Suffolk County NY - Septic Improvement Program - 6 Bedroom ......Dec 31, 2019  · South Fork Septic...

19
Suffolk County NY - Septic Improvement Program - 6 Bedroom Quote List I/A OWTS Vendor List Contact Information Vendor Contact Information A&A Sewer and Drain Maintenance Inc. [email protected] 631-849-1599 Beltran Cesspools [email protected] 631-582-0222 Cardo Site Development, Inc. [email protected] 631-653-4377 Clear River Environmental [email protected] Eastern Suffolk: 631-298-7749 Western Suffolk: 631-467-5447 CMM Sitework, Inc. [email protected] 631-286-3650 Direct Drainage [email protected] 631-472-0677 Diversified Services of Water Mill, Inc. [email protected] 631-324-6933 East End Excavating Corp. [email protected] 631-324-1718 Eastern Site Development [email protected] 631-209-4240 Excav Services, Inc. [email protected] 631-687-9507 Guillo Contracting Corp. [email protected] 631-727-5702 J&C Contracting of East Hampton Inc. [email protected] 516-885-0400 Ken Rousell, Inc. [email protected] 631-288-2545 Micro Earth Moving Inc. [email protected] 631-725-1236 Quakenbush Cesspools [email protected] 631-907-4426 Roman Stone Systems LLC [email protected] 631-667-0566 Ext.114 S.L. Worby & Son, Inc. [email protected] 631-653-9300 Shelter Island Sand, Gravel & Contracting Inc. [email protected] 631-749-1040 South Fork Septic [email protected] 631-283-0333 SYP Industries [email protected] 631-924-1703 DISCLAIMER: Actual costs may vary based on site constraints. Homeowners are urged to contact Vendors to discuss project specific costs for their Property. In addition, miscellaneous Vendor Costs can be found here: Miscellaneous Installation Costs Septic Improvement Program Notes: Sales tax, Engineering and Design Costs are not included in the tables provided and are the responsibility of the Property Owner All prices are base price estimates only Use of Grant Funds is Not Allowed for the Following: Sales tax Engineering and Design Related Costs Irrigation repairs landscaping electrical improvements unrelated to the I/A OWTS

Transcript of Suffolk County NY - Septic Improvement Program - 6 Bedroom ......Dec 31, 2019  · South Fork Septic...

Page 1: Suffolk County NY - Septic Improvement Program - 6 Bedroom ......Dec 31, 2019  · South Fork Septic john@southforkseptic.com 631-283-0333 $19,825 CMM Sitework, Inc. info@cmmsitework.com

Suffolk County NY - Septic Improvement Program - 6 Bedroom Quote ListI/A OWTS Vendor List Contact Information

Vendor Contact InformationA&A Sewer and Drain Maintenance Inc. [email protected] 631-849-1599

Beltran Cesspools [email protected] 631-582-0222

Cardo Site Development, Inc. [email protected] 631-653-4377

Clear River Environmental [email protected] Suffolk: 631-298-7749Western Suffolk: 631-467-5447

CMM Sitework, Inc. [email protected] 631-286-3650

Direct Drainage [email protected] 631-472-0677

Diversified Services of Water Mill, Inc. [email protected] 631-324-6933

East End Excavating Corp. [email protected] 631-324-1718

Eastern Site Development [email protected] 631-209-4240

Excav Services, Inc. [email protected] 631-687-9507

Guillo Contracting Corp. [email protected] 631-727-5702

J&C Contracting of East Hampton Inc. [email protected] 516-885-0400

Ken Rousell, Inc. [email protected] 631-288-2545

Micro Earth Moving Inc. [email protected] 631-725-1236

Quakenbush Cesspools [email protected] 631-907-4426

Roman Stone Systems LLC [email protected] 631-667-0566 Ext.114

S.L. Worby & Son, Inc. [email protected] 631-653-9300

Shelter Island Sand, Gravel & Contracting Inc. [email protected] 631-749-1040

South Fork Septic [email protected] 631-283-0333

SYP Industries [email protected] 631-924-1703

DISCLAIMER: Actual costs may vary based on site constraints. Homeowners are urged to contact Vendors to discuss project specific costs for their Property. In addition,

miscellaneous Vendor Costs can be found here: Miscellaneous Installation CostsSeptic Improvement Program Notes:

• Sales tax, Engineering and Design Costs are not included in the tables provided and are the responsibility of the Property Owner• All prices are base price estimates only• Use of Grant Funds is Not Allowed for the Following:

Sales tax Engineering and Design Related Costs Irrigation repairs landscaping electrical improvements unrelated to the I/A OWTS

Page 2: Suffolk County NY - Septic Improvement Program - 6 Bedroom ......Dec 31, 2019  · South Fork Septic john@southforkseptic.com 631-283-0333 $19,825 CMM Sitework, Inc. info@cmmsitework.com

Suffolk County NY - Septic Improvement Program Vendor Cost Ranking Sheet - Scenario 1 for a 6-Bedroom Home

Vendor Quotes: Scenario 1 – I/A OWTS with Reuse of Existing Leaching StructureTechnology Vendor Contact Cost

Hydro-Action AN Series

Provisional SamplingResults for Total Nitrogen

10.5 mg/L **

Micro Earth Moving [email protected]

631-725-1236$16,725

Clear River [email protected]

Eastern Suffolk Office: 631-298-7749Western Suffolk Office: 631-467-5447

$17,230

Diversified Services of Water Mill, [email protected]

