1 08-2011 Power Transmission SolutionsE T PS S/Re1 08-2011 E T PS S/Re
Volker Hild Dietmar Retzmann
Power Transmission Solutions
Super Grids with UHV DC – Challenges and Solutions for Bulk Power Transmission
2011
2 08-2011 Power Transmission SolutionsE T PS S/Re2 Power Transmission SolutionsE T PS S/Re08-2011
CO2 Reduction – Green EnergyMegacities – Security of Supply
ocus on
3 08-2011 Power Transmission SolutionsE T PS S/Re3 Power Transmission Solutions
Prospects of Grid Developments:
08-2011
“Micro Grid” “Smart Grid”
Generation
C
C
C
C
C C
C
C
C
C
C
CCA
CC
CC
CC
CC
CC CC
CC
CC
CC
CC
CC
CCCACA
CA =CA = Cell Agent
Virtual Power Plant
Cell
C
C
C
C
C C
C
C
C
C
C
CCA
CC
CC
CC
CC
CC CC
CC
CC
CC
CC
CC
CCCACA
GG
C
C
C
C
C C
C
C
C
C
C
CCA
CC
CC
CC
CC
CC CC
CC
CC
CC
CC
CC
CCCACA
C
C
C
C
C C
C
C
C
C
C
CCA
CC
CC
CC
CC
CC CC
CC
CC
CC
CC
CC
CCCACA
C
C
C
C
C C
C
C
C
C
C
CCA
CC
CC
CC
CC
CC CC
CC
CC
CC
CC
CC
CCCACA
GG
GG
CA
“Super Grid”
GGGG
GG
Bulk Power AC/DCEnergy HighwayE T PS S/Re3 E T PS S/Re08-2011
L
L
L
L
L
L
LL
LL
LL
LL
LL
LL
LL
LL
LL
LL
LL
LL
LL
DC
GG + =SS CCLL+Storage
SS
SSLSmart, controlled Loads
(autonomous)
AC
4 08-2011 Power Transmission SolutionsE T PS S/Re
S System Interconnection
4 Power Transmission SolutionsE T PS S/Re
olutions for
08-2011
Grid Extension and
5 08-2011 Power Transmission SolutionsE T PS S/Re5 E T PS S/Re Power Transmission Solutions08-2011
2010
P = 400 MWQ = +/- 170-300 MVAr Dynamic Voltage Support
Elimination of Transmission Bottlenecks
~=
=~
==
~ == ~ ==
Transmission Constraints before TBC
Transmission Constraints after TBC
No Increase inShort-Circuit Power
Power Exchangeby Sea Cable
No Increase inShort-Circuit PowerNo Increase inShort-Circuit Power
Power Exchangeby Sea CablePower Exchangeby Sea Cable
HVDC PLUS: Trans Bay Cable Project, USASecurity of Supply for San Francisco Area
6 08-2011 Power Transmission SolutionsE T PS S/Re
HVDC PLUS: Trans Bay Cable Project, USA
6 01-2011 Power Transmission SolutionsE T PS S/Re
Energy Project of the Year – American Society of Civil Engineers, Region 9; Sacramento, 9th March 2011Energy Project of the Year – American Society of Civil Engineers, Region 9; Sacramento, 9th March 2011
7 08-2011 Power Transmission SolutionsE T PS S/Re
No Increase inShort-Circuit Power
Benefits of HVDC – in Eastern and Western-Europe …
Customer:RTE and REE
Sharing ofReserve Capacity
Power Exchange &
Customer:Energotrans Ltd.
System Data:Rating 2 x 350 MWVoltage 96 kV DCThyristor 8 kV LTT
Black Sea B2B 2013
2013
INELFE
World’s 1st VSC HVDCwith 2 x 1,000 MW –each @ VDC = +/- 320 kVCable: XLPE, 65 km
Increase in Stability
8 08-2011 Power Transmission SolutionsE T PS S/Re
… and in USA: HVDC B2B close to New York
Customer:Hudson Transmission Partners LLC.
.System Data:Rating 660 MWVoltage 170 kV DCThyristor 8 kV LTT
2013
Hudson Transmission ProjectRidgefield (New Jersey), USA
No Increase inShort-Circuit Power
Sharing ofReserve Capacity
Power Exchange &
Increase in Stability
9 08-2011 Power Transmission SolutionsE T PS S/Re
From West to East – Benefits of HVDC
Bangladesh B2B
Customer:AltaLinkSystem Data:Rating 1,000 MWVoltage 500 kV DCThyristor 8 kV LTTOHL 400 km
WATL – Western AlbertaTransmission Link
2013Customer:Power Grid Company of Bangladesh Ltd.
