Student Achievement - Oakland Schoolsinternet.oakland.k12.mi.us/CIP/Cluster Action Plans...March 1,...
Transcript of Student Achievement - Oakland Schoolsinternet.oakland.k12.mi.us/CIP/Cluster Action Plans...March 1,...
OS Technical Campus Northwest BIOTECH/ENVIRONMENTAL SCIENCE 2011-12 Action Plan
Area Measurable Goal Objectives/Measures Owner Support Persons
Completion Date
Action Steps/Status Notes Status
Stud
ent A
chiev
emen
t
Students will demonstrate technical competency (CIP Goal 1.1).
Student will demonstrate technical competency as measured by increasing the number of students earning certificates by June 21, 2012.
Tom, Joel Carol Miller June 21, 2011 Keep students directed at completing SCARS (INFORM) and Certificate requirements Provide Students with what scars need to be accomplished to receive the certification.
Open Partial Complete Closed
Students will become successful learners with academic content (CIP Goal 1.1).
78% of 11th grade students will demonstrate math proficiency in KeyTrain by March 1, 2012.
Tom, Joel Michelle, Jeff, Dave
March 1, 2011 Set aside one day for Keytrain each week. Monitor students progress every 15 to 20 minutes to keep students on task
Open Partial Complete Closed
Student achievement will increase do to improved parent connection (CIP Goals 1.1 and 2.1).
Implement electronic system to identify and communicate 70% parent engagement on student achievement each semester.
Tom, Joel Carol Miller, tech support Chuck Locklear
Each Marking Period Final June 21, 2011
Students will ask parents to use Parent Connect at least once per marking period to check student performance, grades, and attendance on Zangle. Work habits will be reported at progress grade time as well as at the end of the marking periods. Ask Chuck to provide regular feedback or access to Parent Connect log in information.
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
OS Technical Campus Northwest Visual Imaging 2011-12 Action Plan
Area Measurable Goal Objectives/Measures Owner Support Person
s
Completion Date
Action Steps/Status Notes Status
Stud
ent A
chiev
emen
t
Students will demonstrate technical competency (CIP Goal 1.1).
Student will demonstrate technical competency as measured by a 5% increase in the number of National PrintEd certificates awarded.
Kristen Miner
Krystle Schlund
06/23/12 Implement PrintEd approved curriculum with students. Provide tutorial and pre-test materials to qualified students. Administer National PrintEd/SkillsConnect exam.
Open Partial Complete Closed
Students will become successful learners with academic content (CIP Goal 1.1).
78% of 11th grade Juniors not taking a pull out academic class will demonstrate math proficiency of level 5 or above in KeyTrain by March 1, 2012
Kristen Miner
Dave Johnson, Krystle Schlund
03/01/12 Provide student logins. Allow 1 hour per week for KeyTrain usage. Utilize KeyTrain to reinforce and teach math skills. Maintain expectation of completion of level 5 for all 1st year Juniors. The KeyTrain ”Grade Book report” will be utilized to monitor progress.
Open Partial Complete Closed
Student achievement will increase do to improved parent connection (CIP Goals 1.1 and 2.1).
Implement electronic system to identify and communicate 70% parent engagement on student achievement each semester.
Kristen Miner
Krystle Schlund
Provide Parent Connect passwords to parents. Review work habit guidelines with students and parents via handbook and syllabus. Communicate with parents at parent teacher conferences and when making attendance calls. Input work habits assessments into Immersive and transfer scores to to be viewed in Parent Connect for parent review.
Open Partial Complete Closed
Open Partial Complete Closed
OS Technical Campus Northwest Visual Imaging 2011-12 Action Plan
Area Measurable Goal Objectives/Measures Owner Support Person
s
Completion Date
Action Steps/Status Notes Status
Open Partial Complete Closed
OS Technical Campus Northwest Visual Imaging 2011-12 Action Plan
Area Measurable Goal Objectives/Measures Owner Support Person
s
Completion Date
Action Steps/Status Notes Status
Care
er D
evelo
pmen
t
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
OS Technical Campus Northwest Visual Imaging 2011-12 Action Plan
Area Measurable Goal Objectives/Measures Owner Support Person
s
Completion Date
Action Steps/Status Notes Status
Regi
onali
zatio
n of
Ser
vices
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
OS Technical Campus Northwest Transportation 2010-11 Action Plan
Area Measurable Goal Objectives/Measures Owner Support Persons
Completion Date
Action Steps/Status Notes Status
Stud
ent A
chiev
emen
t
Students will demonstrate technical competency (CIP Goal 1.1).
