Subway Car Park - Amazon S3...Car Park Subway 1 Car Park 2 63 Subway 205 to 209 127.1m FB 7 201 203...
Transcript of Subway Car Park - Amazon S3...Car Park Subway 1 Car Park 2 63 Subway 205 to 209 127.1m FB 7 201 203...
S
u
b
w
a
y
Warehouse
7
5
Works
5
1
t
o
5
4
T
e
l E
x
2
7
5
Works
2
8
1
6
3
t
o
6
8
6
1
Works
2
8
9
4
0
t
o
4
9
Works
PH
2
7
1
Council Offices
1
1
4
.
0
m
2
8
to
3
2
114.6m
5
Works
PH
5
5
6
2
9
0
115.2m
W
o
r
k
s
114.9m
Depot
3
0
5
3
0
5
9
El Sub Sta
W
a
r
d
B
d
y
5
6
T
o
6
0
Car Park
2
El
Sub Sta
Car
Park
5
S
h
e
l
t
e
r
Shelter
Shelter
G
a
n
try
G
a
n
t
r
y
S
u
b
w
a
y
Warehouse
7
5
Works
5
1
t
o
5
4
T
e
l E
x
2
7
5
Works
2
8
1
6
3
t
o
6
8
6
1
Works
2
8
9
4
0
t
o
4
9
Works
PH
2
7
1
Council Offices
1
1
4
.
0
m
2
8
to
3
2
114.6m
5
Works
PH
5
5
6
2
9
0
115.2m
W
o
r
k
s
114.9m
Depot
3
0
5
3
0
5
9
El Sub Sta
W
a
r
d
B
d
y
5
6
T
o
6
0
Car Park
2
El
Sub Sta
Car
Park
5
S
h
e
l
t
e
r
Shelter
Shelter
G
a
n
try
G
a
n
t
r
y
BLANK OUT AREA
SHOWN ON SIGN
BLANK OUT AREA
SHOWN ON SIGN
BLANK OUT AREA
SHOWN ON SIGN
BLANK OUT AREA
SHOWN ON SIGN
BLANK OUT AREA
SHOWN ON SIGN
50m
1 : 500
305 10 200 40
This drawing includes map data licensed from Ordnance Survey with the permission
of the controller of Her Majesty's Stationery Office.
ã Crown copyright licence number 100019543 (2020)
KEY
EXISTING ROAD MARKINGS
PROPOSED WHITE ROAD MARKINGS
PROPOSED KERB
TRAFFIC CONE
BARRIERS
TEMPORARY TRAFFIC SIGN A-FRAME
LOCATION PLAN
NOTES
1. ALL DIMENSIONS IN METRES UNLESS OTHERWISE STATED.
2. NOTES PLACED DIRECTLY ON THE LAYOUT DRAWING
SUPERSEDE THOSE DETAILED IN KEYS.
3. ALL DIAGRAMS ARE TO THE TRAFFIC SIGNS REGULATIONS
AND GENERAL DIRECTIONS 2016 (TSRGD).
4. ALL DESIGNS ARE BASED ON ORDNANCE SURVEY MAPPING.
5. WHERE NO CHANGE IS SHOWN, EXISTING RESTRICTIONS
APPLY.
6. WHERE CYCLES ARE PERMITTED THROUGH ROAD
CLOSURES, A MINIMUM OF 1.5m GAP SHOULD BE PROVIDED
BETWEEN THE KERB AND TEMPORARY BARRIER.
100 BROAD STREET BIRMINGHAM B15 1AE
Telephone +44 (0)121 456 1616Email: [email protected]
www.pellfrischmann.com
P03
104130-PF-100-C1-DR-TR-006b
Sheet 11
For Construction
Tranche 1
Birmingham Traffic Cells
Transport Plan
Emergency Birmingham
FOR CONSTRUCTION
T
C
B
s
4
4
b
El Sub Sta
S
u
b
w
a
y
Su
bw
ay
4
9
4
4
a
6
1
4
5
4
4
PH
S
u
b
w
a
y
Slo
pin
g M
asonry
1
1
Car Park
S
u
b
w
a
y
1
Car Park
2
6
3
S
u
b
w
a
y
2
0
5
to
2
0
9
127.1m
FB
7
2
0
1
2
0
3
Sub Sta
129.5m
El
W
a
r
e
h
o
u
s
e
Chy
L
O
V
E
D
A
Y
S
T
PC
W
a
rd
B
d
y
W
a
r
d
B
d
y
Shelter
Shelter
G
a
n
try
L Twr
L Twr
L Twr
L Twr
T
C
B
s
4
4
b
El Sub Sta
S
u
b
w
a
y
Su
bw
ay
4
9
4
4
a
6
1
4
5
4
4
PH
S
u
b
w
a
y
Slo
pin
g M
asonry
1
1
Car Park
S
u
b
w
a
y
1
Car Park
2
6
3
S
u
b
w
a
y
2
0
5
to
2
0
9
127.1m
FB
7
2
0
1
2
0
3
Sub Sta
129.5m
El
W
a
r
e
h
o
u
s
e
Chy
L
O
V
E
D
A
Y
S
T
PC
W
a
rd
B
d
y
W
a
r
d
B
d
y
Shelter
Shelter
G
a
n
try
L Twr
L Twr
L Twr
L Twr
BLANK OUT AREA
SHOWN ON SIGN
BLANK OUT AREA
SHOWN ON SIGN
BLANK OUT AREA
SHOWN ON SIGN
BLANK OUT AREA
SHOWN ON SIGN
BLANK OUT AREA
SHOWN ON SIGN
BLANK OUT AREA
SHOWN ON SIGN
BLANK OUT AREA
SHOWN ON SIGN
50m
1 : 500
305 10 200 40
This drawing includes map data licensed from Ordnance Survey with the permission
of the controller of Her Majesty's Stationery Office.
ã Crown copyright licence number 100019543 (2020)
KEY
EXISTING ROAD MARKINGS
PROPOSED WHITE ROAD MARKINGS
PROPOSED KERB
TRAFFIC CONE
BARRIERS
TEMPORARY TRAFFIC SIGN A-FRAME
LOCATION PLAN
NOTES
1. ALL DIMENSIONS IN METRES UNLESS OTHERWISE STATED.
2. NOTES PLACED DIRECTLY ON THE LAYOUT DRAWING
SUPERSEDE THOSE DETAILED IN KEYS.
3. ALL DIAGRAMS ARE TO THE TRAFFIC SIGNS REGULATIONS
AND GENERAL DIRECTIONS 2016 (TSRGD).
4. ALL DESIGNS ARE BASED ON ORDNANCE SURVEY MAPPING.
5. WHERE NO CHANGE IS SHOWN, EXISTING RESTRICTIONS
APPLY.
6. WHERE CYCLES ARE PERMITTED THROUGH ROAD
CLOSURES, A MINIMUM OF 1.5m GAP SHOULD BE PROVIDED
BETWEEN THE KERB AND TEMPORARY BARRIER.
100 BROAD STREET BIRMINGHAM B15 1AE
Telephone +44 (0)121 456 1616Email: [email protected]
www.pellfrischmann.com
P03
104130-PF-100-C1-DR-TR-006b
Sheet 12
For Construction
Tranche 1
Birmingham Traffic Cells
Transport Plan
Emergency Birmingham
FOR CONSTRUCTION