631-324-6933$17,575

Guillo Contracting [email protected]

631-727-5702$17,575

A&A Sewer and Drain Maintenance Inc. [email protected]

631-849-1599$17,850.85

Eastern Site [email protected]

631-209-4240$18,107.17

S.L. Worby & Son, [email protected]

631-653-9300$18,325

Direct Drainage [email protected]

631-472-0677$18,850.94

South Fork Septic [email protected]

631-283-0333$19,825

CMM Sitework, [email protected]

631-286-3650$20,016.81

East End Excavating [email protected]

631-324-1718$21,075

Quakenbush [email protected]

631-907-4426$21,478

Ken Rousell, [email protected]

631-288-2545$21,623

SYP Industries [email protected]

631-924-1703$21,828.40

Cardo Site Development, [email protected]

631-653-4377$22,200

J&C Contracting of East Hampton [email protected]

516-885-0400$22,270

Excav Services, [email protected]

631-687-9507$31,746

Notes:1. Actual costs may vary based on site constraints. Homeowners are urged to contact Vendors to discuss project specific costs for their Property.

2. All estimated costs not highlighted in red would fall under the intended SIP funding limits, not including $2,500 in estimated design costs that the homeowner is responsible for.

3. All costs exclude engineering and design costs which is the responsibility of the homeowner.

4. Costs highlighted in red would require additional homeowner out-of-pocket expenseSALES TAX, ENGINEERING AND DESIGN COSTS ARE NOT INCLUDED IN THE

TABLE AND ARE THE RESPONSIBILITY OF THE PROPERTY OWNER ***

**19 mg/L is the Suffolk County Standard, results as of 12/31/2019

Page 3: Suffolk County NY - Septic Improvement Program - 6 Bedroom ......Dec 31, 2019  · South Fork Septic john@southforkseptic.com 631-283-0333 $19,825 CMM Sitework, Inc. info@cmmsitework.com

Suffolk County NY - Septic Improvement Program Vendor Cost Ranking Sheet - Scenario 1 for a 6-Bedroom Home

Vendor Quotes: Scenario 1 – I/A OWTS with Reuse of Existing Leaching Structure

Technology Vendor Contact Cost

Orenco Advantex AX-20

Provisional Sampling Results for Total Nitrogen

9.5 mg/L **

A&A Sewer and Drain Maintenance [email protected]

631-849-1599$26,573.05

Orenco Advantex AX-RT

Provisional Sampling Results for Total Nitrogen26.8 mg/L **

A&A Sewer and Drain Maintenance [email protected]

631-849-1599$20,200.45

Notes:1. Actual costs may vary based on site constraints. Homeowners are urged to contact Vendors to discuss project specific costs for their Property.

2. All estimated costs not highlighted in red would fall under the intended SIP funding limits, not including $2,500 in estimated design costs that the homeowner is responsible for.

3. All costs exclude engineering and design costs which is the responsibility of the homeowner.

4. Costs highlighted in red would require additional homeowner out-of-pocket expense

*** SALES TAX, ENGINEERING AND DESIGN COSTS ARE NOT INCLUDED IN THE TABLE AND ARE THE RESPONSIBILITY OF THE PROPERTY OWNER ***

**19 mg/L is the Suffolk County Standard, results as of 12/31/2019

Page 4: Suffolk County NY - Septic Improvement Program - 6 Bedroom ......Dec 31, 2019  · South Fork Septic john@southforkseptic.com 631-283-0333 $19,825 CMM Sitework, Inc. info@cmmsitework.com

Suffolk County NY - Septic Improvement Program Vendor Cost Ranking Sheet - Scenario 1 for a 6-Bedroom Home

Vendor Quotes: Scenario 1 – I/A OWTS with Reuse of Existing Leaching Structure

Technology Vendor Contact Cost

Norweco Singulair TNT

Provisional SamplingResults for Total Nitrogen

23.0 mg/L **

Clear River [email protected]

Eastern Suffolk Office: 631-298-7749Western Suffolk Office: 631-467-5447

$15,375

Micro Earth Moving [email protected]

631-725-1236$15,950

Roman Stone Systems [email protected]

631-667-0566 Ext.114$16,392

Diversified Services of Water Mill, [email protected]

631-324-6933$16,500

Guillo Contracting [email protected]

631-727-5702$16,500

Direct [email protected]

631-472-0677$17,750.94

CMM Sitework, [email protected]

631-286-3650$18,200

Ken Rousell, [email protected]

631-288-2545$18,923

South Fork Septic [email protected]

631-283-0333$19,278

Quakenbush [email protected]

631-907-4426$21,198

Cardo Site Development, [email protected]

631-653-4377$21,700

J&C Contracting of East Hampton [email protected]

516-885-0400$26,845

Excav Services, [email protected]

631-687-9507$30,171

Notes:1. Actual costs may vary based on site constraints. Homeowners are urged to contact Vendors to discuss project specific costs for their Property.

2. All estimated costs not highlighted in red would fall under the intended SIP funding limits, not including $2,500 in estimated design costs that the homeowner is responsible for.

