPERATING AND DESIGN DATA ............................................................................................. 7 6. OPERATIONS & CONTROL PHILOSOPHY ................................................................................ 8 7. DESIGN PHILOSOPHY ............................................................................................................ 8 8. ODORIZING SYSTEM .............................................................................................................. 8 9. PAINTING, MARKING AND SHIPMENT ................................................................................. 16 10. DRAWING & DOCUMENTATION ........................................................................................... 16 11. HEALTH, SAFETY & ENVIRONMENT ...................................................................................... 18 ANNEXURE-1 ................................................................................................................................. 19 ANNEXURE-2 ................................................................................................................................. 20

                

Page 13 of 40

             

TECHNICAL SPECIFICATION – ODORISING UNIT

P.013702 D 11077

030

Rev.0 Odorisation Unit for City Gas Distribution Project

1. GENERAL

Odorant mixed in natural gas is important for identifying leakages in the associated equipment during transportation of piped gas in the operational CGD area.

Owner is now inviting tender for procurement & installation of “ODORISATION UNIT” of odorization system.

The present document covers the technical specifications for this tender.

2. STANDARDS AND CODES

The design, construction, manufacture, supply, testing and other general requirements of the odorizing system should be strictly in accordance with the data sheets, applicable codes, and should comply fully with relevant national / International standards, Indian Electricity Act, Indian Electricity Act, Indian Electricity Rules, regulations of Insurance Association of India and factories Act while carrying out work as per this specification.

Mechanical

Equipment shall generally be designed in accordance with the relevant Institute of Gas Engineers (IGE) codes and the following principal codes of practice.

2.1 ASME Boiler and Pressure Vessel Code

Section-V : Non-destructive examination

Section-VIII : Pressure Vessel Division-1

Section-IX : Welding and brazing qualifications

2.2 American National Standard Code

ANSI/ ASME B16.5 : Flanges and Flange Fittings

ANSI/ ASME B31.8 : Gas Transmission and Distribution Systems

2.3 American Petroleum Institute

API RP 520 : Parts 1 & 2, Design and installation of pressure relieving systems in refineries

API RP 521 : Guide for Pressure Relief and Depressing Systems

API RP 550 : Manual on installation of refinery instrument and control systems

API 6D : Specifications for pipeline valves, and closures and swivels

API 5L : Specification for line pipe

2.4 Instrumentation

Instrumentation shall generally be in accordance with the applicable sections of the following principles codes of practice:

BS 1041 : Code for Temperature Measurement

BS 1042 : Code for Flow Measurement

ISO/TR 15377 : Measurement of fluid flow by means of pressure-differential devices

BS 5501 : Part-1, Electrical apparatus for potentially explosive atmospheres

ISA A5.1 : Instrument Symbols & Identification

BS 2765 : Specifications for dimensions of temperature detecting elements and corresponding pockets

BS 1259 : Intrinsically safe electrical apparatus and circuits for use in explosive atmospheres

Page 14 of 40

             

TECHNICAL SPECIFICATION – ODORISING UNIT

P.013702 D 11077

030

Rev.0 Odorisation Unit for City Gas Distribution Project

BS 5345 : Part 1- Code of practice for selection, installation and maintenance of electrical apparatus for use in potentially explosive atmospheres (other than mining applications or explosive atmospheres (other than mining applications or explosive processing and manufacture). General recommendations

BS EN 60529 : Degrees of protection provided by enclosure (IP code)

IS 5572 : Classification of hazardous areas (other than mines0 for electrical installations.

IS 5571 : Guide for selection of electrical equipment for hazardous area

OISD 113 : Classification of areas for electrical installations at hydrocarbon processing and handling facilities.

OISD-STD-220(DRAFT III) : For restricted circulation

ANSI, ASTM, NEC, NEMA Indian Electricity Rules, Indian Explosives Act.

If there is any conflict in respect of specification, process data sheets, related standards, code etc. Package Supplier shall refer the matter to Owner for clarification and only after obtaining the same he should proceed further.

2.5 National code

PNGRB : PNGRB notified on 9th March, 2016 (with Principal regulation notification no. G.S.R 612(E), dated 27th August, 2008, amended vide G.S.R 750 (E) dated 14.10.2009, F. No. M(I)/T4S/CGD/1/2010 dated 16.12.2014

3. SCOPE

This particular technical specifications covers the minimum requirements for the design, engineering with dosing calculation, fabrication and assembly with suitable shade for complete field mounted skid, inspection, testing, supply of odorization system which operate in auto mode, transport and unloading at respective site, interconnection with other system, erection, installation, testing and commissioning at site of odorisation unit, including first fill of odorant tank, any minor civil & electrical works.

CMC shall be paid on per visit basis during period of 4 years, after completion of warrantee period i.e min one year from the date of installation of odorisation skid.

3.1 Odorizing system consisting of regulators with SSV(Slam Shut Valve), storage container (stainless steel-304) with filled odorant, electronic control unit, dosing system with stand by injection unit (1Working+1Standby) having 1W+1SB pumps, flow meter & flow transmitter, necessary tubing, pipe valves, safety relief valves, venting system, serial communication port splitter complete with all auxiliaries for efficient and safe controller serial communication and requirement mentioned here with in documents.

3.2 Complete instrumentation works including design, procurement, supply, installation and inspection at manufacture / suppliers premises, hook-up, support for testing and calibration of all instruments. The scope includes installation, testing and commissioning at site and also includes supply of spares, accessories, installation material etc. arranging all types of equipment for testing and calibration purposes as required at site.

3.3 The Odorizing System should be capable of injecting a pre-determined quantity of odorant “proportional to gas flow rate” in to the natural gas pipeline network and should be capable of Measuring and Sensing the odorant level on Real-Time basis, send & store the data to the owner’s server. It is required that system should generate the alarm for any abnormalities & send it to Owner on real time basis for corrective action.

3.4 The Odorizing System should be designed with a view to minimize operator intervention. The maintenance frequency of the system shall be as per OEM recommendations converted into Annual Operation Maintenance Plan (AOMP). Bidder has to submit the operation and maintenance plan at the time of submission of technical bid.

Page 15 of 40

             

TECHNICAL SPECIFICATION – ODORISING UNIT

P.013702 D 11077

030

Rev.0 Odorisation Unit for City Gas Distribution Project

3.5 A suitable portable odorant concentration-measuring device shall be quoted separately for measuring the PPM of odorant (as define) in Natural gas to check the concentration at various pipeline locations. The hand held instrument shall be equipped with electro chemical sensor suitable for measuring TBM in Natural gas in mg/m3, with range of 0 – 50 mg/m3 and resolution of digital display of 0.1 mg/m3 along with Calibration gas, ATEX approval, and internal storage of minimum 5000 measurement data.

3.6 Automatic Dosing System with stand by pump (1W+1SB) and Injection probe assembly (One working and one stand by). For any emergency situation such as main odorising system stops due to power failure/ECU failure, vendor has to provide Emergency dosing pump / arrangement for automatic continuous odorisation. Emergency dosing pump must register the amount of odorant dosed into the pipeline during failure of the main system. A suitable metering arrangement shall be made.

3.7 It is anticipated that the flow rate and pressure of natural gas will be fluctuating. Hence, Bidder should design the Odorizing System with optimum degree of flexibility, reliability, and operability to accommodate the varying composition of feed, other unexpected contaminants, flow rate and pressure.

3.8 The Odorizing system facilities should consist of standardized modules, which are assembled into a complete system. Each system should be designed in packaged frame, housing etc. The design life of the odorizing system shall be 40 Years (Minimum).

3.9 The installation shall be designed considering the maximum flow rate at design pressure. The system shall be capable of carrying out dosing even with a filled level of 10% in odorant tank.

3.10 The odorising system control unit should be able to sense the flow signal in the form of 4-20 mA or in the serial (RS232/422/485)/Ethernet/TCP/IP communication protocol to inject the odorant in the proportional to flow mode.

3.11 Explosion proof 24 V DC supplied intrinsically safe certified SOV shall be used as an actuating device for pneumatic operation.

3.12 The odorising system unit should be able to communicate with owner third party devices such as flow computer /PLC/ RTU/ SCADA/ DCS with Modbus protocol (RS232/RS485 & Ethernet, TCP/IP) for monitoring of odorization parameters such as level, tank pressure, expansion tank pressure, pump stroke /displacement etc. It is required that the system should be able to store log/event of the system & generate alarm for any abnormality & send to owner on real time basis for corrective action.

3.13 Odorant Storage Container with Odorant and should have positive pressure (max. 2.0 kg/cm2) before first fill of odorant. The odorant tank shall be constructed to ASME specifications. The tank shall have fitting, hoses, NRV and other necessary valves, etc for safe filling, as well as volume indication, pressure relief, and pressure gauges. Manual pumping or any other method or N2 cylinder (if milkman concept) can be used for refilling the odorant and it is scope of Bidder.

3.14 Supply of suitable Odorant absorber (ABSORBENT 10 or equivalent) as a neutraliser for spillage handling of Odorant. Each will be in 10 Kg containers.

