Submit 1 Copy To Appropriate District State of New Mexico...

11
Submit 1 Copy To Appropriate District Office ( DjstricL! -(575)393-6161 1625 N. French Dr., Hobbs, NM 88240 District 11 - (575) 748-1283 811 S. First St., Artesia, NM 88210 District 111 - (505) 334-6178 1000 Rio Brazos Rd., Aztec, NM 874i District IV - (505) 476-3460 , ' 1220 S. St. Francis Dr., Santa Fe, NM 87505 / State of New Mexico ' Energy, Minerals and Natural Resources HOBBS asm CONSERVATION DIVISION 1220 South St. Francis Dr. 2 1 20 , j Santa Fe, NM 87505 SUNDRY Nf^IJgS/jAND REPORTS ON WELLS (DO NOT USE THIS FORM "FOR PROPOSALS TO DRILL OR TO DEEPEN OR PLUG BACK TO A DIFFERENT RESERVOIR. USE "APPLICATION FOR PERMIT" (FORM C-101) FOR SUCH PROPOSALS.) , fl 1. Type of Well: Oil Well Ga/Well Other ^^77^/Z>t^ 7. Lease Name or Unit Agreement Name CENTRAL VACUUM UNIT / SUNDRY Nf^IJgS/jAND REPORTS ON WELLS (DO NOT USE THIS FORM "FOR PROPOSALS TO DRILL OR TO DEEPEN OR PLUG BACK TO A DIFFERENT RESERVOIR. USE "APPLICATION FOR PERMIT" (FORM C-101) FOR SUCH PROPOSALS.) , fl 1. Type of Well: Oil Well Ga/Well Other ^^77^/Z>t^ 8. Well Number 259 / 2. Name of Operator / V CHEVRON U.S.A. INC. 9. OGRID Number 4323 3. Address of Operator 15 SMITH ROAD, MIDLAND, TEXAS 79705 10. Pool name or Wildcat ' VACUUM GRAYBURG SAN ANDRES 4. Well Location y/' Unit Letter C: 1019 feet from the NORTH line and 1514 feet from the WEST line S / Section 31 Township 17-S Range 35-E NMPM County LEA 11. Elevation (Show whether DR, RKB, RT, GR, etc.) Form C-103 Raised August 1, 2011 WELL API NO. 30-025-40464 5. Indicate Type of Lease STATE (El FEE 6. State Oil & Gas Lease No. 12. Check Appropriate Box to Indicate Nature of Notice, Report or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: PERFORM REMEDIAL WORK • PLUG AND ABANDON REMEDIAL WORK ALTERING CASING TEMPORARILY ABANDON CHANGE PLANS COMMENCE DRILLING OPNS.D P AND A PULL OR ALTER CASING MULTIPLE COMPL CASING/CEMENT JOB DOWNHOLE COMMINGLE OTHER: OTHER COMPLETION FOR NEW WELL 13. Describe proposed or completed operations. (Clearly state all pertinent details, and give pertinent dates, including estimated date of starting any proposed work). SEE RULE 19.15.7.14 NMAC. For Multiple Completions: Attach wellbore diagram of proposed completion or recompletion. PLEASE FIND ATTACHED, REPORTS FOR WORK DONE FROM 12/13/2012 THROUGH 03/04/2013 FOR THE COMPLETION OF THIS NEW WELL. 04/24/2013: INJECTING 221 MCFD @ 162 PSI. Spud Date: Rig Release Date: I hereby certify that the information above is true and complete to the best of my knowledge and belief. _ TITLE: REGULATORY SPECIALIST DATE: 05/17/2013 Type or print nanW DENISE PINKERTON E-mail address: [email protected] PHONE: 432-687-7375 SIGNATUR APPROVED BY Conditions of Approvtff^ifany): E-mail address: [email protected] Petroleum Engineer TITLE DATE

Transcript of Submit 1 Copy To Appropriate District State of New Mexico...

Page 1: Submit 1 Copy To Appropriate District State of New Mexico ...ocdimage.emnrd.state.nm.us/imaging/filestore/Hobbs/... · hsm, discuss tenet #8, discuss hazard id wheel #8, discuss e-colors

Submit 1 Copy To Appropriate District Office (

DjstricL! -(575)393-6161 1625 N. French Dr., Hobbs, NM 88240 District 11 - (575) 748-1283 811 S. First St., Artesia, NM 88210 District 111 - (505) 334-6178 1000 Rio Brazos Rd., Aztec, NM 874i District IV - (505) 476-3460 , ' 1220 S. St. Francis Dr., Santa Fe, NM 87505 /

State of New Mexico ' Energy, Minerals and Natural Resources

HOBBS asm CONSERVATION DIVISION 1220 South St. Francis Dr.