3. All costs exclude engineering and design costs which is the responsibility of the homeowner.

4. Costs highlighted in red would require additional homeowner out-of-pocket expenseSALES TAX, ENGINEERING AND DESIGN COSTS ARE NOT INCLUDED IN THE

TABLE AND ARE THE RESPONSIBILITY OF THE PROPERTY OWNER ***

**19 mg/L is the Suffolk County Standard, results as of 12/31/2019

Page 5: Suffolk County NY - Septic Improvement Program - 6 Bedroom ......Dec 31, 2019  · South Fork Septic john@southforkseptic.com 631-283-0333 $19,825 CMM Sitework, Inc. info@cmmsitework.com

Suffolk County NY - Septic Improvement Program Vendor Cost Ranking Sheet - Scenario 1 for a 6-Bedroom Home

Vendor Quotes: Scenario 1 – I/A OWTS with Reuse of Existing Leaching Structure

Technology Vendor Contact Cost

Norweco Hydro-Kinetic

Provisional SamplingResults for Total Nitrogen

19.7 mg/L **

Micro Earth Moving [email protected]

631-725-1236$16,950

Diversified Services of Water Mill, [email protected]

631-324-6933$17,500

Guillo Contracting [email protected]

631-727-5702$17,500

Roman Stone Systems [email protected]

631-667-0566 Ext.114$17,792

Clear River [email protected]

Eastern Suffolk Office: 631-298-7749Western Suffolk Office: 631-467-5447

$18,300

Direct [email protected]

631-472-0677$18,850.94

CMM Sitework, [email protected]

631-286-3650$19,700

Eastern Site [email protected]

631-209-4240$19,871.38

South Fork Septic [email protected]

631-283-0333$20,318

Quakenbush [email protected]

631-907-4426$22,298

Ken Rousell, [email protected]

631-288-2545$23,258

Excav Services, [email protected]

631-687-9507$31,171

Notes:1. Actual costs may vary based on site constraints. Homeowners are urged to contact Vendors to discuss project specific costs for their Property.

2. All estimated costs not highlighted in red would fall under the intended SIP funding limits, not including $2,500 in estimated design costs that the homeowner is responsible for.

3. All costs exclude engineering and design costs which is the responsibility of the homeowner.

4. Costs highlighted in red would require additional homeowner out-of-pocket expenseSALES TAX, ENGINEERING AND DESIGN COSTS ARE NOT INCLUDED IN THE

TABLE AND ARE THE RESPONSIBILITY OF THE PROPERTY OWNER ***

**19 mg/L is the Suffolk County Standard, results as of 12/31/2019

Page 6: Suffolk County NY - Septic Improvement Program - 6 Bedroom ......Dec 31, 2019  · South Fork Septic john@southforkseptic.com 631-283-0333 $19,825 CMM Sitework, Inc. info@cmmsitework.com

Suffolk County NY - Septic Improvement Program Vendor Cost Ranking Sheet - Scenario 1 for a 6-Bedroom Home

Vendor Quotes: Scenario 1 – I/A OWTS with Reuse of Existing Leaching Structure

Technology Vendor Contact Cost

SeptiTech STAAR

Provisional SamplingResults for Total Nitrogen

14.1 mg/L **

Clear River [email protected]

Eastern Suffolk Office: 631-298-7749Western Suffolk Office: 631-467-5447

$16,445

Beltran [email protected]

631-582-0222$17,040

Direct [email protected]

631-472-0677$18,850.94

Diversified Services of Water Mill, [email protected]

631-324-6933$19,300

A&A Sewer and Drain Maintenance Inc. [email protected]

631-849-1599$19,401.32

South Fork Septic [email protected]

631-283-0333$20,300

Ken Rousell, [email protected]

631-288-2545$21,925

Quakenbush [email protected]

631-907-4426$22,722

SeptiTech STAARConcrete

Provisional SamplingResults for Total Nitrogen

14.1 mg/L **

Clear River [email protected]

Eastern Suffolk Office: 631-298-7749Western Suffolk Office: 631-467-5447

$18,860

Beltran [email protected]

631-582-0222$18,885

Diversified Services of Water Mill, [email protected]

631-324-6933$20,900

Ken Rousell, [email protected]

631-288-2545$24,010

Quakenbush Cesspools [email protected]

$26,739

Notes:1. Actual costs may vary based on site constraints. Homeowners are urged to contact Vendors to discuss project specific costs for their Property.

2. All estimated costs not highlighted in red would fall under the intended SIP funding limits, not including $2,500 in estimated design costs that the homeowner is responsible for.

3. All costs exclude engineering and design costs which is the responsibility of the homeowner.

4. Costs highlighted in red would require additional homeowner out-of-pocket expenseSALES TAX, ENGINEERING AND DESIGN COSTS ARE NOT INCLUDED IN THE

TABLE AND ARE THE RESPONSIBILITY OF THE PROPERTY OWNER ***

**19 mg/L is the Suffolk County Standard, results as of 12/31/2019

Page 7: Suffolk County NY - Septic Improvement Program - 6 Bedroom ......Dec 31, 2019  · South Fork Septic john@southforkseptic.com 631-283-0333 $19,825 CMM Sitework, Inc. info@cmmsitework.com

Suffolk County NY - Septic Improvement Program Vendor Cost Ranking Sheet - Scenario 1 for a 6-Bedroom Home

Vendor Quotes: Scenario 1 – I/A OWTS with Reuse of Existing Leaching Structure

Technology Vendor Contact Cost

Fuji Clean CEN Series

Provisional SamplingResults for Total Nitrogen

11.4 mg/L **

Clear River [email protected]

East: 631-298-7749 West: 631-467-5447$16,520

Micro Earth Moving [email protected]