Student will demonstrate technical competency as measured by increasing the number of students earning certificates by June 21, 2012.
Mike Ales, Joel Massarello
Mike Adams, Jack Cantrell
June 23, 2012 _Implement National Safety certifications through SP2 online training _Implement National EPA Auto Air Conditioning certification process _Increase use of SCARS to track student progress toward certification _Maintain SCARS in student notebooks and review regularly.
Open Partial Complete Closed
Students will become successful learners with academic content (CIP Goal 1.1).
78% of 11th grade students will demonstrate math proficiency in KeyTrain by March 1, 2012 (level 5 or above).
Mike Ales, Joel Massarello
Mike Adams, Jack Cantrell
March 1, 2012
Train/retrain staff on Keytrain usage Develop a Keytrain schedule *All first year juniors will begin working on math skills as a component of their daily grade. Instructors will monitor and record progress *First year students not enrolled in academic pullout classes
Open Partial Complete Closed
Student achievement will Implement electronic Mike Ales, Mike Adams, March 1, Have students review their Open
OS Technical Campus Northwest Transportation 2010-11 Action Plan
Area Measurable Goal Objectives/Measures Owner Support Persons
Completion Date
Action Steps/Status Notes Status
increase do to improved parent connection (CIP Goals 1.1 and 2.1).
system to identify and communicate 70% parent engagement on student achievement each semester.
Joel Massarello
Jack Cantrell 2012 work habits performance daily/weekly Create student assignment to have parents use ParentConnect/Immersive Mail user names and passwords to parents with first progress report Enter work habits scores in Immersive Track Parent Connect hits for individual students in Zangle
Partial
Complete
Closed Open
Partial Complete Closed
Open Partial Complete Closed
OS Technical Campus Northwest Transportation 2010-11 Action Plan
Area Measurable Goal Objectives/Measures Owner Support Persons
Completion Date
Action Steps/Status Notes Status
Care
er D
evelo
pmen
t
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
OS Technical Campus Northwest Transportation 2010-11 Action Plan
Area Measurable Goal Objectives/Measures Owner Support Persons
Completion Date
Action Steps/Status Notes Status
Regi
onali
zatio
n of
Ser
vices
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
OS Technical Campus Northwest Hospitality Cluster 2011-12 Action Plan
Area Measurable Goal Objectives/Measures Owner Support Persons
Completion Date
Action Steps/Status Notes Status
Stud
ent A
chiev
emen
t
Students will demonstrate technical competency (CIP Goal 1.1).
Student will demonstrate technical competency as measured by increasing the number of students earning certificates by June 21, 2012.
Joe Mucaria Jan Drew
Janet Hughes
June 21, 2012 Implement Sunrise curriculum each student earn certificates at each level of accomplishment. Students will qualify for national certificates in the ServSafe program Moodle and additional forms of technology will be used to increase student involvement and engagement.
Open Partial Complete Closed
Students will become successful learners with academic content (CIP Goal 1.1).
78% of 11th grade students will demonstrate math proficiency in KeyTrain by March 1, 2012 (level 5 or above).
Joe Mucaria Jan Drew
Janet Hughes
March 1st 2012 Students will participate in a mandatory math day each week. Students will be using key train and E-2020 to demonstrate proficiency.
Open Partial Complete Closed
Student achievement will increase do to improved parent connection (CIP Goals 1.1 and 2.1).
Implement electronic system to identify and communicate 70% parent engagement on student achievement each semester.
Joe Mucaria Jan Drew
Janet Hughes
Semester Increase and maintain parent involvement using Zangle parent connect, Moodle, special events, phone calls, and emails. Use Zangle visits/referrals to track parent contacts.
