Summary of Data Handling Meeting: DAQ and Controls LHCb Plenary Meeting 17 September 1998 Beat Jost...

16
Summary of Data Handling Meeting: DAQ and Controls LHCb Plenary Meeting 17 September 1998 Beat Jost Cern/EP

Transcript of Summary of Data Handling Meeting: DAQ and Controls LHCb Plenary Meeting 17 September 1998 Beat Jost...

Page 1: Summary of Data Handling Meeting: DAQ and Controls LHCb Plenary Meeting 17 September 1998 Beat Jost Cern/EP.

Summary of Data Handling Meeting:DAQ and Controls

LHCb Plenary Meeting17 September 1998Beat JostCern/EP

Page 2: Summary of Data Handling Meeting: DAQ and Controls LHCb Plenary Meeting 17 September 1998 Beat Jost Cern/EP.

Contents

Introduction Summary of DAQ activities

Readout Unit Project Event Building Project TFC Project Event Filter Farm

Controls

Page 3: Summary of Data Handling Meeting: DAQ and Controls LHCb Plenary Meeting 17 September 1998 Beat Jost Cern/EP.

Introduction:DAQ Architecture

Trigger Level 2 & 3Event Filter

Read-out Network (RN)

RU RU

SFC

Control &

Monitoring

SFC

CPU

CPU

RU

CPU

CPU

2-4 GB/s

4 GB/s

20 MB/sVariable latency

L2 ~10 msL3 ~200 ms

LA

N

Sub-Farm Controllers (SFC)

Read-out units (RU)

Timing&

FastControl

Front-End Electronics

VDET TRACK ECAL HCAL MUON RICH

LHC-B Detector

L0

L1

Level 0Trigger

Level 1Trigger

40 MHz

1 MHz

40 kHz

Fixed latency 3.2 ms

Variable latency <256 ms

Datarates

40 TB/s

1 TB/s

Front-End Multiplexers (FEM)1 MHz

Front End Links

Storage

Page 4: Summary of Data Handling Meeting: DAQ and Controls LHCb Plenary Meeting 17 September 1998 Beat Jost Cern/EP.

Introduction:Hardware Components

Hardware Components Timing and Fast Control (TFC) Front-End Multiplexers (FEM) Readout Units (RU) Event Building Network Sub-Farm Controllers Filter Farm

}Event Building Strategy

Trigger Level 2 & 3Event Filter

Read-out Network (RN)

RU RU

SFC

Control &

Monitoring

SFC

CPU

CPU

RU

CPU

CPU

2-4 GB/s

4 GB/s

20 MB/sVariable latency

L2 ~10 msL3 ~200 ms

LA

N

Sub-Farm Controllers (SFC)

Read-out units (RU)

Timing&

FastControl

Front-E nd Electronics

VDE T TRACK ECAL HCAL MUON RICH

LHC-B Detector

L0

L1

Level 0Trigger

Level 1Trigger

40 MHz

1 MHz

40 kHz

Fixed latency 3.2 ms

Variable latency <256 ms

Datarates

40 TB/s

1 TB/s

Front-E nd Multiplexers (FEM)1 MHz

Front End Links

Storage

Page 5: Summary of Data Handling Meeting: DAQ and Controls LHCb Plenary Meeting 17 September 1998 Beat Jost Cern/EP.

Readout Unit Project

PCI bus

embeddedCPU

D ata Merger DM

Sub-event Buffer

Subevent Builder SEB LA N

CPU memorybus

DPM

DM-FPG A

Readout Netw ork Interface

Network Link

SEB-FPGA

Input Links

Output Link

Throttle Full

Architecture

Page 6: Summary of Data Handling Meeting: DAQ and Controls LHCb Plenary Meeting 17 September 1998 Beat Jost Cern/EP.

CPU

PCI bus

inputconnectors

ReadoutNetworkInterface

outputconnector

DPM

Sub-

even

tbu

ilder

Memorybus

FPG

A

LAN

DPM_Full

64

64

64

64

64

32

D ata M erger

32

32

32

64-bit

The architectureis scalable

8 or 16FPGA

4*16 bit

16

1

8+32

32

Mux 8>32

RN

PCI-Lan chip

Readout Unit

Input Stage blowup

Page 7: Summary of Data Handling Meeting: DAQ and Controls LHCb Plenary Meeting 17 September 1998 Beat Jost Cern/EP.

Readout Unit

Data Formats

Event Number

Data Size

Source Id

Data 1

Data 2

...

Data n

Status CRC

32 Bits

Status CRC

Event Number

Data Size

Source Id

Data 1

Data 2

...

Data m

32 Bits

Event Number

Data Size

Source Id

Data 1

Data 2

...

Data n

Data 1

Data 2

...

Data m

Status CRC

It is assumed that the data is self-describing

Page 8: Summary of Data Handling Meeting: DAQ and Controls LHCb Plenary Meeting 17 September 1998 Beat Jost Cern/EP.