3.15 The supply, laying, termination of signal cables, control cable from flow computer panel / Data concentrator / Electronic control unit of each metering stream to odorizing electronic control unit, field unit including cable tray (whenever required) & cable laying in trench shall be in Bidder’s scope.

3.16 Bidder shall maintain uniformity in selection for makes of similar instruments and their accessories for operational convenience ease of maintenance and spare parts inventory point of view.

3.17 Bidder to supply all field instruments required to make the odorising unit functional and also a wall mounted control panel. Bidder shall be responsible for proper interfacing between field instruments and control panel. Bidder to also note that gas flow rate signal shall be available at the flow computer of the metering system in the same control room and bidder to take that signal into the controller of odorization panel.

3.18 Transporting & unloading to CLIENT/OWNER designed stores/locations including unloading of odorisation system on foundation at site.

Page 16 of 40

             

TECHNICAL SPECIFICATION – ODORISING UNIT

P.013702 D 11077

030

Rev.0 Odorisation Unit for City Gas Distribution Project

3.19 Supply of all the cables (instrument & power), CONTROLLER, Serial Communication port, tubing, Cable trays, drawings, documents, P & ID, BOM required, accessories, with all the related connectivity to existing network (tubing etc.)

3.20 Odorising system should have the provision of automatic washing in order to prevent smell during dismantling of equipment for maintenance i.e. sending odorant from the system equipment, Tubing etc back to odorant tank.

3.21 All instrumentation required for safe operations, Quick coupling arrangement for tank filling & electronic controller unit along with all Tubing, cabling, Protective & safety equipment such as Face shield mask, Rubber hand Gloves (2 set), Oscent (2 litre) with dispenser shall be supplied.

3.22 Inspection by third party.

3.23 Required tools & tackles and resources are in the scope of Bidder. A list of such special tools & tackles (if any) shall be submitted along with the bid.

3.24 Bidder scope shall start from connection of natural gas from main gas pipe line tap-off with necessary valves, tubing, and fittings for operation of odorisation system, Regulator, dosing point connection tubing, valves and fittings to the main gas pipeline. FRLS sheathed armoured electrical/control cables laying which includes having in the pipe conduit as and when required, connection to control room and electrical panel including necessary cabling.

3.25 Supply of FRLS sheathed, armoured cable of length up to 100 meters is in Bidders scope. Bidder shall also quote per meter price of cabling for payment beyond 100 meters, if executed.

3.26 Vent connection from odorizing unit with scrubber, flame arrestor, valves with scrubber and vent stack 3m above the unit top is also included in this scope of Bidder.

3.27 The unit shall be skid mounted and shall be complete with foundation bolts.

3.28 Any additional requirement necessary for smooth operation of the system will be in Bidder’s scope at no extra cost to CLIENT/OWNER. Bidder shall provide warning instruction on each container for safe use.

3.29 The Bidder shall provide civil foundation drawing & weight of skid within two weeks of placement of order. In case the requisite information regarding foundation and other fixing inserts etc. to be provided by owner as required for proper installation of equipment is not indicated by the Bidder within two weeks from the placement of order, such facility shall be arranged/provided by the Bidder at their own cost.

3.30 The Bidder shall not alter the scope of work as detailed in tender and approved drawings without written permission of owner.

3.31 The Bidder should prepare the design basis required to meet the demands as per the SOR line items and liaise with CLIENT/OWNER to obtain necessary confirmation and approval.

3.32 The skid shall be complete in all respects, ready for installation and commissioning at the respective site. There shall be minimum work to be done at site. All field mounted instruments shall be supplied loose to avoid damages of the same during transportation of the skids.

3.33 The main pipeline size for the Gas Inlet and the Odorant injection provided in the process data sheet tentatively. All end connection shall be 1”/ ¾” NPT Female (Min.). The entire tubing up to Gas pipeline for Injectors or inlet Tapping is in the Bidder’s Scope. Any adaptor required for other size is in the Bidder’s scope. The Line size will be indicated elsewhere in the tender is tentative and will be confirmed at the time of detail engineering.

3.34 The gas inlet at define pressure will be provided from the metered section at any one point for Odoriser (Size for tapping: as per flow). Any pressure difference and pressure reduction if required for inlet gas to odorizing system shall be the responsibility of the Bidder.

3.35 All direct mounted, instruments shall be installed in such a way that they have better readability and accessibility. All capillary type instruments shall have the capillary supported properly and shall have protection of capillary against mechanical damage.

3.36 Accessories used for mounting all pressure, differential pressure instruments shall have block and bleed, by pass, drain/vent valves etc. as per the installation sketches, and shall have accessibility.

Page 17 of 40

             

TECHNICAL SPECIFICATION – ODORISING UNIT

P.013702 D 11077

030

Rev.0 Odorisation Unit for City Gas Distribution Project

3.37 All items in the skid shall be properly supported to avoid vibration.

3.38 Special supports, as required, shall also be supplied by bidder.

3.39 All impulse lines shall be supported at regular intervals.

3.40 All welding shall be carried out as per the relevant code with proper electrodes. Any testing (non-destructive) like UT, RT, DP test on root weld and final weld shall be carried out as applicable. All consumable shall be part of Bidder’s scope of supply. Any pre/post weld treatment as required by the codes shall be carried out.

3.41 Separate routing or physical separation shall be maintained between signal cables and shutdown/power cables.

3.42 The presence of Bidder’s representative shall be required to ensure safety precaution during the first filling of Odorant in tank post installation of system at site with no extra cost to CLIENT/OWNER

Pressure regulator shall be provided, with SSV (Slam Shut Valve) and safety feature, for reducing inlet pressure to provide

a. Blanketing pressure inside the tank b. Pump Functioning (if required) c. Inlet gas pressure reduction for blanketing

The pressure relief valve shall be designed or set to open at a predetermined set pressure to protect storage tanks from being subjected to pressures that exceed their design limits.

The odorant injection probe with sight flow glass shall include stainless steel probe, visual odorant sight indicator, and an also valve for location at the pipeline.

3.43 Bidder’s scope of supply shall include but not limited to the following:-

Supply of complete odorization system including secondary containment skid with all instruments, equipment and associated accessories mentioned in this document.

All instruments/equipment, pumps, SOVs etc. which is located in hazardous area shall be ex-proof .

Supply of all instruments, controller serial communication port, valves, PSV/SRV/CRV etc. and accessories required for complete odorization system. Supplier to furnish P&ID and list of instruments.

Supply of various installation materials including but not limited to the following:

A. Impulse piping/tubing and fittings B. Instruments valves & Manifolds, Regulators C. Junction Box, câble gland, Plugs, cables and accessories etc.

Supply of scrubber, flame arrestor at all vents, isolation valves, gauges, associated cabling, SS tubing, and other accessories required for proper functioning of the system.

Manuals relating to installation, operation and maintenance, test certificates should necessarily be sent along with the equipment, besides being furnished after placement of orders.

Whenever clearances are to be taken before placement of order, it would be necessary to submit only one technically acceptable offer for CLIENT/OWNER’s approval. The details of the instruments and materials involved shall be brought out in the contract document and to be firmed up during the residual engineering stage.

Onsite Training of Purchaser’s Personnel for 2 (Two) days each installation locations for Odorant Handling, Re Filling, Operation & Maintenance, safety & general educational awareness programme for odorising, emergency & contingency plans etc of the Odorising System all inclusive rates. Training procedure & plan has to be submitted and training has to be completed before final commissioning and Handing over system to client.

All instruments shall be field proven both with respect to design and materials. No prototype instrument or instrument or instrument of an experimental nature shall be accepted.

Page 18 of 40

             

TECHNICAL SPECIFICATION – ODORISING UNIT

P.013702 D 11077

030

Rev.0 Odorisation Unit for City Gas Distribution Project

Before ordering, approval shall be taken from CLIENT/OWNER for all the instruments and materials. Any item ordered which do not conform to the Contractual requirement, identified at any stage of the project, and shall be liable to rejection. Replacement/modification cost and project delay arising out of this shall be liable to rejection. Replacement/modification cost and project delay arising out of this shall be deducted from the Package Supplier’s account.

Vendor to provide training for minimum two (2) owner designated persons for each station.

NOTE: This TECHNICAL SPECIFICATION specifies the system with odorant pump. Vender may offer other design, if any, which is already working successfully elsewhere. Additional hardware (valve, etc.) which may be required due to different design shall be supplied by the bidder.

4. CLIENT/OWNER SCOPE OF SUPPLY

CLIENT/OWNER Shall supply following:

4.1 The flow signal from flow computer /PLC/RTU or its local Data concentrator in the form of 4-20 mA or in the serial (RS232/422/485)/Ethernet/TCP/IP communication protocol to sense and operate the odorizing system in the proportional to flow mode.

4.2 200-240V AC, 50Hz ±3 UPS & Non-UPS power supply.