System Data:Rating 500 MWVoltage 158 kV DCThyristor 8 kV LTT
Customer:ATCOSystem Data:Rating 1,000 MWVoltage 500 kV DCThyristor 8 kV LTTOHL 500 km
Sunnybrook
Crossings
Heathfield
Newell
2014 East DC Link Project
2014
10 08-2011 Power Transmission SolutionsE T PS S/Re10 Power Transmission SolutionsE T PS S/Re
Yunnan-Guangdong
08-2011
World’s first 800 kV HVDC – 5,000 MW
More Powerout of the Grid …
plus CO2 Reduction
In China Southern Power Grid
11 08-2011 Power Transmission SolutionsE T PS S/Re
2 x 800 kV UHV DC in China Southern Power Grid
+/- 800 kV DC
World’s first 800 kV Bulk Power UHV DC Transmission SystemYunnan-Guangdong5,000 MW 1,418 km
Commercial OperationYunnan-Guangdong: Dec. 2009 – Pole 1 June 2010 – Pole 2
Reduction in CO2 versus local Power Supply with Energy Mix
2 x 33 m tons p.a. – by using Hydro Power and HVDC for Transmission
Return to Sustainability
Nuozhadu-Guangdong1,451 km5,000 MW 2013: +/- 800 kV
2012: +/- 400 kV
2 x +/- 800 kV DC
12 08-2011 Power Transmission SolutionsE T PS S/Re12 Power Transmission Solutions08-2011 E T PS S/Re
Single-Line Diagram of Yunnan-Guangdong HVDC System
13 08-2011 Power Transmission SolutionsE T PS S/Re
Yunnan-Guangdong – from ‘3D Models’ …
14 08-2011 Power Transmission SolutionsE T PS S/Re
World’s first 800 kV UHV DC – 5,000 MW
2009/2010
… to Reality: Sending Station Chuxiong
14 Power Transmission Solutions08-2011 E T PS S/Re
Example of HVDC “Bulk”
15 08-2011 Power Transmission SolutionsE T PS S/Re
Thorough Testing is essential …
15 Power Transmission SolutionsE T PS S/Re08-2011
TU Graz
FGH MannheimHSP Cologne
TU Munich
TU Dresden
PSW Berlin
IPH Berlin
KIT Karlsruhe
16 08-2011 Power Transmission SolutionsE T PS S/Re
Examples of UHV DC Bushing, DC Arrestor and Voltage Divider
16 08-2011 Power Transmission SolutionsE T PS S/Re16 08-2011 E T PS S/Re
800 kV DC
9 m
12.8 m
Power Transmission Solutions
10.6 m
17 08-2011 Power Transmission SolutionsE T PS S/Re
DC (2 hrs) 1,175 kVAC (1 min) 1,020 kVPR (90/90/45 min) 935 kVSI 1,790 kVLI (FW/CW) 2,080/2,320 kV
48** Transformers – for the Yunnan-Guangdong UHV DC Project
Test Voltages
** plus 8 Spare Units
800 kV HVDC Transformers under Construction250/244 MVA Single-Phase* Transformers
* for Transportation Reasons
Core Design: 3 Limbs & 2 Return LimbsL x W x H: 26 x 6.4 x 15.2 mTotal Weight: 512 tons
18 08-2011 Power Transmission SolutionsE T PS S/Re
Yunnan-Guangdong – HVDC Transformer Data
19 08-2011 Power Transmission SolutionsE T PS S/Re19 Power Transmission Solutions08-2011 E T PS S/Re
A long Way: Transportation of Transformers –from Germany, Transformer Factory, to China
20 08-2011 Power Transmission SolutionsE T PS S/Re
UHV DC Transformers: welcome to the City
20 08-2011 Power Transmission SolutionsE T PS S/Re
21 08-2011 Power Transmission SolutionsE T PS S/Re
UHV DC Substation – coming closer
21 Power Transmission SolutionsE T PS S/Re08-2011
22 08-2011 Power Transmission SolutionsE T PS S/Re
Yunnan-Guangdong: UHV DC – ‘Welcome’
22 08-2011 Power Transmission SolutionsE T PS S/Re
23 08-2011 Power Transmission SolutionsE T PS S/Re
UHV DC Transformers – ready to ‘enter’the Valve Hall
23 08-2011 Power Transmission SolutionsE T PS S/Re
24 08-2011 Power Transmission SolutionsE T PS S/Re
Yunnan-Guangdong – UHV DC Valve Hall
800 kV DC
AC Side
25 08-2011 Power Transmission SolutionsE T PS S/Re
Yunnan-Guangdong – UHV DC Valve Hall
25 08-2011 Power Transmission SolutionsE T PS S/Re
800 kV DC
DC Side
26 08-2011 Power Transmission SolutionsE T PS S/Re
UHV DC – Sending Station: from indoor to outdoor
26 08-2011 Power Transmission SolutionsE T PS
800 kV DC
27 08-2011 Power Transmission SolutionsE T PS S/Re
Top View: Transformer Bushings & Valve Towers
27 08-2011 Power Transmission SolutionsE T PS S/Re
800 kV DC
28 08-2011 Power Transmission SolutionsE T PS S/Re
Yunnan-Guangdong – 800 kV DC Line
28 08-2011 Power Transmission SolutionsE T PS S/Re
29 08-2011 Power Transmission SolutionsE T PS S/Re
800 kV DC Overhead Line
Welcome great Outdoors !
