Supplier Manual for Sealant Division
Transcript of Supplier Manual for Sealant Division
1
Yokohama Industries Americas, Inc.
Sealant Division
103 Kuhlman Boulevard
Versailles , Kentucky USA 40383
Telephone (859) 873-2188
Facsimile (859) 879-0574
Quality Control (859) 879-2802
Materials Coordinator (859) 879-2823
2
Approved by:
_______________________________________ _______________________________________
Quality Control Purchasing
_______________________________________ _______________________________________
Operations Manager Manufacturing
Date: Revision Level: Pages Affected: Approval:
Initiated by: Checked by: Approved by:
12-Oct-01 Draft All L. Burton/
K. Sutherland
10-Jan-02 Release All L.B./K.S. A.H. Above
24-Oct-06 1.0 All L. Burton K. Perry A. H.
06-Feb-15 3.0 All L. Lacy D. Wade A. H.
3
TABLE OF CONTENTS
PAGE SECTION TITLE 4 SUPPLIER ORGANIZATION AND CONTACT LIST
5 QUOTATION PROCESS
6 MATERIALS REQUIREMENTS
15 QUALITY SYSTEMS REQUIREMENTS
17 RMSA APPROVAL PROCESS
22 NON-CONFORMING MATERIAL
25 CORRECTIVE ACTION REPORT
26 SUPPLIER QUALITY RATING SYSTEM
27 CHANGE REQUEST
4
SUPPLIER ORGANIZATION AND CONTACT LIST Any questions regarding organization and contact list requirements should be directed to YIA Q.C.
Supervisor.
1.0 ORGANIZATION CHART
All suppliers are required to submit a current organization chart to YIA Q.C. Assistant Manager. The
purpose of the chart is to allow YIA to understand the supplier’s organizational structure and lines of
responsibility. It is the responsibility of the supplier to provide updated organizational charts when
appropriate.
2.0 CONTACT LIST
All suppliers are required to complete the Contact List Form and ISO Sign-off and submit to YIA Q.C.
Supervisor. Whenever there is a change in the information on the Contact List, the supplier is responsible
for re-submitting this form. The completed form must include the name, telephone number, and fax number
of the Quality Manager and Quality Contact (the actual person to be contacted about quality issues - can be
same as Quality Manager). This list must be updated whenever changes in personnel occur. The ISO
section must be signed by the person from the supplier who will have control and possession of YIA’s
Supplier Manual and a copy returned to YIA within two weeks of receipt of the manual. This is the person
that any revisions to the manual will be sent to and will be responsible for updating the supplier’s copy of
the manual. This is a YIA controlled document under ISO guidelines.
QUOTATION PROCESS
Any questions on interpretation of this procedure should be directed to YIA Materials Coordinator.
1.0 REQUEST FOR QUOTE
YIA Materials Coordinator may issue a Request for Quotation (R.F.Q.) to the supplier. The R.F.Q. will
have an assigned Inquiry Number, which must be referenced when the quotation is submitted. The R.F.Q.
will also have a due date. It is imperative the quotation be received by YIA Materials Coordinator on or
before the due date in order to receive consideration. Attached to the R.F.Q. will be the specifications for
each part identified on the R.F.Q.. Supplier is responsible to reference any drawing numbers, part numbers,
material specification, etc., which affect the cost of the product being asked to quote. YIA personnel may
request an informal quote from the supplier verbally or in writing.
2.0 QUOTATION SUBMISSION
Suppliers should review the specifications carefully for any exceptions or Change Requests. When
applicable, the supplier must submit the quotation describing in detail the exception or Change Requested.
All completed quotes must indicate any additional costs for tooling or engineering, and include applicable
lead times. For purposes of quotation, do not amortize any cost into the piece price. All quotes must be
signed, dated, and received by YIA Materials Coordinator on or before the due date indicated on the
R.F.Q.. Each quote must reference the Inquiry Number indicated on the R.F.Q.. YIA reserves the right to
accept or reject any quotation.
5
MATERIAL REQUIREMENTS
Any questions regarding interpretation of this procedure should be directed to YIA’s Materials Coordinator.
