Summary of e - cloud activity in straight sections during the scrubbing run 2012
description
Transcript of Summary of e - cloud activity in straight sections during the scrubbing run 2012
Summary of e- cloud activity in straight sections during the scrubbing run 2012
C. Octavio Domínguez
Thanks to the machine Coordinators, Cryogenics, Damper, EN/STI, Injection, Operation, Vacuum
teams, ABP, RF and BI colleagues contributing to measurements
11 January 2013 - e- cloud meeting
Nb (Beam 1)
Nb (
10∙14
p+ )
Overview
Time (hours)11 January 2013 - e- cloud meeting
P (
10∙-8
m
bar)
VGI.454.4R7.BVGI.99.4L3.B
Nb (Beam 1)
Nb (
10∙14
p+ )
Overview
Time (hours)11 January 2013 - e- cloud meeting
VGI.454.4R7.BVGI.99.4L3.B
Nor
m. P
(10∙
-22 m
bar/
p+ )
Fill 3396
Fill 3397Fill 3398
Fill 3405
Fill 3
406
Fill 3407
Overview
11 January 2013 - e- cloud meeting
• No dedicated fills for straight sections benchmarking• Instable beams Losses No stable pressure Some needed considerations:
P = 11.83n_t - 5.8486R² = 0.9978
0
20
40
60
80
100
120
140
160
180
0 2 4 6 8 10 12 14 16
Pres
sure
[nTo
rr]
# of "double trains" in the machine
VGI.141.6L4.B
10 April 2011
P = 7.6131n_t - 17.485R² = 0.9911
0
10
20
30
40
50
60
70
80
0 2 4 6 8 10 12 14
Pres
sure
[nTo
rr]
# of "triple trains" in the machine
VGI.141.6L4.B
19 May 2011
Overview
11 January 2013 - e- cloud meeting
• No dedicated fills for straight sections benchmarking• Instable beams Losses No stable pressure Some needed considerations:
DP1
DP2
DP3DP4
DPav
DPav
DPav
dmax evolution
11 January 2013 - e- cloud meeting
Fill 3396 ≈ Fill 3397
…
925 ns
250 ns
925 ns 925 ns
Coarse grid!
dmax evolution
11 January 2013 - e- cloud meeting
Coarse grid!
Further analysis
11 January 2013 - e- cloud meeting
Fill 3406 ≈ Fill 3407
…
925 ns
250 ns
925 ns 925 ns
Small DP
No DP!
• Scrubbing effect can be noticed from fill to fill
Further analysis
11 January 2013 - e- cloud meeting
Fill 3407
…
925 ns
250 ns
925 ns 925 ns
No DP!
• We can check into simulations to find a pair of values [dmax, R] which fulfills:
not to saturate for a batch of 144 bunches (at the measured pressure) to saturate for a batch of 288 bunches (at the measured pressure)
• We find dmax < 1.24 for any R, and dmax ≈ 1.22 if we consider R=0.2 In agreement with previous analysis
Further analysis
11 January 2013 - e- cloud meeting
… …
Fill 3406Fill 3405
N
i measured
simulation
rr
NQ
1
2
11Quality factor
vs.
• Qmin d max = 1.23 and R=0.2
• Not very accurate in this case because: N = 1 too small d max might have varied during fill 3405 difficult comparison
• But still in agreement with previous estimations
Threshold
11 January 2013 - e- cloud meeting
• A revision of the threshold has become necessary (previous value given for injection energy was d max = 1.25)
• I used 3 trains of 4 batches each
• For R=0.2 the threshold at 450 GeV would be d max ≈ 1.16
Summary
11 January 2013 - e- cloud meeting
• The scrubbing effect is clearly visible through the reduction of the D P along the different fills
• Several fills at injection energy have been used to infer beam chamber properties in straight sections (where pressure gauges are located)
• Analysis is still on going but a clear reduction of can be observed (from ~1.3 to ~1.23)
• Different methods point out to a similar solution at the end of the fills at injection energy (d max ≈ 1.23 and R ≈ 0.2 )
• The threshold at injection energy for these locations has been calculated:
d max ≈ 1.16 with R ≈ 0.2