Summary of EDD Annual Performance Plan April 2013

39
1 Summary of EDD Annual Performance Plan April 2013 2013/14

description

2013/14. Summary of EDD Annual Performance Plan April 2013. The Planning Framework. Strategic Plan multi-year framework within which the Department operates. The Strategic Plan is not normally revised annually and is expected to be tabled at the start of a new administration - PowerPoint PPT Presentation

Transcript of Summary of EDD Annual Performance Plan April 2013

Page 1: Summary of EDD Annual Performance Plan April 2013

1

Summary of EDD Annual Performance PlanApril 2013

2013/14

Page 2: Summary of EDD Annual Performance Plan April 2013

The Planning Framework

Strategic Plan– multi-year framework within which the Department operates. The

Strategic Plan is not normally revised annually and is expected to be tabled at the start of a new administration

Annual Performance Plan– an annual plan that sets out the performance indicators and budget that

guides the work of the Department. These are broken down further into quarterly targets where appropriate. The Department reports on its performance against target to the Minister, National Treasury and Parliament.

2

Page 3: Summary of EDD Annual Performance Plan April 2013

Strategic goal and statement

Strategic Goal Promote decent work through meaningful economic transformation and inclusive growth

Goal Statement Provide participatory, coherent and coordinated economic policy, planning and dialogue for the benefit for all South Africans

The strategic outcome-oriented goal and goal statement is:

The strategic outcome-oriented goal and goal statement is:

Page 4: Summary of EDD Annual Performance Plan April 2013

The policy mandate of the Department

– Integration – how to assist the existing functions and mandates of government departments to achieve better jobs and industrialisation goals

– Coordination – bringing development finance institutions and regulatory agencies into a common jobs-centred policy framework

– Implementation – giving effect to the EDD Annual Performance Plan and decisions of the executive structures of government.

4

Page 5: Summary of EDD Annual Performance Plan April 2013

Policy Framework

State of Nation of Address (SONA) annually National Development Plan November 2012 (policy)New Growth Path October 2010 (strategy)National Infrastructure Plan February 2012 (jobs driver)Industrial Policy Action Plan 2 April 2013 (jobs driver)

Outcome 4, 5, 6, 7 delivery agreementsOutcome 4: Decent employment through inclusive economic growthOutcome 5: Skilled and capable workforce to support inclusive growthOutcome 6: Efficient, competitive and responsive infrastructure Outcome 7: Vibrant, equitable, sustainable rural communities

Framework for South Africa’s response to the international economic crisis

Policy Framework

State of Nation of Address (SONA) annually National Development Plan November 2012 (policy)New Growth Path October 2010 (strategy)National Infrastructure Plan February 2012 (jobs driver)Industrial Policy Action Plan 2 April 2013 (jobs driver)

Outcome 4, 5, 6, 7 delivery agreementsOutcome 4: Decent employment through inclusive economic growthOutcome 5: Skilled and capable workforce to support inclusive growthOutcome 6: Efficient, competitive and responsive infrastructure Outcome 7: Vibrant, equitable, sustainable rural communities

Framework for South Africa’s response to the international economic crisis

Legislative FrameworkExisting acts –• Industrial Development Corporation

Act, 1940• The Competition Act, 1998• Competition Amendment Act S16

(2008) s16 promulgated 2013• International Trade Administration Act,

2002Acts to be introduced - • Infrastructure Development Bill •Amendments to Competition and International Trade Administration Acts

Legislative FrameworkExisting acts –• Industrial Development Corporation

Act, 1940• The Competition Act, 1998• Competition Amendment Act S16

(2008) s16 promulgated 2013• International Trade Administration Act,

2002Acts to be introduced - • Infrastructure Development Bill •Amendments to Competition and International Trade Administration Acts

Accords already signed• Basic Education Accord •National Skills Accord •Local Procurement Accord •Green Economy •October 2012 Social AccordDue to be signed•Youth Employment Accord

Accords already signed• Basic Education Accord •National Skills Accord •Local Procurement Accord •Green Economy •October 2012 Social AccordDue to be signed•Youth Employment Accord

Entities reporting to EDD – Development Finance Institutions – IDC and sefa, Economic Regulatory Bodies – Competition Commission, Competition Tribunal, ITAC

Entities reporting to EDD – Development Finance Institutions – IDC and sefa, Economic Regulatory Bodies – Competition Commission, Competition Tribunal, ITAC