1.0 PURCHASE ORDERS AND REVISED PURCHASE ORDERS
A. PURCHASE ORDERS
This document is the initial notification of firm material requirements from YIA to suppliers. The list
below will provide interpretation of the YIA Purchase Order.
1. YIA shipping address
2. Purchase order numbers are released by the Materials Coordinator of YIA.
3. Ship Via – This give the carrier’s name to be used.
4. FOB: this details whether freight is collect, prepaid, or prepay & add
5. YIA’s Invoice payment terms
6. Vendor Address
7. Vendor Remit to Address – where payment will be sent.
8. The Line # designates the line number of the item on the purchase order. This number should be
referenced on the packing list and invoices of shipments made to YIA on purchase orders with
multiple part numbers and/or due dates.
9. Quantity Ordered
10. YIA’s Item Number
11. Date Due at YIA. This is a firm delivery date. Any item delivering after this date can be counted
as a late delivery against the suppliers delivery performance. Shipments should also not deliver
early. Any change to this date must be approved by YIA’s material Coordinator. If YIA
production shuts down due to a late delivery by a supplier, the supplier will
be charged a minimum of $1500.00 per hour for Sealant raw material
suppliers and $1000.00 per hour for Hotmelt raw material suppliers for loss
of production man hours. 12. The Unit Price – If no change is made to this price and communicated to YIA at the time the
order is placed, this is the amount YIA will pay.
13. Extended Price
14. Item Name, Description
15. Read this note carefully – Order confirmation is required with 24 hours of the order placement. If
no change is made to price and communicated to YIA at the time the order is placed, this is
the amount YIA will pay.
B. REVISED PURCHASE ORDER
In the event that a purchase order is changed for quantity change, due date change, price change etc., a
“Revised” purchase order will be released and sent to the vendor, if so required by the vendor.
2.0 CERTIFICATE OF ANALYSIS (COA’S)
As a tool to provide notification of delivery and conformance to YIA material specification
requirements, YIA will require a “Certificate of Analysis” (COA) to be emailed or faxed to YIA’s QC
Assistant Manager on the day before the material arrives at YIA and that a copy also accompany the actual
shipment. The COA should include the following information:
1. Name of company
2. Contact name, phone and facsimile number
6
3. YIA’s Purchase Order number
4. The total quantity shipped to the corresponding purchase order.
5. Lot Number
6. Test results in comparison to YIA material specification requirements.
7. Due date (date material is due at YIA)
Data supplied on the COA may be used as part of YIA’s process to calculate flow rates, etc.
that can critically affect the quality of YIA’s product. Should any data on the COA be
reported incorrectly, the supplier will be held totally responsible for any quality problems
experienced and any costs incurred as a result. Please reference section on NON-
CONFORMING MATERIAL for per hour charges.
Any questions of this section should be directed to YIA’s QC Assistant Manager. COA will be
considered the Advance Notification of Shipment from the supplier to YIA.
3.0 RECEIVING DISCREPANCY REPORT
YIA will closely monitor the accuracy of incoming shipments of material. Any discrepancy pertaining to
the accuracy in comparison to the YIA purchase order number, quantity, etc. will be reported back to the
vendor. The vendor should review this report and adjust the order status of the item in question. This will
also assist in receiving prompt payment.
4.0 VENDOR RETURN
The Vendor Return is used to ship non-conforming material back to the originating source. The vendor
return is used in conjunction with the Defective Material Report (D.M.R) as described in the
Quality Systems Requirements section of this manual.
5.0 RECEIVING DAMAGE NOTIFICATION
This report is used as a notification that the Receiving department has received material from a supplier in
which there is visual damage to the pallets and/or the container in which the material is packed. This report
is filled out by the attending Receiving clerk and submitted along with photos of the existing condition to
the YIA Materials Coordinator. This form will then be faxed to the supplier and subsequent conversations
held to determine responsibility/resolution.
6.0 PACKAGING AND IDENTIFICATION REQUIREMENTS
The following will provide packaging and identification requirements for all production material as
supplied by the vendor to YIA.