21 20 , j Santa Fe, NM 87505

SUNDRY Nf^IJgS/jAND REPORTS ON WELLS (DO NOT USE THIS FORM "FOR PROPOSALS TO DRILL OR TO DEEPEN OR PLUG BACK TO A DIFFERENT RESERVOIR. USE "APPLICATION FOR PERMIT" (FORM C-101) FOR SUCH PROPOSALS.) , f l 1. Type of Well: Oil Well Ga/Well • Other ^ ^ 7 7 ^ / Z > t ^

7. Lease Name or Unit Agreement Name CENTRAL VACUUM UNIT /

SUNDRY Nf^IJgS/jAND REPORTS ON WELLS (DO NOT USE THIS FORM "FOR PROPOSALS TO DRILL OR TO DEEPEN OR PLUG BACK TO A DIFFERENT RESERVOIR. USE "APPLICATION FOR PERMIT" (FORM C-101) FOR SUCH PROPOSALS.) , f l 1. Type of Well: Oil Well Ga/Well • Other ^ ^ 7 7 ^ / Z > t ^ 8. Well Number 259 /

2. Name of Operator / V CHEVRON U.S.A. INC.

9. OGRID Number 4323

3. Address of Operator 15 SMITH ROAD, MIDLAND, TEXAS 79705

10. Pool name or Wildcat ' VACUUM GRAYBURG SAN ANDRES

4. Well Location y / '

Unit Letter C: 1019 feet from the NORTH line and 1514 feet from the WEST line S / Section 31 Township 17-S Range 35-E NMPM County LEA

11. Elevation (Show whether DR, RKB, RT, GR, etc.)

Form C-103 Raised August 1, 2011

WELL API NO. 30-025-40464 5. Indicate Type of Lease

STATE (El FEE • 6. State Oil & Gas Lease No.

12. Check Appropriate Box to Indicate Nature of Notice, Report or Other Data

NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: PERFORM REMEDIAL WORK • PLUG AND ABANDON • REMEDIAL WORK • ALTERING CASING • TEMPORARILY ABANDON • CHANGE PLANS COMMENCE DRILLING OPNS.D P AND A • PULL OR ALTER CASING • MULTIPLE COMPL • CASING/CEMENT JOB • DOWNHOLE COMMINGLE •

OTHER: OTHER COMPLETION FOR NEW WELL 13. Describe proposed or completed operations. (Clearly state all pertinent details, and give pertinent dates, including estimated date

of starting any proposed work). SEE RULE 19.15.7.14 NMAC. For Multiple Completions: Attach wellbore diagram of proposed completion or recompletion.

PLEASE FIND ATTACHED, REPORTS FOR WORK DONE FROM 12/13/2012 THROUGH 03/04/2013 FOR THE COMPLETION OF THIS NEW WELL.

04/24/2013: INJECTING 221 MCFD @ 162 PSI.

Spud Date: Rig Release Date:

I hereby certify that the information above is true and complete to the best of my knowledge and belief.

_ TITLE: REGULATORY SPECIALIST DATE: 05/17/2013

Type or print nanW DENISE PINKERTON E-mail address: [email protected] PHONE: 432-687-7375

SIGNATUR

APPROVED BY Conditions of Approvtff^if any):

E-mail address: [email protected] Petroleum Engineer

TITLE DATE

Page 2: Submit 1 Copy To Appropriate District State of New Mexico ...ocdimage.emnrd.state.nm.us/imaging/filestore/Hobbs/... · hsm, discuss tenet #8, discuss hazard id wheel #8, discuss e-colors

Chevron Summary Report Completion

Complete Job Start Date: 12/13/2012

Job End Date: 3/4/2013 Well Name CENTRAL VACUUM UNIT 259

Lease

Central Vacuum Unit Field Name

Vacuum Business Unit Mid-Continent/Alaska

Ground Elevation (ft) 3,984.00

Original RKB (ft)

4,002.50 Current RKB Elevation

4,002.50, 11/17/2012 Mud Line Elevation (ft) Water Depth (ft)

Report Start Date: 12/13/2012 Com !!«

REVIEW JSA'S AND WRITE OUT PERMIT TO WORK. CHECK WELL PRESSURE 0#, OPEN WELL, REMOVE B-1 FLANGE, MOVE IN VETCO GRAY TO BLEED OFF PRESSURE ON BPV, BROUGHT OUT WRONG TOOL, INSTALL 2-5KX 7 1\16" FRAC VALVES.

WAITED ON VETCO GRAY TECHS SHOWED UP, STUNG TOOL IN BPV AND WAS NOT ABLE TO RELEASE. PULLED TOOL OUT AND SHUT FRAC VALVES. SHUT IN WELL AND SHUT DOWN

PREP TO ND FRAC VALVES, RELEASE BPV, NU FRAC VALVES AND LOG (RAL-CCL-GR)

Report Start Date: 12/14/2012 > Com

REVIEW JSA'S. CHECK WELL PRESSURE 0#, REMOVE 2-5K X 7 1\16" FRAC VALVES, MOVE IN VETCO GRAY TECH, STUNG INTO BPV 0 PRESSURE, REMOVE BPV. INSTALL 2-K X 7 1\16" FRAC VLAVES, CHANGED OUT RING-GASKETS.