Presidential Infrastructure Co-ordinating Commission - Minister of Economic Development as head of the PICC Secretariat: EDD co-ordinates, integrates and provides secretariat services to the PICCPresidential Infrastructure Co-ordinating Commission - Minister of Economic Development as head of the PICC Secretariat: EDD co-ordinates, integrates and provides secretariat services to the PICC

MinMEC/Tech MinMEC with provincial MECs and Economic Development Departments: EDD works with other national, provincial and local departments and agencies to support common priorities and initiatives. Economic and Employment Sector Cluster works with other Departments

MinMEC/Tech MinMEC with provincial MECs and Economic Development Departments: EDD works with other national, provincial and local departments and agencies to support common priorities and initiatives. Economic and Employment Sector Cluster works with other Departments

5

The policy mandate

Page 6: Summary of EDD Annual Performance Plan April 2013

• NDP: broad vision for overall economic and social development, and integrator to connect the various elements of public policy and implementation capacity

• NGP: economic strategy designed to shift the trajectory of economic development, including through identified drivers of job creation and achieve NDP economic vision

• Industrial Policy Action Plan (IPAP) guides the re-industrialisation of the South African economy and gives effect to the NGP manufacturing jobs driver

• National Infrastructure Plan gives effect to the NGP infrastructure driver.

6

Context: policy integration “Some of the key programmes of the

National Development Plan are already being implemented. These include the New Growth Path framework with its major infrastructure development programme, as well as the state-led industrial policy.”

- President Zuma, January 2013

“…the New Growth Path is government's key programme to take country onto a higher growth trajectory… The proposals in this chapter are largely consistent with these policies.”

-NDP, p 117

Page 7: Summary of EDD Annual Performance Plan April 2013

7

NDP: Vision 2030Other strategies (crime prevention, health, education, etc.)

Infra-structure

for employ-ment and develop-

ment

Economic sectors: Farming and mining

value chains, manufacturing,

tourism and high-level services

Investing in social capital:

The social economy and public sector

New economies: The green economy

and knowledge economy

Spatial development:

Rural development and African

regional development

Non-economic implemen-tation plans

New Growth Path

Page 8: Summary of EDD Annual Performance Plan April 2013

• Target: 5 million new jobs by 2020

• Core strategy: jobs-rich growth

• Focus: jobs drivers based on key sectors and markets

• Means: more integrated actions in the state and partnerships with private sector

The NGP toolbox:• Jobs drivers: Infrastructure, core

productive sectors, value-adding and public services, social economy, African regional development, rural development

• Policy drivers: Competition and trade policy, BBBEE, labour policy, skills development, industrial policy, innovation policy

• Resource drivers: Government budgets, DFIs, retirement funds

• Social dialogue: Building SA through partnership and social pacts .

A summary: NGP

Page 9: Summary of EDD Annual Performance Plan April 2013

Managing the jobs drivers• NGP links long-term

growth and employment creation

• Government makes choices about the production structure every time it decides on a regulation, what kind of infrastructure and skills to provide, who gets a tax break

9

Good

for jobs

Not greatfor jobs orgrowth

Good for jobs and

growth

Good for growth

Mining and refining High-tech industries (pharmaceuticals, nuclear) Auto and capital goods industries

Light manufacturing (including appliances and components)Mid-skill services (health, tourism, software, media, advanced BPS)

Commercial agriculture and smallholder farmers

ConstructionPublic employment schemesHome-based care and other

low-level servicesSmall-scale retailCall centresSubsistence agricul- ture and food gardens

Speculative financial activities

Energy-intensive refineries that do not

feed into domestic industry Illicit economic activities

Page 10: Summary of EDD Annual Performance Plan April 2013

Progress in some areas... October 2010-December 2012

Secret 10

Jobs up by

603 000

Capital stock up by 6,8%

2010-12

Inequality down (2006-2011)

GDP bigger by R570 bn

Nominal , 9 quarters

R4 trillion Infrastructure Plan

adopted

Women’s jobs up 283 400

GDP growth of 3% a

year

Labour intensity of growth up from 0.8 to

0.9

IDC funding approved:

R30bn

African exports: 25 000

more jobs

Biggest jobs gainsGauteng,

Limpopo and KZN*

New investment for BMW 3-series, Ford Ranger, C-class Benz and African taxi production

SA now a member of

BRICS

Ratio of employed to dependents declined

from 2.86 to 2.77

Manufacturing productivity is up and factories using more

capacity

New film studio and production of films

Jobs now central to trade

and competition

policy

International tourism up 2x global rate

Page 11: Summary of EDD Annual Performance Plan April 2013

...but more to be done

• Unemployment levels still high and youth unemployment a particular challenge

• Need to improve performance of productive sectors of the economy: manufacturing, mining and beneficiation, agriculture and agro-processing

• Effective implementation of decisions need to be improved• New challenges from

– Worsening global environment – Rising electricity and other user costs – Workplace and community conflicts.