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
OS Technical Campus Northwest Hospitality Cluster 2011-12 Action Plan
Area Measurable Goal Objectives/Measures Owner Support Persons
Completion Date
Action Steps/Status Notes Status
Care
er D
evelo
pmen
t
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
OS Technical Campus Northwest Hospitality Cluster 2011-12 Action Plan
Area Measurable Goal Objectives/Measures Owner Support Persons
Completion Date
Action Steps/Status Notes Status
Regi
onali
zatio
n of
Ser
vices
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
OS Technical Campus Northwest [Health Sciences] 2011-12 Action Plan
Area Measurable Goal Objectives/Measures Owner Support Persons
Completion Date
Action Steps/Status Notes Status
Stud
ent A
chiev
emen
t
Students will demonstrate technical competency (CIP Goal 1.1).
Student will demonstrate technical competency as measured by increasing the number of students earning certificates by June 21, 2012.
JKessler RFeatherstone
Open Partial Complete Closed
Students will become successful learners with academic content (CIP Goal 1.1).
78% of 11th grade students will demonstrate math proficiency in KeyTrain by March 1, 2012 (level 5 or above).
1.Pre-test in KeyTrain on 9/14/11
Open Partial Complete Closed
Student achievement will increase do to improved parent connection (CIP Goals 1.1 and 2.1).
Implement electronic system to identify and communicate 70% parent engagement on student achievement each semester.
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
OS Technical Campus Northwest [Health Sciences] 2011-12 Action Plan
Area Measurable Goal Objectives/Measures Owner Support Persons
Completion Date
Action Steps/Status Notes Status
Care
er D
evelo
pmen
t
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
OS Technical Campus Northwest [Health Sciences] 2011-12 Action Plan
Area Measurable Goal Objectives/Measures Owner Support Persons
Completion Date
Action Steps/Status Notes Status
Regi
onali
zatio
n of
Ser
vices
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
OS Technical Campus Northwest [Insert your cluster name here] 2011-12 Action Plan
Area Measurable Goal Objectives/Measures Owner Support Persons
Completion Date
Action Steps/Status Notes Status
Stud
ent A
chiev
emen
t
Students will demonstrate technical competency (CIP Goal 1.1).
Student will demonstrate technical competency as measured by increasing the number of students earning certificates by June 21, 2012.
Open Partial Complete Closed
Students will become successful learners with academic content (CIP Goal 1.1).
78% of 11th grade students will demonstrate math proficiency in KeyTrain by March 1, 2012 (level 5 or above).
Open Partial Complete Closed
Student achievement will increase do to improved parent connection (CIP Goals 1.1 and 2.1).
Implement electronic system to identify and communicate 70% parent engagement on student achievement each semester.
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
OS Technical Campus Northwest [Insert your cluster name here] 2011-12 Action Plan
Area Measurable Goal Objectives/Measures Owner Support Persons
Completion Date
Action Steps/Status Notes Status
Care
er D
evelo
pmen
t
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
OS Technical Campus Northwest [Insert your cluster name here] 2011-12 Action Plan
Area Measurable Goal Objectives/Measures Owner Support Persons
Completion Date
Action Steps/Status Notes Status
Regi
onali
zatio
n of
Ser
vices
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
OS Technical Campus Northwest Construction Technology 2011-12 Action Plan
Area Measurable Goal Objectives/Measures Owner Support Persons
Completion Date
Action Steps/Status Notes Status
Stud
ent A
chiev
emen
t
Students will demonstrate technical competency (CIP Goal 1.1).
Student will demonstrate technical competency as measured by increasing the number of students earning certificates by June 21, 2012.
J. Wiechec D. Olds R. Collins D. Moscovic
Johnathan Flukes
6/1/2012 1. Student performance will be evaluated each marking period using SCAR worksheets. 2. Then SCAR data is entered into INFORM. 3. Track student growth every staff meeting.
Open Partial Complete Closed
Students will become successful learners with academic content (CIP Goal 1.1).
78% of 11th grade students will demonstrate math proficiency in KeyTrain by March 1, 2012 (level 5 or above).
