PROJECT TITLE_ RAMP CONSTRUCTION

<DETAILS><Calculation of slope of ramp>

<Construction of ramp>

Page 3: Summer training (civil engineering)-Ramp construction

<CONTENTS>

• Comparison b/w ramp & stairs• Theory• About

Page 4: Summer training (civil engineering)-Ramp construction

<Comparison>

Stairs Ramp

Page 5: Summer training (civil engineering)-Ramp construction
Page 6: Summer training (civil engineering)-Ramp construction

<theory>

• The maximum recommended slope of ramps is 1:20.

• Steeper slopes may be allowed in special cases depending on the length to be covered.

• Simple mathematics is used for calculation of slope.......

Page 7: Summer training (civil engineering)-Ramp construction
Page 8: Summer training (civil engineering)-Ramp construction

Meaning of 1:20

Page 9: Summer training (civil engineering)-Ramp construction

<recommended standards>

Page 10: Summer training (civil engineering)-Ramp construction

<About >• OPD BLOCK & OTHER ASSOCIATED SERVICES• Project:-OPD Block & other Associated Services • Client:-The Director AIIMS C/O M/S HSCC (India) Ltd. • Location:-AIIMS Campus, Ansari Nagar, New Delhi • Architect:-The Genral Manager (CIVIL), HSCC (India) Ltd.E-6 (A),

Sector-1, Noida-201301• Project Highlights:-Rcc Frame structure building (3B+G+8) Cilvil,

Plumbing, Electrical, HVAC, Lift, Fire Alram, external development, drainage etc..

Page 11: Summer training (civil engineering)-Ramp construction

<AHLUWALIA CONTRACTS LTD.>

• Project cost -251 crore• Project duration-09 months • My training duration-25 days

Page 12: Summer training (civil engineering)-Ramp construction

<Memories>

Page 13: Summer training (civil engineering)-Ramp construction
Page 14: Summer training (civil engineering)-Ramp construction

<Notes>

• Circular and round slope can not be construct.