29 08-2011 Power Transmission SolutionsE T PS S/Re
30 08-2011 Power Transmission SolutionsE T PS S/Re
Yunnan-Guangdong: UHV DC – Inauguration Pole 2World‘s highest bipolar DC Power * ever trans-mitted – with 4 Valve Groups, 2010, June 18
* 4,000 MW
* More Hydro Powerwas not available …at that Time
31 08-2011 Power Transmission SolutionsE T PS S/Re
Yunnan-Guangdong: full Power Transfer 5,000 MW
= 1,600 kV
=Full Hydro Poweris now available …
2,502 MW
+ +
800 kV
800 kV
2,499 MW
2011, April 04
32 08-2011 Power Transmission SolutionsE T PS S/Re32 Power Transmission SolutionsE T PS S/Re08-2011
HVDC “Bulk” – Overload Characteristics
Continuous overload at Chuxiong side
1.00
1.05
1.10
1.15
1.20
1.25
1.30
-10 -5 0 5 10 15 20 25 30 35 40
Ambient Temperature in Degree C
Ove
rload
in p
u of
500
0 M
W
(Bip
olar
)
w ith red. cooling equipment w ithout red. cooling equipment
Note: max. ambient temperature is 34.2°C in Chuxiong
Two hour overload at Chuxiong side
1.00
1.05
1.10
1.15
1.20
1.25
1.30
-10 -5 0 5 10 15 20 25 30 35 40
Ambient Temperatur in Degree C
Ove
rload
in p
u of
500
0 M
W (B
ipol
ar)
w ith red. cooling equipment w ithout red. cooling equipment
* 1.2 pu (required by TS)
*
Example of UHV DCYunnan-Guangdong, China (5,000 MW *)
* Chuxiong: Sending Station
33 08-2011 Power Transmission SolutionsE T PS S/Re33 Power Transmission SolutionsE T PS S/Re08-2011
HVDC “Bulk” – Overload Characteristics
Note: max. ambient temperature is 34.2°C in Chuxiong
Transient Overload at Chuxiong side with and without redundant cooling
1.00
1.10
1.20
1.30
1.40
1.50
1.60
-10 -5 0 5 10 15 20 25 30 35 40
Ambient Temperature in Degree C
Ove
rload
in p
u of
500
0 M
W
(Bip
olar
)
10 s overload 5 s overload 3 s overload
Transient Overload (starting from two-hour Overload)
Very high Overload Capacity = Security of Power Supply !