631-725-1236$17,350

Guillo Contracting [email protected]

631-727-5702$18,430

A&A Sewer and Drain Maintenance [email protected]

631-849-1599$18,659.94

CMM Sitework, [email protected]

631-286-3650$19,202.13

Direct [email protected]

631-472-0677$19,785

Shelter Island Sand, Gravel & Contracting Inc.*

[email protected]

$20,046

South Fork Septic [email protected]

631-283-0333$20,200

S. L. Worby & Son, [email protected]

631-653-9300$21,230

Eastern Site [email protected]

631-209-4240$21,556.09

East End Excavating [email protected]

631-324-1718$21,700

J&C Contracting of East Hampton [email protected]

516-885-0400$22,245

Ken Rousell, [email protected]

631-288-2545$22,438

SYP Industries [email protected]

631-924-1703$22,764.54

Cardo Site Development, [email protected]

631-653-4377$23,100

Quakenbush [email protected]

631-907-4426$23,378

Diversified Services of Water Mill, [email protected]

631-324-6933$24,400

Excav Services, [email protected]

631-687-9507$31,621

* Shelter Island Sand, Gravel & Contracting Inc. prices apply only to installations on Shelter Island.

Notes:1. Actual costs may vary based on site constraints. Homeowners are urged to contact Vendors to discuss project specific costs for their Property.

2. All estimated costs not highlighted in red would fall under the intended SIP funding limits, not including $2,500 in estimated design costs that the homeowner is responsible for.

3. All costs exclude engineering and design costs which is the responsibility of the homeowner.

4. Costs highlighted in red would require additional homeowner out-of-pocket expenseSALES TAX, ENGINEERING AND DESIGN COSTS ARE NOT INCLUDED IN THE

TABLE AND ARE THE RESPONSIBILITY OF THE PROPERTY OWNER ***

**19 mg/L is the Suffolk County Standard, results as of 12/31/2019

Page 8: Suffolk County NY - Septic Improvement Program - 6 Bedroom ......Dec 31, 2019  · South Fork Septic john@southforkseptic.com 631-283-0333 $19,825 CMM Sitework, Inc. info@cmmsitework.com

Suffolk County NY - Septic Improvement Program Vendor Cost Ranking Sheet – Scenario 2 for a 6-Bedroom Home

Vendor Quotes: Scenario 2 – I/A OWTS with New Gravity Leaching Structure

Technology Vendor Contact Cost

Hydro-Action AN Series

Provisional Sampling Results for Total Nitrogen

10.5 mg/L **

Eastern Site [email protected]

631-209-4240$19,907

Micro Earth Moving [email protected]

631-725-1236$20,035

Diversified Services of Water Mill, [email protected]

631-324-6933$20,825

Guillo Contracting [email protected]

631-727-5702$20,825

S. L. Worby & Son, [email protected]

631-653-9300$21,575

A&A Sewer and Drain Maintenance [email protected]

631-849-1599$21,750.85

Direct Drainage [email protected]

631-472-0677$22,400.94

Clear River [email protected]

Eastern Suffolk Office: 631-298-7749Western Suffolk Office: 631-467-5447

$22,430

South Fork Septic [email protected]

631-283-0333$23,555

East End Excavating [email protected]

631-324-1718$23,775

Cardo Site Development, [email protected]

631-653-4377$24,800

Quakenbush [email protected]

631-907-4426$24,844

SYP Industries [email protected]

631-924-1703$25,569.50

J&C Contracting of East Hampton [email protected]

516-885-0400$26,770

Ken Rousell, [email protected]

631-288-2545$26,801

CMM Sitework, [email protected]

631-286-3650$27,416.81

Excav Services, [email protected]

631-687-9507$32,558

Notes:1. Actual costs may vary based on site constraints. Homeowners are urged to contact Vendors to discuss project specific costs for their Property.

2. All estimated costs not highlighted in red would fall under the intended SIP funding limits, not including $2,500 in estimated design costs that the homeowner is responsible for.

3. All costs exclude engineering and design costs which is the responsibility of the homeowner.

4. Costs highlighted in red would require additional homeowner out-of-pocket expenseSALES TAX, ENGINEERING AND DESIGN COSTS ARE NOT INCLUDED IN THE

TABLE AND ARE THE RESPONSIBILITY OF THE PROPERTY OWNER ***

**19 mg/L is the Suffolk County Standard, results as of 12/31/2019

Page 9: Suffolk County NY - Septic Improvement Program - 6 Bedroom ......Dec 31, 2019  · South Fork Septic john@southforkseptic.com 631-283-0333 $19,825 CMM Sitework, Inc. info@cmmsitework.com

Suffolk County NY - Septic Improvement Program Vendor Cost Ranking Sheet – Scenario 2 for a 6-Bedroom Home

Vendor Quotes: Scenario 2 – I/A OWTS with New Gravity Leaching Structure

Technology Vendor Contact Cost

Orenco Advantex AX-20

Provisional Sampling Results for Total Nitrogen

9.5 mg/L **

A&A Sewer and Drain Maintenance Inc.

[email protected]

$30,473.05

Orenco Advantex AX-RT

Provisional Sampling Results for Total Nitrogen

26.8 mg/L **

A&A Sewer and Drain Maintenance Inc.

[email protected]

$24,100.45

Notes:1. Actual costs may vary based on site constraints. Homeowners are urged to contact Vendors to discuss project specific costs for their Property.

