STRATHCLYDE PARTNERSHIP FOR TRANSPORT
Subway Modernisation
IMechE Presentation, February 2014
Charles Hoskins, Director Projects
![Page 2: Subway Modernisation - Institution of Mechanical Engineers](https://reader034.fdocuments.us/reader034/viewer/2022050713/6275f875b5b9e15cf73c204d/html5/thumbnails/2.jpg)
STRATHCLYDE PARTNERSHIP FOR TRANSPORT
• Overview
• The Past………our origins
• The present…..our challenges and opportunities
• The future.........our modernisation
Contents
![Page 3: Subway Modernisation - Institution of Mechanical Engineers](https://reader034.fdocuments.us/reader034/viewer/2022050713/6275f875b5b9e15cf73c204d/html5/thumbnails/3.jpg)
STRATHCLYDE PARTNERSHIP FOR TRANSPORT
Overview (video)
![Page 4: Subway Modernisation - Institution of Mechanical Engineers](https://reader034.fdocuments.us/reader034/viewer/2022050713/6275f875b5b9e15cf73c204d/html5/thumbnails/4.jpg)
STRATHCLYDE PARTNERSHIP FOR TRANSPORT
The Past……..
![Page 5: Subway Modernisation - Institution of Mechanical Engineers](https://reader034.fdocuments.us/reader034/viewer/2022050713/6275f875b5b9e15cf73c204d/html5/thumbnails/5.jpg)
STRATHCLYDE PARTNERSHIP FOR TRANSPORT
Subway – The Past
Some “unique” features:
• 4ft track gauge, 11ft tunnel diameter
• Ballasted track
• 60t of cable hauled at 15 mph
• Rolling stock with two braking
systems (mechanical and air)
• Own power station at Scotland St
with steam engines
The origins:
• Three attempts at promoting
Parliamentary Bill – successful 1890
• Construction started in 1891
• Opened to public December 1896 as
a cable-hauled railway propelled by
steam engines and privately owned.
![Page 6: Subway Modernisation - Institution of Mechanical Engineers](https://reader034.fdocuments.us/reader034/viewer/2022050713/6275f875b5b9e15cf73c204d/html5/thumbnails/6.jpg)
STRATHCLYDE PARTNERSHIP FOR TRANSPORT
1935
• Converted to electric traction
• Utilise third rail
• Trains lifted out of service for
maintenance (no ramped access)
Subway – The Past
1977 - 1980
• Business case………
• New trains (33 cars),signalling, track,
upgraded stations, power supply, systems
and new depot (ramped access)
• CLOSED for last modernisation
![Page 7: Subway Modernisation - Institution of Mechanical Engineers](https://reader034.fdocuments.us/reader034/viewer/2022050713/6275f875b5b9e15cf73c204d/html5/thumbnails/7.jpg)
STRATHCLYDE PARTNERSHIP FOR TRANSPORT
The Present……..
![Page 8: Subway Modernisation - Institution of Mechanical Engineers](https://reader034.fdocuments.us/reader034/viewer/2022050713/6275f875b5b9e15cf73c204d/html5/thumbnails/8.jpg)
STRATHCLYDE PARTNERSHIP FOR TRANSPORT
Subway – Present
![Page 9: Subway Modernisation - Institution of Mechanical Engineers](https://reader034.fdocuments.us/reader034/viewer/2022050713/6275f875b5b9e15cf73c204d/html5/thumbnails/9.jpg)
STRATHCLYDE PARTNERSHIP FOR TRANSPORT
Subway - Present
Operations:
• c13 million passenger journeys per annum
• Automatic train operation
• 41 train cars (each train 3 car set)
• 4 minute frequency at peak
• 600v DC traction power fed from five
substations
• Control room – controls signalling, traction
current switching, public address, CCTV
monitoring, communication with trains via
TETRA radio system
• TMS/Scada – Bombardier Ebiscreen
• Contactless trainstop system
![Page 10: Subway Modernisation - Institution of Mechanical Engineers](https://reader034.fdocuments.us/reader034/viewer/2022050713/6275f875b5b9e15cf73c204d/html5/thumbnails/10.jpg)
STRATHCLYDE PARTNERSHIP FOR TRANSPORT
Subway – Present
Staffing/Depot:
• 170 Operations staff covering control
room, stations, driving and ancillary duties
• 75 maintenance staff covering Rolling
Stock, Stations & Equipment, Tunnels,
Track and Signalling Systems
• Broomloan Depot, Govan is the
Maintenance facility where all the
maintenance exams and repairs to the
rolling stock are undertaken.