MIRU BAKER ATLAS, OPEN INT AND SURFACE VALVES 0 PRESSURE, TEST LOWER AND UP FRAC VALVES TO 3500# GOOD NO LOSS, NO COMM ON SURFACE OR INT CSG, RU LUBACATOR AND TEST TO 250# LOW AND 1000# HIGH GOOD TEST. PU LOGGING TOOLS AND TIH, TIE INTO SCHLUMBERGER GR-CNL-DENSITY LOG DATED 12/2/1212. s r v l ^ O RUN LOG O PSI ON REPEAT PASS AND 1,000# ON MAIN PASS, TOH LD TOOLS. TAG BOTTOM @ 5030' TOC @ SURFACE

SHUT IN WELL, RIG DOWN BAKER ATLAS BAKER TO SEND LOGS TO ENG

Report Start Date: 12/19/2012

HELD SAFETY MTG, REVIEW JSA'S, DISCUSS WIND CONDITIONS MIRU GRAY WIRE LINE TIH WITH 3 1\8" SLICK GUNS AND TIE INTO CCL-GR-CBL 12/14/2012 (BAKER ATLAS) SHOT HOLES FROM 4999' TO 5024'.

TOH AND RIG DOWN EQUIPMENT, SHUT DOWN DUE TO HIGH WINDS PREP TO CONTINUE PERFORATE Report Start Date: 12/20/2012

Com HELD SAFETY MTG, REVIEW PROCEDURE AND JSA'S. WRITE OUT PTW FOR CRANE OPERATIONS, POST SIGNS LOCATION ENTRANCE CHECK WELL PRESSURE =0#, MIRU GRAY WIRE LINE, MOVE IN KEY TRUCKING AND TEST LUBICATOR TO 1,000# HIGH AND 250 LOW, TIH, TIE INTO RAL-CCL-GR 12/14/2012, CONTINUE PERFORATING WITH 3 1\8" SLICK GUNS, 2 JSPF, 120 DEGREE PHASING, 0.47" EHD, 24.96" PENETRATION, 4965' TO 4999', 4940' TO 4965', 4860' TO 4878', 4922' TO 4930', 4796' TO 4827', 4827' TO 4848', 4852' TO 4856', 4770' TO 4792',SHUT IN WELL AND SHUT DOWN

RIG DOWN GRAY WIRE LINE PREP TO ACIDIZE Report Start Date: 12/21/2012

SAFETY MTG, SPOT EQUIPMENT MIRU PETROPLEX, MIX 1ST PATCH OF RAW ACID WAITED ON 2ND PATCH OF RAW ACID

MIX RAW ACID TEST LINES TO 6700#, PUMP 20,000 GALS 15 % NEFE ACID IN STAGES AND 4 STAGES ROCK SALT. 3 STAGES BRINE GEL WATER EST INJ RATE 1 BBLS IN 8.2 BPM 2400# BRAKE @ 2300#

98 BBLS GEL BRINE 100 BBLS GEL BRINE 101 BBLS GEL BRINE

4,000 GALS ACID 4,000 GALS ACID 4,000 GALS ACID 4,000 GALS ACID 4,000 GALS ACID

2000# ROCK SALT 1000# ROCK SALT 1800# ROCK SALT 2700# ROCK SALT FLUSH WITH F\W 208 BBLS, SHUT IN WELL

TBTR=1113 ISIP=2135 5-MIN SN1924 10-MIN Sl=1679 15-MIN Sl=1496 MAX PRESS=3420 MIN PRESS=2228 AVG PRESS=2824 MAX RATE 9.5 AVG RATE=9.2 1ST BLOCK ON FORMATIOIN 2400# TO 3420# 2ND BLOCK ON FORMAION 2200# TO 2400# 3RD BLOCK ON FORMATION 2400# TO 3050# 4TH BLOCK ON FORMATION 2380# TO 2480#

RIG DOWN ACID TRUCK, RIG UP FLOW BACK LINE FROM MANIFOLD TO B-1 FLANGE PREP TO FLOW BACK WELL IN A.M. Report Start Date: 12/22/2012

Com HELD SAFETY MTG, WATCH WIND DIRECTION, NO ONE TO GO ON TOP OF FRAC TK, CHECK WELL PRESSURE 0#, OPEN WELL, FLOW WELL BACK ON 48\48 CHOKE, FLOW BACK 6 HOURS AND RECOVERED 20 BBLS ALL WATER WELL PRESSURE 10#. SHUT IN WELL

Page 1/3 Report Printed: 5/17/2013

Page 3: Submit 1 Copy To Appropriate District State of New Mexico ...ocdimage.emnrd.state.nm.us/imaging/filestore/Hobbs/... · hsm, discuss tenet #8, discuss hazard id wheel #8, discuss e-colors

Chevron Summary Report Completion

Complete Job Start Date: 12/13/2012

Job End Date: 3/4/2013

Well Name

CENTRAL VACUUM UNIT 259 Lease

Central Vacuum Unit Field Name

Vacuum Business Unit

Mid-Continent/Alaska Ground Elevation (ft)

3,984.00 Original RKB (ft)

4,002.50 Current RKB Elevation

4,002.50, 11/17/2012 Mud Line Elevation (ft) Water Depth (ft)

Report Start Date: 12/26/2012 Com

Travel time

Review JSA's, tenet #6, hazard i.d. wheel #6, e-colors #6

RU Gray Wireline

Test lubricator to 1000#, held good

RIH w/ composite plug, would not set. POOH w/ composite plug and replace ignitor. RIH again w/ composite plug and set ( POOH and PU RBP. RIH w/ RBP and set @ 1520'. Test to 1000#, held good.