Page 12: Summary of EDD Annual Performance Plan April 2013

National Infrastructure Plan

• February 2012: Plan outlined by President• 18 Strategic integrated Projects covering whole country• Action: moved from planning to active implementation – SONA

February 2013 contained some highlights• Jobs: 150 000 construction jobs in state-led infrastructure

projects monitored by PICC• Example: Electricity: 675kms of electricity transmission lines that

were laid last year. It is the largest level in more than 20 years. • Example: Rail: Majuba rail line – it is the first large new rail line

laid by the state since 1986.• Example: Water: De Hoop Dam together with the Mooi Mgeni

Dam created a new water yield of 126 million cubic meters – significantly more than the water consumption of the city of Mangaung and Pietermaritzburg combined.

Page 13: Summary of EDD Annual Performance Plan April 2013

Infrastructure & role of EDD

• Convenes meetings of the PICC Council, MANCO and Secretariat• Collects information on 18 SIPs every quarter for Cabinet,

showing level of implementation, spending and jobs• Coordinates information to develop Skills Plans for every SIP and

to aggregate these into a National Skills Plan• Work with the IDC on a localisation Plan for every SIP• Collects and analyses data on quarterly infrastructure spending

by key public agencies, provinces, metros and national departments for Cabinet to consider

• Identifies blockages in implementation and makes recommendations to the PICC and Cabinet

• Monitors work to deepen the 20 year project pipeline by ensuring proposals are subjected to feasibility processes and timelines are developed.

Page 14: Summary of EDD Annual Performance Plan April 2013

Infrastructure and localisation

• EXAMPLE 1: in six cities we are connecting bus, train and taxi transport to provide urban workers with a cheaper and quicker means of travel. Previously, the buses imported from Brazil. Last year, we introduced new tender conditions that require 80% local manufacturing. Close to 250 buses will be made in South Africa.

The Jo'burg buses will be made at Marco Polo’s plant in Gauteng. The chassis will be made at Mercedes Benz in East London. Busmark is setting up a new factory in Cape Town, with IDC support, to manufacture this city’s buses there.

• EXAMPLE 2: last year the IDC partnered with a local company to complete a contract for supply, manufacturing and erection of an air-cooled condenser system for Eskom’s Kusile power station. The contract value is R2,4 billion. It will use 53 000 tons of steel and create about 750 jobs.

Page 15: Summary of EDD Annual Performance Plan April 2013

Competition and Trade Commissions

• Competition Commission– Reduce input costs in the economy– Increase levels of competition– Ensure mergers/acquisition approval promote public interest goals

such as employment and small business development– Investigate price-fixing and corporate collusion and take firm action

• International Trade Administration Commission– Promote improved trade levels, with a focus on a developmental

trade policy that promotes industrialisation and jobs– Reduce input costs for value-added products through lower tariffs

or rebates of duty– Provide protection for industries as part of a plan to boost

competitiveness and jobs.

15

Page 16: Summary of EDD Annual Performance Plan April 2013

The IDC and sefa

• The IDC is the country’s largest Development Finance Institution:– Increase the level of funding– Decrease the time taken for approval of projects– Reduce the cost of lending to local companies – Shift to key New Growth Path sectors– Improve development outcomes: jobs, rural development

• sefa is the new agency for small business funding– Consolidate the work and operations of the three merged groupings into

an effective small business funding machine– Improve the level of funding available– Measure the impact on SMMEs and cooperatives– Strengthen the capacity in rural areas and poorer provinces– Consolidate the work with other agencies and departments as well as

provinces and local government– Promote training and communication projects to support small business:

eg partnership with SAICA.16

Page 17: Summary of EDD Annual Performance Plan April 2013

Dialogue and Accords

• Implement the Accords on– National Skills– Basic Education– Local Procurement– Green Economy

• Support the – October 2012 Social Accord

• Complete and support the Youth Employment Accord• Develop consensus on other NGP areas such as infrastructure.