• Significant landholding including old test
track area
![Page 11: Subway Modernisation - Institution of Mechanical Engineers](https://reader034.fdocuments.us/reader034/viewer/2022050713/6275f875b5b9e15cf73c204d/html5/thumbnails/11.jpg)
STRATHCLYDE PARTNERSHIP FOR TRANSPORT
Subway – Present
Infrastructure:
• 1220mm track gauge, 3.4m nominal
tunnel diameter
• Fixed concrete trackbed
• Narrow island platforms in stations
• Flank platforms in five stations
• Twenty eight escalators and two
travelators (no lift access)
• Twin tunnels (2x10km) with minimum
cover in places- lots of water!
• Turnout chamber and ramped access
![Page 12: Subway Modernisation - Institution of Mechanical Engineers](https://reader034.fdocuments.us/reader034/viewer/2022050713/6275f875b5b9e15cf73c204d/html5/thumbnails/12.jpg)
Subway – patronage
12,000,000
12,500,000
13,000,000
13,500,000
14,000,000
14,500,000
15,000,000
19
85
-86
19
86
-87
19
87
-88
19
88
-89
19
89
-90
19
90
-91
19
91
-92
19
92
-93
19
93
-94
19
94
-95
19
95
-96
19
96
-97
19
97
-98
19
98
-99
19
99
-00
20
00
-01
20
01
-02
20
02
-03
20
03
-04
20
04
-05
20
05
-06
20
06
-07
20
07
-08
20
08
-09
20
09
-10
20
10
-11
20
11
-12
20
12
-13
20
13
-14
Subway Patronage
![Page 13: Subway Modernisation - Institution of Mechanical Engineers](https://reader034.fdocuments.us/reader034/viewer/2022050713/6275f875b5b9e15cf73c204d/html5/thumbnails/13.jpg)
Subway – patronage network flows
![Page 14: Subway Modernisation - Institution of Mechanical Engineers](https://reader034.fdocuments.us/reader034/viewer/2022050713/6275f875b5b9e15cf73c204d/html5/thumbnails/14.jpg)
Subway – patronage by time of day
![Page 15: Subway Modernisation - Institution of Mechanical Engineers](https://reader034.fdocuments.us/reader034/viewer/2022050713/6275f875b5b9e15cf73c204d/html5/thumbnails/15.jpg)
Subway – patronage network flows am peak
![Page 16: Subway Modernisation - Institution of Mechanical Engineers](https://reader034.fdocuments.us/reader034/viewer/2022050713/6275f875b5b9e15cf73c204d/html5/thumbnails/16.jpg)
Subway – patronage by station
![Page 17: Subway Modernisation - Institution of Mechanical Engineers](https://reader034.fdocuments.us/reader034/viewer/2022050713/6275f875b5b9e15cf73c204d/html5/thumbnails/17.jpg)
Subway – patronage by month
800,000
900,000
1,000,000
1,100,000
1,200,000
1,300,000
1,400,000
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Patronage by month
2010
2011
2012
2013
![Page 18: Subway Modernisation - Institution of Mechanical Engineers](https://reader034.fdocuments.us/reader034/viewer/2022050713/6275f875b5b9e15cf73c204d/html5/thumbnails/18.jpg)
18
Our customers
Subway – patronage origins
58.6%
6,375 passengers
41.4%
4,500 passengers
Origin of Trips made on Glasgow Subway (AM Peak)
5.7%
17.8%
4.7%
10.4%
19.9%
8.2%
7.2%
3.6%
4.6%
2.7% 2.8%
1.1%
4.0%
2.1% 1.9%1.5% 1.7%
0.0%0.0%
5.0%
10.0%
15.0%
20.0%
25.0%
Home Postcode of Subway Passengers
Glasgow G1-G5
Glasgow G11-G20
Glasgow G21-G34
Glasgow G40-G43
Glasgow G56/G51-G58
Renfrewshire
North Lanarkshire
South Lanarkshire
East Renfrewshire
East Dunbartonshire
West Dunbartonshire
Edinburgh (EH)
Ayrshire (KA)
Inverclyde
Stirling Area
Other Scotland
Other
Refused
![Page 19: Subway Modernisation - Institution of Mechanical Engineers](https://reader034.fdocuments.us/reader034/viewer/2022050713/6275f875b5b9e15cf73c204d/html5/thumbnails/19.jpg)
STRATHCLYDE PARTNERSHIP FOR TRANSPORT
Subway – Todays Challenges
![Page 20: Subway Modernisation - Institution of Mechanical Engineers](https://reader034.fdocuments.us/reader034/viewer/2022050713/6275f875b5b9e15cf73c204d/html5/thumbnails/20.jpg)
STRATHCLYDE PARTNERSHIP FOR TRANSPORT
Subway – Todays Challenges
![Page 21: Subway Modernisation - Institution of Mechanical Engineers](https://reader034.fdocuments.us/reader034/viewer/2022050713/6275f875b5b9e15cf73c204d/html5/thumbnails/21.jpg)
STRATHCLYDE PARTNERSHIP FOR TRANSPORT
The Future…….