! 4720'. Test to 1000#, held good.

RD Gray Wireline. Have Guardian ND 2 frac valves on top of wellhead and NU flange onto wellhead.

Travel time

Report Start Date: 2/20/2013

ROAD TO LOCATION

HSM, DISCUSS TENETS REVIEW JSA' S AND SOP'S

RIG UP ND B-1 FLANGE NU TUBING HANGER NU BOP VETCO GRAY DID NOT HAVE 7" TOOL TO PULL BPV SET TO PULL IN A.M.

OFF LOAD REVSE PUMP, TANKS, LD/PU TRAILER UNLOAD W.S. RACK TALLY LOAD WTR IN TANKS SD

TRAVEL TIME

Report Start Date: 2/21/2013 . Com

TRAVEL TIME

HSM, DISCUSS TENET # 1 , DISCUSS HAZARD ID WHEEL # 1 , DISCUSS E-COLORS # 1 , REVIEW JSA'S AND SOP'S CALIPER TBG. ELEVATORS DOCUMENT ON DAILY SHEET IN DOG HOUSE

PULL 7" BPV FROM TBG. HAGER

SD DUE TO HIGH WINDS

TRAVEL TIME

Report Start Date: 2/22/2013

TRAVEL TIME

HSM, DISCUSS TENET #2, DISCUSS HAZARD ID #2, DISCUSS E-COLORS #2, REVIEW JSA'S AND SOP'S CALIPER TBG. ELEVATORS AND DOCUMENT ON DAILY SHEET IN DOGHOUSE

PU RETRIEVINH HEAD PU TBG. RIH TO 1532' LATCH RBP RELEASE POOH W/ RBP

POOH W/TBG. RBP

PU BIT BHA PU TBG. RIH TO 4732' TAG

PU SWIVEL BREAK CIRC

DRILL ON COMPOSITE PLUG FELLL THRU TO 4746' SDON

TRAVEL TIME

Report Start Date: 2/23/2013

TRAVEL TIME

HSM, DISCUSS TENET #3, DISCUSS HAZARD ID WHEEL #3, DISCUSS E-COLORS #3 REVIEW JSA'S AND SOP'S CALIPER TBG. ELEVATORS AND DOCUMENT ON DAILY SHEET IN DOG HOUSE PERFORMED BOP DRILL DISCUSSED FIRE DRILL SPILL DRILL EVACUATION DRILL

PRES. ON VAC CHASE COMPOSITE PLUG TO 5006'

DILL DOWN TO 5045' SET DWON SOLID

CIRC CLEAN

POOH W/ TBG LD, DC AND BIT .

PU PKR RIH TO 5035' SET PRESS. UP ON TBG. TO 5000# HELD OK 15 MIN BLED OFF PULL PKR UP TO 4899' SET PUMP 13 BBLS 3,5 BPM DOWN TBG, AND COMMUNICATED TO SURF, SD PULL PKR UP TO 4738' SET PRESS CSG. TO 1000# HELD 15 MIN OK BLED OFF

POOH W/ TBG. PKR SDOW

TRAVEL TIME

Report Start Date: 2/25/2013

shut down due ice, snow and high wing

Report Start Date: 2/26/2013

travel time

hsm, discuss tenet #6, discuss harzard id wheel #6, discuss e-colors #6, review jsa' and sop's caliper tbg. elevators document on daily sheet in dog house discussed

press. 0# rih w/ tbg. open ended

sd wait on pu/ld operator had saftey meeting and had float on way out

Page 2/3 Report Printed: 5/17/2013

Page 4: Submit 1 Copy To Appropriate District State of New Mexico ...ocdimage.emnrd.state.nm.us/imaging/filestore/Hobbs/... · hsm, discuss tenet #8, discuss hazard id wheel #8, discuss e-colors

Chevron Summary Report Completion

Complete Job Start Date: 12/13/2012

Job End Date: 3/4/2013 Well Name CENTRAL VACUUM UNIT 259

Lease

Central Vacuum Unit Field Name

Vacuum Business Unit Mid-Continent/Alaska

Ground Elevation (ft) 3,984.00

Original RKB (ft)