4.3 Necessary approval and work permit to carry out the job as required.

5. OPERATING AND DESIGN DATA

5.1 Operating Conditions

Parameters Data

Flow 500-13,500 SCMH

Pressure operating 15-45 Barg

Temperature operating 5 – 50 oC

Design pipeline rating 300#

Design Pressure 49 Barg

Design Temperature Min/Max -20 / 60 oC

End Connection All End connection at pipeline shall be 1” / ¾” NPT Female with Isolation Valves.

Gas Inlet Tapping One no. 1” / ¾”, more tapping as per the requirements of Vendor. The necessary Isolation Valves and weld –o- let in vendor’s Scope.

Injector Probe Tapping Two nos. 1” / ¾”. The necessary Isolation Valves and weld –o- let suitable for the Injector probe is in vendor’s Scope

Flow Signal Pulse / Analog 4 – 20 mA from flow computers /EVC (two stream one working one standby)

Loading / unloading system As per milkman concept with blanketing

Page 19 of 40

             

TECHNICAL SPECIFICATION – ODORISING UNIT

P.013702 D 11077

030

Rev.0 Odorisation Unit for City Gas Distribution Project

5.1 Natural Gas Characteristics

NOTES:

• O2: Not more than 0.5 % mole • Total non-hydrocarbon : Not more than 2.0 % • Total Sulphur including H2S : Not more than 10 PPM by weight

H2S not more than 4 PPM by volume • Water content in the range 112 to 144 Kg/ MMSCM • Specific gravity (SG) to be calculated by Bidder • Calorific value Net Kcal/SCM to be calculated by Bidder • Temp of gas Shall be 20 to 40 °C.

6. OPERATIONS & CONTROL PHILOSOPHY

The Odorizing System should be designed with minimum operator intervention. Any system requirement at site for proper operation shall be consider in the Scope of supply and design. The maintenance frequency of the system shall be as per SOR/MR.

7. DESIGN PHILOSOPHY

It is anticipated that the natural gas feed composition, flow rate and pressure will be fluctuating. Hence, Supplier should design the Odorizing System with optimum degree of flexibility, reliability, and operability to accommodate the varying composition of feed, other unexpected contaminants, flow rate and pressure.

The Odorizing System facilities should consist of standardised modules, which are assembled into a complete system. Each system should be designed in packaged frame, housing, etc. The design life of the Odorizing System should be minimum 40 years.

8. ODORIZING SYSTEM

Odorizing Agent: : 75-80 % TBM (Tert-Butyl Mercaptan) + 20-25 % MES (Methyl Ethyl Sulphide)/

Component Range mole % Deign case mole %

Methane 84.50-98.77 89.0

Ethane 0.69- 9.00 5.0

Propane 0.03-4.00 1.5

Butane 0.00-2.00 0.5

Pentane 0.00-0.35 0.35

Hexane 0.00-0.15 0.15

Heptane 0.00 0

Carbon Dioxide 0.00-4.50 3

Nitrogen 0.05-1.25 0.5

SUM 100.00 100

Page 20 of 40

             

TECHNICAL SPECIFICATION – ODORISING UNIT

P.013702 D 11077

030

Rev.0 Odorisation Unit for City Gas Distribution Project

Vendor shall recommend the necessary changes in the system for the particular alternate odorant.

As per PNGRB Notification: “A pre – determined quantity of suitable odorant shall be dosed into the gas stream. The dosing should be such that it is safe for human as well as materials and equipment used in CGD system”.

Dosing Rate : Maximum 25 mg/Nm3 adjustable to meet PNGRB requirement

8.1 Storage Container

8.1.1 Bidder shall supply storage tank as mentioned in SOR/MR for odorant storage. The design and calculation of storage tank shall be approved by NABCB approved TPIA at no extra cost to CLIENT/OWNER. The storage container should be made up of SS 304 or higher grade complete with inlet, outlet, valves, level gauge, level switch (high and low), level transmitter, pressure gauge and suitable odorant filters, non-return valves, pressure regulation valves with safety alarm, pressure relief valve along with manual gas vent valve.

8.1.2 As Natural Gas is to be used for blanketing purpose, the tubing connecting the NG pipeline (Designed pressure 49 Bar Max) to the odorant tank should be provided with redundant pressure regulator that can reduce the pressure to blanketing pressure. Regulator with SSV shall be used for avoiding entry of high pressure to storage tank from pipeline through connecting tubing and fittings. System should be capable enough to continue odorant dosage even when the system trip due to regulator failure or any other failure. Bidder to specify the blanketing pressure in odorant storage tank so that CLIENT/OWNER can monitor that the blanketing pressure does not exceed the defined pressure during normal operation. All interconnect tubing between the odorant tank and the system shall be of SS316.

8.1.3 The odorant tank shall be constructed to ASME SCE VIII DIV.1. The tank shall have all necessary valve for safe and proper filling, the tank filling should be bottom filled in such a manner to minimize the generation of static energy during filling to, as well as level gauge for volume indication, pressure relief, and pressure gauge with remote excess of all.

8.1.4 No odorant shall be vented from the storage container or the pneumatic/hydraulic system/circuit direct into the atmosphere in any case. The vented gas has to be routed through neutralizer/scrubber such that the maximum concentration of odorant is not exceed beyond 0.5ppm at the vented at a measuring distance of ½ feet.

8.1.5 All associated fittings, valves, pressure regulator, instrumentation accessories and steel tubing shall be designed considering the designed pressure 49 bar and thickness shall be calculated considering the corrosion allowance for a design life of 40 years.

8.2 Level Gauge

Level gauge should be welded to the end connections provided in the odorant tank. Closed at both ends and should be connected to the odorant tank at both top and bottom. MOC of the float chamber should be SS 304 or of higher grade. The visible range should be able to show odorant level as per the volume of the tank.

A magnetic flapper assembly type level gauge shall be required. Position of the float inside the chamber to be indicated outside by bicolored flappers embedded with magnet by 180 Degree rotation and setting into uniform colour along the traverse of the float.

Bidder to submit the datasheet for CLIENT/OWNER approval. All the glass gauges have to be protect by suitable means to protect the glass from accidental breakage due to external activity/impact.

8.3 Pressure Gauge

Pressure gauge accuracy shall be ± 1.0% of full range. Pressure Gauge Dial shall be white back ground with black figures marked on it, size shall be minimum 100 mm and case shall be SS316 as a minimum, bayonet bezel type. Blow out disc and solid front protection shall be provided and gauges shall be orientated such that they vent safely.

Pressure Gauge shall be weather proof and shall have externally zero adjustable micro meter adjustment without opening the bezzle.

All pressure gauges shall be liquid filled type. Over-range protection shall be 1.3 times the maximum scale range. Where a gauge is subject to greater pressure, a gauge protector shall be used.

Page 21 of 40

             

TECHNICAL SPECIFICATION – ODORISING UNIT

P.013702 D 11077

030

Rev.0 Odorisation Unit for City Gas Distribution Project

On pulsating service, Snubber shall be fitted in the input connection. Siphon shall be fitted to pressure gauges on steam or hot condensable gas services.

Static pressure sensing connections on horizontal lines are normally made at the top. All tube fittings shall be of compression type with double ferrule. Two-valve SS316/SS316L stainless steel manifolds shall be provided for pressure Gauge. Valve and seat material shall be determined by the process requirement.

All pressure instruments shall be mounted so as to minimize the length of impulse lines.

To facilitate pressure gauge removal and alignment, gauges shall be connected to the piping by means of gauge adapter and not directly to into valves.

8.4 Level transmitters:

Level transmitter shall be provided on top of odorant tank & interface with controller cabinet. Bidder to submit the datasheet for CLIENT/OWNER approval. Accuracy shall be 0.1% or better. All transmitters shall be Exd IIB T4. Appropriate transmitter with ATEX certification to be provided for remote access.

8.5 Temperature transmitters:

Temperature transmitter shall be interface with Controller cabinet. Bidder to submit the datasheet for CLIENT/OWNER approval. Accuracy shall be 0.1% or better. All transmitters shall be Exd IIB T4. Appropriate transmitter with ATEX certification to be provided for remote access.

8.6 Pressure transmitters:

Pressure transmitter shall be interface with Controller cabinet. Bidder to submit the datasheet for CLIENT/OWNER approval. Accuracy shall be 0.075% or better. Appropriate transmitter with ATEX certification to be provided for remote access.

8.7 Flow transmitter:

Flow transmitter shall be interface with Controller cabinet. Bidder to submit the datasheet for CLIENT/OWNER approval. Accuracy shall be 0.075% or better. Appropriate transmitter with ATEX certification to be provided for remote access.

8.8 Pump:

The system shall utilize a positive displacement style pump that is constructed entirely of 316 stainless steel or higher grade. The pump shall have adjustable displacement and also adjustable no. of strokes that can be confirmed through panel as per the dosing volume required.

The pump shall be designed such that the actuation mechanism is not in contact with the odorant. The pump shall have inlet and outlet check valves which are designed to be accessible and may be removed and replaced easily without the removal of any tubing or piping.