A. PACKAGING
All items shipped by the supplier to YIA must be received by YIA in good condition, free of damage,
and/or contamination. To insure that this is the rule, the following packaging requirements must be
followed without exception:
1. Pallets must be strong enough to support the load of material and withstand transit via the motor
carrier. The following pallet sizes are recommended:
A. 48” x 48”, 4 way entry
Please see picture of preferred pallets.
7
2. The top of the pallet must contain the number of slats that is needed to prevent the containers
falling through the pallet.
4. The bottom of the pallet must contain a minimum of three (3) slats, which must be located at both
entries and in the middle of the pallet.
5. Containers must be secure to the pallet by the use of stretch film and/or strapping. It is important to
note that the material must be secured to the pallet. Failure to do this may result in shifting and/or
sliding of the material off or away from the pallet, which may result in damage to the material.
6. Double stacking may result in damage to the material. It is recommended that the vendor place a
“DO NOT DOUBLE STACK” label on the outside of the pallet of any material, which should not
be double stacked. This will prevent the motor carrier from double stacking during transit to YIA.
7. Mixing of multiple part numbers on a pallet is acceptable. However, a “mixed pallet” label must
be attached to outside of the pallet.
8. YIA Materials Coordinator prior to production startup must approve packaging methods by the
supplier. The YIA Materials Coordinator must also approve any deviation to the packaging
requirements as listed in this manual. Deviation requests must be submitted in writing.
9. Returnable packaging methods, i.e. containers, trays, pallets, will be considered on a case by case
basis with cost justification to be submitted by the supplier.
B. IDENTIFICATION
Each container supplied to YIA should be identified with the product name, lot number, and quantity.
7.0 SHIPPING INSTRUCTIONS
WEIGHT CARRIER COMMENTS
1 – 150 LBS UPS or AGGREGATE WT.
FEDEX GROUND
151-500 LBS UPS-cwt AGGREGATE WT.
501-12000 LBS LTL As Advised
OVER 12000 LBS FTL CONTACT YIA MATERIALS COORDINATOR
YIA may drop ship product from your facility to another outside supplier other than to Versailles, KY. If
3rd
party shipment freight is to be paid by YIA, then BOL issued to carrier must show 3rd
party billing to
YIA.
8.0 DELIVERY
Suppliers are required to maintain a 100% on-time delivery performance. Each month, the suppliers not
maintaining 100% on-time delivery will be issued a Corrective Action Request for Late Delivery from the
Materials Coordinator.
QUALITY SYSTEMS REQUIREMENTS Any questions regarding interpretation of this procedure should be directed to YIA’s Quality Department.
1.0 QUALITY PLANNING
Suppliers must have a documented process for Quality Planning. This process should utilize a team
approach with emphasis on defect prevention and continuous improvement.
Elements that should be included in this process are:
A. Specification review
8
B. Preparation of Process Flow Chart
C. Preparation of FMEA’s
D. Preparation of Quality Control Process Chart
E. Preparation of Inspection Standards
2.0 GAGE CONTROL AND CALIBRATION
Suppliers must maintain a documented system for the routine calibration and maintenance of all gages,
measurement devices, and test equipment at sufficiently frequent intervals to assure continued accuracy.
Any production fixture, jig, or tool used for process control or to make product acceptance decisions must
be maintained and documented in the same manner as any other gage. All gages, measurement devices, and
test equipment should be uniquely identified and indicate calibration status. Records including calibration
schedule and actual results should be maintained on file and available for periodic review.
3.0 PRODUCT IDENTIFICATION AND TRACEABILITY
Suppliers must have a documented procedure to provide positive identification of all materials throughout
all stages of the process. Suppliers must maintain a positive system for age control (FIFO).
4.0 PROCESS CONTROL
Suppliers must have a documented system that defines the procedures, methods, and documentation
requirements for control of the manufacturing process. This system should include:
A. Documented work instructions for each operation
B. Procedure for set-up verification
C. Identification and handling of non-conforming material
D. Application of statistical methods for critical characteristics – SPC for all critical specifications
as shown on YIA’s raw material specification agreement must be maintained within the supplier
process and be available to YIA immediately upon request.
