Study and Prepare Model of the Powerhouse and Switchyard of Panauti Hydropower Project

18
STUDY AND PREPARE MODEL OF THE POWERHOUSE AND SWITCHYARD OF PANAUTI HYDROPOWER PROJECT Incharge : Mr. Janak Raj Joshi Suresh Manandhar(17) Supervisor: Mr. Subash Ghimire Upendra Oli(19) Dhruba Poudel(21) Rita Ranjit(23) Department of Civil and Geomatics Engineering School of Engineering Kathmandu University Dhulikhel ,Kavre 1 st July 2011 Final Presentation

description

3D model of powerhouse and switchyard of panauti hydropower prepared by Bachelors in Geomatics Engineering 1st year 2nd semester students.

Transcript of Study and Prepare Model of the Powerhouse and Switchyard of Panauti Hydropower Project

Page 1: Study and Prepare Model of the Powerhouse and Switchyard of Panauti Hydropower Project

STUDY AND PREPARE MODEL OF THE POWERHOUSE AND SWITCHYARD OF PANAUTI

HYDROPOWER PROJECT

Incharge : Mr. Janak Raj Joshi Suresh Manandhar(17)

Supervisor: Mr. Subash Ghimire Upendra Oli(19)

Dhruba Poudel(21)

Rita Ranjit(23)

Department of Civil and Geomatics Engineering

School of Engineering

Kathmandu University

Dhulikhel ,Kavre

1st July 2011

Final Presentation

Page 2: Study and Prepare Model of the Powerhouse and Switchyard of Panauti Hydropower Project

CONTENTSIntroductionObjectiveMethodologyPrimary dataScaleDimension in reduced scaleResource usedSteps used to prepare 3-D modelDifficulties on Fieldwork BenefitsConclusions

Page 3: Study and Prepare Model of the Powerhouse and Switchyard of Panauti Hydropower Project

INTRODUCTIONPanauti Hydropower Project is the third hydropower

project of Nepal.Located in Roshi river, Khopasi(Kavre), 35 km east of

Kathmandu.Commissioned during 1960-1965 by the joint effort of

USSR and Nepal government.An installed capacity of 2.4 MW.

Page 4: Study and Prepare Model of the Powerhouse and Switchyard of Panauti Hydropower Project

OBJECTIVEStudy and prepare the 3-D model for the powerhouse and

switchyard of Panauti Hydropower Project.

Sub-objectives: To study the placement of general equipments inside.To know the surveying techniques, fieldwork, etc.

Page 5: Study and Prepare Model of the Powerhouse and Switchyard of Panauti Hydropower Project

METHODOLOGY

Primary Data collection (measurements,

observations , etc.)

Start

Desk study Field study

Secondary Data collection (surfing

internet, library visit)

Model Preparation

Final report

Page 6: Study and Prepare Model of the Powerhouse and Switchyard of Panauti Hydropower Project

PRIMARY DATAPowerhouse

Length=2475cm.

Breadth=1840cm.

Height=709cm.

SwitchyardLength=2740cm.

Breadth=1140cm.

Height of fence=244cm.

Height difference between powerhouse and switchyard=975cm.

Page 7: Study and Prepare Model of the Powerhouse and Switchyard of Panauti Hydropower Project

Scale:The scale is reduced in the ratio 1:55 to include

powerhouse and switchyard in the plywood of 1*1 m

which further includes automatically staff house.

Page 8: Study and Prepare Model of the Powerhouse and Switchyard of Panauti Hydropower Project

DIMENSIONS IN REDUCED SCALE:S.N.

Dimension Of : Dimension(cm)

1 Length of powerhouse 45

2 Breadth of powerhouse 33.5

3 Height of wall towards switchyard (powerhouse)

13

4 Height of wall towards river (powerhouse)

15

5 Height difference between powerhouse and switchyard from base to base

17.7

6 Length of switchyard 49.8

7 Breadth of the switchyard 20.7

8 Height of fence of switchyard 4.5

9 Height of the highest tower inside switchyard

12.9

Page 9: Study and Prepare Model of the Powerhouse and Switchyard of Panauti Hydropower Project

RESOURCES USED• Instruments: Measuring Tape• Software: AutoCAD

Materials:

- Plywood - Net

- Thermo coal - Hammer

- Fevicol - Chisel

- Paint - Rip saw

- Buttons - Aluminium plate

- Wires - Aluminium and wire cutter

- Knife

Page 10: Study and Prepare Model of the Powerhouse and Switchyard of Panauti Hydropower Project

STEPS USED TO PREPARE 3-D MODEL -wood works by rip saw and chisels

- cutting the thermo coal by knife -representing the wire by house wire -representing insulators by buttons -potential transformer and oil circuit breaker

by aluminium plate -fence of switchyard by net -towers by net and wood - transformers, turbines and generators by

thermo coal

Page 11: Study and Prepare Model of the Powerhouse and Switchyard of Panauti Hydropower Project
Page 12: Study and Prepare Model of the Powerhouse and Switchyard of Panauti Hydropower Project

ACTIVITIES Feb April May June July

weeks weeks weeks weeks week

1 2 3 1 2 3 1 2 3 4 1 2 3 1

Discussion on project and preparing proposal

Proposal presentation

Site visit and field work.

Materials Purchased

Mid Term Presentation

Model preparation including topography

Making and presenting report+model

Page 13: Study and Prepare Model of the Powerhouse and Switchyard of Panauti Hydropower Project

DIFFICULTIES ON FIELDWORKCrossing the fence of switchyard was prohibited.Restriction of close observation of equipments and

machinery of the powerhouse.Cost overrun compared to forecasted.

Page 14: Study and Prepare Model of the Powerhouse and Switchyard of Panauti Hydropower Project

RESULTSSurvey and Measurement of power house and switchyard2-D model of powerhouse and switchyard in AutoCAD3-D model (scale 1:55) with topography and details like

transformer, oil circuit breaker, isolator etc of switchyard and powerhouse.

Page 15: Study and Prepare Model of the Powerhouse and Switchyard of Panauti Hydropower Project
Page 16: Study and Prepare Model of the Powerhouse and Switchyard of Panauti Hydropower Project

BENEFITSWe learned the measuring techniques.Able to develop teamwork spirit and communication

skills.Learn the technique to make a 3-D modelKnowledge of proper execution and presentationKnowledge about some of the equipments inside

powerhouse and switchyard.

Page 17: Study and Prepare Model of the Powerhouse and Switchyard of Panauti Hydropower Project

CONCLUSION:

We came to know about the team work. We prepared 2-dimensional model(Top view) of our project site. We got the theoretical and practical knowledge from this project.

Page 18: Study and Prepare Model of the Powerhouse and Switchyard of Panauti Hydropower Project

Thank You!