17

Page 18: Summary of EDD Annual Performance Plan April 2013

Overview of development of DepartmentKey phases of department’s work

Phase 1: establish a Ministry for policy integration work (2009)

Phase 2: coordinate response to recession/global economic crisis (2009-11)

Phase 3: establish a functioning Department: EDD (2010-12)

Phase 4: transfer 6 public entities to EDD and begin process of mandate alignment on jobs (2010)

Phase 5: complete development of a New Growth Path: NGP (2010)

Phase 6: align work in government to NGP; start implementing Outcome 4: Jobs and Growth and launch work on infrastructure jobs driver (2011-12)

Phase 7: refocus the IDC and Competition and Trade Commission on jobs (2011-13)

Phase 8: dialogue to develop social accords on key NGP areas (2011-13)

Phase 9: consolidate small business entities (2012-13)

Phase 10: launch and implement infrastructure plan and strengthen NGP focus on industrial policy (2012-2013).

18

Page 19: Summary of EDD Annual Performance Plan April 2013

Organisational Environment

• Mandate and work focus of EDD continues to evolve as government implements larger parts of its electoral mandate and in the light of the roll-out of New Growth Path programmes

• Audits: Received unqualified audits since establishment • Governance structures in place: Internal Audit; Audit Committee;

Bid Adjudication Committee; Supply Chain Management capacity; HR-related committees

• Staffing– Staff numbers up by 14% over past financial year: 131 staff

appointed by 31 March 2013; EDD continues to recruit new staff– 146 posts are targeted to be filled in 2013/14 financial year– Continue to work on strengthening operations and

appropriately-skilled staff with use of a range of staff options• Premises: expanding to new offices on dti campus, with 2056

square meters of new space allocated during past financial year.

19

Page 20: Summary of EDD Annual Performance Plan April 2013

Annual Performance Plan

• The Plan sets out the key products that EDD will deliver during 2013/14– Programme 1 has 5 indicators with 21 products– Programme 2 has 9 indicators with 28 products– Programme 3 has 14 indicators with 137 products– Programme 4 has 10 indicators with 42 products

• Number of outputs have been increased from 148 to 228 , reflecting the growing capacity within EDD

• This is a 54% growth in outputs

20

YEAR NUMBER OFINDICATORS

NUMBER OF PRODUCTS

2012/13 41 148

2013/14 38 228

Page 21: Summary of EDD Annual Performance Plan April 2013

Plans, strategies, instruments 8

Meetings, dialogues, roadshows 46

Implementation, actions, including unblocking obstacles, policy Interventions,

67

Reports, surveys, monitoring, audits 89

Agreements 2

Industrial funding 1

Capacity building, training 12

Total number of products 228

Overview of the products

Staff and admin targets 3

Page 22: Summary of EDD Annual Performance Plan April 2013

Annual Performance Plan

• Focus shifts from policy development and planning to greater emphasis on implementation, providing for – reviews of progress on all the Strategic Integrated Projects

(SIPs) of the National Infrastructure Plan– Unblocking obstacles to the build-programme

• Entities that report through EDD will be held accountable for direct impact on jobs and development

• New indicator on jobs impact introduced, (consolidated on a quarterly basis).

• EDD will evaluate rulings and outcomes of economic regulatory bodies to strengthen and monitor developmental impacts

• Ministerial oversight is provided for iro agencies• Developmental assessment will be done for agencies impact on

jobs, women, youth and rural population• Additional funding of R30 million allocated in 2012 budget to

build capacity across economic regulators over next few years.22

Page 23: Summary of EDD Annual Performance Plan April 2013

Annual Performance Plan

• Capacity-building programmes on jobs, the NGP and productivity, directed at – State institutions– Social partners

• Action to promote African regional integration is now an explicit KPI

• R5 bn will be targeted as financial commitments for targeted NGP sectors, small businesses and companies in distress

• Budget includes an additional allocation of R450 million over the medium term for the capitalisation of the sefa through the economic competitiveness support package

• Small business entities will have target of road-shows and stakeholder sessions to communicate facilities in government

• Small business funding is complemented by other actions such as the promotion of the SAICA partnership on skills.