E. Handling, storage, and packaging
5.0 INSPECTION AND TESTING
Suppliers must have a documented system of inspection and testing throughout all stages of the process.
Suppliers should have procedures for and maintain records of all inspections and tests for the items listed
below:
A. Incoming materials
B. In-process inspection and testing
C. Final inspection and testing
6.0 CONTROL OF NON-CONFORMING PRODUCTS AND MATERIALS
Suppliers must have a documented system for control of non-conforming products and materials.
The system should include:
A. Positive identification of all non-conforming or suspect products or materials
B. Segregation of all non-conforming or suspect material from the normal process flow
C. Defined responsibility for review and disposition of non-conforming
and suspect products or materials
A. Reworked products are re-inspected and/or tested for conformance to
specification
E. Traceability
9
7.0 CORRECTIVE ACTION
Suppliers must have a documented corrective action procedure that defines the methods and responsibilities
for developing effective corrective action plans and implementing countermeasures to prevent recurrence.
This system should include:
A. Identification of the root cause
B. Containment action
C. Short-term corrective action
D. Long-term corrective action
E. Verification of effectiveness
8.0 QUALITY RECORDS
Suppliers must maintain a system for control and retention of quality systems records for all products
supplied to YIA for the active life of the product plus one (1) calendar year. The record retention
requirement includes:
A. Process change control
B. Gage and test equipment calibration
C. Quality performance records indicating inspection and test results
for all products shipped to YIA
The records must be made available for review by YIA upon request.
RAW MATERIAL SPECIFICATION APPROVAL Any questions on interpretation of this procedure should be directed to YIA Quality Department
1.0 WHEN SUBMISSION IS REQUIRED
RMSA Approval is always required prior to the first production shipment of product in the following
situations:
1. A new or changed product.
2. Correction of discrepancy on a previously submitted product
3. Following an Engineering change to design, specification, tolerances, or materials.
4. Product is ordered after a 12 month or more inactive period.
Additionally, suppliers must notify YIA and submit RMSA samples for approval prior to the first
production shipment in the following situations unless this requirement is specifically waived in writing by
QC Assistant Manager.
5. Use of an optional construction or material other than was used in the previously approved part.
6. Production following a change in the manufacturing process, method, or plant location.
7. Change of source for subcontracted parts, materials, or services (i.e. raw material, etc.).
8. To re-certify existing product due to a quality concern or re-certification requirement by a YIA
customer.
9. Refurbishment or rearrangement of existing tooling or equipment.
The purpose of these requirements is to identify changes that might affect YIA or YIA customer
requirements. Primary suppliers are responsible for subcontracted material and services.
2.0 RMSA REQUEST PROCEDURE
A RMSA Request/Evaluation will be issued to the supplier when RMSA Sample Approval is required for
Number 1 – 4 as detailed in Section 2.0 “When Submission is Required”. The supplier is responsible for
notifying YIA for any situation as shown in Number 5 – 10 in Section 2.0. The RMSA Request/ Evaluation
will specify the applicable requirements as detailed in Section 4.0 “Sample and Documentation
Requirements”.
10
3.0 SAMPLE AND DOCUMENTATION REQUIREMENTS
A. SAMPLE REQUIREMENTS
All products submitted as RMSA samples shall be produced at the production site, using production
equipment, tooling, gauging, process, materials, and operators. Parts submitted for RMSA Approval must
be taken from eight to twenty four hours of production unless otherwise agreed upon in writing by QC
Assistant Manager. Unless otherwise specified on the RMSA Request/Evaluation Form, three (3) samples,
Each sample must be numbered to correspond to the reported data.
B. MATERIAL CERTIFICATION REQUIREMENTS
Material Certifications are required for all materials used to complete the product. The certification must
show the comparison of the specification with the actual test results. Standard Certificates of Compliance
are not acceptable.
C. PROCESS FLOW CHART REQUIREMENTS
A Process Flow chart may be included with each RMSA Sample Submission package. The chart must
identify inspection points and routing for rework operations.