Event-Building Project

Aim is to devise an event building strategy for LHCb Activities

Evaluation of Myrinet 2 PCI Interfaces and one switch ordered

• Material received 2 PCs ordered

• 1 received

Modeling of Myrinet (Finnish Students) Reproduced Results (obtained using Ptolemy) with Foresight Small systems (4x4) for the time being

Other technologies will also be evaluated if necessary

Page 9: Summary of Data Handling Meeting: DAQ and Controls LHCb Plenary Meeting 17 September 1998 Beat Jost Cern/EP.

Timing and Fast Control (TFC)

Technical note in preparation (ready end of the month?)

General Architecture Readout Supervisor Block Diagram

We need to find manpower to put into the TFC sub-system

Page 10: Summary of Data Handling Meeting: DAQ and Controls LHCb Plenary Meeting 17 September 1998 Beat Jost Cern/EP.

General TFC Architecture

ODE

TTCrx ADC

DSP

FEchipFEchipL1buffCtrl

L1

FEchip

LHCb trig

L-1

TTCtx

Switch

LHCClock

DAQthrottle

FEE

TTCrx

L0 trigger data

L1 trigger data

DAQ system

Det

ecto

r si

gnal

s

Con

trol

sys

tem

Slow Contr ol F low

Clock, Tr igger Flow

Data Flow

FEchipFEchipFEchip

Clk,L0,RST

Readout SupervisorFan-out

ReadoutSupervisor

L-0

L0

L1

Switch

ReadoutSupervisor

Subdett rig.

L0

L1

gL0gL1

TTC opt icalf an-out

FEchipFEE

TTCrx

ODE

TTCrx ADC

DSP

FEchipFEchipFEchip

FEchipFEchipL1buff

Clk,L0,RST

Ctrl

L1

TTCtx

Fanout TT

Ctx

ReadoutSupervisor

Subdett rig.

L0

L1

gL0gL1

Page 11: Summary of Data Handling Meeting: DAQ and Controls LHCb Plenary Meeting 17 September 1998 Beat Jost Cern/EP.

Readout Supervisor Block Diagram

ControlInterface

Counters

TTC EncodingTTCrxTTC

OR OR

Self Triggers,Resets

Clk

gL1gL0

AND AND

L1L0

L1 Inhibit

L0 Inhibit

to TTCtx

CTRL

Front-EndModel,Rules

L0 Pipeline

L1 Buffer

to DAQ

Resets

Page 12: Summary of Data Handling Meeting: DAQ and Controls LHCb Plenary Meeting 17 September 1998 Beat Jost Cern/EP.

Event Filter Farm

Common project between LHC experiments being set up

LHCb participation is currently very minor (~0), we are just following the activities. More active participation would probably be welcome….

Page 13: Summary of Data Handling Meeting: DAQ and Controls LHCb Plenary Meeting 17 September 1998 Beat Jost Cern/EP.

Controls

Joint Project between LHC Experiments and IT/CO Finished or currently active of sub-projects

Technology Market Survey of available commercial Control Systems

• Supervisory Control And Data Acquisition (SCADA) tools Choice of Test Stand facilities for in-depth evaluation

Architecture Design for Experiment Control Systems (including DAQ Controls)

Level 3 Alarm Transmission at CERN

Small Hands-On Projects ATLAS TRT gas system test setup : WAGO + I/O modules via Profibus ALICE HPMID Cooling System: Siemens PLCs and Bridgeview

CANbus evaluation (especially in view of preferences inside Atlas - LMBs)

Eye on Fieldbuses in General Continuing Study of Use of PLCs (contacts with Working group on PLCs, which

has issued recommandations for 3 brands of PLCs for CERN)

Page 14: Summary of Data Handling Meeting: DAQ and Controls LHCb Plenary Meeting 17 September 1998 Beat Jost Cern/EP.

Controls

Identified future sub-projects Standardization of High Voltage Controls Evaluation of the OPC (OLE for Process Control)

Standard Feasibility Study for ComponentWare Magnet Controls Rack Controls Communication with LHC

pre-alarms (things leading to emergencies) environment parameters (temperatures, leaks, opacity

(=smoke),…) machine parameters

Page 15: Summary of Data Handling Meeting: DAQ and Controls LHCb Plenary Meeting 17 September 1998 Beat Jost Cern/EP.

Controls

General State of Health of Joint Project Project is gaining momentum and real work is being done. Cause

for (guarded) optimism that a joint Control System can be done. What is required from the LHCb collaboration?

Quite some experience from LEP experiments available in the JCOP project, so the standard control questions for an LHC exp. well answered. The URD that was produced for ALICE/LHCb serves as a basis.

BUT: in case of specific control needs or specific hardware equipment that you expect to use, please keep in contact with Pere or Wolfgang. Please do NOT postpone this issue until later … and later…

and…any participation in joint project and its sub-projects very welcome

Page 16: Summary of Data Handling Meeting: DAQ and Controls LHCb Plenary Meeting 17 September 1998 Beat Jost Cern/EP.

Conclusion

DAQ Hardware good progress in RU project starting activity on event building

need manpower for TFC more participation in Filter Farm project welcome

Software, I.e. Controls Joint project seems to be in good shape LHCb involved in a number of sub-projects new sub-projects being launched external participation welcome

Plan to organize a DAQ/Controls Workshop in near future