34 08-2011 Power Transmission SolutionsE T PS S/Re
Yunnan-Guangdong – UHV DC completed
34 Power Transmission SolutionsE T PS S/Re08-2011
35 08-2011 Power Transmission SolutionsE T PS S/Re35 Power Transmission SolutionsE T PS S/Re
Xiangjiaba-ShanghaiWorld’s biggest and longest 800 kV HVDC
08-2011
More Powerout of the Grid …
plus CO2 Reduction
Fulong Converter Station – HVDC Transformers & Thyristor Valves with new 6-inch Thyristors
In Co-Operation with
36 08-2011 Power Transmission SolutionsE T PS S/Re
Xiluodu-Zhexi 1728km
Zhexi
Xiluodu rightXiluodu right
Nanhui
XiangjiabaXiangjiaba
Sichuan Power Grid
Xiluodu-Zhuzhou 970kmZhuzhou
Xiluodu leftXiluoduleft
Wuhan
Guangdong
LeshanChongqing
Changsha
Shanghai
6,400 MW+/- 800 kV DC
2,071 km Commercial Operation: July 2010 – both Poles
36 08-2011 Power Transmission SolutionsE T PS S/Re
Reduction in CO2 versus local Power Supply with Energy Mix
41 m tons p.a. – by using Hydro Power and HVDC for Transmission
World’s biggest and longest 800 kV UHV DCSystem in Operation – State Grid Corporation of China
Xiangjiaba-ShanghaiFulong – World’s biggest HVDC Converter Station in Operation: Transformers & Thyristor Valves with new 6-inch Thyristors from Siemens
37 08-2011 Power Transmission SolutionsE T PS S/Re
Schematic Arrangement of Xiangjiaba-Shanghai Converters
37 Power Transmission Solutions08-2011 E T PS S/Re
38 08-2011 Power Transmission SolutionsE T PS S/Re
Thyristor Modular Unit for Fulong Converter Station
38 Power Transmission SolutionsE T PS S/Re08-2011
39 08-2011 Power Transmission SolutionsE T PS S/Re
Design of Thyristor Valves for Fulong Station:Latest Development of Power Thyristors: 6“-ETT
39 Power Transmission Solutions08-2011 E T PS S/Re
DC Current Capability ofmore than 4,500 A Optimum Blocking Voltage
of 8.5 kV Joining of the Silicon Pellet
to a Molybdenum Carrier Diskusing low-Temperature high-Pressure Sintering Excellent thermal Coupling Low thermal Resistance Outstanding Short-Circuit
Current Capability: > 80 kA High Reliability, Failure Rate < 10 fit
6“ high-Power Thyristor – compared with 4“ and 5“ Elements
40 08-2011 Power Transmission SolutionsE T PS S/Re
Arrangement of 800 kV Converters for Fulong Station
40 Power Transmission SolutionsE T PS S/Re08-2011
Two HV and two LVValve Towers for Fulong Converter Station during Erection for thedielectric Type Testsin Xihari HV Test Fieldin Xi‘an, China(Arresters not yet connected)
41 08-2011 Power Transmission SolutionsE T PS S/Re41 Power Transmission Solutions08-2011 E T PS S/Re
Conclusions:Prospects of Smart and Bulk PowerTransmission Technologies
42 08-2011 Power Transmission SolutionsE T PS S/Re
Sunan
To Sichuan Power GridJinping Plant I
GuandiLinping
Jinping Plant I I
Xichang
Wuhan
Guangdong
LeshanChongqing
Changsha
Shanghai
42 Power Transmission SolutionsE T PS S/Re08-2011
* 7,200 MW+/- 800 kV DC
2013
* 6.4 GW initially
2,095 km
+/- 800 kV DC
For Comparison: Germany
World’s biggest and longest 800 kV UHV DCProject: Jinping – State Grid Corporation of China
RWE amprion
Elia 50hertz
TenneTtranspower
EnBWTransport-netze
840 km
Yulong – World’s biggest HVDC Converter Station*: Thyristor Valves with new 6-inch Thyristors from Siemens
Jinping-Sunan
43 08-2011 Power Transmission SolutionsE T PS S/Re43 08-2011 Power Transmission SolutionsE T PS S/Re
World’s biggest 500 kV HVDC Transmission Project: 2 Systems in parallel – China Southern Power Grid
6,400 MW2 x +/- 500 kV DC
1,268 km
Xiluodo-Guangdong
Reduction in CO2 similar Benefits as in UHV DC Projects
Zhaotong – World’s biggest 500 kV Converter Station: 2 x 3,200 MW with Thyristor Valves from Siemens
2013
44 08-2011 Power Transmission SolutionsE T PS S/Re Power Transmission SolutionsE T PS S/Re
Connecting:Wind Power Hydro Plants Solar Fields
08-201144
The Vision: DC Energy Highway –why not in Europe too ?
44
FOSG*
Desertec
Medgrid
* Friends of the Supergrid
45 08-2011 Power Transmission SolutionsE T PS S/Re
The Future ? Global Link for Green Energywith HVDC – including DESERTEC & SEATEC
5-10 GW DCs in China
Thank You for Your Attention !