Summer Plan: 2013 (1 st March – 31 st May)
description
Transcript of Summer Plan: 2013 (1 st March – 31 st May)
![Page 1: Summer Plan: 2013 (1 st March – 31 st May)](https://reader034.fdocuments.us/reader034/viewer/2022051418/5681502e550346895dbe2575/html5/thumbnails/1.jpg)
Summer Plan: 2013Summer Plan: 2013(1st March – 31st May)
Prepared by
Mr. Mahadev, Chief General Manager, Operations
Approved by
Managing Director
21st, February, 2013.
Bangalore Electricity Supply Company Limited
![Page 2: Summer Plan: 2013 (1 st March – 31 st May)](https://reader034.fdocuments.us/reader034/viewer/2022051418/5681502e550346895dbe2575/html5/thumbnails/2.jpg)
BESCOM ProfileBESCOM Profile Bangalore Electricity Supply Company Limited (BESCOM) is Power
Distribution Utility distributing electricity across 8 districts viz.,
Population Base : 2.07 Cr
Consumer Base : 79 Lakhs
Districts
Peak Load
Requirement (MW)
Energy
Requirement (MU )
Bangalore Urban 2100 41
Bangalore Rural 365 7.13
Ramanagar 100 1.95
Kolar 275 5.37
Chikkaballapura 245 4.78
Tumkur 495 9.66
Chitradurga 230 4.49
Davanagere 290 5.66
![Page 3: Summer Plan: 2013 (1 st March – 31 st May)](https://reader034.fdocuments.us/reader034/viewer/2022051418/5681502e550346895dbe2575/html5/thumbnails/3.jpg)
Demand & Supply (2011-2013)
![Page 4: Summer Plan: 2013 (1 st March – 31 st May)](https://reader034.fdocuments.us/reader034/viewer/2022051418/5681502e550346895dbe2575/html5/thumbnails/4.jpg)
Energy Consumption(2011-2013)
![Page 5: Summer Plan: 2013 (1 st March – 31 st May)](https://reader034.fdocuments.us/reader034/viewer/2022051418/5681502e550346895dbe2575/html5/thumbnails/5.jpg)
Energy Consumption (2011-2013)
For 2012-13 : Initially proposed by BESCOM: 32,193 MUs.
Approved by KERC: 31,305 MUs.
Consumption till date(17th Feb-2013) : 24,576 MUs.
Balance Upto end of March-2013 : 6,729 Mus(Adequate).
![Page 6: Summer Plan: 2013 (1 st March – 31 st May)](https://reader034.fdocuments.us/reader034/viewer/2022051418/5681502e550346895dbe2575/html5/thumbnails/6.jpg)
Reasons for Shortages / Gap
1.Low Wind Energy Generation : means no ‘reserve’ available
2. Unforeseen shut downs of thermal generating units at RTPS (Raichur) : 150 MW
3.10 % Unforeseen shutdowns in CGS (Central Generating Station) share to the state : 150 MW
Total Shortage of Load Expected : 300 MW
![Page 7: Summer Plan: 2013 (1 st March – 31 st May)](https://reader034.fdocuments.us/reader034/viewer/2022051418/5681502e550346895dbe2575/html5/thumbnails/7.jpg)
How BESCOM will close the GAP ?
1. Strict measures to stop illegal conversion of Single Phase to 3 Phase
by IP Set owners and excess consumption [Open Delta] : 210 MW
2. Vigilance Activities : 60 MW
3. Shifting of Peak Load : 30 MW ( From 6 PM to 9 PM to beyond 9 PM)
![Page 8: Summer Plan: 2013 (1 st March – 31 st May)](https://reader034.fdocuments.us/reader034/viewer/2022051418/5681502e550346895dbe2575/html5/thumbnails/8.jpg)
Open Delta System
1. Open Delta System is a scheme which avoids illegal use of power
supply to IP Sets. Thus there won’t be overloads or excess drawl
from the network.
2. Effective Implementation saves 210 MW
![Page 9: Summer Plan: 2013 (1 st March – 31 st May)](https://reader034.fdocuments.us/reader034/viewer/2022051418/5681502e550346895dbe2575/html5/thumbnails/9.jpg)
Open Delta Configuration
![Page 10: Summer Plan: 2013 (1 st March – 31 st May)](https://reader034.fdocuments.us/reader034/viewer/2022051418/5681502e550346895dbe2575/html5/thumbnails/10.jpg)
Vigilance Activities : 60 MW
1. Strengthening of BESCOM Vigilance network by providing 30
additional vehicles & staff .
2. Extra Vigilance during peak hours and at night : to have check
on illegal welding, lights, theft etc.,
3. Both Special Vigilance Team & BESCOM Officers will be on
strict vigil. Expected to do : 1500 inspections / Everyday.
![Page 11: Summer Plan: 2013 (1 st March – 31 st May)](https://reader034.fdocuments.us/reader034/viewer/2022051418/5681502e550346895dbe2575/html5/thumbnails/11.jpg)
Load Shifting : 30 MW
1. BESCOM would request consumers to shift the use of major
loads like Water pumps, Geysers etc., from peak to non- peak
hours ( after 10 PM)
2. BESCOMs brand ambassador will promote
Conservation, and load shifting activities like above
![Page 12: Summer Plan: 2013 (1 st March – 31 st May)](https://reader034.fdocuments.us/reader034/viewer/2022051418/5681502e550346895dbe2575/html5/thumbnails/12.jpg)
Rural Power Supply Schedule during summer8 SLOTS of 3 HRS DURATION
Batches 6 am - 9 am
9 am - 12 noon
12 noon - 3 pm
3 pm - 6 pm
6 pm - 9 pm
9 pm - 12 am
12 am - 3 am
3 am - 6 am
B1 Single Phase
3 Phase OFF OFF Open
Delta 3
PhaseSingle Phase
Single Phase
B2 Single Phase OFF 3
Phase OFF Open Delta
Single Phase
3 Phase
Single Phase
B3 Single Phase OFF OFF 3
Phase Open Delta
Single Phase
Single Phase
3 Phase
3 Phase : 3 Phase Power Supply Batches B1,B2, B3 will not have same timings,
the batches will be intimated by issuing
pamphlets.
Single Phase: Single Phase Power Supply
Open Delta: Open Delta Power supplyOFF : No Power Supply
![Page 13: Summer Plan: 2013 (1 st March – 31 st May)](https://reader034.fdocuments.us/reader034/viewer/2022051418/5681502e550346895dbe2575/html5/thumbnails/13.jpg)
Reduction in Power Outages in past 5 years
![Page 14: Summer Plan: 2013 (1 st March – 31 st May)](https://reader034.fdocuments.us/reader034/viewer/2022051418/5681502e550346895dbe2575/html5/thumbnails/14.jpg)
In Case of any grievances ! Reach us
1. Online Complaint Registration
Log onto www.bescomhelpline.com to register your complaint
2. 24×7 SMS Facility
Just type BESCOM <Space> Subdivision code<space> nature of
complaint and send it to 92431 50000
3. 24×7 Helpline
Call to BESCOMs 24X7 Customer Helpline (080-22873333)-(25 lines are
there)
![Page 15: Summer Plan: 2013 (1 st March – 31 st May)](https://reader034.fdocuments.us/reader034/viewer/2022051418/5681502e550346895dbe2575/html5/thumbnails/15.jpg)
Thank You