J. Wiechec D. Olds R. Collins D. Moscovic
Jeff Fagan Dave Johnson
6/1/2012 1. All first-year students will take KeyTrain pre-assessment. 2. First-year students will work on KeyTrain weekly to achieve level 5 or above. 3. Refer to IDP’s as needed for accomedations.
Open Partial Complete Closed
Student achievement will increase do to improved parent connection (CIP Goals 1.1 and 2.1).
Implement electronic system to identify and communicate 70% parent engagement on student achievement each semester.
J. Wiechec D. Olds R. Collins D. Moscovic
Carol Miller 6/1/2012 1. Work habits will be evaluated daily for each student. 2. All parents will be given usernames and passwords. 3. Works habits are posted using standards and benchmarks. 4. Track parent hits on ParentConnect every staff meeting.
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
OS Technical Campus Northwest Construction Technology 2011-12 Action Plan
Area Measurable Goal Objectives/Measures Owner Support Persons
Completion Date
Action Steps/Status Notes Status
Care
er D
evelo
pmen
t
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
OS Technical Campus Northwest Construction Technology 2011-12 Action Plan
Area Measurable Goal Objectives/Measures Owner Support Persons
Completion Date
Action Steps/Status Notes Status
Regi
onali
zatio
n of
Ser
vices
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
OS Technical Campus Northwest Business, Management, Marketing and Technology 2011-12 Action Plan
Area Measurable Goal Objectives/Measures Owner Support Persons
Completion Date
Action Steps/Status Notes Status
Stud
ent A
chiev
emen
t
Students will demonstrate technical competency (CIP Goal 1.1).
Student will demonstrate technical competency as measured by increasing the number of students earning certificates by June 21, 2012.
1. Use the “Practice Test” in Certiport as a pretest for each Microsoft Office certification. 2. Provide instruction 3. Use “Learning Mode” in Certiport as a practice test for National Certification to ensure that students are ready to take national certification tests 4. Provide interventions as identified 5. Record student SCARS into INFORM.
Open Partial Complete Closed
Students will become successful learners with academic content (CIP Goal 1.1).
78% of 11th grade students will demonstrate math proficiency in KeyTrain by March 1, 2012 (level 5 or above).
1. Initial assessment (placement test) given to each student 2. Students work on KeyTrain weekly to achieve level 5 or above. 3. Assist students as necessary. 4. Provide intervention as required.
Open Partial Complete Closed
Student achievement will increase do to improved parent connection (CIP
Implement electronic system to identify and communicate 70% parent
1. Have students review their work habits performance each marking
Open Partial Complete
OS Technical Campus Northwest Business, Management, Marketing and Technology 2011-12 Action Plan
Area Measurable Goal Objectives/Measures Owner Support Persons
Completion Date
Action Steps/Status Notes Status
Goals 1.1 and 2.1). engagement on student achievement each semester.
period. 2. Mail user names and passwords to parents with first progress report. 3. Enter work habits scores in Parent Connect. 4. Track Parent Connect hits for individual students.
Closed
Open Partial Complete Closed
Open Partial Complete Closed
OS Technical Campus Northwest Business, Management, Marketing and Technology 2011-12 Action Plan
Area Measurable Goal Objectives/Measures Owner Support Persons
Completion Date
Action Steps/Status Notes Status
Care
er D
evelo
pmen
t
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
OS Technical Campus Northwest Business, Management, Marketing and Technology 2011-12 Action Plan
Area Measurable Goal Objectives/Measures Owner Support Persons
Completion Date
Action Steps/Status Notes Status
Regi
onali
zatio
n of
Ser
vices
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
OS Technical Campus Northwest BIOTECH/ENVIRONMENTAL SCIENCE 2011-12 Action Plan
Area Measurable Goal Objectives/Measures Owner Support Persons
Completion Date
Action Steps/Status Notes Status
Care
er D
evelo
pmen
t
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
OS Technical Campus Northwest BIOTECH/ENVIRONMENTAL SCIENCE 2011-12 Action Plan
Area Measurable Goal Objectives/Measures Owner Support Persons
Completion Date
Action Steps/Status Notes Status
Regi
onali
zatio
n of
Ser
vices
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
OS Technical Campus Northwest Business, Management, Marketing and Technology 2011-12 Action Plan
Area Measurable Goal Objectives/Measures Owner Support Persons
Completion Date
Action Steps/Status Notes Status
Stud
ent A
chiev
emen
t
Students will demonstrate technical competency (CIP Goal 1.1).
