SUDBURY CONTACT MINES LTD.

17
31M05NE2008 2.19315 COLEMAN 010 SUDBURY CONTACT MINES LTD. MAGNETOMETER SURVEY COLEMAN TOWNSHIP PROJECT GRID NO. 97-6 March 1997

Transcript of SUDBURY CONTACT MINES LTD.

Page 1: SUDBURY CONTACT MINES LTD.

31M05NE2008 2.19315 COLEMAN 010

SUDBURY CONTACT MINES LTD.

MAGNETOMETER SURVEY

COLEMAN TOWNSHIP PROJECT

GRID NO. 97-6

March 1997

Page 2: SUDBURY CONTACT MINES LTD.

31M05NE2008 2.19315 COLEMAN 010C

TABLE OF CONTENTS

I - INTRODUCTION P. l

H-PROPERTY P. l

m - LOCATION A ACCESSIBILITY P. l

IV - MAGNETOMETER SURVEY P. 2

V - CONCLUSION A RECOMMENDATION p. 3

MAPS

1 - Claim Map 1:20 000

2 - Topographic Map 1:100000

3 - Location Map 1:250 000

Page 3: SUDBURY CONTACT MINES LTD.

I - INTRODUCTION:

At the request of SUDBURY CONTACT MINES LTD., a magnetometer

survey was carried out by Exploration Services Reg'd, during the month of

March, 1997, on the Company's Coleman township property.

The magnetometer survey was carried out to obtain information which

could be usefull to the interpretation of the local geology.

H - PROPERTY:

The magnetometer survey was carried out on a 2 unit claim numbered

1211672. This claim lies within the southern half of Concession VI and

occupies the northwestern and northeastern quadrants of lot 10, Coleman

township.

ffl - LOCATION A ACCESSIBILITY:

Claim 1211672 is located in the northwestern area of Colemant township

at a distance of l Km east of highway 11 and at a distance of 3 Km west

of the town of Cobalt, Ontario.

From Cobalt, the claim is readily accessible by driving westward along an

access road for a distance of 3 Km; this road traverses the western area of

the claim to connect with highway H.

Page 4: SUDBURY CONTACT MINES LTD.

- 2 -

IV - MAGNETOMETER SURVEY;

The survey was carried out along a previously cut grid whose 400 m

long base line strikes at 180 degrees; cross lines, spaced at every 50 m

intervals extend eastwards for a distance of 500 m. Thus a total of

4.1 line Km were covered by the survey.

- Instrumentation:

An Exploranium G-816 proton magnetometer was used for the survey;

readings were taken at every 12.5 meters.

- Data Presentation:

The data were plotted on maps at the scale of 1:2 500; the report includes

a map with posted readings, a map with contour intervals and a coloured

map.

- Interpretation:

The 520 gamma contour line defines a weak negative magnetic feature in

the vicinity of the small lake located on the eastern part of the claim. This

irregular oval-shaped pattern has an approximate north-south length of

300 m and an approximate east-west length of 250 meters.

Page 5: SUDBURY CONTACT MINES LTD.

- 3 -

V - CONCLUSIONS A RECOMMENDATIONS:

The magnetometer survey has outlined a small negative anomaly

in the eastern area of the claim. To determine the true nature of

the presumed mafic intrusive, a vertical drill hole should be bored

on line 200 S at 250 E.

Respectfully submitted:

E. Chartre, B.A., B.Sc. /C/W^ March 30, 1997

Page 6: SUDBURY CONTACT MINES LTD.

BUQKE 8

.,GRID MR97-6

rr:..' /, |W.94oc

Sudbury Contact Mines Ltd.

CLAIM MAP

COLEMAN TWP.

Page 7: SUDBURY CONTACT MINES LTD.

TOWN OF NEW LISKEARD

IO\VNOI\("OBA l T '^'""•

; --', 4-,-1.1.W.V v,v,-. v 0v;. -. ,- . . . -r" A TOW X LIMIT, J

SUDBURY CONTACT MINES LTD.

HAILEYBURY AREA PROJECTS

LOCATION MAP

March 997

Page 8: SUDBURY CONTACT MINES LTD.

Mt a - t.-yg-'ta l,f -\ *-y*gy"'y! ^

^fe H^FS^TJ^^, i-. Uss? , /-^WlssG.