The pump shall be capable of operation at a maximum flow rate. The pump shall be capable of dosing against network design pressure of 49 Bar-g. Bidder must indicate the normal gas consumption per stroke.

8.9 Pipe Work, Valves And Fittings

Pipe work should be designed tested and installed to ensure its safe operation at the worst conceivable condition of flow, pressure and temperature. All high pressure SS tubing work should be fully annealed (bright annealed) seamless conforming to ASTM A-269, SS-316 or higher.

The system should be “go-no-go” gauge-able to demonstrate that the fittings are properly tightened wherever possible, valves and control device should incorporate the same and connector system. The number of fittings used should be minimized. The bidder should ensure that personnel assembling the pipe work should be competent to commission the system.

The preferred valve types of isolation are ¼ (quarter) turn ball valves. Such valves shall have similar material as of the tube they are attached to. Ball valves must be of good quality and be appropriately selected for frequent use. Ball seat must be suitable for natural gas operation of gas composition as indicated above and odorant.

Page 22 of 40

             

TECHNICAL SPECIFICATION – ODORISING UNIT

P.013702 D 11077

030

Rev.0 Odorisation Unit for City Gas Distribution Project

Valves and fitting subject to corrosion must be either inherently resistant, or be coated with a corrosion inhibiting paint or surface treatment.

End connections including fittings & valves shall be supplied with the unit. Details are to be confirmed at the time of the detail engineering.

Relief valves shall be designed considering the designed pressure 49bar-g and system shall be designed on the basis of what if analysis of failure of relief valves.

Any accessories required for Odoriser Control Unit and the field unit & interconnection is in the Vendor’s scope.

8.10 Secondary spill containment skid/tray:

Bidder to design, supply and install secondary spill containment skid/tray as per approved process & design parameters at no extra cost to owner.

Material of construction should be SS 304.

The secondary containment system must be leak proof (use of any epoxies/silicones or similar materials must not be used to achieve leak proofing of the containment) as per system design with provision of draining valve with plug/blind.

Secondary containment until must be either sloped or specifically designed to quickly and easily remove or leaking liquid.

Secondary containment must have sufficient capacity to contain 110% of the volume of the primary container (any space occupied inside the containment has to be accounted for volume during design calculations of capacity).

Secondary containment for multiple containers will be, 150% of the largest container’s volume OR 10% of the aggregate volumes of all containers, whichever is greater.

Placed on a foundation or base capable of providing support to the secondary containment system, resistance to pressure gradients above and below the system and capable of preventing failure due to settlement, compression or uplift.

Designed and installed to surround the tank completely and to cover all surrounding earth likely to come into contact with the hazardous chemical if the chemical is released from the tank(s) (i.e., capable of preventing lateral as well as vertical migration of the hazardous chemical).

Other items not listed here, but required to make the system operational.

8.11 Scrubber

A scrubber must be installed in Gas/Vapor vent line, to ensure odor is in control during venting.

The system shall have the provisions for purging odorant in a closed loop type during maintenance to avoid odorant venting into the atmosphere.

8.12 ELECTRONIC CONTROL UNIT (Main Odorizing Units)

AC Single Phase, 230V±10%, 50Hz±3% supply for electronic control unit shall be made available for the odorizing system through UPS & Non-UPS on site shall be provided by client.

Bidder has to provide Surge protection device of Make MTL/ Pheoenix in 230 V AC UPS Supply (provided by the client). This should be installed at the JB where incoming power supply will be terminated. Any problem in the input supply, the equipment should be protected. The surge protection devise shall be pluggable and testable with thermal disconnection and indication facility. It should be for input power supply as per IEC standard IEC-61643-12

Note: Vendor to confirm that the supplied Electronic Control Unit are suitable with the above power supply and indicate the maximum and minimum tolerable values of voltage for safe operation of Odorizing System. Vendors must include suitable voltage conditioning system (Voltage Stabiliser) in their scope to prevent failure from voltage fluctuations if supplied equipment need the same.

Page 23 of 40

             

TECHNICAL SPECIFICATION – ODORISING UNIT

P.013702 D 11077

030

Rev.0 Odorisation Unit for City Gas Distribution Project

Electronic Control Unit should have the following specifications as minimum:

8.12.1 Electronic Control Unit should be provided with a Liquid Crystal Display (LCD) for ongoing Flow Monitoring, Operation Modes etc. It should be easy to read lighted display. Displays must remain active for at least 15 minutes after power failure. Necessary battery backup shall be provided in the system. Electronic unit shall have the external keypad for entering the data and provide password protection for unauthorised use.

8.12.2 Owner will provide dedicated UPS & Non-UPS supply for Odoriser Control Unit. The Power Supply cable up to electronic control unit, laying, terminations of power supply cable at Odoriser control Unit is in the Vendor’s scope.

8.12.3 Odoriser Electronic controller unit shall be provided with inbuilt GSM/ GPRS modem. Vendor shall demonstrate the communication (read & write) from Master control room (MCS) to Odoriser control unit installed at site. The vendor shall provide the necessary accessories required for proper GSM/GPRS communication

8.12.4 For the Odoriser auto Mode operation flow signal shall be provided in the form of analogue 4-20 mA / serial communication data inputs / pulse from Flow Computers/ metering device. The offered Electronic Control Unit is able to accept two nos. of pulses/4-20 mA signal/ serial inputs corresponding to instantaneous standard flow rates from each flow computer of dual steam metering system. For serial communication the protocol will be Modbus and all the necessary register addressing has to be done by the vendor.

8.12.5 Physical design should be of steel body with doors/panels with suitable paint to minimize corrosion and on-going wear and tear. The Electronic Control Unit should have locking arrangement. The panel/cabinet should be suitably designed to accommodate all required electronic equipment.

8.12.6 Necessary provision for proper mounting shall be provided. Cable entry shall be from bottom, therefore necessary removable Gland plate with matching hole as per supplied Cable glands shall be provided. Supplier shall considered approx. 100 mtrs cable length of each type for each site from each Flow Computer panel to control room & Odoriser unit.

8.12.7 The Protection Class of Electronic Control Unit shall be weatherproof to IP55.

8.12.8 Odorizing System should NOT BE SHUT OFF IN CASE OF:

a. Power failure

b. Failure of throttling valve/regulator

c. Low flow

d. Failure of any field instruments (Transmitters, temp. element, etc.)

8.12.9 The Electronic Control Unit should be capable of storing odorizing data and such data should be downloaded frequently into another portable computer to store the data. In order to meet the above requirement, 2 Nos. of RS232 Serial Communication ports shall be included in the Electronic Control Unit. One Port will be utilized for Portable Computer and another port will be utilized for future SCADA application. For this application, Vendor shall include in the scope all relevant software, together with the license, compatible to Microsoft Windows XP/2000 software.

8.12.10 The data of odorising unit shall be hook-up by the client in future by providing SCADA system and RTU. The odoriser electronics shall have facility to read & write the data remotely through SCADA. The electronics should have provision and dedicated communication card & port for connection to RTU for monitoring and control the transaction parameter. The detail requirements of SCADA will be communicated to the successful vendor during detail engineering. For selection of equipment compatibility for SCADA system vender shall considered the MODBUS RTU protocols, FCC-68, RJ 45 connection type, RS 232 D communication standard, Baud rate upto 19.2K, with configurable software.

8.12.11 All the cabling (Signal, Control, Power, Communication), Ex. proof JB, termination and mounting accessories from field to Control unit, Cable gland (Double Compression Type) shall be provided by Bidder. All the cable and tubing shall be mounted and dressed on the cable tray.

8.12.12 All the cabling (Signal, Control, Power) shall be armoured type.

Page 24 of 40

             

TECHNICAL SPECIFICATION – ODORISING UNIT

P.013702 D 11077

030

Rev.0 Odorisation Unit for City Gas Distribution Project

8.12.13 CONTROLLER:

The system controller shall have provision for programming desired injection rate in mg/SCMH. The controller shall have a provision of both flow proportionate injection mode and time proportionate injection mode.

The controller shall have a provision of both flow programming desired injection mode and time proportionate injection mode. The controller shall have automatic monitor of system function and have capability to alarm in case of system malfunction. This alarm system will monitor flow signal, power supply, the volume verification system, and the injection pump. The information from the controller can be accessed via a communication cable.

The controller shall monitor system performance, and display (LCD type) locally in a continuous scrolling manner the below minimum information and shall be to send the data to CLIENT/OWNER server simultaneously. a. Odorant tank level

b. Tank pressure

c. Odorant inlet pressure

d. Battery Voltage

e. Odorant injection

f. Gas flow rate

g. Injection rate

h. Proportional to time stroke rate

i. Odorant volume high and low

j. System stopped/ running

k. Proportional to time/ flow

l. Current odorant temperature

m. Alarm conditions such as pump failure, low battery etc.

n. Centralized alarm for any malfunctioning.

Contract outputs shall be present for system alarm, as well as odorant volume injected, with a high resolution.

The system should have facility to monitor actual use of odorant compensated for temperature variation.