Student will demonstrate technical competency as measured by increasing the number of students earning certificates by June 21, 2012.
1. Use the “Practice Test” in Certiport as a pretest for each Microsoft Office certification. 2. Provide instruction 3. Use “Learning Mode” in Certiport as a practice test for National Certification to ensure that students are ready to take national certification tests 4. Provide interventions as identified 5. Record student SCARS into INFORM.
Open Partial Complete Closed
Students will become successful learners with academic content (CIP Goal 1.1).
78% of 11th grade students will demonstrate math proficiency in KeyTrain by March 1, 2012 (level 5 or above).
1. Initial assessment (placement test) given to each student 2. Students work on KeyTrain weekly to achieve level 5 or above. 3. Assist students as necessary. 4. Provide intervention as required.
Open Partial Complete Closed
Student achievement will increase do to improved parent connection (CIP
Implement electronic system to identify and communicate 70% parent
1. Have students review their work habits performance each marking
Open Partial Complete
OS Technical Campus Northwest Business, Management, Marketing and Technology 2011-12 Action Plan
Area Measurable Goal Objectives/Measures Owner Support Persons
Completion Date
Action Steps/Status Notes Status
Goals 1.1 and 2.1). engagement on student achievement each semester.
period. 2. Mail user names and passwords to parents with first progress report. 3. Enter work habits scores in Parent Connect. 4. Track Parent Connect hits for individual students.
Closed
Open Partial Complete Closed
Open Partial Complete Closed
OS Technical Campus Northwest Business, Management, Marketing and Technology 2011-12 Action Plan
Area Measurable Goal Objectives/Measures Owner Support Persons
Completion Date
Action Steps/Status Notes Status
Care
er D
evelo
pmen
t
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
OS Technical Campus Northwest Business, Management, Marketing and Technology 2011-12 Action Plan
Area Measurable Goal Objectives/Measures Owner Support Persons
Completion Date
Action Steps/Status Notes Status
Regi
onali
zatio
n of
Ser
vices
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
OS Technical Campus Northwest Construction Technology 2011-12 Action Plan
Area Measurable Goal Objectives/Measures Owner Support Persons
Completion Date
Action Steps/Status Notes Status
Stud
ent A
chiev
emen
t
Students will demonstrate technical competency (CIP Goal 1.1).
Student will demonstrate technical competency as measured by increasing the number of students earning certificates by June 21, 2012.
J. Wiechec D. Olds R. Collins D. Moscovic
Johnathan Flukes
6/1/2012 1. Student performance will be evaluated each marking period using SCAR worksheets. 2. Then SCAR data is entered into INFORM. 3. Track student growth every staff meeting.
Open Partial Complete Closed
Students will become successful learners with academic content (CIP Goal 1.1).
78% of 11th grade students will demonstrate math proficiency in KeyTrain by March 1, 2012 (level 5 or above).
J. Wiechec D. Olds R. Collins D. Moscovic
Jeff Fagan Dave Johnson
6/1/2012 1. All first-year students will take KeyTrain pre-assessment. 2. First-year students will work on KeyTrain weekly to achieve level 5 or above. 3. Refer to IDP’s as needed for accomedations.
Open Partial Complete Closed
Student achievement will increase do to improved parent connection (CIP Goals 1.1 and 2.1).
Implement electronic system to identify and communicate 70% parent engagement on student achievement each semester.
J. Wiechec D. Olds R. Collins D. Moscovic
Carol Miller 6/1/2012 1. Work habits will be evaluated daily for each student. 2. All parents will be given usernames and passwords. 3. Works habits are posted using standards and benchmarks. 4. Track parent hits on ParentConnect every staff meeting.
