SUNY PACS - Environnent Management Regroup 2/10/2016.
-
Upload
sandra-newton -
Category
Documents
-
view
213 -
download
0
description
Transcript of SUNY PACS - Environnent Management Regroup 2/10/2016.
SUNY PACS - Environnent Management Regroup
2/10/2016
Project Home Page
• Project home page can be found here. • This document the state of the stores. • It compliments the Extranet that stores
project documentation.• It compliments Engage that stores that status
or work items.
Store MatrixServer Typeand Number #1 #2 #3
DEV
Not used. Sole development
environment. Not used.
STG
Staging for releases to PROD. Is a close copy of
PROD, regularly re-baselined from PROD. The settings should be the same as PROD. This is the place where we test the deployment. The settings on this store should only be
changed if specified in the release notes.
Staging stores for testing Phase 2,3 work.
Takes latest patches from DEV on all
solutions. Is a dead-end. The content and
configuration is not deployed to PROD
because that is done from STG1.
Settings and code are tested here.
Training/sandbox site. Updated 1/22. Will not be patched or updated unless SUNY requests a
change. This should ideally be a close match
for PROD. Consider rebaselining from time to time but delete the
PROD data to avoid security concerns.
PRD
University at Buffalo
Prod Live Stony Brook Prod Not live All Other Prod Not live
Patch History
Any patch that is released to any store is recorded here. You can filter by store and to see the full patch history.
Base Change Log
Updates that are made that are either not contained in a patch (outside of source control) or that are made to APPS configuration (and are therefore at risk of regression in upgrade) are recorded here. A developer would review this list after an upgrade. There are currently 14 items on the list.
Latest Releases
Live data from all your stores on the most recent patch applied.
Requesting Releases
• Request these using an item in Engage on the Environment Management delivereable
• Will permit tracking and audit. • The items will link to the project home page.