23

Page 24: Summary of EDD Annual Performance Plan April 2013

Objectives and Measures: Programme 1

KPI 1. Percentage compliance with service standards and administrative systems

KPI 2. Management meetingsKPI 3. Internal audit reportsKPI 4. Percentage (%) of posts to be filledKPI 5. An approved Information and Communication Technology Strategy.

24

Page 25: Summary of EDD Annual Performance Plan April 2013

Objectives and Measures: Programme 2KPI 6. Technical instruments on economic development refined KPI 7. Surveys and reports on implementation of New Growth PathKPI 8. Platforms held on New Growth PathKPI 9. Training workshops held on assessing employment impact of state KPI 10. Inclusive growth policy interventions and/or policy platforms held KPI 11. Sector interventions aligned, evaluated and improvedKPI 12. Monitoring of Competition Act implementation and proposed changesKPI 13. Policy platforms held or reports completed on impact of BBEEKPI 14. Reports on impact of NGP on women, youth and rural people

evaluated and improved KPI 15. Micro enterprises, livelihoods and social economy strategy adopted and

reviewedKPI 16. Skills development proposals in NGP and skills accord implemented.

25

Page 26: Summary of EDD Annual Performance Plan April 2013

Objectives and Measures: Programme 3KPI 17. Economic development initiatives facilitated and unblocked KPI 18. Economic development plans completed KPI 19. Spatial economic plans produced and / or reviewedKPI 20. Strategic Integrated Projects construction progress reviews KPI 21. Infrastructure projects unblocked and/ or fast tracked KPI 22. Ministerial oversight engagements with Development Finance InstitutionsKPI 23. Road shows marketing products of Small Enterprise Finance Agency to

SMMEs KPI 24. Value of financing facilitated for small businesses, targeted growth sectors

and companies in distress [Rbillion]KPI 25. Evaluative Reports on jobs targets achieved by EDD agencies (IDC, sefa,

Competition and Trade Commissions) KPI 26. Ministerial strategic engagements with Economic Regulatory BodiesKPI 27. Interventions in relation to Economic Regulatory BodiesKPI 28. Regional integration interventions (research or company /sector support) KPI 29. Actions and meetings to implement Local Procurement AccordKPI 30. Green economy interventions or reports on implementation of green

accord. 26

Page 27: Summary of EDD Annual Performance Plan April 2013

Objectives and Measures: Programme 4KPI 31. Social dialogue engagements to increase awareness of accords

and other economic issues among social partners KPI 32. Monitoring reports and strategies developed to improve

implementation of accords KPI 33. Sectoral and workplace economic development agreements

facilitated with social partnersKPI 34. Engagements at company/cluster level to save or create new

jobsKPI 35. Knowledge network sessions and/or publications to enhance

public policy and strategyKPI 36. Capacity building projects for social partners on the New

Growth Path KPI 37. Workplace interventions on productivity and/or innovation

facilitatedKPI 38. Advocacy initiatives on productivity, entrepreneurship and

innovation at sectoral and national level implemented. 27

Page 28: Summary of EDD Annual Performance Plan April 2013

BUDGET AND MTEF PROGRAMME 1: ADMINISTRATION

Table 2. Administration  

Sub-programme Audited outcome Adjusted

appropriation

Averagegrowth

rate(%)

Expen-diture/

total:Average

(%) Medium-term expenditure

estimate

Averagegrowth

rate(%)

Expen-diture/

total:Average

(%)

R thousand 2009/10 2010/11

2011/1

2 2012/13 2009/10-2012/13 2013/14 2014/

15 2015/16 2012/13-2015/16 Ministry 16 653 23 947 18 355 19 500 5.4% 50.7% 22 397 23 836 25 207 8.9% 35.7%

Office of the Director-General

– 4 265 9 559 6 236 – 13.0% 9 615 10 182 10 725 19.8% 14.4%

General Management Services

– 6 832 22 908 26 564 – 36.4% 31 552 33 552 35 279 9.9% 49.9%

Total 16 653 35 044 50 822 52 300 46.4% 100.0% 63 564 67 570 71 211 10.8% 100.0%

Change to 2012 Budget estimate

(7 765) 222 323 71 21128

Expenditure estimates

Page 29: Summary of EDD Annual Performance Plan April 2013

•The spending focus over the medium term will be on expanding and building capacity in support functions, such as IT, finance and human resources.