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
OS Technical Campus Northwest Construction Technology 2011-12 Action Plan
Area Measurable Goal Objectives/Measures Owner Support Persons
Completion Date
Action Steps/Status Notes Status
Care
er D
evelo
pmen
t
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
OS Technical Campus Northwest Construction Technology 2011-12 Action Plan
Area Measurable Goal Objectives/Measures Owner Support Persons
Completion Date
Action Steps/Status Notes Status
Regi
onali
zatio
n of
Ser
vices
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
OS Technical Campus Northwest [Insert your cluster name here] 2011-12 Action Plan
Area Measurable Goal Objectives/Measures Owner Support Persons
Completion Date
Action Steps/Status Notes Status
Stud
ent A
chiev
emen
t
Students will demonstrate technical competency (CIP Goal 1.1).
Student will demonstrate technical competency as measured by increasing the number of students earning certificates by June 21, 2012.
Open Partial Complete Closed
Students will become successful learners with academic content (CIP Goal 1.1).
78% of 11th grade students will demonstrate math proficiency in KeyTrain by March 1, 2012 (level 5 or above).
Open Partial Complete Closed
Student achievement will increase do to improved parent connection (CIP Goals 1.1 and 2.1).
Implement electronic system to identify and communicate 70% parent engagement on student achievement each semester.
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
OS Technical Campus Northwest [Insert your cluster name here] 2011-12 Action Plan
Area Measurable Goal Objectives/Measures Owner Support Persons
Completion Date
Action Steps/Status Notes Status
Care
er D
evelo
pmen
t
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
OS Technical Campus Northwest [Insert your cluster name here] 2011-12 Action Plan
Area Measurable Goal Objectives/Measures Owner Support Persons
Completion Date
Action Steps/Status Notes Status
Regi
onali
zatio
n of
Ser
vices
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
OS Technical Campus Northwest [Health Sciences] 2011-12 Action Plan
Area Measurable Goal Objectives/Measures Owner Support Persons
Completion Date
Action Steps/Status Notes Status
Stud
ent A
chiev
emen
t
Students will demonstrate technical competency (CIP Goal 1.1).
Student will demonstrate technical competency as measured by increasing the number of students earning certificates by June 21, 2012.
JKessler RFeatherstone
Open Partial Complete Closed
Students will become successful learners with academic content (CIP Goal 1.1).
78% of 11th grade students will demonstrate math proficiency in KeyTrain by March 1, 2012 (level 5 or above).
1.Pre-test in KeyTrain on 9/14/11
Open Partial Complete Closed
Student achievement will increase do to improved parent connection (CIP Goals 1.1 and 2.1).
Implement electronic system to identify and communicate 70% parent engagement on student achievement each semester.
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
OS Technical Campus Northwest [Health Sciences] 2011-12 Action Plan
Area Measurable Goal Objectives/Measures Owner Support Persons
Completion Date
Action Steps/Status Notes Status
Care
er D
evelo
pmen
t
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
OS Technical Campus Northwest [Health Sciences] 2011-12 Action Plan
Area Measurable Goal Objectives/Measures Owner Support Persons
Completion Date
Action Steps/Status Notes Status
Regi
onali
zatio
n of
Ser
vices
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
OS Technical Campus Northwest Hospitality Cluster 2011-12 Action Plan
Area Measurable Goal Objectives/Measures Owner Support Persons
Completion Date
Action Steps/Status Notes Status
Stud
ent A
chiev
emen
t
Students will demonstrate technical competency (CIP Goal 1.1).
Student will demonstrate technical competency as measured by increasing the number of students earning certificates by June 21, 2012.
Joe Mucaria Jan Drew
Janet Hughes
June 21, 2012 Implement Sunrise curriculum each student earn certificates at each level of accomplishment. Students will qualify for national certificates in the ServSafe program Moodle and additional forms of technology will be used to increase student involvement and engagement.
Open Partial Complete Closed
Students will become successful learners with academic content (CIP Goal 1.1).
78% of 11th grade students will demonstrate math proficiency in KeyTrain by March 1, 2012 (level 5 or above).
Joe Mucaria Jan Drew
Janet Hughes
March 1st 2012 Students will participate in a mandatory math day each week. Students will be using key train and E-2020 to demonstrate proficiency.