SUDBURY CONTACT MINES LTD.

TRI-TOWN AREA PROJECT

^rt^r-*^r-^e,,a7 r-'-'r,,-,, \ - r \ ' \. l J- rti^m,,, n j'" ' '

Page 9: SUDBURY CONTACT MINES LTD.

STARR'sPOND

CONC. IV

L zun s

GILLIES LAKE

Sudbury Contact Mines Ltd

MAGNETOMETER SURVEY

COLEMAN TWP. GRID 97-6

Page 10: SUDBURY CONTACT MINES LTD.

r--- en CD LO c*o rxj Pn T—* •— i -M *' i -~ - - . ^ - .uo LO Ln UT: UT UT un u~) u~j LO LO un LP un to un LIT Lo us

GILLIES LAKE

Base of postagp^idngs STOOD gammas

Sudbury Contact Mines Ltd.

MAGNETOMETER SURVEY

COLEMAN TWP. GRID 97-6

Page 11: SUDBURY CONTACT MINES LTD.

OD uo en r\ 53 O-j CD ^f m rn '—

STARR'S POND

i^^S^SSrsSSSSSS?m PR S tB Ln Lo LO uS L?S LO Ln co un LO LO en

r^ en -s- en m LP S LO uo

^^e^ss^ssLO LO LO LO LO LO LP

CD CD CO CD CO -, . ,, ,—. ,—^j r^) r~- CD v - .—. T LT5 LO LO LO LO LO UT LO

100 E

GILLIES LAKE

57OOO gammas

Sudbury Contact Mines Ltd

MAGNETOMETER SURVEY

COLEMAN TWP.

MARCH/97 l

GRID MR97-6

1:2#)0

Page 12: SUDBURY CONTACT MINES LTD.

MaT-ir-88 03:18pa^ FrorV A HUBACHECK CONSULTANTS LTD 4163645384 T-612 P.OZ/02 F-036 Ontario ^Si?'^**"*'!* ?e^oVmed "on Mining land

MdetCfeftMiivM

31M05NE2008 2.19315 COLEMAN 900

tnswwBwriw. - -- . , ~ , .. ...-- ,..- - - . Please typo, or prtnf In Ink.

1. Recorded holders) (Attach a Bst If neeeB*aryj

"* ****oaontC6p)*i* aepq *l^**f***g Mi.'un0*r ew

AftooptfsW* MfritsMty c* NonnWB o*WgwDpwH)iw HB M"IMPB

j recording a claim, use form 0340.

sot awMin**. em Hour,

'ffa^l ——————^ ^

iE. .rff^l

15* Mumbvr

8. Typo of work performed; Check C ^ ) and report on only ONE of the following groups lor this declaration.

f~1 Rehabilitation' Geotechnics: prosoectirtg, s and work under trenching, and

Commodity

Worfc Ctalrfwd

NTS ReferenceTSmmMNprw*

Please rememoer to: - obtain s work permH from the. Ministry of Natural Resources ae required;- provide proper notice to surfaoo rights holden) batons starting work;- complete and attach a Statement of Cost*, form 0212;- provide a map snowing contiguous mining lands that are finked for assigning work;- include two copies of your technical report.

3. Person or companies) who prepared the technical report (Attach a list tf necessary)

j MAR 15 VSS3 NUfDMT

4. Oertfflpatton by Recorded Holder or Aoent

Us ^J. , do hereby certify that l have personal knowledge of the facts setform in mis Declaration of Assessment Work having caused the work w lw performed or witnessed the same during or attar Ha eomptetlon and. to the beat of my knowledge, the annexed report le true.

iTJ55 loBS •m

•NO**.' VSU.HCUT?

MPR 17 '99 14:22 ^ o l4163645384

TOTAL PAGE. 82 **

PAGE. 02

4. Certification by Recorded Holder or Agent

tfk VV. L. , do hereby certify that l have personal knowledge of the facts setl,forth In this Declaration of Assessment Work having caused the work to be performed or witnessed the same during or after its completion and, to the best of my knowledge, the annexed report Is true.

Page 13: SUDBURY CONTACT MINES LTD.

5. Work to be recorded and distributed. Work can only be assigned to claims that are contiguous laajommg; to the mining land where work was performed, at the time work was performed. A map showing the contiguous link -M fa* UQ WO.