2. All estimated costs not highlighted in red would fall under the intended SIP funding limits, not including $2,500 in estimated design costs that the homeowner is responsible for.

3. All costs exclude engineering and design costs which is the responsibility of the homeowner.

4. Costs highlighted in red would require additional homeowner out-of-pocket expense

*** SALES TAX, ENGINEERING AND DESIGN COSTS ARE NOT INCLUDED IN THE TABLE AND ARE THE RESPONSIBILITY OF THE PROPERTY OWNER ***

**19 mg/L is the Suffolk County Standard, results as of 12/31/2019

Page 10: Suffolk County NY - Septic Improvement Program - 6 Bedroom ......Dec 31, 2019  · South Fork Septic john@southforkseptic.com 631-283-0333 $19,825 CMM Sitework, Inc. info@cmmsitework.com

Suffolk County NY - Septic Improvement Program Vendor Cost Ranking Sheet – Scenario 2 for a 6-Bedroom Home

Vendor Quotes: Scenario 2 – I/A OWTS with New Gravity Leaching Structure

Technology Vendor Contact Cost

Norweco Singulair TNT

Provisional Sampling Results for Total Nitrogen

23.0 mg/L **

Micro Earth Moving [email protected]

631-725-1236$19,268

Diversified Services of Water Mill, [email protected]

631-324-6933$19,900

Guillo Contracting [email protected]

631-727-5702$19,900

Roman Stone Systems [email protected]

631-667-0566 Ext.114$19,998

Clear River [email protected]

Eastern Suffolk Office: 631-298-7749Western Suffolk Office: 631-467-5447

$20,575

Direct Drainage [email protected]

$21,300.94

South Fork Septic [email protected]

631-283-0333$23,088

Ken Rousell, [email protected]

631-288-2545$24,101

Cardo Site Development, [email protected]

631-653-4377$24,300

Quakenbush [email protected]

631-907-4426$24,564

CMM Sitework, [email protected]

631-286-3650$25,600

J&C Contracting of East Hampton [email protected]

516-885-0400$26,845

Excav Services, [email protected]

631-687-9507$30,983

Notes:1. Actual costs may vary based on site constraints. Homeowners are urged to contact Vendors to discuss project specific costs for their Property.

2. All estimated costs not highlighted in red would fall under the intended SIP funding limits, not including $2,500 in estimated design costs that the homeowner is responsible for.

3. All costs exclude engineering and design costs which is the responsibility of the homeowner.

4. Costs highlighted in red would require additional homeowner out-of-pocket expenseSALES TAX, ENGINEERING AND DESIGN COSTS ARE NOT INCLUDED IN THE

TABLE AND ARE THE RESPONSIBILITY OF THE PROPERTY OWNER ***

**19 mg/L is the Suffolk County Standard, results as of 12/31/2019

Page 11: Suffolk County NY - Septic Improvement Program - 6 Bedroom ......Dec 31, 2019  · South Fork Septic john@southforkseptic.com 631-283-0333 $19,825 CMM Sitework, Inc. info@cmmsitework.com

Suffolk County NY - Septic Improvement Program Vendor Cost Ranking Sheet – Scenario 2 for a 6-Bedroom Home

Notes:1. all estimated costs not highlighted in red would fall under the intended SIP funding limits, not including $2,500 in estimated design costs that the homeowner is responsible for.

2. All costs exclude Engineering and design costs which is the responsibility of the homeowner.

3. Costs highlighted in red would require additional homeowner out-of-pocket expense

**19 mg/L is the Suffolk County Standard, results

as of 12/31/2019

SALES TAX, ENGINEERING AND DESIGN COSTS ARE

NOT INCLUDED IN THE TABLE AND ARE THE

RESPONSIBILITY OF THE PROPERTY OWNER ***

Vendor Quotes: Scenario 2 – I/A OWTS with New Gravity Leaching Structure

Technology Vendor Contact Cost

Norweco Hydro-Kinetic

Provisional SamplingResults for Total Nitrogen

19.7 mg/L **

Micro Earth Moving [email protected]

631-725-1236$20,260

Diversified Services of Water Mill, [email protected]

631-324-6933$20,900

Guillo Contracting [email protected]

631-727-5702$20,900

Roman Stone Systems [email protected]

631-667-0566 Ext.114$21,398

Eastern Site [email protected]

631-209-4240$22,171.38

Direct [email protected]

631-472-0677$22,400.94

Clear River [email protected]

Eastern Suffolk Office: 631-298-7749Western Suffolk Office: 631-467-5447

$23,500

South Fork Septic [email protected]

631-283-0333$24,048

Quakenbush [email protected]

631-907-4426$25,664

CMM Sitework, [email protected]

631-286-3650$27,100

Ken Rousell, [email protected]

631-288-2545$28,436

Excav Services, [email protected]

631-687-9507$31,983

Page 12: Suffolk County NY - Septic Improvement Program - 6 Bedroom ......Dec 31, 2019  · South Fork Septic john@southforkseptic.com 631-283-0333 $19,825 CMM Sitework, Inc. info@cmmsitework.com

Suffolk County NY - Septic Improvement Program Vendor Cost Ranking Sheet – Scenario 2 for a 6-Bedroom Home

Vendor Quotes: Scenario 2 – I/A OWTS with New Gravity Leaching Structure

Technology Vendor Contact Cost

SeptiTech STAAR

Provisional SamplingResults for Total Nitrogen

14.1 mg/L **

Beltran [email protected]

