Summary Application Documents

download Summary Application Documents

of 1

Transcript of Summary Application Documents

  • 8/2/2019 Summary Application Documents

    1/1

    Application Documents Summary

    The Application Documents consist of the loan guarantee applications for Georgia Power

    Company, Municipal Electric Authority of Georgia, and Oglethorpe Power Company. These applications

    vary in length between about 1,300 pages to over 2,000 pages and contain thorough descriptions of the

    technical and financial information for construction of Vogtle Units 3 & 4. Unfortunately, nearly all of

    this pertinent information is withheld in a series of sweeping redactions. In some places, these long

    stretches of redactions span 200 pages. DOE claims FOIAs trade secrets and deliberative process

    exemptions to justify these redactions, though it does not indicate which particular exemption applies to

    each redaction.

    Also among the Application Documents is a thirty-page Environmental Critique. DOE

    performed this assessment in accordance with NEPA procedures, citing 10 C.F.R. 1021.216(g), to

    support the selection process for the loan guarantee program. The final document included in the

    Application Documents is the Nuclear Application Criteria, a document that defines the three major

    criteria for loan guarantee approval (creditworthiness; construction and start up factors; and legal,

    regulatory, and permitting factors) in terms of measurable attributes. Neither the Environmental

    Critique nor Nuclear Application Criteria contain many redactions.