![Page 22: Subway Modernisation - Institution of Mechanical Engineers](https://reader034.fdocuments.us/reader034/viewer/2022050713/6275f875b5b9e15cf73c204d/html5/thumbnails/22.jpg)
22
Subway – Options for the future
• ‘Do Nothing’ – and effectively close
the system
• ‘Base Case’ – keep operating with
short term investment approach
• ‘Modernisation (Enhancement)
Case’ – transform the system and
deliver a 21st century service
• ‘Blue Sky’ – potential extensions
![Page 23: Subway Modernisation - Institution of Mechanical Engineers](https://reader034.fdocuments.us/reader034/viewer/2022050713/6275f875b5b9e15cf73c204d/html5/thumbnails/23.jpg)
23
To Modernise or Not?
Long term operating impacts
Historic and Projected Subway deficit (nominal)
0
5
10
15
20
25
1998
2000
2002
2004
2006
2008
2010
2012
2014
2016
2018
2020
2022
2024
2026
2028
2030
2032
2034
2036
2038
2040
Year
£ m
illion
s
Historic deficit
Base Case
Enhancement case
![Page 24: Subway Modernisation - Institution of Mechanical Engineers](https://reader034.fdocuments.us/reader034/viewer/2022050713/6275f875b5b9e15cf73c204d/html5/thumbnails/24.jpg)
Subway Modernisation
Five Principle Workstreams:
• Human Resources – Modernised
employee relations and working practices
• New Smart Ticketing System (incl
Station 16 Test and Training Centre at
Broomloan)
• Station Refurbishments (including
Escalator/Travelator replacement)
• Infrastructure Improvements (tunnels,
track, yard and depot upgrades)
• New Rolling Stock, Signalling, Comms
etc (full driverless technology)
![Page 25: Subway Modernisation - Institution of Mechanical Engineers](https://reader034.fdocuments.us/reader034/viewer/2022050713/6275f875b5b9e15cf73c204d/html5/thumbnails/25.jpg)
STRATHCLYDE PARTNERSHIP FOR TRANSPORT
Modernisation – employee relations/HR
• Working in partnership with our
employees and trade unions
• Modern terms and conditions
• More flexible workforce for now and the
future
• Overall cost savings achieved whilst
providing job security
• Agreement signed in August 2012
• Further changes already underway and
more to come
![Page 26: Subway Modernisation - Institution of Mechanical Engineers](https://reader034.fdocuments.us/reader034/viewer/2022050713/6275f875b5b9e15cf73c204d/html5/thumbnails/26.jpg)
New Subway Smartcard Ticketing System
TICKET OFFICE MACHINE (TOM) COMPONENTS
SLIMLINE AUTOMATIC
TICKET GATE (ATG)
WEB RETAIL
SMARTCARD
HOPS CMS
S&B
Ecebs
(NT)
TICKET VENDING MACHINE (TVM)
![Page 27: Subway Modernisation - Institution of Mechanical Engineers](https://reader034.fdocuments.us/reader034/viewer/2022050713/6275f875b5b9e15cf73c204d/html5/thumbnails/27.jpg)
STRATHCLYDE PARTNERSHIP FOR TRANSPORT
Modernisation – infrastructure
Minimising future maintenance
costs with investment focused
on:
• Water sealing and tunnel lining
• Rail and trackbed improvements /
renewals
• Yard/depot improvements incl full
renewal turnouts and ramps
• Drainage channels and associated
infrastructure
• Technology and innovation (e.g KTP
with Glasgow Caledonian University)
![Page 28: Subway Modernisation - Institution of Mechanical Engineers](https://reader034.fdocuments.us/reader034/viewer/2022050713/6275f875b5b9e15cf73c204d/html5/thumbnails/28.jpg)
STRATHCLYDE PARTNERSHIP FOR TRANSPORT
Modernisation – stations and accessibility
• Full refurbishment of all 15 stations
• Station refresh for all stations in
advance of Commonwealth Games
• New escalators and travelators
• Accessibility improvements (incl lifts
at St Enoch and Govan)
• Integration of advertising, public art,
retail and non operational activities
and income
![Page 29: Subway Modernisation - Institution of Mechanical Engineers](https://reader034.fdocuments.us/reader034/viewer/2022050713/6275f875b5b9e15cf73c204d/html5/thumbnails/29.jpg)