631-582-0222$19,040

Clear River [email protected]

Eastern Suffolk Office: 631-298-7749Western Suffolk Office: 631-467-5447

$21,645

Diversified Services of Water Mill, [email protected]

631-324-6933$22,700

A&A Sewer and Drain Maintenance [email protected]

631-849-1599$23,301.32

Direct [email protected]

631-472-0677$23,438

South Fork Septic [email protected]

631-283-0333$24,030

Quakenbush [email protected]

631-907-4426$26,088

Ken Rousell, [email protected]

631-288-2545$27,103

SeptiTech STAARConcrete

Provisional SamplingResults for Total Nitrogen

14.1 mg/L **

Beltran [email protected]

631-582-0222$20,885

Clear River [email protected]

Eastern Suffolk Office: 631-298-7749Western Suffolk Office: 631-467-5447

$24,060

Diversified Services of Water Mill, [email protected]

631-324-6933$24,300

Ken Rousell, [email protected]

631-288-2545$29,188

Quakenbush [email protected]

631-907-4426$30,105

Notes:1. Actual costs may vary based on site constraints. Homeowners are urged to contact Vendors to discuss project specific costs for their Property.

2. All estimated costs not highlighted in red would fall under the intended SIP funding limits, not including $2,500 in estimated design costs that the homeowner is responsible for.

3. All costs exclude engineering and design costs which is the responsibility of the homeowner.

4. Costs highlighted in red would require additional homeowner out-of-pocket expenseSALES TAX, ENGINEERING AND DESIGN COSTS ARE NOT INCLUDED IN THE

TABLE AND ARE THE RESPONSIBILITY OF THE PROPERTY OWNER ***

**19 mg/L is the Suffolk County Standard, results as of 12/31/2019

Page 13: Suffolk County NY - Septic Improvement Program - 6 Bedroom ......Dec 31, 2019  · South Fork Septic john@southforkseptic.com 631-283-0333 $19,825 CMM Sitework, Inc. info@cmmsitework.com

Suffolk County NY - Septic Improvement Program Vendor Cost Ranking Sheet – Scenario 2 for a 6-Bedroom Home

Vendor Quotes: Scenario 2 – I/A OWTS with New Gravity Leaching Structure

Technology Vendor Contact Cost

Fuji Clean CEN Series

Provisional SamplingResults for Total

Nitrogen11.4 mg/L **

Micro Earth Moving [email protected]

631-725-1236$20,660

Clear River [email protected]

East: 631-298-7749 West: 631-467-5447$21,720

Guillo Contracting [email protected]

631-727-5702$21,830

A&A Sewer and Drain Maintenance [email protected]

631-849-1599$22,559.94

Direct [email protected]

631-472-0677$23,335

Shelter Island Sand, Gravel & Contracting Inc.*

[email protected]

$23,896

South Fork Septic [email protected]

631-283-0333$23,930

S. L. Worby & Son, [email protected]

631-653-9300$24,030

East End Excavating [email protected]

631-324-1718$24,700

Cardo Site Development, [email protected]

631-653-4377$25,700

SYP Industries [email protected]

631-924-1703$26,519.70

CMM Sitework, [email protected]

631-286-3650$26,602.13

J&C Contracting of East Hampton [email protected]

516-885-0400$26,745

Quakenbush [email protected]

631-907-4426$26,944

Ken Rousell, [email protected]

631-288-2545$27,616

Diversified Services of Water Mill, [email protected]

631-324-6933$29,200

Eastern Site [email protected]

631-209-4240$29,256.09

Excav Services, [email protected]

631-687-9507$32,433

* Shelter Island Sand, Gravel & Contracting Inc. prices apply only to installations on Shelter Island.

Notes:1. Actual costs may vary based on site constraints. Homeowners are urged to contact Vendors to discuss project specific costs for their Property.

2. All estimated costs not highlighted in red would fall under the intended SIP funding limits, not including $2,500 in estimated design costs that the homeowner is responsible for.

3. All costs exclude engineering and design costs which is the responsibility of the homeowner.

4. Costs highlighted in red would require additional homeowner out-of-pocket expenseSALES TAX, ENGINEERING AND DESIGN COSTS ARE NOT INCLUDED IN THE

TABLE AND ARE THE RESPONSIBILITY OF THE PROPERTY OWNER ***

**19 mg/L is the Suffolk County Standard, results as of 12/31/2019

Page 14: Suffolk County NY - Septic Improvement Program - 6 Bedroom ......Dec 31, 2019  · South Fork Septic john@southforkseptic.com 631-283-0333 $19,825 CMM Sitework, Inc. info@cmmsitework.com

Suffolk County NY - Septic Improvement Program Vendor Cost Ranking Sheet – Scenario 3 for a 6-Bedroom Home

Vendor Quotes: Scenario 3 – I/A OWTS with Pressurized Shallow Drainfield

Technology Vendor Contact Cost

Hydro-Action AN Series

Provisional SamplingResults for Total Nitrogen

10.5 mg/L **

Diversified Services of Water Mill, [email protected]

631-324-6933$24,100

Guillo Contracting [email protected]

631-727-5702$24,100

Direct Drainage [email protected]

631-472-0677$24,300.60

Eastern Site [email protected]

631-209-4240$24,607

S. L. Worby & Son, [email protected]

631-653-9300$24,850

A&A Sewer and Drain Maintenance [email protected]

