Superload Move April 06, 2013 Prasad Nallapaneni & Jonathan Mallard Structure and Bridge, VDOT.
Superload Move
description
Transcript of Superload Move
![Page 1: Superload Move](https://reader035.fdocuments.us/reader035/viewer/2022062323/56816692550346895dda70a4/html5/thumbnails/1.jpg)
Superload MoveApril 06, 2013Prasad Nallapaneni & Jonathan MallardStructure and Bridge, VDOT
![Page 2: Superload Move](https://reader035.fdocuments.us/reader035/viewer/2022062323/56816692550346895dda70a4/html5/thumbnails/2.jpg)
2
Superload - Route
![Page 3: Superload Move](https://reader035.fdocuments.us/reader035/viewer/2022062323/56816692550346895dda70a4/html5/thumbnails/3.jpg)
3
Superload- DetailsTotal Distance :
Approximately 96 Miles Number of Structures: 62 (61 VDOT)
Bridges: 25Culverts: 37
VDOT Structures:Analyzed in-house: 47Third Party Analysis: 16
![Page 4: Superload Move](https://reader035.fdocuments.us/reader035/viewer/2022062323/56816692550346895dda70a4/html5/thumbnails/4.jpg)
4
Superload - DetialsAnalysis Method:
In house: LFR/LRFR – »VIRTIS if available»Compared Simple span moments with HS20 ratings
Third Party: LRFR -16 BridgesVerified hand calculations/ LFR analysis
Structures Jumped: 5 (five)
![Page 5: Superload Move](https://reader035.fdocuments.us/reader035/viewer/2022062323/56816692550346895dda70a4/html5/thumbnails/5.jpg)
5
Superload - Permit
![Page 6: Superload Move](https://reader035.fdocuments.us/reader035/viewer/2022062323/56816692550346895dda70a4/html5/thumbnails/6.jpg)
6
Superload - Permit
![Page 7: Superload Move](https://reader035.fdocuments.us/reader035/viewer/2022062323/56816692550346895dda70a4/html5/thumbnails/7.jpg)
7
Superload - Jump
![Page 8: Superload Move](https://reader035.fdocuments.us/reader035/viewer/2022062323/56816692550346895dda70a4/html5/thumbnails/8.jpg)
8
Superload - Restrictions
![Page 9: Superload Move](https://reader035.fdocuments.us/reader035/viewer/2022062323/56816692550346895dda70a4/html5/thumbnails/9.jpg)
9
Superload - Crabs
![Page 10: Superload Move](https://reader035.fdocuments.us/reader035/viewer/2022062323/56816692550346895dda70a4/html5/thumbnails/10.jpg)
10
Superload
![Page 11: Superload Move](https://reader035.fdocuments.us/reader035/viewer/2022062323/56816692550346895dda70a4/html5/thumbnails/11.jpg)
11
Superload
![Page 12: Superload Move](https://reader035.fdocuments.us/reader035/viewer/2022062323/56816692550346895dda70a4/html5/thumbnails/12.jpg)
12
SuperloadAttempt Made:
• Run few bridges in 6.5 with Non Standard Gage Vehicle
• Compare with calculations received from Third Party and in-house STAAD runs
![Page 13: Superload Move](https://reader035.fdocuments.us/reader035/viewer/2022062323/56816692550346895dda70a4/html5/thumbnails/13.jpg)
13
SuperloadBridge Fed ID: 24505
![Page 14: Superload Move](https://reader035.fdocuments.us/reader035/viewer/2022062323/56816692550346895dda70a4/html5/thumbnails/14.jpg)
14
Superload
BrR Model Hand Clacs % Diff Reason
Dead Load Moment (K ft) 1550 1519 2.04% Model has slightly higher
Superimposed loadsCapacity (K Ft) 6271 6221 0.80% Round of errorRating Factor 2.01 2.09 -4.22%
Live Load (K ft) 2355 2246 4.83%
May be round off error in Distribution Factor. No detail output in BrR for
Live Load.