D. CONTROL PLAN REQUIREMENTS
A Control Plan must be included with each RMSA Sample Submission package unless otherwise noted on
RMSA Request/Evaluation. This plan is used to identify by sequence of operation, what is to be controlled,
by whom, the frequency, the method, and the reaction to discovery of non-compliance. Any changes to the
control plan after RMSA Approval must be submitted to YIA Q.C. SUPERVISOR for approval.
E. INSPECTION STANDARD REQUIREMENTS
An Inspection Standard may be included with each RMSA Sample Submission. The standard must identify
all inspections and tests the supplier will perform on the product, the type of measurement or test equipment
to be used, and the frequency of the inspection or test.
F. PROCESS CAPABILITY REQUIREMENTS
Process Capability Studies are required. All capability studies shall be performed using a minimum of ten
(10) lot samples. Actual data from the ten (10) piece sample must be included with the capability
summary. A CpK of at least 1.33 is required for approval. A PpK of at least 1.67 is required. Conflict
with this requirement due to destructive test or other reasons shall be handled jointly between the supplier
and QC Assistant Manager.
G. ON-SITE AUDIT REQUIREMENTS
YIA may require an on-site quality audit as a part of the RMSA Evaluation an Approval Process.
Whenever possible this audit is performed while the product is actually running. When applicable, this
requirement will be identified on the RMSA Request Form and the appropriate arrangements will be made
between the supplier and YIA QC Assistant Manager.
H. SPECIAL REQUIREMENTS
Certain products or materials may require additional documentation, completion of engineering tests,
qualification through YIA production process trials, or verification by YIA customers. When applicable,
these special requirements will be identified on the RMSA Request Form and the appropriate arrangements
will be made between the supplier and QC Assistant Manager.
11
5.0 RMSA SUBMISSION AND REPORTING FORMAT
All RMSA Sample Submissions are to be sent directly to YIA QC Assistant Manager. Each submission
must include the appropriate documentation as required on the RMSA Request/Evaluation Form and the
numbered product samples. The RMSA Submission may be submitted on the forms as shown in the
Production Part Approval Process section of the AIAG manuals or on the sample forms included in this
manual. Suppliers may use their own forms for the items listed below provided the reported information
is the same as required on the YIA forms:
1. Control Plan.
2. Process Capability.
For Material Certification, a copy of the actual mill certification or lab results are acceptable provided the
certification indicates the specification and the actual results.
6.0 RMSA EVALUATION
YIA Quality will evaluate each RMSA Sample Submission to insure it meets the requirements of this
procedure and for conformance to the requirements of this purchase order and applicable specifications.
Results of the evaluation of the RMSA Sample Submission will be reported to the supplier using the RMSA
Request/Evaluation Form.
A. Disposition Criteria:
1. Approval - This disposition is issued when all elements of the RMSA Sample Submission
Procedure, RMSA Request, Purchase Order, and applicable specifications have been satisfied.
2. Rejected - This disposition is issued when one or more elements of the RMSA Sample Submission
procedure, RMSA Request, Purchase Order, , or applicable specifications do not comply with or
are found non-conforming to the applicable requirement.
3. Conditional Approval - This disposition may be issued under the following circumstances:
A. Pending results from Engineering tests or process trials where
all other criteria have been satisfied.
B. Pending YIA Customer Approval where all other criteria has
been satisfied.
C. All criteria has been satisfied except for a minor discrepancy or
element as determined by YIA Q.C. SUPERVISOR.
4. Hold - This disposition may be issued when all information or data is not available to give an
actual disposition.
B. RMSA SAMPLE RE-SUBMISSION Any RMSA Submission, which is Rejected or given Conditional Approval, must be re-submitted in whole
or in part as instructed on the Request/Evaluation Form. Resubmission is generally required within 10
working days unless otherwise specified on the Request/Evaluation Form. Suppliers must contact YIA
Quality to confirm the instructions and make arrangements for re-submission.
NON-CONFORMING MATERIAL Any questions regarding interpretation of this document should be directed to YIA QC Assistant Manager.
