Dams of the Cuyahoga Obsolete Dams on the Cuyahoga River Studied Since 1995 Middle Cuyahoga TMDL established dams as the major cause of non- attainment of water quality standards in section of the Cuyahoga River 1995 Kent dam studied/modified: cost $5 M 1998 - 2005 Monroe Falls dam studied/removed: cost $2.6 M 1998 - 2006 Powerhouse & Sheraton Dams, Cuyahoga Falls, studied/removed: cost $1 M 2000 - 2013 Gorge Dam, built 1914 for Hydro and Coal Generated Electricity Hydro Operations Cease Coal Operations Cease Proposed Hydro Project (Abandoned) US EPA Sediment Study Phase 1 Study: Sediment Management & Dam Removal Engineering & Cost (Estimated $70 Million) Phase 2 Study: Environmental & Hydrology Possible Removal 1958 1991 2003-2009 2009 & 2011 2015 Unknown Unknown Brecksville Dam, originally built 1827 for O & E Canal (current dam built 1952 for industrial water) Environmental Studies Conducted Studies Completed – Projected Possible Removal - Projected (Estimated Cost $1 Million) 2006 – present 2016 2017 Gorge Dam Original Cuyahoga Falls (Currently behind dam) Summary compiled by Friends of the Crooked River www.cuyahogariver.net 330-666-4026 [email protected] Presentations available for your group.

Transcript of Summary Sheet All Obsolete Dams - Friends of the...

Dams of the Cuyahoga

Obsolete Dams on the Cuyahoga River Studied Since 1995

Middle Cuyahoga TMDL established dams as the major cause of non-attainment of water quality standards in section of the Cuyahoga River

1995

Kent dam studied/modified: cost $5 M

1998 - 2005

Monroe Falls dam studied/removed: cost $2.6 M

1998 - 2006

Powerhouse & Sheraton Dams, Cuyahoga Falls, studied/removed: cost $1 M

2000 - 2013

Gorge Dam, built 1914 for Hydro and Coal Generated Electricity Hydro Operations Cease Coal Operations Cease Proposed Hydro Project (Abandoned) US EPA Sediment Study Phase 1 Study: Sediment Management & Dam Removal Engineering & Cost (Estimated ∼ $70 Million) Phase 2 Study: Environmental & Hydrology Possible Removal

1958 1991 2003-2009 2009 & 2011 2015 Unknown Unknown

Brecksville Dam, originally built 1827 for O & E Canal (current dam built 1952 for industrial water) Environmental Studies Conducted Studies Completed – Projected Possible Removal - Projected (Estimated Cost ∼ $1 Million)

2006 – present 2016 2017

Gorge Dam Original Cuyahoga Falls (Currently behind dam)