8.12.14 Control Alarms

1. Odorization tank Alarm

Low level Alarm High level Alarm

2. Controller Battery Alarm

Low Battery Alarm 3. Signal indicators

Low Flow No Flow High Flow Low Flow shut off

4. Signal Alarm

Loss of Signal 5. Pump Alarm (Separate Alarm for each Pump)

Page 25 of 40

             

TECHNICAL SPECIFICATION – ODORISING UNIT

P.013702 D 11077

030

Rev.0 Odorisation Unit for City Gas Distribution Project

Over Pressure Pump Alarm Under Pressure Pump Alarm Pump Failure

The system should have a provision of siren for critical alarm such as Odorant volume, Pump failure, System stopped etc. Any other alarms needed for operation of Odorization system is to be provided by Bidder.

8.13 Odorant loading / unloading system:

Vendor shall provide Odorant Loading / unloading System for the filling of Odorant in to the Storage Containers. Manual pump (portable type) or any other method, with proper safety features and with necessary connecting Hose & connector / coupler should be provided and shall be suitable for uses in Hazardous area. If refilling through Milkman concept then filling system shall have Nitrogen Blanketing System to avoid leakages of Odorant to Atmosphere during loading / Unloading. Necessary Nitrogen Cylinder may be provided for blanketing.

Vendor shall provide detail procedure and the arrangement for filling the Container with Odorant. It is the responsibility of the Vendor to fill the odorant (to be supplied by Vendor for first time filling) in Container/ tanks at site during final commissioning. The Handling, transportation, storage, filling and final commissioning shall be in Vendor’s scope.

Vendor shall Supply “Active Carbon Saw Dust” & “Sodium Hydrochloride” for Odorant 10 Kg each in Container for Odor and neutraliser for spillage handling of Odorant. The container shall be suitable for handling and Storing of these Chemicals for uses.

8.14 Measurement interfacing equipment (meter to odorizer):

The system shall be capable of accepting either an analog input proportional to the flow rate, or a pulse input proportional to the flow rate for multiple meters.

8.15 Verification

The system shall have an accurate means of measuring the volume of odorant injected. The system shall have electronic means of indicating the verification device is working properly.

The system shall have means to test the operation of the verification device. 

8.16 System Audit Trail:

A system audit trail shall be available which will record all events specific to system performance. This data will accumulate with the use of a board memory device which may be accessible for remote downloading, or local downloading, as well as accessible communication links in conjunction with proprietary software.

The audit trail device shall be capable of recording system data for 90 days prior to downloading. The system audit trail software shall be windows compatible and capable of handling records for several

odorant systems. The software shall be capable of easily providing odorant record for each odorant system. These records

shall be for daily operation or hourly operation, and shall include any and all pertinent information specific to that systems operation including odorant use alarms, high and low odorant rates, parameter changes.

8.17 Certification & Approvals for Hazardous Areas:

The system shall be suitable for Class I, Division 1. Group C/D service and shall be certified by approval agency.

Bidder shall conduct HAZOP study and submit document of the same.

Page 26 of 40

             

TECHNICAL SPECIFICATION – ODORISING UNIT

P.013702 D 11077

030

Rev.0 Odorisation Unit for City Gas Distribution Project

8.18 System Mounting

System enclosure will be corrosion resistant and weather tight, with a secure locking system. System shall include electronics controller isolation from mechanical components via an additional

separate enclosure within the system enclosure for the controller. Enclosure shall have field connections for

I. Flow signal, alarm, and communications in conduit of ½ “ or other approved size II. Chemical in III. Chemical out IV. Actuation gas (if any) V. Actuation exhaust (if any)

The system enclosure shall be a complete package which includes structural steel base frame, odorant storage tank, pump panel, controller, scrubber and containment skid that can contain volume 110% of the capacity of odorant storage tank.

The Odorization system shall be configured in such a manner that the controller electronics shall be housed in a water tight enclosure.

Interconnection between the electronic and mechanical enclosures shall be of FRLS armoured cable. The electronic enclosures shall be constructed such that system operation data may be read without

opening the electronics enclosure.

8.19 Testing And Commissioning

All materials and equipment shall be factory tested before shipment in the presence of CLIENT/OWNER’s representative. No material shall be transported to site until all required tests have been carried out and equipment is certified as ready for shipment. Acceptance of equipment or the exemption of inspection or tests thereof, shall in no way to solve Bidder of the responsibility for delivering equipment meeting the requirements of the specifications.

8.20 NDT of welds including radiography, UT, MPT, DPT etc.

8.21 Thickness testing of storage tank material.

8.22 Testing to demonstrate set point accuracy and actuation time for all self-actuated valves.

8.23 Seat tightness test for Pressure Regulators and pressure relief valve.

8.24 The Equipment shall be tested at factory prior to shipment to site. Bidder to submit the QAP FAT (Factory Acceptance Test) & SAT (Site Acceptance Test) document for approval. FAT should be carried out to demonstrate the functioning of all equipment trips and control system.

8.25 The ODORIZER UNIT hydro testing. Hydro testing shall be carried out at minimum test pressure 1.5 times of design pressure witnessed by NACB approved TPIA, who will also certify the compliance of the tanks to the design and specifications.

8.26 Leak test (at 7 barg) of complete ODORIZER UNIT with air/N2.

8.27 ODORIZER UNIT functional testing considering pressure regulation, limiting and safety characteristics.

8.28 Any other tests which are not mentioned above, but required to assess the overall performance of the skids.

8.29 Bidder should give 2 week notice to the Purchaser for the date and location of the tests so that the equipment may be witnessed if desired.

8.30 Bidder shall perform the usual standard tests to maintain quality control procedures. These test certificates shall be submitted, for review, before starting inspection by Purchaser, Bidder shall be responsible for testing and

Page 27 of 40

             

TECHNICAL SPECIFICATION – ODORISING UNIT

P.013702 D 11077

030

Rev.0 Odorisation Unit for City Gas Distribution Project

complete integration of the system. Detailed procedures of test and inspection shall be submitted by the Bidder for review before order and mutually agreed upon.

8.31 Bidder shall arrange inspection by the CLIENT/OWNER representative at Bidder’s shop as and when asked by CLIENT/OWNER. For this inspection manpower, consumable, equipment and utilities as required shall be in Bidder’s scope.

8.32 Upon delivery to the site, all the equipment should be assembled in a complete system. Thereafter, final site acceptance test would be carried out, such tests should be witnessed and signed by the Company representative. The Bidder should rectify and replace all defects, faults, failures etc. and all costs should be borne by Bidder. The costs should include accommodation, travelling, expenses etc.

9. PAINTING, MARKING AND SHIPMENT

9.1 Bidder shall use stainless steel material unless otherwise approved. All exposed carbon steel parts if used to be painted shall be thoroughly cleaned from inside and outside to remove scale, dirt and other foreign materials by wire brushing and sand blasting as applicable. Minimum acceptable standard in case of power tool cleaning shall be Sa 3 and in case of blast cleaning shall be Sa 21/2 as per ISO 8501-1 or Swedish Standard SIS 0055900. Also, stainless steel surfaces both inside and outside shall be pickled and passivated.

9.2 Nonferrous materials austenitic stainless steels, plastic or plastic coated materials, insulated surfaces of equipment and Pre-painted items shall not be painted.

9.3 All threaded and flanged opening shall be protected to prevent entry of any foreign materials.

9.4 All field mounted instruments shall be supplied loose to avoid damages during transportation.

9.5 ODORIZER UNIT shall bear proper shipping markings.

9.6 ODORIZER UNIT and all the instruments in the ODORIZE UNIT shall have a SS name plate attached firmly to it at a visible furnishing the following information:

Manufacturer’s Name

Manufacturer’s marking

Tag number as per Purchaser’s data sheets

Design Pressure

Serial Number

Manufacturer’s model number

Name of client

Size & Weight of the equipment

Note: Please note that non-metallic labels are not allowed.

Caution Markings like “No Smoking”, No Flame’, “High Pressure Gas Station” etc. shall be affixed to the ODORIZER UNIT frame as per relevant practices.

10. DRAWING & DOCUMENTATION

Bidder shall submit the following documents:

10.1 Bill of Materials-The Bill of Material should indicate all items, quantity of all items, their part nos. and make.

10.2 Cause and effect diagram

10.3 HAZOP report along with P&ID of the system to be supplied tack

10.4 Design parameters and calculations for storage tank duly approved by NABCB approved TPIA complying with all applicable standards Fabrication details/ documents along with drawing testing and inspection certificates.

Page 28 of 40

             

TECHNICAL SPECIFICATION – ODORISING UNIT

P.013702 D 11077

030

Rev.0 Odorisation Unit for City Gas Distribution Project

10.5 Design parameters and dosing calculation cindered complying with applicable standards.

10.6 UPS Load calculation & main electrical supply load calculation (if any).

10.7 Data sheets of all the pressure regulators, Slam shut valve, relief valves and all mandatory spares list and equipment.