4,002.50 Current RKB Elevation 4,002.50, 11/17/2012

Mud Line Elevation (ft) Water Depth (ft)

l.d. w.s. and pkr nd annular change out pipe rams to 2 3/8 rih w/ pkr 29' set test 2 3/8 pipe rams 250/1000* ok bled off sisdon

travel time Report Start Pate: 2/27/2013

travel time hsm, discuss tenet #7, discuss hazard id wheel #7, discuss e-colors #7 review jsa's and sop's shut down dual pkr not ready

travel time Report Start Pate: 2/28/2013

travel time hsm, discuss tenet #8, discuss hazard id wheel #8, discuss e-colors #8 review jsa's and sop's caliper tbg. elevators and document on daily sheet in dog house

ru test truck pu dual pkrs amd tbg. hydro test and make up fiberlined tech rih to 4896' left hanging prep to install dual hanger and test in a.m sdon

travel time Report Start Date: 3/1/2013

.-v.: ' ; . , . .;: , . \ . . 'Com - _ ' . . /1, :/u . ' •; ; ° .' travel time hsm, discuss tenet #1, discuss hazard id wheel #1, discuss e-colors #1, review jsa's and sop's caliper tbg elevators and document on daily sheet in dog house perform bop drill discussed fire, spill and evacuation drills

LOAD TBG. PRESS TO 1000* WAIT 10 MIN NO MOVEMENT PRESS FELL TO 550# PRESS. UP TO 1500# SENN MOVEMENT ON GAUGE WAIT 10 MIN PRESS, 1100# PREES TO 2000# WAIT 10 MIN NO MOVEMENT PRESS. FELL TO 1600* PRESS, TO 2490# AND PUMP OUT PLUG BLEW LONG STRING ON VAC,

SET BPV IN LONG STRING

PULL BPV RU SLICK LINE RIH W/1,43 R PLUG SET PRESS, UP TO 1000# SHEARED OFF RD SLICKILINE INSTALL BPV LOAD CSG PRESS, TEST TO 500# HELD SOLID FOR 48 MIN BLED OFF SDON

TRAVEL TIME

Report Start Date: 3/2/2013 , - ; ' . „ . • • ' • v." . '.c -- . / . . .,. ; • 'Com \< :.};v;:

;: /.:. v^'.»'. " \ . ' *- ; v TRAVEL TIME HSM, DISCUSS TENET #2, DISCUSS HAZARD ID WHEEL #2, DISCUSS E-COLORS #2, REVIEW JSA 'S AND SOP'S CALIPER TBG. ELEVATORS AND DOCUMENT ON DAILY SHEET IN DOG HOUSE

PU SEAL ASSB AND 1.56 R PROFILE NIPPLE PU 2 3/8 FIBERLINED TBG. HYDRO TEST TBG, IN HOLE BELOW SLIPS 4000# HAD TUBOSCOPE TECH ON LOCATION MAKE UP CONNECTIONSRIH TO 4660' RD TESTERS

CIRC PKR FLUID LAND TBG IN HANGER PRETEST CSG TO 500# LEAKED OFF ND BOP CHECKED HANGER SEALS HAD LEAK AROUND HANGER SEALS WAS NOT SEATED IN HANGER ABOUT 1/2" ABOVE LONG STRING LANDING NIPPLE INSTALLED BULL PLUG ON TOP HANGER CONNECTION AND HAMMERED DOWN 1/2" AND SEATED RETESTED TO 500# HELD 30 MIN NO LEAKS BLED

NU TREE TEST OK REMOVED BPV IN LONG STRING AND SHORT STRING TRAVEL TIME Report Start Date: 3/4/2013

TRAVEL TIME HSM, DISV-0CUSS TENET #4, DISCUSS HAZARD ID WHEEL #4, DISCUSS E-COLORS #4 REVIEW JSA'S AND SOPS RU SLICKLINE RETRIEVE 1,43 R PLUG FORM LONG STRING 3 TIMES TO RETRIEVE 1.43 R PLUG FROM SHORT STRING RD

PRESS, CST TO 540# FOR MIT FOR NMOCD LOST 5# IN 33 MIN BLED OFF PUMP 30 BBLS BRINE WTR DOWN SHORT STRING 3.8 BPM 2100# ISIP VAC PUMP 30 BBLS BRINE WTR DOWN LONG STRING 2.5 BPM 2300* ISIP 1200 HAD NO COMMUNICATION ABOVE TOP PKR

RIGGED DOWN

Page 3/3 Report Printed: 5/17/2013

Page 5: Submit 1 Copy To Appropriate District State of New Mexico ...ocdimage.emnrd.state.nm.us/imaging/filestore/Hobbs/... · hsm, discuss tenet #8, discuss hazard id wheel #8, discuss e-colors

Chevron Wellbore Schematic

Well Name Lease Field Name Business Unit

CENTRAL VACUUM UNIT 259 Central Vacuum Unit Vacuum Mid-Continent/Alaska

Original Hole 5/17/2013 2 22 36 PM

. Vert ical 'schematic (actual)

• I I " 7.70; ' / Profile

" / /"3/8; 1

y i-ii

Transition sub ss; 17-18; 0.80; 2 3/8; 1.992; 2-1

•Casing Hanger; 19-23; 6.00; 7; 6.366; 4-3 -Liner Hanger; 18-23; 5.00; 9 5/8; 8.921; 3-

