    HKIA M629

    Reconfiguration of Commercial Counters at H1 Buffer Hall

    Hoarding Arrangement at Buffer Halls for

    Phase I Works.

    Date : 12 August, 2008

    Revision : A

  • 8/14/2019 SUB-0022-B

    11/17

    HKIA M629

    Reconfiguration of Commercial Counters at H1 Buffer Hall

    1. Introduction

    According to the ERI no. 03 item 1 and 2, the hoarding layout & the construction

    period for Phase 1 works at Buffer Halls are revised to suit the new requirements.

    2. Working Portion PlanIn order to reduce the interference to passenger, SFK will divide the works in phase 1

    into 2 portions (A & B). The working period for Portion A is from 1 September 08 to

    6 October 08. For the portion B, the working period is from 4 October, 08 to 17

    November, 08. The detail is shown on the Appendix A.

    3. Hoarding Arrangement3.1Hoarding Arrangement for Portion AThe overall hoarding arrangement for Portion A is shown on Appendix B. The wall,

    floor finishes and new counters will be completed before hoarding removal. However,

    due to several long-lead materials installed at the ceiling still may not be delivered on

    time, therefore; fire resistant sheet will be provided to cover the dismantled ceiling

    areas until completion of ceiling works.

    3.2 Hoarding Arrangement for Portion B

    The overall hoarding arrangement for Portion B is shown on Appendix C

  • 8/14/2019 SUB-0022-B

    12/17

    HKIA M629

    Reconfiguration of Commercial Counters at H1 Buffer Hall

    5. Counters Relocation

    5.1 Under Potion A Works

    According to the given comments on the rev. 0, the relocation of the MTR counter can

    be referring to the appendix B.

    5.2 Under Portion B Works

    5.2.1 MTR Counter

    When the portion A is completed, the new counter will be installed. We propose MTR

    to use the new counter in order to reduce the congestion of the remaining area.

    5.2.2 HKTB Counter & AA Information DirectoryAccording to the given comments on the rev. 0, the HKTB counter and AA

    information directory can be referring to the appendix C.

  • 8/14/2019 SUB-0022-B

    13/17

  • 8/14/2019 SUB-0022-B

    14/17

  • 8/14/2019 SUB-0022-B

    15/17

  • 8/14/2019 SUB-0022-B

    16/17

    Fire Resistant Sheet

    Fire Resistant

    Sheet

  • 8/14/2019 SUB-0022-B

    17/17

    Fire Resistant Cover

    with Aluminium Frame

    at the Back