HKIA M629
Reconfiguration of Commercial Counters at H1 Buffer Hall
Hoarding Arrangement at Buffer Halls for
Phase I Works.
Date : 12 August, 2008
Revision : A
-
8/14/2019 SUB-0022-B
11/17
HKIA M629
Reconfiguration of Commercial Counters at H1 Buffer Hall
1. Introduction
According to the ERI no. 03 item 1 and 2, the hoarding layout & the construction
period for Phase 1 works at Buffer Halls are revised to suit the new requirements.
2. Working Portion PlanIn order to reduce the interference to passenger, SFK will divide the works in phase 1
into 2 portions (A & B). The working period for Portion A is from 1 September 08 to
6 October 08. For the portion B, the working period is from 4 October, 08 to 17
November, 08. The detail is shown on the Appendix A.
3. Hoarding Arrangement3.1Hoarding Arrangement for Portion AThe overall hoarding arrangement for Portion A is shown on Appendix B. The wall,
floor finishes and new counters will be completed before hoarding removal. However,
due to several long-lead materials installed at the ceiling still may not be delivered on
time, therefore; fire resistant sheet will be provided to cover the dismantled ceiling
areas until completion of ceiling works.
3.2 Hoarding Arrangement for Portion B
The overall hoarding arrangement for Portion B is shown on Appendix C
-
8/14/2019 SUB-0022-B
12/17
HKIA M629
Reconfiguration of Commercial Counters at H1 Buffer Hall
5. Counters Relocation
5.1 Under Potion A Works
According to the given comments on the rev. 0, the relocation of the MTR counter can
be referring to the appendix B.
5.2 Under Portion B Works
5.2.1 MTR Counter
When the portion A is completed, the new counter will be installed. We propose MTR
to use the new counter in order to reduce the congestion of the remaining area.
5.2.2 HKTB Counter & AA Information DirectoryAccording to the given comments on the rev. 0, the HKTB counter and AA
information directory can be referring to the appendix C.
-
8/14/2019 SUB-0022-B
13/17
-
8/14/2019 SUB-0022-B
14/17
-
8/14/2019 SUB-0022-B
15/17
-
8/14/2019 SUB-0022-B
16/17
Fire Resistant Sheet
Fire Resistant
Sheet
-
8/14/2019 SUB-0022-B
17/17
Fire Resistant Cover
with Aluminium Frame
at the Back