631-849-1599$25,258.19

Micro Earth Moving [email protected]

631-725-1236$25,275

Clear River [email protected]

Eastern Suffolk Office: 631-298-7749Western Suffolk Office: 631-467-5447

$26,830

Quackenbush [email protected]

631-907-4426$28,385

South Fork Septic [email protected]

631-283-0333$28,525

SYP Industries [email protected]

631-924-1703$29,448.47

East End Excavating [email protected]

631-324-1718$29,500

Cardo Site Development, [email protected]

631-653-4377$30,200

J&C Contracting of East Hampton [email protected]

516-885-0400$33,670

CMM Sitework, [email protected]

631-286-3650$34,066.81

Ken Rousell, [email protected]

631-288-2545$34,265

Excav Services, [email protected]

631-687-9507$50,458

Notes:1. Actual costs may vary based on site constraints. Homeowners are urged to contact Vendors to discuss project specific costs for their Property.

2. All estimated costs not highlighted in red would fall under the intended SIP funding limits, not including $2,500 in estimated design costs that the homeowner is responsible for.

3. All costs exclude engineering and design costs which is the responsibility of the homeowner.

4. Costs highlighted in red would require additional homeowner out-of-pocket expenseSALES TAX, ENGINEERING AND DESIGN COSTS ARE NOT INCLUDED IN THE

TABLE AND ARE THE RESPONSIBILITY OF THE PROPERTY OWNER ***

**19 mg/L is the Suffolk County Standard, results as of 12/31/2019

Page 15: Suffolk County NY - Septic Improvement Program - 6 Bedroom ......Dec 31, 2019  · South Fork Septic john@southforkseptic.com 631-283-0333 $19,825 CMM Sitework, Inc. info@cmmsitework.com

Suffolk County NY - Septic Improvement Program Vendor Cost Ranking Sheet – Scenario 3 for a 6-Bedroom Home

Vendor Quotes: Scenario 3 – I/A OWTS with Pressurized Shallow Drainfield

Technology Vendor Contact Cost

Orenco Advantex AX-20Provisional Sampling Results for

Total Nitrogen9.5 mg/L **

A&A Sewer and Drain Maintenance [email protected]

631-849-1599$34,487.73

Orenco Advantex AX-RTProvisional Sampling Results for

Total Nitrogen26.8 mg/L **

A&A Sewer and Drain Maintenance [email protected]

631-849-1599$26,507.79

Notes:1. Actual costs may vary based on site constraints. Homeowners are urged to contact Vendors to discuss project specific costs for their Property.

2. All estimated costs not highlighted in red would fall under the intended SIP funding limits, not including $2,500 in estimated design costs that the homeowner is responsible for.

3. All costs exclude engineering and design costs which is the responsibility of the homeowner.

4. Costs highlighted in red would require additional homeowner out-of-pocket expense

*** SALES TAX, ENGINEERING AND DESIGN COSTS ARE NOT INCLUDED IN THE TABLE AND ARE THE RESPONSIBILITY OF THE PROPERTY OWNER ***

**19 mg/L is the Suffolk County Standard, results as of 12/31/2019

Page 16: Suffolk County NY - Septic Improvement Program - 6 Bedroom ......Dec 31, 2019  · South Fork Septic john@southforkseptic.com 631-283-0333 $19,825 CMM Sitework, Inc. info@cmmsitework.com

Suffolk County NY - Septic Improvement Program Vendor Cost Ranking Sheet – Scenario 3 for a 6-Bedroom Home

Vendor Quotes: Scenario 3 – I/A OWTS with Pressurized Shallow Drainfield

Technology Vendor Contact Cost

Norweco Hydro-Kinetic

Provisional SamplingResults for Total Nitrogen

19.7 mg/L **

Guillo Contracting [email protected]

631-727-5702$23,975

Direct [email protected]

631-472-0677$24,300.60

Eastern Site [email protected]

631-209-4240$25,621.38

Micro Earth Moving [email protected]

631-725-1236$26,000

Clear River [email protected]

Eastern Suffolk Office: 631-298-7749Western Suffolk Office: 631-467-5447

$27,000

South Fork Septic [email protected]

631-283-0333$29,018

Quakenbush [email protected]

631-907-4426$29,205

Roman Stone Systems [email protected]

631-667-0566 Ext.114$29,348

CMM Sitework, [email protected]

631-286-3650$32,750

Ken Rousell, [email protected]

631-288-2545$35,900

Excav Services, [email protected]

631-687-9507$49,883

Notes:1. Actual costs may vary based on site constraints. Homeowners are urged to contact Vendors to discuss project specific costs for their Property.

2. All estimated costs not highlighted in red would fall under the intended SIP funding limits, not including $2,500 in estimated design costs that the homeowner is responsible for.