'1 '• Tubing Pup Joint fiberlined; 18-24; 6.00; 2 • '3/8; 1.740; 2-2 -Casing Joint; 25-78; 60.00; 20; 18.375; 1-1 Casing Joint; 23-1.362; 1,338.34; 9 5/8; -8.921; 3-2 Casing Joint; 19-1.432; 1,432.20; 13 3/8; 12.615; 2-1 ™ External Casing Packer; 1,362-1,386; ... ... 24.58; 9 5/8; 8.921; 3-3 Float Collar; 1,432-1,434; 1.35; 133/8; 12.615; 2-2 Casing Joint; 1.434-1,513; 79.24; 13 3/8; 12.615; 2-3 Guide Shoe; 1,513-1,515; 2.06; 13 3/8; . .. 12.615:2-4

[^Casing Joint; 23-3,037; 3.013.66; 7; 6.366; |4 -4

Casing Joint; 1,386-3,082; 1,696.00; 9 5/8; 8.921; 3-4 Tubing fiberlined ; 17-4,616; 4,599.45; 2 ... 3/8; 1.740; 1-1 Tubing fiberlined ; 24-4,627; 4,602.66; 2 " ' 3/8; 1.995; 2-3 External Casing Packer; 3,037-3,061; 24.65; 7; 6.366; 4-5 Float Collar; 3,082-3,084; 1.44; 9 5/8; - -8.921; 3-5 Casing Joint; 3,084-3,159; 75.78; 9 5/8; '"' 8.921; 3-6 Float Shoe; 3,159-3,161; 1,63; 9 5/8; 8.921:3-7 Casing Joint; 3,061-3,476; 414.87; 7; 6.366; 4-6 Marker Joint; 3~476-3',496; 14^28; 7; "6.366;' 4-7 Casing Joint; 3.490-5.042; 1,551.25; 7; 6.366; 4-8 Cross Over 10rd by8rd ; 4,616-4.617; 0.50; 2 3/8; 1-2 Tubing Pup Joint fiberlined ; 4,617-4,624; -

" 2 3/8; 1.740; 1-3 le Nipple 1.56 R ; 4.627-4,627; 0.80; 2

560; 2-4 Peak Hydro 11 dual pkr 1.43 r pn ; 4.625- "

,630; 5.40; 2 3/8; 1-4 latch toolseal; 4,627-4,629; 1.23; 2 3/8; 2 - ' '

, . , . . . collar extension; 4,630-4,631; 1.10; 2 3/8; r,-5

• / • HYDRO I DUAL PKR ; 4,629-4,634; 5.40; /~2 3/8; 2-6

Tubing Pup Joint fiberlined ; 4,631-4.639; • " 7 .70 : 2 3/8; 1.740; 1-6 >V Tubing Pup Joint IPC ; 4,634-4.636; 2.38; v 2 3/8; 1.880; 2-7

" \ PROFILE NIPPLE 1.43 R; 4,636-4,637; ... 0.80; 2 3/8; 2-8

\_Cross Over 10rd by 8rd ; 4,639-4.639; 0.30; 2 3/8; 1-7

s^Tubingf ryco wrapped od) ipc ; 4,639- . . . . v 4,888; 249.43; 2 3/8; 1.867; 1-8 ^ C a s e d Hole; 4,770-4,792; 12/19/2012 '~ '

-Cased Hole; 4,796-4,827; 12/19/2012

-Cased Hole; 4,827-4,848; 12/19/2012

-Cased Hole; 4,852-4,856; 12/19/2012

Cased Hole; 4,860-4,878; 12/19/2012 "" Cross Over 2 3/8x2 7/8 ; 4,888-4,889; / "0 .35 ;2 3/8; 1-9

—' 9 2 7/8 x 1,43 r profile nipple ; 4,8 _ ^ 0 . 9 2 ; 2 3/8; 1-10

• Peak Hydrol dual pkr 1,43 r pn ; 4,890-"4.896; 6.30; 2 3/8; 1-12 ' PUMP'OUT PLUG "; 4,896-4,896; 0.46; 2 "3/8; 1-13

-Cased Hole; 4,922-4,930; 12/19/2012

-Cased Hole; 4,940-4,965; 12/19/2012

-Cased Hole; 4,965-4,999; 12/20/2012

-Cased Hole; 4,999-5,024; 12/19/2012

' Float Collar; 5,042-5,043; 1.15; 7; 6.366; 4-

Casing Joint; 5,043-5,125; 81.80; 7; 6.366; - > ^ 4 - 1 0

Float Shoe; 5,125-5,126; 1.47; 7; 6.366; 4-

Job Details .Job Category

Completion Completion Completion

12/13/2012

12/19/2012

2/20/2013

' * Release Date

12/14/2012

12/26/2012

3/4/2013

Casing Strings

i-V-; Csg Pes .

Conductor Surface Intermediate Casing 1

Production Casing

-OD (in) .