•The bulk of expenditure in this programme over the medium term goes towards spending on compensation of employees, machinery and equipment, and the related goods and services, such as operating leases and travel and subsistence.

•Expenditure in the Office of the Director-General sub-programme is expected to grow significantly over the medium term to provide strategic direction on policy and legislation.

•Expenditure is also expected to increase significantly in the General Management sub-programme as the department continues building capacity in human resources, IT, legal services and the Office of the Chief Financial Officer.

EXPENDITURE TRENDS

Page 30: Summary of EDD Annual Performance Plan April 2013

Table 3. Economic Policy Development  

Subprogramme Audited outcome Adjusted

appropriation

Averagegrowth

rate(%)

Expen-diture/

total:Average

(%) Medium-term expenditure

estimate

Averagegrowth

rate(%)

Expen-diture/

total:Average

(%)

R thousand

2009/10 2010/11

2011/12 2012/13 2009/10-2012/13 2013/14 2014/15 2015/16 2012/13-2015/16 Growth Path and Creation of Decent Work

– 833 2 637 6 236 – 25.8% 7 778 8 277 8 756 12.0% 31.1%

Economic Policy – 5 814 9 568 8 232 – 62.8% 10 710 11 396 12 052 13.5% 42.4%

Broad Based Black Economic Empowerment

– – 294 3 317 – 9.6% 3 972 4 221 4 447 10.3% 16.0%

Second Economy – – – 682 – 1.8% 3 089 3 283 3 458 71.8% 10.5%

Total – 6 647 12 499 18 467 – 100.0% 25 549 27 177 28 713 15.8% 100.0%

Change to 2012 Budget estimate

(10 589 (5 108) (5 377) 28 713

Budget and MTEF Programme 2: Economic Policy Development

Page 31: Summary of EDD Annual Performance Plan April 2013

•The bulk of spending will be in the Growth Path and Creation of Decent Work and the Economic Policy sub-programmes, and will go mostly towards compensation of employees.

•Over the medium term significant increases in expenditure are expected in the Second Economy sub-programme to allow the department to promote strategies and

policies that grow an inclusive economy, and advance economic activities to address youth unemployment. This includes developing the economic developmental index and holding consultations on the national infrastructure plan with key stakeholders.

• Funds will be reprioritised over the medium term from spending on external services and venues and facilities to spending on compensation of employees to provide for these activities.

EXPENDITURE TRENDS

Page 32: Summary of EDD Annual Performance Plan April 2013

BUDGET AND MTEF PROGRAMME 3: ECONOMIC PLANNING AND CO-ORDINATION

Table 4. Economic Planning and Coordination  

Subprogramme Audited outcome

Adjusted appropriatio

n

Average

growthrate(%)

Expen-diture/

total:Average

(%) Medium-term expenditure

estimate

Average

growthrate(%)

Expen-diture/

total:Averag

e(%)

R thousand 2009/10 2010/11 2011/12 2012/13 2009/10-2012/13 2013/14 2014/15

2015/16 2012/13-2015/16

Spatial, Sector and Planning

– 1 630 10 881 39 572 – 2.9% 24 469 26 029 27 459 -11.5% 4.2%

Economic Development, Financing and Procurement

– 172 7 402 3 885 – 0.6% 6 162 6 555 6 929 21.3% 0.8%

Investment for Economic Development

143 328 161 096 270 504 286 921 26.0% 48.7% 346 890 301 024 511 310 21.2% 52.0%

Competitiveness and Trade for Decent Work

154 664 195 629 212 226 282 627 22.3% 47.7% 281 493 299 680 315 614 3.7% 42.4%

Green Economy – – – – – – 4 779 5 082 5 316 – 0.5%Total 297 992 358 527 501 013 613 005 27.2% 100.0% 663 793 638 370 866 628 12.2% 100.0%

Change to 2012 Budget estimate

47 543 65 584 119 083 866 628 32

Expenditure estimates

Page 33: Summary of EDD Annual Performance Plan April 2013

33

EXPENDITURE TRENDS

•The spending focus over the medium term period will be on strengthening the institutional capacity of the competition bodies, development finance institutions and trade administration for which the department has an oversight function.

•Between 2009/10 and 2012/13, expenditure increased in the Investment for Economic Development sub-programme due to transfers and subsidies to the capitalisation of the Agro-processing Competitiveness Fund. To date, the fund has committed R76 million in

disbursements, which are expected to result in job creation.