10.8 Operational methodology

10.9 Monitoring systems

10.10 Safety interlocks

10.11 Control Philosophy

10.12 Operation and Maintenance plan

10.13 Piping and instrumentation Diagram.

10.14 General Arrangement Drawing giving overall dimensions along with details of inlet gas termination including X, Y, Z co-ordinates with respect to Centre of Odorizing Unit or any reference and erection/shipping weight.

10.15 Wiring Diagram of Electronic Control Unit.

10.16 Data Sheet of odorizing Unit along with leaflets/catalogues for all major items.

10.17 Detailed foundation drawing of the Odorizing unit for casting foundation giving load pattern etc. Data sheets.

10.18 A complete electrical dossier and zone drawings of the Odorizing Unit, all certification for all components used within the hazardous areas should be provided.

10.19 Mechanical and electrical installation drawing including interconnection.

10.20 Software (logic diagram) of Odorizing Units on CD-ROM with suitable communication protocol for communication with odorizing in unit in order to change Odorizing Unit parameters, if required.

10.21 Certificates from statutory authorities confirming suitability of design/construction of all electrical and electronic items for use in hazardous area classification in case of foreign supply, the Bidder should have all certificates endorsed by the concerned statutory authorities, Govt. of India.

10.22 Test certificates relevant to the chemical analysis and mechanical properties of the materials used for the various parts used in odorization system as per the relevant standards.

10.23 Welding Procedure Qualification Test and Procedure Qualification Record for welder to be used in welding of tank and various.

10.24 Non Destructive Test Report Hydro test of Tank Air Leak Test Report

10.25 Odorant Tank Calibration record

10.26 Test/Inspection Certificate for Gauge and Instrument valves, Test/Calibration report for Pressure Gauges, Test/Compliance Certificate for Level Gauges.

10.27 Test/Performance Certificate for Injection Pump along with material certificate.

10.28 Material and Performance test certificates and catalogues of all major components like valves, flow meter, tubing etc.

10.29 Calibration certificates for all measuring and protection devices (e.g. Pressure transmitter, pressure gauges, PSV, temperature transmitter, etc.)

10.30 SRV/PSV/CRV Bidder shall provide the calibration certificate verified and certified by the competent authority authorized under SMPV rules or under DISH as per factories act 1948.

10.31 FAT and SAT Procedures & Acceptance Report

10.32 Final Dimension Record

10.33 Installation manual

Page 29 of 40

             

TECHNICAL SPECIFICATION – ODORISING UNIT

P.013702 D 11077

030

Rev.0 Odorisation Unit for City Gas Distribution Project

10.34 Operation and maintenance manuals-2 sets (all in original) of odorizing unit. The instruction manual should describe in details the construction and recommended procedure for maintaining, operating and troubleshooting of the Odorizing Unit should also include cross-sectional drawings, exploded views of all spare parts along with part nos., quantity installed per Odorizing unit. The manual should provide detailed catalogues for all bought out items.

10.35 Bidder shall furnish all manuals necessary to test, operate and maintain the system.

10.36 The soft copies (in CD, DVD, etc.)-2 no. of above mentioned documents shall also be provided to the purchaser at the time of delivery of each skid.

10.37 Note: Final drawings from the Bidder shall include dimensional details, foundation details, and weight, mounting details and any other special requirements etc. for the ODORIZER UNIT. All dimensions in general shall be in millimetres.

11. HEALTH, SAFETY & ENVIRONMENT 11.1 Bidder shall apply and obtain work permit from Owner for the work to be performed at CLIENT/OWNER site.

After completion of work a joint inspection shall be done at work place.

11.2 Bidder shall submit documents required for the establishing competences a person deputed to execute job including medical fitness if job requirement.

11.3 Bidder’s Representative should not be without Identity Card at Owner sites/office as well as Sites. The I Card shall be provided by Bidder.

11.4 Bidder shall carry out the work within the duty hours agreed with Owner. No Work shall be carried out without permission of Company representative beyond the official duty hours.

11.5 Bidder shall ensure that all tools, appliances, machines, vehicles, or other equipment, are in safe working condition at all times and comply with current regulations and, where appropriate, are used only be authorized and competent persons. This provisions includes all emergency response life-saving equipment.

Any breach of the HSE requirement shall be deemed by the company to be a material breach of the terms of the contract between the parties and the company shall be entitled to take appropriated action including instructing the Bidder to (a) Remedy the breach; (b0 Suspend the work or (c) Terminate the contract.

All activities shall be carried out as per owner documented procedure and HSE requirement and deviation from it shall be dealt with very strictly.

Page 30 of 40

             

TECHNICAL SPECIFICATION – ODORISING UNIT

P.013702 D 11077

030

Rev.0 Odorisation Unit for City Gas Distribution Project

ANNEXURE-1  

DATA SHEET OF ODORISING UNIT  

1 Flow rate of Natural Gas (SCMH) As per TECHNICAL SPECIFICATION/PO 2 Operating pressure 15-45 Bar (Maximum)3 Design Pressure 49 Bar4 Main Header manifold size 4” to 16” dia., 1” tap off (2nos.) with isolation valve Where

Odorization unit is to be installed5 Main Gas Line 4” to 16” dia. 300#, API 5L X 526 Operating Principle Microprocessor based programmable, Injection System (1W+1SB)

Automatic dozing system. 7 Odorant Injection rate To be adjusted automatically proportional to flow rate mode and

proportional to time base mode using 4 to 20 mA signal from Electronic Control Unit.

8 Operating Temperature Suitable for installation in open atmospheric conditions at ambient temp. of 5-50⁰C and design -20 to 60⁰C

9 Odorant Concentration Rate As per CLIENT/OWNER requirement- Actual use of odorant monitored using an on-line separate calibration device.

10 Gas Odorant 75-80 % TBM (Tert-Butyl Mercaptan) + 20-25 % MES(Methyl Ethyl Sulphide)

11 Power Supply 200-240V±10%, 50Hz±3% Single Phase UPS & Non UPS supply.

12 Electrical components in Hazardous Area

Installed in hazardous area Zone-1. Exd IIC T4 Intrinsically safe

13 No. of Injection Units required Dual Stream with complete standalone (1 W+1 S), Only one tapping for injection in main pipeline.

14 Electronic Control Unit To be installed in safe area, with RS 485 communication port & provision for remote connectivity and lockable. Software to configure the odorizing system. Battery backup for memory to maintain configuration data in the event of power failure.

15 Protection class(ECU) IP 55 ( control room mounted).16 Display Back lit Alphanumeric LCD display17 Operating Modes Automatic with proportional to flow rate mode and proportional to

time base mode.

18 Storage tanks with level gauge Material specification for storage container

SS 304 or higher

19 Emergency Provision Automatic continue odorisation if main odorizing system stop due to power/control unit failure.

20 Maintenance Frequency To be submitted by Bidder

21 System Features In case of power / control unit failure, system to continue dozing at constant flow rate, till the power supply resumes

22 Odorant Filter (Installed in the suction pipe before the proportioning pump)

Required

23 Pressure Regulator valve installed at the odorant tank

Required

24 Measurement Interfacing Equipment ( Meter to Odorizer )

The system shall be capable of accepting either an analog input proportional to the flow rate, a pulse input or serial communication proportional to the flow rate and proportional to time based mode.

Page 31 of 40

             

TECHNICAL SPECIFICATION – ODORISING UNIT

P.013702 D 11077

030

Rev.0 Odorisation Unit for City Gas Distribution Project

ANNEXURE-2 SCOPE OF COMPREHENSIVE MAINTENANCE OF ODORIZATION SYSTEM

The bidder’s scope for Comprehensive maintenance Charges includes but not limited to:

As per the frequency defined in AOMP approved by OWNER. Rates to be quoted in SOR for each Visit.

Leakage Testing: - Checking up of each tubing connections for any leakages using soap solution. In case any leakage is found, the same to be replaced.

Tubing’s should be opened, cleaned and reaffixed.

Replacement of odorant neutralizing agent (to be supplied by Bidder without any extra cost implication to OWNER), if the same are saturated/exhausted, in the existing system (only if applicable).

Checking of all the cable for its joints and any cuts in the cabling exposed to atmosphere. If the joints are loose or there is cut in the cable, then replacing the portion of the cable. (Cable and cable glands to be supplied by the Bidder).

Cleaning of display parts of PG, LG, etc.

Replacement of any spare, if required.

Checking up the electronic panel, components and cables for its proper functioning. In case of malfunctioning of the same, it should be repaired. Spares required, if any, shall be provided the Bidder.

Checking up of Controller parameters like odorant injection, pump strokes, pump displacement, Odorant level, battery voltage, flow signal %, date & temperature or any other parameter. In case of any of these not working properly, it should be checked and problem should be rectified.

The electro-mechanical components like solenoid valves, relays, filters etc. should be checked and if having any problem, they should be changed.

Calibration of Pressure gauge.

Testing of PSV/CRV/SRV- Bidder shall test PSV/CRV/SRV as per the frequency advised and provide the calibration certificate verified by the component authority authorized under SMPV rules or under DISH as per factories act 1948.