20 13 3/8

9 5/8

VWLen (ib/ft)

169.00

54.50

36.00

23.00 J-55

K-55 J-55

J-55

Top Thread ' Set Depth ;

(MP) (ftKB) -

79

1,515

3,161

5,126

Tubing Strings Tubing long string set at 4,896.5ftKB on 2/28/2013 15:00 Tubing Description Tubing long string

Run Date

2/28/2013 String Length (ft)

4,879.61 Set Depth (MD) (ftKB)

4,896.5 - ,' • Item pes i ;.. '" Jts OD (in) Wt (lb/ft) Grade . • L e n ( f t ) . - Btm (ftKB)

Tubing fiberlined 143 2 3/8 4.70 L-80 4,599.45 4,616.3

Cross Over 10rd by8rd 1 2 3/8 0.50 4,616.8

Tubing Pup Joint fiberlined 1 2 3/8 7.70 4,624.5

Peak Hydro 11 dual pkr 1.43 r pn 1 2 3/8 5.40 4,629.9

collar extension 1 2 3/8 1.10 4,631.0

Tubing Pup Joint fiberlined 1 2 3/8 7.70 4,638.7 Cross Over 10rd by 8rd 1 2 3/8 0.30 4,639.0 Tubing( ryco wrapped od) ipc 8 2 3/8 4.70 L-80 249.43 4,888.4 Cross Over 2 3/8x2 7/8 1 2 3/8 0.35 4,888.8 2 7/8x1,43 r profile nipple 1 2 3/8 0.92 4,889.7 Cross Over 2 7/8 by 3.5 1 2 3/8 0.00 4,889.7 Peak Hydrol dual pkr 1,43 r pn 1 2 3/8 6.30 4,896.0 PUMP OUT PLUG 1 2 3/8 0.46 4,896.5

Tubing Short string set at 4,637.1 ftKB on 3/2/201315:15 ,. ".V.N .N ;•• *;'€/".',. Tubing Description

Tubing Short string Run Date

3/2/2013 String Length (ft)

4,620.07 Set Depth (MD) (ftKB)

4,637.1 Item Pes , >Jts OD (in) Wt (lb/ft) Grade ' Len (ft) Btm (ftKB)- ,:

Transition sub ss 1 2 3/8 4.70 L-80 0.80 17.8 Tubing Pup Joint fiberlined 1 2 3/8 6.00 23.8 Tubing fiberlined 1 2 3/8 4.70 L-80 4,602.66 4,626.5 Profile Nipple 1.56 R 1 2 3/8 0.80 4,627.3 j-latch toolseal 1 2 3/8 1.23 4,628.5 HYDRO I DUAL PKR 1 2 3/8 5.40 4,633.9 Tubing Pup Joint IPC 1 2 3/8 2.38 4,636.3 PROFILE NIPPLE 1.43 R 1 2 3/8 0.80 4,637.1

Perforations

Date" , • Top (ftKB). Btm (ftKB)

Shot ,: Dens" •

(shots/ft) .Entered Shot

•• Total . ' Zone & Completion'; • .'V

12/19/2012 4,770.0 4,792.0 2.0 12/19/2012 4,796.0 4,827.0 2.0 12/19/2012 4,827.0 4,848.0 2.0 12/19/2012 4,852.0 4,856.0 2.0

12/19/2012 4,860.0 4,878.0 2.0 12/19/2012 4,922.0 4,930.0 2.0 12/19/2012 4,940.0 4,965.0 2.0

12/20/2012 4,965.0 4,999.0 2.0

12/19/2012 4,999.0 5,024.0 2.0 Other Strings

jSet Depth (ftKB). Com.

Page 1/2 Report Printed: 5/17/2013

Page 6: Submit 1 Copy To Appropriate District State of New Mexico ...ocdimage.emnrd.state.nm.us/imaging/filestore/Hobbs/... · hsm, discuss tenet #8, discuss hazard id wheel #8, discuss e-colors

Chevron Wellbore Schematic

Well Name Lease Field Name Business Unit CENTRAL VACUUM UNIT 259 Central Vacuum Unit Vacuum Mid-Continent/Alaska

.OriginaliHole:>:-5/17/2013'2:22i37^PM.

Vertrcal 'schematic (actual)"

r r5

Transition sub ss; 17-18; 0.80; 2 3/8; r 1.992; 2-1 r-Casing Hanger; 19-23; 6.00; 7; 6.366; 4-3 I Liner Hanger; 18-23; 5.00; 9 5/8; 8.921; 3-n

Tubing Pup Joint fiberlined; 18-24; 6.00; 2 • 3/8; 1.740; 2-2 Casing Joint; 25-78; 60.00; 20; 18.375; 1-1 Casing Joint; 23-1,362; 1,338.34; 9 5/8; 8.921:3-2 Casing Joint; 19-1,432; 1,432.20; 13 3/8; 12.615; 2-1 ui External Casing Packer; 1,362-1,386; . .. . 24.58; 9 5/8; 8.921; 3-3 Float Collar; 1,432-1,434; 1.35; 13 3/8; ' " 12.615; 2-2 Casing Joint; 1.434-1,513; 79.24; 13 3/8; 12.615; 2-3 Guide Shoe; 1,513-1,515; 2.06; 13 3/8; . .. 12.615; 2-4 Casing Joint; 23-3,037; 3,013.66; 7; 6.366; 4-4 Casing Joint; 1,386-3,082; 1,696.00; 9 5/8; 8.921; 3-4 Tubing fiberlined ; 17-4,616; 4,599.45; 2 .... 3/8; 1.740; 1-1 Tubing fiberlined ; 24-4,627; 4,602.66; 2 " " 3/8; 1.995; 2-3 External Casing Packer; 3,037-3,061; 24,65; 7; 6.366; 4-5 Float Collar; 3,082-3,084; 1.44; 9 5/8; 8,921; 3-5 Casing Joint; 3,084-3,159; 75.78; 9 5/8; "" 8,921:3-6 Float Shoe; 3,159-3,161; 1.63; 9 5/8; 8.921;3-7 Casing Joint; 3,061-3,476; 414.87; 7; . - . . 6.366; 4-6 Marker Joint; 37476-3,490; 14"28; 7; a366; 4-7 Casing Joint; 3,490-5,042; 1,551.25; 7; 6.366; 4-8 Cross Over 10rd by8rd ; 4,616-4,617; 0.50; 2 3/8; 1-2 Tubing Pup Joint fiberlined ; 4,617-4,624; -