Mining Claim Number. Or H work waa done on other eligible mining tend, enow In this column the location number indicated on the claim map.

*9

•g•g12

3

4

5

6

7

8

9

10

11

12

13

14

15

TB 7827

1234567

1234568

izntoZL

Number of Claim Unite. For other mining land, list hectares.

18 ha

12

2

^

Column Totals

Value of work performed on this claim or other mining land.

526,825

0

9 8, 892

^3=2- 7

t

331

Value of work applied to this claim.

N/A

524.000

S 4,000

2*0

~-

ZcrO

Value of work assigned to other mining claims.

524,000

0

0

O

•M*

0

Bank. Value of work to be distributed at a future date.

52,825

0

54,892

tS^-l

Ifoll. lx.\U KU. k* , do hereby certify that the above work credits are eligible under

(Print Ful Hunt)

subsection 7 (1) of the Assessment Work Regulation 6/96 for assignment to contiguous claims or for application to the claim where the work was done.Signature of Recorded Agent :ed In Writing

6. Instructions for cutting back credits that are not approved.

Some of the credits claimed in this declaration may be cut back. Please check ( ^) in the boxes below to show howyou wish to prioritize the deletion of credits:

DZf l. Credits are to be cut back from the Bank first, followed by option 2 or 3 or 4 as Indicated. O 2. Credits are to be cut back starting with the claims listed last, working backwards; or D 3. Credits are to be cut back equally over all claims listed In this declaration; or D 4. Credits are to be cut back as prioritized on the attached appendix or as follows (describe):

Note: If you have not indicated how your credits are to be deleted, credits will be cut back from the Bank first, followed by option number 2 if necessary.

For Office Use OnlyReceived Stamp

RECEIVESffi rXJ. JO

MAR'15 '-3GEOSCIENCE ASSESSMENT

OFFICE

Deemed Approved Date

Date Approved

Date Notification Sent

Total Value of Credit Approved

Approved for Recording by Mining Recorder (Signature)

Page 14: SUDBURY CONTACT MINES LTD.

Ontario Ministry ofNorthern Developmentand Mines

Statement of Costs for Assessment Credit

Trantaction-Number (ot1!c9ii]W)v Y

Personal Information collected on this form is obtained under the authority of subsection 8(1) of the Assessment Work Regulation 6/96. Under section 8 of the Mining Act. the information is a public record. This Information will be used to review the assessment work and correspond with the mining land holder. Questions about this collection should be directed to the Chief Mining Recorder, Ministry of Northern Development and Mines, 6th Floor, 933 Ramsey Lake Road, Sudbury, Ontario, P3E 6B5.

Work Type

*S?j(rvOor^TVo\er4- U^nloca

Lin-e^/ClAta K\A

CUuivjL (TfaftK^fcjCiY*

risnea -tVcu? T~kp/J

Units of WorkDepending on the type of work, list the number of hours/days worked, metres of drilling, kilo metres of grid line, number of samples, etc.

*k

} ————————————

Associated Costs (e.g. supplies, mobilization and demobilization).

Transportation Costs

Food and Lodging Costs

Calculations of Filing Discounts

QFPPIVED

Cost Per Unit of work

I75"^y^ V l""*' otal Value of Assessment Work

MAR 1 5 1C33GEOSCIENCE ASSESSMENT

nfFiCE

Total Cost

-?S9o. fro/*2. l D. OH

tt^.CD~ ^^/../^' r

3S*^o. UK

1. Work filed within two years of performance is claimed at 1000/*) of the above Total Value of Assessment Work.2. If work is filed after two years and up to five years after performance, it can only be claimed at 500xb of the Total

Value of Assessment Work. If this situation applies to your claims, use the calculation below:TOTAL VALUE OF ASSESSMENT WORK x 0.50 Total S value of worked claimed.

Note:- Work older than 5 years is not eligible for credit.- A recorded holder may be required to verify expenditures claimed in this statement of costs within 45 days of a request for verification and/or correction/clarification. If verification and/or correction/clarification is not made, the Minister may reject all or part of the assessment work submitted.

Certification verifying costs:

l, lAl\Cy \\\ ^ ( do hereby certify, that the amounts shown are as accurate as may(please print full name)

reasonably be determined and the costs were incurred while conducting assessment work on the lands indicated on

the accompanying Declaration of Work form as

to make this certification.(recorded holder, agqnUor state company position with signing authority)

l am authorized

0212 (02/96)

Signature Date

Page 15: SUDBURY CONTACT MINES LTD.