1.0 NON-CONFORMING MATERIAL DISCOVERED BY THE SUPPLIER
If the supplier discovers non-conforming material has been shipped to YIA, the supplier must notify YIA
QC Assistant Manager immediately and provide the following information:
1. Lot numbers and quantities involved
2. Shipment dates
3. Containment action
4. Temporary countermeasure
12
YIA will issue a Defective Material Report (D.M.R.) and disposition the defective material appropriately at
the supplier’s expense. Prompt response to YIA’s need for replacement material is essential.
3.0 NON-CONFORMING MATERIAL DISCOVERED BY YIA
YIA will issue a D.M.R. and appropriately disposition the non-conforming material to the supplier at the
supplier’s expense. YIA will make every effort to exchange the rejected material for certified stock
whenever possible, Prompt response to YIA’s need for replacement material is essential. Suppliers will
receive a copy of all D.M.R.’s and will be contacted to discuss arrangements for return, replacement. The
following is a brief description of the information shown on the D.M.R..
1. Supplier - The name of the company responsible for the non-conformance.
2. Material name - which actually has the non-conformance.
3. Date Received - The date the suspect lot of material was received at YIA.
4. Quantity Received - The actual quantity received in the lot of suspect material.
5. P.O. Number - The Purchase Order Number under which the suspect lot of material was
received at YIA.
6. Lot Number – Actual supplier lot number of material if applicable.
7. Quantity Rejected - The total quantity of material rejected .
8. Problem Location - Where the non-conformance was found - YIA Receiving Inspection, YIA
In-process, or Other (YIA customer complaint, etc.).
9. Problem Classification -
A. Critical - could result in field failure, field complaint, or assembly problem by YIA’s
customer, will affect fit, function, performance, or safety
B. Major - could result in assembly problem at YIA, may affect performance or could
result in rejection at YIA’s customer, may require rework before use
C. Minor - does not affect fit, function, performance, or safety at YIA or YIA’s
customer
10. Points Assessed for D.M.R. - Reference the Supplier Quality Rating System Section of this
manual for explanation of this procedure.
11. Problem Description - Brief description of non-conformance
12. Initial Disposition - This is the disposition of the material with the non-conformance:
A. Use As Is - Quantity determined to be useable without replacement, May require an
Change Request Form to be submitted by the supplier
B. Return to Vendor - Material determined to be unusable to be returned to the supplier
rework or replacement
13. Pending Testing – Certain testing may need to be done by the YIA Q.C. Lab to determine
usability of the product. This testing will be done at the supplier’s expense of $50.00 per
hour to cover the costs of performing the test.
14. Pending Production Trial – An actual production trial may need to be done to determine
usability of the product. This trial will be done at the supplier’s expense of $275 per hour to
cover costs of Production performing the trial and of Quality evaluating the results.
15. Final Disposition after Testing/Trial – This section will report the disposition of the material
after the testing and/or production trial has been completed.
13
16. Total Testing Time and Total Trial Time: This reports the total amount of time that YIA
personnel spent performing either the Q.C. Testing or Production Trial.
17. Total Shut-down Time – This section will report any production hours that are lost because of
a supplier defect/discrepancy. The supplier will be responsible for any financial losses
incurred because of a material defect/discrepancy. If YIA production shuts down
due to a supplier material defect/discrepancy, the supplier will be
charged a minimum $1500.00 per hour for Sealant raw material suppliers
and $1000.00 per hour for Hotmelt raw material suppliers for loss of
production man hours. In addition, supplier will be responsible for any disposal
fees, freight fees, etc. that are incurred because of a supplier defect/discrepancy. This
may include, but is not limited to, actual functional defect in the material or data
reported incorrectly on the Certificate of Analysis.
18. Supplier Contact - Name of person at supplier that was contacted by YIA Quality personnel
regarding the non-conformance
19. Q.C. Sign-off - YIA QC Assistant Manager who dispositioned the material and contacted the
supplier.
20. Supplier Corrective Action Required – If a Corrective Action is requested by YIA, this
section will be marked and contain an assigned CAR Number and due date to YIA (Example:
02S001 due by 12/01/02) - Reference the Corrective Action Report Section of this manual for
full procedure.