Open Partial Complete Closed
Student achievement will increase do to improved parent connection (CIP Goals 1.1 and 2.1).
Implement electronic system to identify and communicate 70% parent engagement on student achievement each semester.
Joe Mucaria Jan Drew
Janet Hughes
Semester Increase and maintain parent involvement using Zangle parent connect, Moodle, special events, phone calls, and emails. Use Zangle visits/referrals to track parent contacts.
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
OS Technical Campus Northwest Hospitality Cluster 2011-12 Action Plan
Area Measurable Goal Objectives/Measures Owner Support Persons
Completion Date
Action Steps/Status Notes Status
Care
er D
evelo
pmen
t
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
OS Technical Campus Northwest Hospitality Cluster 2011-12 Action Plan
Area Measurable Goal Objectives/Measures Owner Support Persons
Completion Date
Action Steps/Status Notes Status
Regi
onali
zatio
n of
Ser
vices
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
OS Technical Campus Northwest Transportation 2010-11 Action Plan
Area Measurable Goal Objectives/Measures Owner Support Persons
Completion Date
Action Steps/Status Notes Status
Stud
ent A
chiev
emen
t
Students will demonstrate technical competency (CIP Goal 1.1).
Student will demonstrate technical competency as measured by increasing the number of students earning certificates by June 21, 2012.
Mike Ales, Joel Massarello
Mike Adams, Jack Cantrell
June 23, 2012 _Implement National Safety certifications through SP2 online training _Implement National EPA Auto Air Conditioning certification process _Increase use of SCARS to track student progress toward certification _Maintain SCARS in student notebooks and review regularly.
Open Partial Complete Closed
Students will become successful learners with academic content (CIP Goal 1.1).
78% of 11th grade students will demonstrate math proficiency in KeyTrain by March 1, 2012 (level 5 or above).
Mike Ales, Joel Massarello
Mike Adams, Jack Cantrell
March 1, 2012
Train/retrain staff on Keytrain usage Develop a Keytrain schedule *All first year juniors will begin working on math skills as a component of their daily grade. Instructors will monitor and record progress *First year students not enrolled in academic pullout classes
Open Partial Complete Closed
Student achievement will Implement electronic Mike Ales, Mike Adams, March 1, Have students review their Open
OS Technical Campus Northwest Transportation 2010-11 Action Plan
Area Measurable Goal Objectives/Measures Owner Support Persons
Completion Date
Action Steps/Status Notes Status
increase do to improved parent connection (CIP Goals 1.1 and 2.1).
system to identify and communicate 70% parent engagement on student achievement each semester.
Joel Massarello
Jack Cantrell 2012 work habits performance daily/weekly Create student assignment to have parents use ParentConnect/Immersive Mail user names and passwords to parents with first progress report Enter work habits scores in Immersive Track Parent Connect hits for individual students in Zangle
Partial
Complete
Closed Open
Partial Complete Closed
Open Partial Complete Closed
OS Technical Campus Northwest Transportation 2010-11 Action Plan
Area Measurable Goal Objectives/Measures Owner Support Persons
Completion Date
Action Steps/Status Notes Status
Care
er D
evelo
pmen
t
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
OS Technical Campus Northwest Transportation 2010-11 Action Plan
Area Measurable Goal Objectives/Measures Owner Support Persons
Completion Date
Action Steps/Status Notes Status
Regi
onali
zatio
n of
Ser
vices
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
OS Technical Campus Northwest Visual Imaging 2011-12 Action Plan
Area Measurable Goal Objectives/Measures Owner Support Person
s
Completion Date
Action Steps/Status Notes Status
Stud
ent A
chiev
emen
t
Students will demonstrate technical competency (CIP Goal 1.1).
Student will demonstrate technical competency as measured by a 5% increase in the number of National PrintEd certificates awarded.
Kristen Miner
Krystle Schlund
06/23/12 Implement PrintEd approved curriculum with students. Provide tutorial and pre-test materials to qualified students. Administer National PrintEd/SkillsConnect exam.
Open Partial Complete Closed
Students will become successful learners with academic content (CIP Goal 1.1).