Ministry ofNorthern Developmentand Mines

Ministere du Developpement du Nord et des Mines Ontario

April 15, 1999

ULLA M. KNOWLESSUDBURY CONTACT MINES LIMITEDc/o W.A. HUBACHECK CONSULTANTS LTD.807-365 BAY STREETTORONTO, ONTARIOM5H-2V1

Dear Sir or Madam:

Subject: Transaction Number(s):

Geoscience Assessment Office 933 Ramsey Lake Road 6th Floor Sudbury, Ontario P3E 6B5

Telephone: (888)415-9846 Fax: (877)670-1555

Visit our website at: www.gov.on.ca/MNDM/MINES/LANDS/mlsmnpge.htm

Submission Number: 2.19315

StatusW9980.00202 Deemed Approval

We have reviewed your Assessment Work submission with the above noted Transaction Number(s). The attached summary page(s) indicate the results of the review. WE RECOMMEND YOU READ THIS SUMMARY FOR THE DETAILS PERTAINING TO YOUR ASSESSMENT WORK.

If the status for a transaction is a 45 Day Notice, the summary will outline the reasons for the notice, and any steps you can take to remedy deficiencies. The 90-day deemed approval provision, subsection 6(7) of the Assessment Work Regulation, will no longer be in effect for assessment work which has received a 45 Day Notice. Allowable changes to your credit distribution can be made by contacting the Geoscience Assessment Office within this 45 Day period, otherwise assessment credit will be cut back and distributed as outlined in Section #6 of the Declaration of Assessment work form.

Please note any revisions must be submitted in DUPLICATE to the Geoscience Assessment Office, by the response date on the summary.

If you have any questions regarding this correspondence, please contact Steve Beneteau by e-mail at [email protected] or by telephone at (705) 670-5855.

Yours sincerely,

ORIGINAL SIGNED BYBlair KiteSupervisor, Geoscience Assessment OfficeMining Lands Section

Correspondence ID: 13618

Copy for: Assessment Library

Page 16: SUDBURY CONTACT MINES LTD.

Work Report Assessment Results

Submission Number: 2.19315

Date Correspondence Sent: April 15, 1999 Assessor: Steve Beneteau

Transaction First Claim Number Number

W9980.00202 1211672

Section:14 Geophysical MAG

Township(s) l Area(s)

COLEMAN

Status

Deemed Approval

Approval Date

April 09, 1999

Correspondence to:

Resident Geologist Kirkland Lake, ON

Assessment Files Library Sudbury, ON

Recorded Holder(s) and/or Agent(s):

ULLA M. KNOWLESSUDBURY CONTACT MINES LIMITEDTORONTO, ONTARIO

Page: 1Correspondence ID: 13618

Page 17: SUDBURY CONTACT MINES LTD.

"\-1

-... J__ .. ,. .. . ,K*L-. .--___ __ _____ TP ^.

TOWNSHIP l 8

FIRSTBROOK 20 19

ARR ^ TOWN S HI P^ "26 25

1211928r— ——— -———---———,1212024 Lake

11860491200891

121202FOR STATUS OF LANDS

TO KITTSON TOWNSHIP MAP 4 . ?: .

0 /'' -"."RL 404 ' ! "*

Portage Bay

TOWNSHKPG44.LIES

306 u \Pickerel \

Lake

SYMBOLSBoundary

Township, Meridian, Baseline....

Road allowance; surveyed

shoreline.

Lot/Concession; surveyed... unsurveyed .

Parcel, surveyedunsurveyed

Right-of-way; road

railway

utility.

Reservation

Cliff, Pit, Pile ....

Contour ....... ,. ... .

Interpolated

ApproximateDepression

Control point (horizontal)

Flooded land

Mine head frame

Pipeline (above ground)

Railway; single trackdouble track .............. .... ..

abandoned

Road; highway, county, township access .. trail, bush

Shoreline (original)

Transmission line .

Wooded area...