Thickness measurement of the odorant storage tank and any other tank to be used in system for odorant handling.

The execution of aforesaid scope of work till completion shall be entirely Bidder’s responsibility and regardless of the number of days spent on site, the execution of the scheduled work in total shall be treated as ONE VISIT ONLY.

Any other work not mentioned herein, however required for proper repair and maintenance and smooth functioning of Odorizer unit, shall be done by Bidder to the satisfaction of OWNER.

On-call basis/Emergency visit: This shall include any repair service provided on call of breakdown from OWNER other than contractual schedule maintenance.

The Bidder shall carry out the modification and up graduation of system as per direction of OWNER as and when required.

Spare during warranty and CMC period is Bidder’s scope

                

Page 32 of 40

QAP NoDatePrepared by MA/DS Chd by: CKSAppd byProjectClientConsultant

MANUF TPI/ OWNER

1

1.1Chemical composition of Material

Review of MTC 100% MTC by supplier Chemical composition as per standard material-SS 304 MTC R R

1.2

Hydrostatic Test at 1.5 times of design pressure kg/cm2(Barg)

Performance Check 100%

ASME SEC VIII DIV 1 edition 2013

No Leakage to be observed from the tank Inspection Report P w

1.3 Dye Penetrant test Performance Check 100%

ASME SEC V DIV 1 edition 2013-Article 6

No Leakage to be observed from the tank Inspection Report P w

2

2.1 Review of Test Certificate Review of MTC 100% API 520 Chemical composition of PRV

as per API-520 MTC R R

2.2 Crack Pressure Test Performance Check 100% API 520 Set cracking pressure Inspection Report P W

3

3.1 Review of Test Certificate Review of MTC 100% Chemical composition as per

standard MTC R R

4

4.1 Calibration Certificate

Review of Calibration certificate

100% Calibration Certificate R R

QUANTUM OF CHECKTYPE OF CHECK

QUALITY ASSURANCE PLANODORIZATION SYSTEM

TE-INHPCL

14.08.2019P.013702 D 11013 008 Rev 0

AR

SR.No REMARKS

PRESSURE RELIEF VALVE

LEVEL INDICATOR

CGD

PRESSURE GAUGE

ODORANT STORAGE TANK

INSPECTIONACCEPTANCE NORMS DOCUMENTATIONREF. DOC.DESCRIPTION

Odorisation Unit for City Gas Distribution Project Page 1 of 2Page 33 of 40

QAP NoDatePrepared by MA/DS Chd by: CKSAppd byProjectClientConsultant

MANUF TPI/ OWNER

QUANTUM OF CHECKTYPE OF CHECK

QUALITY ASSURANCE PLANODORIZATION SYSTEM

TE-INHPCL

14.08.2019P.013702 D 11013 008 Rev 0

AR

SR.No REMARKS

CGD

INSPECTIONACCEPTANCE NORMS DOCUMENTATIONREF. DOC.DESCRIPTION

5

5.1 Review of Test Certificate Review of MTC 100% EN 10204 Chemical composition as per

EN 10204 MTC R R

5.2 Set Pressure Test Performance Check 100% EN 10204 Inspection Report P W

6

6.1 Review of Test Certificate Review of MTC 100% ASTM A629 Chemical composition as per

ASTM A629 MTC R R

7

7.1 Review of Test Certificate Review of MTC 100% ASTM-A-479 Chemical composition as per

ASTM-A-479 MTC R R

8

8.1 Review of Test Certificate Review of MTC 100% Chemical composition as per

standard MTC R R

8.2 leakage Test at 6 Barg

Review of report by vendor 100%

API 2000 6th edition Testing EN-12874

Inspection Report R R

9Performance of complete odorizing unit

Performance Check 100%

Performance test in AUTO mode against back pressure of 40 Barg with respect to 4-20ma signal at 8, 12, 16, 20 ma with simulator

Performance test report P R

10 FAT & SAT REVIEW 100% As per approved procedure P R

Note QAP is indicative purpose. Bidder to submit the detailed QAP for review and approval to EC / Owner based on tendet technical Specification of this tender.

Flame Arrestor

Valves

PRESSURE REGULATOR

Tubing & Tube Fittings

Odorisation Unit for City Gas Distribution Project Page 2 of 2Page 34 of 40

RECOMMENDED VENDOR LIST

P.013702 D 11040

003

HINDUSTAN PETROLEUM CORPORATION LIMITED (HPCL)

CITY GAS DISTRIBUTION PROJECT

RECOMMENDED VENDOR LIST

0 14.08.2019 Issued for Procurement Mukesh Agrawal Debasis Samantray Amitabh Ranjan

Rev. Date Description Prepared By Checked By Approved By

Page 35 of 40

RECOMMENDED VENDOR LIST

P.013702 D 11040

003

Rev.0 Odorisation Unit for City Gas Distribution Project

LIST OF ACCEPTABLE MANUFACTURERS FOR ODORISATION UNIT.

