Summary of the CHOD working group
description
Transcript of Summary of the CHOD working group
Siena, NA62 Collaboration meeting – Plenary meeting31/08/2012 1
Summary of the CHOD working group
Mauro Piccini on behalf of the “Old CHOD” team(Giuseppina Anzivino, Marco Bizzari, Antonio Cassese, Patrizia Cenci,
Viacheslav Duk, Monica Pepe, Roberto Piandani, M.P., Antofranco Piluso, Mauro Raggi, Cristiano Santoni)
Siena, 31st of August 2012
NA62 Collaboration meeting
Siena, NA62 Collaboration meeting – Plenary meeting28/08/2012 2
Summary of talks The first NA62 dedicated CHOD section, mainly on the old CHOD:(summary on dry run activities)
• Status of the hardware by Viacheslav Duk
• Test of electronics boards (LAV FEE and TDCB) by Roberto Piandani
• Status of the CHOD decoding by Antonio Cassese
• Progress on the firmware to generate L0 trigger primitives from CHOD by Cristiano Santoni
But also a talk on the new CHOD by Vladimir Obraztsov
Note from Italo concerning the geometry of LAV12 and of the new CHOD
Siena, NA62 Collaboration meeting – Plenary meeting31/08/2012 3
Old CHOD status After dry run:
All channel powered, tested and connected to the readout
All the electronics in place, cabling completed
The complete chain has still to be tested, firmware has to be completed and improved, as well as the software running on the online PCs
4
Plan
1. New HV cabling2. Signal cables: from the patch
panel to the TEL62 board3. CHOD signals from cosmics4. Conclusions
28.08.2012 V.Duk, INFN Perugia
By Viacheslav Duk
5
New HV cabling
28.08.2012 V.Duk, INFN Perugia
Cables go outside the rack
CHOD H-plane
CHOD V-plane
SAC (8 cables)
Problems with fixing the modules: to be solved after the Technical Run
6
Patch panel
28.08.2012 V.Duk, INFN Perugia
From the detector side (BNC) From the rack side (LEMO)
7
LAV FEE
28.08.2012 V.Duk, INFN Perugia
LAV FEE from the back:Signal 16-channel cables
LAV FEE front:DCS ethernet cables
in the end of the Dry Run: no input cable 4 ethernet cables the last board terminated
8
From LAV FEE to TEL62
28.08.2012 V.Duk, INFN Perugia
32-channel cables and supportsTDCB input sockets
9
Signals from cosmics
28.08.2012 V.Duk, INFN Perugia
Signals from all channels observed at HV=1800V
Signal equalization will be done in October (starting from HV known from the previous runs)
100mV per division
10
TDCB mapping
28.08.2012 V.Duk, INFN Perugia
TDC number
Socket number
quadrant
TDC0
0 V1
1 V4
2 H1
3 H4
TDC1
0 V2
1 V3
2 H2
3 H3
TDC2
TDC3
TDC
1
2
3
0
TDC0
TDC1
H4 V4
V1 H1
H3
V2
V3
H2
1
2
4
3
CHODbeam
Siena, NA62 Collaboration meeting – Plenary meeting31/08/2012 11
L0 by CHOD Technical run will give a good opportunity to test the firmware developed by Cristiano S. for the generation of the L0 trigger primitives inside the TEL62.
By the way it is also mandatory to have a low level trigger by CHOD already working at the early stage of the technical run.
We can exploit the analog sums available in LAV FEE board to setup abasic trigger distributed to the talk board via a lemo cable.A NIM create and few modules (discriminators, coincidences) will make the job.
Main issue: Timing of the signals before to search for coincidences between horizontal and vertical plane
Siena, NA62 Collaboration meeting – Plenary meeting31/08/2012 12
Talk by R. Piandani
Siena, NA62 Collaboration meeting – Plenary meeting31/08/2012 13
Talk by R. Piandani
Siena, NA62 Collaboration meeting – Plenary meeting31/08/2012 14
Talk by R. Piandani
Siena, NA62 Collaboration meeting – Plenary meeting31/08/2012 15
Talk by A. Cassese
Siena, NA62 Collaboration meeting – Plenary meeting31/08/2012 16
Talk by A. Cassese
Siena, NA62 Collaboration meeting – Plenary meeting31/08/2012 17
Talk by A. Cassese
Siena, NA62 Collaboration meeting – Plenary meeting31/08/2012 18
Talk by A. Cassese
Siena, NA62 Collaboration meeting – Plenary meeting
31/08/2012 19
Talk by V. Obraztsov
20
21
22
23
24
25
26