Superfast wireless in Lincolnshire
-
Upload
independent-networks-co-operative-association -
Category
Technology
-
view
69 -
download
3
description
Transcript of Superfast wireless in Lincolnshire
Delivering Superfast Broadband in Lincolnshire.
Neil J Tucker, Sales & Marketing DirectorINCA Seminar: Delivering Superfast Wireless Broadband ServicesPeople's History Museum, Manchester25th June 2014
@abinternetltdwww.abinternet.co.uk
• Lincoln based Internet Service Provider with a national
presence.
• 50+ areas and communities across the most remote parts of
Wales, England and Scotland
• Delivering residential and small business broadband from 2Mb
up to 50Mb from £14.99 per month
• Specialising in the delivery of Superfast Broadband in a rural
environment; primarily via fixed wireless access on a Multi
vendor platform.
• Deliver fibre and copper services from over 3,000 exchanges.
• Unique software and network management capability.
AB Internet…AB Internet…
East Lincolnshire Wireless Pilots 2012
The requirement.The requirement.
• £300,000 ERDF funded project to bring high speed broadband to the East Coast.
• 11 months from tender to contract (including SAC)
• 1 year rollout
The coverageThe coverage• 9 Core PoPs, covering 6,358km2
• Mix of fully licensed and licence exempt equipment, 100% wireless
backhaul to Lincoln
• Multi gigabit fibre bearer to Manchester (IFL2 peering)
……resulting inresulting in
As envisaged by the original tenderTotal Core Infrastructure spend (Design & Build) £300,000
Total Premises in 1st Intervention zone 2000
Total Premises passed 2000
Cost per premises passed £150.00
As tendered by AB Internet
Capital Spend £300,000Total Premises in 1st Intervention zone 2000
Total Premises in 2nd Intervention zone 2500
Total Premises passed 4500
Cost per premises passed £66.67
As finally covered by AB Internet
Capital Spend £300,000Combined Premises of both intervention areas 4500
Premises covered in Incidental coverage 8000
Total Premises passed 12500Cost per premises passed £24.00
A very successful project.
•50, 25, 10, 4 and 2Mb delivered to homes in intervention
areas
•Most popular speed 10Mb
•Customer/Operator funded client install successful.
•909 service enquiries; 202 customers to date, 500 Target.
•The real ‘kicker’ is the cost per premises passed:
……benefitting from lessonsbenefitting from lessons
• Beware of ‘wireless nay-sayers’ and ‘wireless vampires’; a socket on the wall is a socket on the wall.
• Never underestimate the power of apathy• Engage with the T&C planning authorities early• Ensure your wireless service provider can deliver different
grades of service across the same infrastructure –Sweating the asset and underpinning sustainability.
• Cost of customer connection pivotal • The Council and the operator are the champions – synergy
counts
Questions?Questions?
[email protected]@abinternet.co.uk
March
Ysceifiog
Nercwys
Pwll-Glas
RogerstoneRuthin
Scothern
Spilsby
Snowdonia
Bala
Anglesey
Denbigh
GoldcliffeGraigfechan
Llay
Maerdy
IngoldmellsGwynedd
Grosmont
Langstone
Holywell
Greenfield
TullochDingwall
Forest of Dean
Strathayre
Holbeach
LlandennySkegness
Argyll
Treuddyn Minting
Lincoln
Cold Harbour
Skendleby Bardney
Scampton
Coningsby
Northop Hall