3 R ; 4.627-4.627; 0.80; 2

I f 7.70; 2 3/8; 1.740; 1 7-y Profile Nipple 1.56 R ' " / f am- 1.560; 2-4 - / P

0 Peak Hydro 11 dual pkr 1.43 r pn ; 4,625- ••

630; 5.40; 2 3/8; 1-4 latch toolseal; 4,627-4,629; 1.23; 2 3/8; 2- '

,. collar extension; 4,630-4,631; 1.10; 2 3/8; / - 1 - 5

' / • HYDRO I DUAL PKR ; 4,629-4,634; 5.40; / " 2 3/8; 2-6

Tubing Pup Joint fiberlined ; 4,631-4,639; - / "7.70: 2 3/8; 1.740; 1-6 , \ Tubing Pup Joint IPC ; 4,634-4,636; 2.38;

2 3/8; 1.880; 2-7 "A 2

•" YPROFILE NIPPLE 1.43 R; 4.636-4,637; 0,80; 2 3/8; 2-8

" \ Cross Over 10rd by 8rd ; 4,639-4,639; 0.30; 2 3/8; 1-7

—^Tubingf ryco wrapped od) ipc ; 4,639- . 4,888; 249.43; 2 3/8; 1.867; 1-8 Cased Hole; 4,770-4,792; 12/19/2012 '

-Cased Hole; 4,796-4.827; 12/19/2012

-Cased Hole; 4.827-4,848; 12/19/2012

-Cased Hole; 4,852-4,856; 12/19/2012

Cased Hole; 4,860-4,878; 12/19/2012 Cross Over 2 3/8x2 7/8 ; 4,888-4,889; —

„V"0 .35; 2 3/8; 1-9 - J 2 7/8x1,43 r proflie nipple ; 4,889-4,890; i y o . 9 2 ; 2 3/8; 1-10

Peak Hydrol dual pkr 1,43 r pn ; 4,890-4,896; 6.30; 2 3/8; 1-12

2 PUMP OUT PLUG ; 4,8 -3/8; 1-13

-4,896; 0,46; 2

-Cased Hole; 4,922-4,930; 12/19/2012

_ ^ 9

-Cased Hole; 4,940-4.965; 12/19/2012

-Cased Hole; 4.965-4.999; 12/20/2012

-Cased Hole; 4,999-5,024; 12/19/2012

Float Collar; 5,042-5,043; 1.15;'7; 6.366; 4-

Casing Joint; 5,043-5,125; 81.80; 7; 6.366; I ^ " 4 - 1 0

" - • F l o a t Shoe; 5,125-5.126; 1.47; 7; 6.366; 4-

Otherln Hole . Des

Bridge Plug (Retrievable) Peak

Bridge Plug (Permanent) Fasdrill

Top (ftKB)

1,520.0

4,720.0

Btm (ftKB) Run Date

12/26/2012

12/26/2012

Page 2/2 Report Printed: 5/17/2013

Page 7: Submit 1 Copy To Appropriate District State of New Mexico ...ocdimage.emnrd.state.nm.us/imaging/filestore/Hobbs/... · hsm, discuss tenet #8, discuss hazard id wheel #8, discuss e-colors
Page 8: Submit 1 Copy To Appropriate District State of New Mexico ...ocdimage.emnrd.state.nm.us/imaging/filestore/Hobbs/... · hsm, discuss tenet #8, discuss hazard id wheel #8, discuss e-colors
Page 9: Submit 1 Copy To Appropriate District State of New Mexico ...ocdimage.emnrd.state.nm.us/imaging/filestore/Hobbs/... · hsm, discuss tenet #8, discuss hazard id wheel #8, discuss e-colors
Page 10: Submit 1 Copy To Appropriate District State of New Mexico ...ocdimage.emnrd.state.nm.us/imaging/filestore/Hobbs/... · hsm, discuss tenet #8, discuss hazard id wheel #8, discuss e-colors
Page 11: Submit 1 Copy To Appropriate District State of New Mexico ...ocdimage.emnrd.state.nm.us/imaging/filestore/Hobbs/... · hsm, discuss tenet #8, discuss hazard id wheel #8, discuss e-colors