•Spending in the Investment for Economic Development sub-programme is expected to increase further due to the capitalisation of the Small Enterprise Finance Agency, a

subsidiary of the Industrial Development Corporation. The agency expects to approve further financing for SMMEs to the value of R185 million over the MTEF period.

•Competitiveness and Trade for Decent Work sub-programme provides policy oversight and strategic direction to the Competition Commission, Competition Tribunal and the International Trade Administration Commission.

Page 34: Summary of EDD Annual Performance Plan April 2013

34

•Between 2009/10 and 2012/13, the transfers to the regulatory bodies increased significantly as a result of transfers to the Competition Commission for the establishment of the cartels division and associated staffing costs. Spending on goods and services is expected to decline significantly due to the reprioritisation of spending on consultants and professional services, while spending on compensation of employees is expected to increase due to improved conditions of service.

•Spending will increase in the Green Economy sub-programme over the medium term due to funds of R4.8 million in 2013/14, R5.1 million in 2014/15 and R5.3 million in 2015/16 reprioritised from other sub-programmes to this sub-programme to enable it to implement its activities. The programme has a funded establishment of 38 posts. The Department used the skills of staff employed in various state-owned entities and DFI’s to implement work connected to the PICC and thus did not need to fill these posts with staff on the EDD establishment. However, in order to address the growing workload in Programme Three, further staff appointments will be made in the year ahead.

EXPENDITURE TRENDS

Page 35: Summary of EDD Annual Performance Plan April 2013

BUDGET AND MTEF PROGRAMME 4: ECONOMIC DEVELOPMENT AND DIALOGUE

35

  Table 5. Economic Development and Dialogue  

Subprogramme Audited outcome

Adjusted appropriation

Averagegrowth

rate(%)

Expen-diture/

total:Average

(%) Medium-term expenditure

estimate

Averagegrowth

rate(%)

Expen-diture/

total:Average

(%)

R thousand

2009/1

0 2010/11 2011/12 2012/13 2009/10-2012/13 2013/14 2014/15 2015/16 2012/13-2015/16 National Social Dialogue and Strategic Frameworks

– 16 5 264 10 444 – 59.4% 12 258 13 033 13 749 9.6% 68.8%

Sector and Workplace Social Dialogue

– 440 5 288 – 2.8% 621 659 690 33.8% 3.1%

Capacity Building for Economic Development

– – – 899 – 3.4% 3 109 3 312 3 512 57.5% 15.1%

Expenditure estimates

Page 36: Summary of EDD Annual Performance Plan April 2013

Productivity, Entrepreneurship, Innovation

– – 8 000 1 115 – 34.4% 2 572 2 739 2 899 37.5% 13.0%

Total – 456 13 269 12 746 – 100.0% 18 560 19 743 20 850 17.8% 100.0%

Change to 2012 Budget estimate

(5 403) (577) (581) 20 850

36

Expenditure estimates

Page 37: Summary of EDD Annual Performance Plan April 2013

37

EXPENDITURE TRENDS

•The spending focus will be on increasing the co-ordination of policies on economic development through the activities of the National Social Dialogue and Strategic Frameworks and Capacity Building for Economic Development sub-programmes.

•The Capacity Building for Economic Development sub-programme is also the fastest growing over the medium term, mainly due to the expected increase in the staff required to conduct the activities effectively. The staff skills base will change with greater emphasis on coordination and implementation skills, focused on

giving effect to the various Accords previously concluded.

Page 38: Summary of EDD Annual Performance Plan April 2013

Concluding Remarks

• In under 4 years EDD has established itself and built its initial capacity. In the past year it has leveraged off this capacity to strengthen its work and impact

• It has played a key role in the development of strategic frameworks, the NGP, Outcome 4, the development of the National Infrastructure Plan and alignment between the NDP and existing frameworks

• EDD-coordinated social dialogue has resulted in five key social accords

• The level of industrial funding has increased significantly over the past year

• EDD has made good progress in implementing its previous APP

• In the period ahead, more focus will be on implementation of previously developed policy and plans including the Industrial Policy Action Plan (IPAP)

• EDD’s evolving mandate and work focus grows as more programmes of the NGP are rolled-out.

38

Page 39: Summary of EDD Annual Performance Plan April 2013

Siyabonga