ENDING APPLICATION UNDER THE PUBLIC LANDS ACT MINING ACT (CLAUSE 5O(B})

\REA ANNEXED

AREAS WITHDRAWN FROM DISPOSITION

MRO- Mining Rights OnlySRO- Surface Rights Only

M -t- S - Mining and Surface Rights

Ministry of Ministry ofNatural Nprthern DevelopmentResources and Mines

SEC. 30 (BJ.I992 s.r. "

w l SEC 35 1990 W-uO^/SSNER 17/09 ByFOR STATUS OF LANDS

W-L-/96 MER SEPT 17/96

NER SEPT (7/96 M-S PREVENT ADVEPREFER'-T6 KITTSON TOWNSHIP MAP

INDEX TO LAND DISPOSITION BY THE CROWN AND W.LLREMAIN WITHDRAWN INDERNrTELY.

0/97NC DfC.12/9"THIS MAP SHOWS THE

M.N.R. ADMINISTRATIVE DISTRICT APPROXIMATE LOCATION

TEMAGAMI OF THE BOUNDARIES OFTHE AREA WHICH IS THE SUBJECT OF CURRENT LITIGATION. THE EXACT LOCATION WILL BE SHOWN FOLLOWING CONFIRMATION BY THE PARTIES TO THE ACTION."

PLAN

G-3418TOWNSHIP

FLOODING ON MONTREAL RIVER v o CONTOUR ELEVATION277.37m BY ONTARIO HYDRO FROM HOUND CHU'E TOTOWN OF LATCHFORD. L.O. 715 l

MINING DIVISION

LARDER LAKELAND TITLES/REGISTRY DIVISION

TIMISKAMING

THIS TOWNSHIP FALLS WITHIN THE TEMAGAMI COMPREHENSIVE PLANING AREA. SPECIAL WORKING CONDITIONS MAY APPLY TO EXPLORATION ACTIVITIES. FOR MORE DETAILS PLEASE CONTACT:

DISTRICT MANAGER, NORTH BAY DISTRICT MINISTRY, NATURAL RESOURCES

Surtae* Right* With*lrawn undar S*c. 36.

MINING CLAIMS ON CLEAR LAKE ETC. SUB.'EC T TO Th. Mining Ac! R 5.0. 1980, ORDER NO. W-OI/9I/ON/.-ATE R RESERVATION T O ^ 0 WN OF COBALT. ^^ ^

COLEMAN Zou* pwlicularty 40.25 m*t*r* or I32 ft. on

Hh*r Jld* of centre tin* oi rigM o1 way}

NOTICE OF FORESTRY ACTIVITYTHIS TOWNSHIP ; AREA FALLS WITHIN THEDISPOSITION OF CROWN LANDSBRIGSTOCKE

PatentSurface & Mining Rights Surface Rights Only Mining Rights Only

LeaseSurface St Mining Rights Surface Rights Only Mining Rights Only

Licence of Occupation ......................... ...... ... ...... .T

Order-in-Cr.i;ncil........................ .......... ............ OC

'tancelled

Resen'ation

Sand S Gravel

TO FORESTRY OPERATONS. FORESTER FOR THIS AREA CAN BE

CONTACTED AT:

P.O. BOX 38LAKESHORE DRIVE TEMAGAMI, ONTPOH 2HO 705-569-3622

Woodpecker \Bay

(Anima Nipissing Contour Interval 10 Metres

geology refcrcnce-COBALT•A {fBay Late)

COPY OF THIS M V LAR ARCHIVED NOV

RESIDENT GEO.

Map base and land disposition drafting by Surveys and Mapping Branch, Ministry of Natural Resources,

The disposition of land, location of lot fabric and parcel boundaries on this index^Hls compiled for administrative purposes only. D. "CAiJ'.r.. ",--. Y "....

AUG 2^/9! W -S T

IO

THE INFORMATION T H A', APPEARS ON THIS ivlAP HAS BEEN COMPILED FROM VARIOUS SOURCES, AND ACCURACY IS NOT GUARANTEED. THOSE ; WISHING TO STAKE WIN- : ING CLAIMS SHOULD CON SULT WITH THE MINI MG JJ RECORDER, MINISTRY OF * NORTHERN DEVELOP O MENT AND MINES, FOR AD- o DITIONAL INFORMATION j, ON THE STATUS OF THE LANDS SHOWN HEREON

COP^OF THIS MYLAR ARCHIVED AUG 29/91

90

31M05NE2008 2.19315 COLEMAN 200