Bridge Fed ID: 24505Wheel Configuration: Straight
![Page 15: Superload Move](https://reader035.fdocuments.us/reader035/viewer/2022062323/56816692550346895dda70a4/html5/thumbnails/15.jpg)
15
SuperloadBridge Fed ID: 25334
![Page 16: Superload Move](https://reader035.fdocuments.us/reader035/viewer/2022062323/56816692550346895dda70a4/html5/thumbnails/16.jpg)
16
Superload
BrR Model Hand Clacs % Diff Reason
Dead Load Moment (K ft) 5701 5691 0.18% Round Off
Capacity (K Ft) 15475 15463 0.08% Round OffRating Factor 1.11 1.19 -6.48%
Live Load (K ft) 8805 8233 6.95%
May be round off error in Distribution Factor. No detail output in BrR for
Live Load.
Bridge Fed ID: 25334Wheel Configuration: Straight
![Page 17: Superload Move](https://reader035.fdocuments.us/reader035/viewer/2022062323/56816692550346895dda70a4/html5/thumbnails/17.jpg)
17
SuperloadBridge 24231
![Page 18: Superload Move](https://reader035.fdocuments.us/reader035/viewer/2022062323/56816692550346895dda70a4/html5/thumbnails/18.jpg)
18
Superload
BrR Model Hand Clacs % Diff Reason
Dead Load Moment (K ft) 320 320 0.0%
Capacity (K Ft) 1828 1828 0.08%Rating Factor 2.07 2.19 -5.6%
Live Load (K ft) 729 688 5.93%
May be round off error in Distribution Factor. No detail output in BrR for
Live Load.
Bridge Fed ID: 24231Wheel Configuration: Straight
![Page 19: Superload Move](https://reader035.fdocuments.us/reader035/viewer/2022062323/56816692550346895dda70a4/html5/thumbnails/19.jpg)
19
SuperloadDifficulties Faced
• Installation issues with 64 vs. 32 bit• Long time run process• Memory issues• Run only from bridge explorer • Not able to get a detailed LL output.
![Page 20: Superload Move](https://reader035.fdocuments.us/reader035/viewer/2022062323/56816692550346895dda70a4/html5/thumbnails/20.jpg)
20
Superload
![Page 21: Superload Move](https://reader035.fdocuments.us/reader035/viewer/2022062323/56816692550346895dda70a4/html5/thumbnails/21.jpg)
21
Superloadhttp://www.youtube.com/watch?v=Dmacnt5GaHw http://www.youtube.com/watch?v=v8_3uyecXSc
![Page 22: Superload Move](https://reader035.fdocuments.us/reader035/viewer/2022062323/56816692550346895dda70a4/html5/thumbnails/22.jpg)
22
Field OperationsField Surveys• LIDAR survey was taken before and after on 5 long
span structures.• Calculated LL deflections from vehicle were up to 6”• Survey showed before and after elevations of the
bridge deck surface and the bottoms of the girders were within the tolerance of the method used.
• Any post move deflection was undetectable from a survey perspective.
![Page 23: Superload Move](https://reader035.fdocuments.us/reader035/viewer/2022062323/56816692550346895dda70a4/html5/thumbnails/23.jpg)
23
Field OperationsStructure 10720, Lee County• Originally designated to be ‘jumped’• Field review of route raised concerns about limited
hospital access for an extended period.• Detour length = 50 miles.• Hauler’s consultants recommended removing a 20 kip
counterweight from each of the tractors.• Tractors effectiveness was limited due to traction
loss.
![Page 24: Superload Move](https://reader035.fdocuments.us/reader035/viewer/2022062323/56816692550346895dda70a4/html5/thumbnails/24.jpg)
24
Field OperationsStructure 24362, Norton• Rated by private consultant. Substructure controlled
at pier due to uneven span arrangement• Travel restrictions were issued. • During transport, hydraulic line broke while crossing
the structure. Lead tractor was over critical pier.• After line replacement, vehicle initiated movement
from rear tractor, which was not on bridge.
![Page 25: Superload Move](https://reader035.fdocuments.us/reader035/viewer/2022062323/56816692550346895dda70a4/html5/thumbnails/25.jpg)
25
Field OperationsStructure 22454, Norton• Simple Span Plate Girder with partial depth welded
diaphragms• First diaphragm on girder 4 cracked at the base.• Retrofitted by drilling, arrested by next inspection
cycle.
![Page 26: Superload Move](https://reader035.fdocuments.us/reader035/viewer/2022062323/56816692550346895dda70a4/html5/thumbnails/26.jpg)
26