3. All costs exclude engineering and design costs which is the responsibility of the homeowner.

4. Costs highlighted in red would require additional homeowner out-of-pocket expenseSALES TAX, ENGINEERING AND DESIGN COSTS ARE NOT INCLUDED IN THE

TABLE AND ARE THE RESPONSIBILITY OF THE PROPERTY OWNER ***

**19 mg/L is the Suffolk County Standard, results as of 12/31/2019

Page 17: Suffolk County NY - Septic Improvement Program - 6 Bedroom ......Dec 31, 2019  · South Fork Septic john@southforkseptic.com 631-283-0333 $19,825 CMM Sitework, Inc. info@cmmsitework.com

Suffolk County NY - Septic Improvement Program Vendor Cost Ranking Sheet – Scenario 3 for a 6-Bedroom Home

Vendor Quotes: Scenario 3 – I/A OWTS with Pressurized Shallow Drainfield

Technology Vendor Contact Cost

SeptiTech STAAR

Provisional SamplingResults for Total Nitrogen

14.1 mg/L **

Beltran [email protected]

631-582-0222$21,390

Clear River [email protected]

Eastern Suffolk Office: 631-298-7749Western Suffolk Office: 631-467-5447

$22,845

A&A Sewer and Drain Maintenance [email protected]

631-849-1599$24,508.66

Direct [email protected]

631-472-0677$25,637.66

South Fork Septic [email protected]

631-283-0333$29,600

Quakenbush [email protected]

631-907-4426$29,692

Ken Rousell, [email protected]

631-288-2545$34,567

SeptiTech STAARConcrete

Provisional SamplingResults for Total Nitrogen

14.1 mg/L **

Beltran [email protected]

631-582-0222$23,235

Clear River [email protected]

Eastern Suffolk Office: 631-298-7749Western Suffolk Office: 631-467-5447

$26,260

Quakenbush [email protected]

631-907-4426$33,646

Ken Rousell, [email protected]

631-288-2545$36,652

Notes:1. Actual costs may vary based on site constraints. Homeowners are urged to contact Vendors to discuss project specific costs for their Property.

2. All estimated costs not highlighted in red would fall under the intended SIP funding limits, not including $2,500 in estimated design costs that the homeowner is responsible for.

3. All costs exclude engineering and design costs which is the responsibility of the homeowner.

4. Costs highlighted in red would require additional homeowner out-of-pocket expenseSALES TAX, ENGINEERING AND DESIGN COSTS ARE NOT INCLUDED IN THE

TABLE AND ARE THE RESPONSIBILITY OF THE PROPERTY OWNER ***

**19 mg/L is the Suffolk County Standard, results as of 12/31/2019

Page 18: Suffolk County NY - Septic Improvement Program - 6 Bedroom ......Dec 31, 2019  · South Fork Septic john@southforkseptic.com 631-283-0333 $19,825 CMM Sitework, Inc. info@cmmsitework.com

Suffolk County NY - Septic Improvement Program Vendor Cost Ranking Sheet – Scenario 3 for a 6-Bedroom Home

Vendor Quotes: Scenario 3 – I/A OWTS with Pressurized Shallow Drainfield

Technology Vendor Contact Cost

Fuji Clean CEN Series

Provisional SamplingResults for Total

Nitrogen11.4 mg/L **

Guillo Contracting [email protected]

631-727-5702$24,905

Direct [email protected]

631-472-0677$25,234.66

Clear River [email protected]

East: 631-298-7749 West: 631-467-5447$25,320

Micro Earth Moving [email protected]

631-725-1236$26,400

A&A Sewer and Drain Maintenance [email protected]

631-849-1599$26,667.28

Shelter Island Sand, Gravel & Contracting Inc.*

[email protected]

$27,496

Eastern Site [email protected]

631-209-4240$27,706.09

South Fork Septic [email protected]

631-283-0333$28,900

East End Excavating [email protected]

631-324-1718$30,325

Quackenbush [email protected]

631-907-4426$30,485

Cardo Site Development, [email protected]

631-653-4377$31,100

SYP Industries [email protected]

631-924-1703$31,489.34

S. L. Worby & Son, [email protected]

631-653-9300$32,874.87

CMM Sitework, [email protected]

631-286-3650$33,252.13

J&C Contracting of East Hampton [email protected]

516-885-0400$33,645

Ken Rousell, [email protected]

631-288-2545$35,080

Diversified Services of Water Mill, [email protected]

631-324-6933$35,625

Excav Services, [email protected]

631-687-9507$50,333

* Shelter Island Sand, Gravel & Contracting Inc. prices apply only to installations on Shelter Island.

Notes:1. Actual costs may vary based on site constraints. Homeowners are urged to contact Vendors to discuss project specific costs for their Property.

2. All estimated costs not highlighted in red would fall under the intended SIP funding limits, not including $2,500 in estimated design costs that the homeowner is responsible for.

3. All costs exclude engineering and design costs which is the responsibility of the homeowner.

4. Costs highlighted in red would require additional homeowner out-of-pocket expenseSALES TAX, ENGINEERING AND DESIGN COSTS ARE NOT INCLUDED IN THE

TABLE AND ARE THE RESPONSIBILITY OF THE PROPERTY OWNER ***

**19 mg/L is the Suffolk County Standard, results as of 12/31/2019

Page 19: Suffolk County NY - Septic Improvement Program - 6 Bedroom ......Dec 31, 2019  · South Fork Septic john@southforkseptic.com 631-283-0333 $19,825 CMM Sitework, Inc. info@cmmsitework.com

Suffolk County NY - Septic Improvement Program

SIP Contractors that work on Fire Island

Vendor Contact

A&A Sewer and Drain Maintenance [email protected]

631-849-1599

Clear River [email protected]

East: 631-298-7749 West: 631-467-5447

Eastern Site [email protected]

631-209-4240

Roman Stone Systems [email protected]

631-667-0566 Ext.114

For More Information visitwww.ReclaimOurWater.info

or call (631) 852-5811