SL No.   ODORISATION 

1 SIGNAL CABLES INDIA

1.1 ASSOCIATED CABLES PVT LTD INDIA

1.2 ASSOCIATED FLEXIBLES AND WIRES [P] LTD INDIA

1.3 CMI LIMITED INDIA

1.4 CORD CABLE INDUSTRIES LTD.

1.5 DELTON CABLES LIMITED INDIA

1.6 ELKAY TELELINKS LTD. INDIA

1.7 K E I INDUSTRIES LIMITED INDIA

1.8 POLYCAB WIRES PVT LTD INDIA

1.9 RALLISON ELECTRICALS PVT LTD. INDIA

1.10 SUYOG ELECTRICALS LTD INDIA

1.11 THERMO CABLES LTD INDIA

1.12 UDEY PYROCABLES PVT. LTD.

2 AIR FILTER REGULATORS

2.1 ABB LTD (FARIDABAD) INDIA

2.2 DIVYA CONTROL ELEMENTS PVT LTD INDIA

2.3 JANATICS INDIA PVT LTD INDIA

2.4 MARSH BELLOFRAM INDIA / USA INDIA

2.5 PLACKA INSTRUMENTS INDIA P LTD INDIA

2.6 SCHRADER DUNCAN LIMITED INDIA

2.7 SHAH PNEUMATICS INDIA

2.8 SHAVO NORGREN (I) PVT LTD INDIA

2.9 THOMPSON VALVES LTD UK INDIA

2.10 VELJAN HYDRAIR PVT LTD INDIA

3 TEMP. ELEMENTS, THERMOWELLS

3.1 ABB AUTOMATION LTD INDIA

3.2 ALTOP INDUSTRIES LTD.

3.3 BAUMER BOURDON HAENNI S.A.S. INDIA / FRANCE

3.4 TECHNO INSTRUMENTS

3.5 DAILY THERMETRICS USA

3.6 DETRIV INSTRUMENTATION & ELECTRONICS LTD INDIA

3.7 GAYESCO LLC USA

3.8 GENERAL INSTRUMENTS CONSORTIUM INDIA

3.9 JAPAN THERMOWELL CO LTD JAPAN

3.10 PYRO-ELECTRIC INSTRUMENTS GOA PVT LTD INDIA

3.11 TEMP-TECH INDIA

3.12 TEMPSEN INSTRUMENT INDIA LTD INDIA

3.13 THERMO ELECTRIC CO. INC. USA

Page 36 of 40

RECOMMENDED VENDOR LIST

P.013702 D 11040

003

Rev.0 Odorisation Unit for City Gas Distribution Project

3.14 THERMO-COUPLE PRODUCTS CO INDIA / USA

3.15 THERMO-ELECTRA B.V NETHERLANDS

3.16 TM TECNOMATIC SPA ITALY

3.17 TECHNO INSTRUMENTS

3.18 WIKA ALEXANDER WIEGAND & CO GMBH GERMANY

4 PRESSURE GAUGES

4.1 AN INSTRUMENTS PVT LTD INDIA

4.2 ASHCROFT INDIA PVT LTD INDIA

4.3 BAUMER TECHNOLOGIES INDIA PVT. LTD.

4.4 BADOTHERM PROCESS INSTRUMENT BV.

4.5 BAUMER BOURDON HAENNI S.A.S. INDIA / FRANCE

4.6 BRITISH ROTOTHERM CO.LTD UK

4.7 BUDENBERG GAUGE CO. LTD UK

4.8 DRESSER INC. USA

4.9 FORBES MARSHALL (HYD) PVT. LTD INDIA

4.10 GAUGES BOURDON (I) PVT. LTD. ( GEN. INST.)

4.11 H GURU INSTRUMENTS (SOUTH INDIA)PVT. LTD INDIA

4.12 H.GURU INDUSTRIES INDIA

4.13 MANOMETER (INDIA) PVT. LTD. INDIA

4.14 NAGANO KEIKI SEISAKUSHO LTD JAPAN

4.15 WALCHANDNAGAR INDUSTRIES LTD(TIWAC DIVN)

4.16 WIKA ALEXANDER WIEGAND & CO GMBH GERMANY

5 PRESSURE SWITCHES

5.1 ASCO JOUCOMATIC

5.2 BETA BV

5.3 BAUMER BOURDON HAENNI

5.4 DAG PROCESS INSTRUMENTATION PVT LTD

5.5 DELTA CONTROLS LTD

5.6 DRESSER INC

5.7 GAUGES BOURDON (I) PVT. LTD. (GEN. INST)

5.8 INDFOS INDUSTRIES LTD

5.9 KAUSTUBHA UDYOG

5.10 NAGANO KEIKI SEISAKUSHO LTD

5.11 PYROPRESS ENGG CO LTD

5.12 ROBERTSHAW CONTROL CO

5.13 REGULATEURS GEORGIN S.A

5.14 SWITZER INSTRUMENT LTD

5.15 SOR INC

5.16 SIRCO CONTROLS LTD

5.17 UNITED ELECTRIC CONTROLS CO

Page 37 of 40

RECOMMENDED VENDOR LIST

P.013702 D 11040

003

Rev.0 Odorisation Unit for City Gas Distribution Project

6 FIELD INSTRUMENTS (P, DP, F, L , T, TD) Transmitters

6.1 ABB AUTOMATION PRODUCTS GMBH

6.2 EMERSON PROCESS MANAGEMENT INDIA PVT LTD

6.3 EMERSON PROCESS MANAGEMENT ASIA PACIFIC PTE LTD

6.4 ENDRESS + HAUSER WETZER GMBH +CO. KG

6.5 FUJI ELECTRIC SYSTEM CO. LTD

6.6 HONEYWELL AUTOMATION INDIA LTD

6.7 HONEYWELL INC.

6.8 INVENSYS INDIA PVT. LTD

6.9 YOKOGAWA INDIA LTD

6.10 YOKOGAWA ELECTRIC CORPORATION

7 TEMP. GAUGES (BI METALLIC, FILLED SYSTEM)

7.1 AN INSTRUMENTS PVT LTD INDIA

7.2 ASHCROFT INDIA PVT LTD INDIA

7.3 BADOTHERM PROCESS INSTRUMENTS B.V.

7.4 BAUMER TECHNOLOGIES INDIA PVT LTD.

7.5 BAUMER BOURDON HAENNI S.A.S. INDIA / FRANCE

7.6 DRESSER INC. USA

7.7 H. GURU INSTRUMENTS (SOUTH INDIA) PVT. LTD INDIA

7.8 H.GURU INDUSTRIES INDIA

7.9 GOA INSTRUMENTS INDUSTRIES PVT. LTD.

7.10 NAGANO KEIKI SEISAKUSHO LTD JAPAN

7.11 PYRO-ELECTRIC INSTRUMENTS GOA PVT LTD INDIA

7.12 SOLARTRON ISA UK

7.13 WALCHANDNAGAR INDUSTRIES LTD(TIWAC DIVN)

7.14 WIKA INSTRUMENTS INDIA PVT LTD INDIA

7.15 FORBES MARSHALL (HYD) PVT. LTD INDIA

8 GAUGE GLASSES & COCKS

8.1 ASIAN INDUSTRIAL VALVES & INSTRUMENTS INDIA

8.2 BLISS ANAND PVT LTD INDIA

8.3 CHEMTROLS ISAMIL (INDIA) PVT LTD.

8.4 CESARE BONNETTI SPA

8.5 GAUGES BOURDON (I) PVT. LTD.(GEN. INST.)

8.6 JERGUSON GAUGE & VALVE USA

8.7 KLINGER SPA ITALY

8.8 LEVCON INSTRUMENTS PVT LTD INDIA

8.9 NIHON KLINGAGE CO LTD JAPAN

8.10 PENBERTHY INC USA

8.11 PHOENIX SYSTEMLEMENTE UND MESSTECHNIK

8.12 PRATOLINA INSTRUMENTS PVT LTD INDIA

Page 38 of 40

RECOMMENDED VENDOR LIST

P.013702 D 11040

003

Rev.0 Odorisation Unit for City Gas Distribution Project

8.13 PUNE TECHTROL PVT LTD INDIA

8.14 R.K. DUTT CONCERNS INDIA

8.15 SIGMA INSTRUMENTS CO INDIA

8.16 TECNOMATIC INDIA PVT LTD INDIA

9 INSTRUMENT TUBING

9.1 HEAVY METALS & TUBES LIMITED(MEHSANA) INDIA

9.2 JINDAL SAW LTD (NASHIK WORKS) INDIA

9.3 RATNAMANI METALS AND TUBES LTD INDIA

9.4 REMI EDELSTAHL TUBULARS LTD.

9.5 63 JUNCTION BOXES

9.6 BALIGA LIGHTING EQUIPMENTS (P) LIMITED INDIA

9.7 FCG FLAMPROOF CONTROL GEARS P. LTD(C-157 INDIA

9.8 FCG POWER INDUSTRIES PVT LTD INDIA

9.9 FLAMEPROOF EQUIPMENTS PVT.LTD INDIA

9.10 FLEXPRO ELECTRICALS PVT LTD INDIA

9.11 PETROLEUM SAFETY PRODUCTS IND. PVT. LTD.

9.12 SUDHIR SWITCHGEARS PVT LTD INDIA

10 SOLENOID VALVES

10.1 ALCON ALEXANDER CONTROLS LIMITED UK

10.2 ASCO NUMATICS (INDIA) LIMITED INDIA

10.3 ASCO JOUCOMATIC LTD INDIA / UK

10.4 ASCO JOUCOMATIC SA FRANCE

10.5 AVCON CONTROLS PVT. LTD. INDIA

10.6 HERION WERKE GERMANY

10.7 PRECISION INSTRUMENT COMPANY INDIA

10.8 ROTEX AUTOMATION LTD. INDIA

10.9 SCHRADER DUNCAN LIMITED INDIA

10.10 THOMPSON VALVES LTD UK

10.11 VERSA BV NETHERLANDS

11 TUBE FITTINGS

11.1 ARYA CRAFTS & ENGINEERING PVT LTD INDIA

11.2 ASTEC VALVES & FITTINGS PVT. LTD. INDIA

11.3 AUTOCLAVE ENGINERS FLUID COMPONENTS USA

11.4 COMFIT & VALVES PVT LTD

11.5 CIRCOR INSTRUMENTATION LTD UK

11.6 EXCEL HYDRO PNEUMATICS PVT LTD INDIA

11.7 EXCELSIOR ENGG. WORKS INDIA

11.8 HAM-LET (ISRAEL-CANADA) LTD. ISRAEL

11.9 MULTIMETAL INDUSTRIES INDIA

11.10 PANAM ENGINEERS INDIA

Page 39 of 40

RECOMMENDED VENDOR LIST

P.013702 D 11040

003

Rev.0 Odorisation Unit for City Gas Distribution Project

Notes :

1) Above vendor list is indicative only and any other vendor(s)apart from as mentioned above may be accepted subject to approval by Owner/Owners representative based on past track record.

2) For the vendors of items not covered in above vendor list, but required for completion of project successfully, bidder shall take approval form Owner/Owners representative for the same. Bidder shall submit the required certifications, documents, PTR and Performance letters from clients for the same.

X-X-X

11.11 PARKER HANNIFIN CORPORATION INDIA / UK / USA

11.12 PRECISION ENGINEERING INDUSTRIES INDIA

11.13 PRIME ENGINEERS INDIA

11.14 RELIANCE ENGINEERING & ELECTRICALS CORPN INDIA

11.15 SWASTIK ENGINEERING WORKS INDIA

11.16 SSP FITTINGS CORPORATION

12 PRESSURE REGULATORS, SLAM SHUT VALVES AND SHUT DOWN VLAVES

12.1 INSTROMET INTERNATIONAL NV

12.2 RMG

12.3 PIETRO FIORENTENI

12.4 EMERSON PROCESS MANAGEMENT

12.5 SCHLUMBERGER

12.6 NIRMAL INDUSTRIAL CONTROLS PVT. LTD.

12.7 GORTER CONTROLS

13 SOLENOID VALVE

13.1 SMC

13.2 ASCO

13.3 ROTEX

14 INSTRUMENT FITTINGS / TUBING

14.1 SWAGELOCK

14.2 SANDVIK (IMPULSE TUBING)

14.3 PARKER

14.4 COMFIT

Page 40 of 40

At the helm of the Energy Transition, Tractebel provides a full range of engineering and advisory servicesthroughout the life cycle of its clients’ projects, including design and project management. As one of the world’sleading engineering and advisory companies and with more than 150 years of experience, it's our mission toactively shape the world of tomorrow. With about 5,000 experts and presence in more than 70 countries, we areable to offer our customers multidisciplinary solutions in energy, water and urban.

TRACTEBEL ENGINEERING PVT. LTD.

Intec House 37Institutional Area, Sector 44122 002 - Gurgaon - INDIAtractebel-engie.com

Chandan Kumar SINGHtel. +91 124 469 8500fax + 91 124 469 [email protected]