CORRECTIVE ACTION REPORT Any questions on interpretation of this procedure should be directed to YIA Q.C. Assistant Manager.
1.0 REQUEST FOR CORRECTIVE ACTION
Suppliers will be required to submit a C.A.R. when so indicated on the Defective Material Report (D.M.R.)
or when requested by YIA QC Assistant Manager.
A. CONTENT REQUIREMENTS
All C.A.R.’s must identify the root cause of the problem, containment action taken, temporary corrective
action, permanent corrective action, and verification of effectiveness.
B. SUBMISSION REQUIREMENTS
Unless otherwise specified, all C.A.R.’s must be submitted to YIA QC Assistant Manager within ten (10)
working days. All C.A.R.’s must be attached to a copy of the D.M.R. and/or reference the C.A.R. control
number indicated on the D.M.R.. In some cases, the supplier may be asked to present their corrective action
at YIA to all for more in-depth discussion and understanding of the problem. In such cases, appropriate
arrangements will be made by YIA QC Assistant Manager and the supplier.
SUPPLIER QUALITY RATING SYSTEM Any questions on interpretation of this procedure should be addressed to YIA’s Quality and Customer
service departments.
1.0 QUALITY PERFORMANCE - POINTS ASSESSED SYSTEM
Penalties are assessed when any D.M.R. is written for a defect against a supplier according to severity of the
defect and the location the defectives were found (YIA, YIA’s Customer, or Field Failure). The chart
below is a summary of how points are assigned for D.M.R.’s:
14
A. Product failure in field due to raw material defect -30
B. Product failure at YIA’s customer due to raw material defect -15
C. Unusable raw material defect at YIA - 7
D. Usable raw material defect at YIA - 5
E. Packaging/paperwork issue resulting in unusable material - 5
F. Packaging/paperwork issue resulting in usable material - 3
Each supplier will begin the month with a 100 rating. Each incident during the month will result in the
above points being deducted from the 100 rating. A corrective action will be required whenever a
supplier’s quality performance rating falls below 85.
2.0 DELIVERY PERFORMANCE – PERCENTAGE AND RATING
Delivery performance will be monitored in two different ways. The actual on-time delivery percentage will
be monitored as well as a delivery performance rating. The on-time delivery percentage will be calculated
by dividing the number of on-time deliveries by the total number of deliveries for that month. Whenever
the individual suppliers on-time delivery percentage falls below 100%, corrective action will be required
from that supplier. The delivery performance rating will monitor the severity of any late or mis-deliveries.
Each month the supplier will start with a 100 rating with penalties deducted for any late delivery. Penalties
will be deducted as follows:
A. Late/mis-delivery resulting in production shutdown -15
B. Late/mis-delivery not resulting in interruption to production - 5
If YIA production shuts down due to a late delivery by a supplier, the supplier will
be charged a minimum of $1500.00 per hour for Sealant raw material suppliers and
$1000.00 per hour for Hotmelt raw material suppliers for loss of production man
hours.
CHANGE REQUEST FORM Any questions on interpretation of this procedure should be addressed to YIA’s Quality department.
1.0 WHEN SUBMISSION IS REQUIRED
When a supplier is requesting a change to a specification, material, production process, or sub-supplier or
any deviation from the normal process either for a new product or a part that have been previously approved
through the RMSA process must be complete and submit a Change Request Form.
2.0 SUBMISSION ROUTE
All completed Change Requests should be submitted through YIA Quality. All Change Requests will be
reviewed by the appropriate department manager at YIA including Material Coordinating, Technical
Service, Manufacturing, Customer Service, and Quality Control. YIA will review each request and render a
decision as quickly as possible. YIA may also request physical samples prior to making a final decision.
3.0 SUBMISSION DISPOSITION
Upon disposition, the Change Request will be returned to the supplier indicating disposition, with any
special instructions that may apply, and signed by personnel from each department in Section 3.0 above.
4.0 IMPLEMENTATION
YIA Materials Coordinator will develop and coordinate implementation of a change request with the
supplier.