STRATHCLYDE PARTNERSHIP FOR TRANSPORT
Modernisation – new rolling stock, signalling etc
New integrated system including:
• New rolling stock
• Fully automated signalling and control
(CBTC based)
• New control room
• Platform screen gates/track protection
measures
• Power supply enhancements
• CCTV/passenger info
• Depot enhancements
• New trains and system maintenance
option
![Page 30: Subway Modernisation - Institution of Mechanical Engineers](https://reader034.fdocuments.us/reader034/viewer/2022050713/6275f875b5b9e15cf73c204d/html5/thumbnails/30.jpg)
STRATHCLYDE PARTNERSHIP FOR TRANSPORT
ITPD ISOS ISIS ISDS ISFS ISFT AWARD
Modernisation – new rolling stock, signalling etc
• Competitive dialogue via Utilities Directive
• Outline solutions, 5 consortium, dialogue sessions and clarification.
• Interim solutions, 2 consortium, more detail
• Design solution, validation of high level design at this stage dialogue
sessions and clarification, aim to fine tune the high level solution
• Detailed final solution, draft final agreement of what is being procured
• Final tender submission, final agreement of what is being procured
• CONTRACT AWARD!!
![Page 31: Subway Modernisation - Institution of Mechanical Engineers](https://reader034.fdocuments.us/reader034/viewer/2022050713/6275f875b5b9e15cf73c204d/html5/thumbnails/31.jpg)
STRATHCLYDE PARTNERSHIP FOR TRANSPORT
Modernisation – new rolling stock, signalling etc
Customer feedback on results of initial testing at Broomloan test track:
![Page 32: Subway Modernisation - Institution of Mechanical Engineers](https://reader034.fdocuments.us/reader034/viewer/2022050713/6275f875b5b9e15cf73c204d/html5/thumbnails/32.jpg)
STRATHCLYDE PARTNERSHIP FOR TRANSPORT
Best Practice – Design Guide
![Page 33: Subway Modernisation - Institution of Mechanical Engineers](https://reader034.fdocuments.us/reader034/viewer/2022050713/6275f875b5b9e15cf73c204d/html5/thumbnails/33.jpg)
STRATHCLYDE PARTNERSHIP FOR TRANSPORT
St enoch example….
![Page 34: Subway Modernisation - Institution of Mechanical Engineers](https://reader034.fdocuments.us/reader034/viewer/2022050713/6275f875b5b9e15cf73c204d/html5/thumbnails/34.jpg)
STRATHCLYDE PARTNERSHIP FOR TRANSPORT
Subway Modernisation- governance
![Page 35: Subway Modernisation - Institution of Mechanical Engineers](https://reader034.fdocuments.us/reader034/viewer/2022050713/6275f875b5b9e15cf73c204d/html5/thumbnails/35.jpg)
35
Outcomes and Benefits of Modernisation
Modernisation will deliver :
• the highest degree of reliability to our
customers;
• more flexibility and ability to have
extended operating hours at weekends
and for large events;
• more frequent service particularly during
peak times;
• new more comfortable trains;
• more attractive, accessible, safe and
secure station environments that also
benefit the surrounding community;
• more socially inclusive to better meet the
needs of our citizens of all abilities;
• continued investment in staff to provide
friendly and efficient customer service;
![Page 36: Subway Modernisation - Institution of Mechanical Engineers](https://reader034.fdocuments.us/reader034/viewer/2022050713/6275f875b5b9e15cf73c204d/html5/thumbnails/36.jpg)
36
Outcomes and Benefits of Modernisation
Modernisation will deliver :
• a new Smartcard ticketing system that will
provide easier access to the system as
well as the potential for seamless travel
on other modes such as bus and train;
• more passengers and hence mean it
costs less and less to run;
• environmental benefits that contribute to
maximise energy efficiency and
minimise pollution;
• a legacy of infrastructure and assets that
will transport our passengers comfortably
for the next 30 years;
• be a source of pride and inspiration for
the city, region and nation.