78% of 11th grade Juniors not taking a pull out academic class will demonstrate math proficiency of level 5 or above in KeyTrain by March 1, 2012
Kristen Miner
Dave Johnson, Krystle Schlund
03/01/12 Provide student logins. Allow 1 hour per week for KeyTrain usage. Utilize KeyTrain to reinforce and teach math skills. Maintain expectation of completion of level 5 for all 1st year Juniors. The KeyTrain ”Grade Book report” will be utilized to monitor progress.
Open Partial Complete Closed
Student achievement will increase do to improved parent connection (CIP Goals 1.1 and 2.1).
Implement electronic system to identify and communicate 70% parent engagement on student achievement each semester.
Kristen Miner
Krystle Schlund
Provide Parent Connect passwords to parents. Review work habit guidelines with students and parents via handbook and syllabus. Communicate with parents at parent teacher conferences and when making attendance calls. Input work habits assessments into Immersive and transfer scores to to be viewed in Parent Connect for parent review.
Open Partial Complete Closed
Open Partial Complete Closed
OS Technical Campus Northwest Visual Imaging 2011-12 Action Plan
Area Measurable Goal Objectives/Measures Owner Support Person
s
Completion Date
Action Steps/Status Notes Status
Open Partial Complete Closed
OS Technical Campus Northwest Visual Imaging 2011-12 Action Plan
Area Measurable Goal Objectives/Measures Owner Support Person
s
Completion Date
Action Steps/Status Notes Status
Care
er D
evelo
pmen
t
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
OS Technical Campus Northwest Visual Imaging 2011-12 Action Plan
Area Measurable Goal Objectives/Measures Owner Support Person
s
Completion Date
Action Steps/Status Notes Status
Regi
onali
zatio
n of
Ser
vices
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
OS Technical Campus Northwest BIOTECH/ENVIRONMENTAL SCIENCE 2011-12 Action Plan
Area Measurable Goal Objectives/Measures Owner Support Persons
Completion Date
Action Steps/Status Notes Status
Stud
ent A
chiev
emen
t
Students will demonstrate technical competency (CIP Goal 1.1).
Student will demonstrate technical competency as measured by increasing the number of students earning certificates by June 21, 2012.
Tom, Joel Carol Miller June 21, 2011 Keep students directed at completing SCARS (INFORM) and Certificate requirements Provide Students with what scars need to be accomplished to receive the certification.
Open Partial Complete Closed
Students will become successful learners with academic content (CIP Goal 1.1).
78% of 11th grade students will demonstrate math proficiency in KeyTrain by March 1, 2012.
Tom, Joel Michelle, Jeff, Dave
March 1, 2011 Set aside one day for Keytrain each week. Monitor students progress every 15 to 20 minutes to keep students on task
Open Partial Complete Closed
Student achievement will increase do to improved parent connection (CIP Goals 1.1 and 2.1).
Implement electronic system to identify and communicate 70% parent engagement on student achievement each semester.
Tom, Joel Carol Miller, tech support Chuck Locklear
Each Marking Period Final June 21, 2011
Students will ask parents to use Parent Connect at least once per marking period to check student performance, grades, and attendance on Zangle. Work habits will be reported at progress grade time as well as at the end of the marking periods. Ask Chuck to provide regular feedback or access to Parent Connect log in information.
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
OS Technical Campus Northwest Visual Imaging 2011-12 Action Plan
Area Measurable Goal Objectives/Measures Owner Support Person
s
Completion Date
Action Steps/Status Notes Status
Stud
ent A
chiev
emen
t
Students will demonstrate technical competency (CIP Goal 1.1).
Student will demonstrate technical competency as measured by a 5% increase in the number of National PrintEd certificates awarded.
Kristen Miner
Krystle Schlund
06/23/12 Implement PrintEd approved curriculum with students. Provide tutorial and pre-test materials to qualified students. Administer National PrintEd/SkillsConnect exam.
Open Partial Complete Closed
Students will become successful learners with academic content (CIP Goal 1.1).
78% of 11th grade Juniors not taking a pull out academic class will demonstrate math proficiency of level 5 or above in KeyTrain by March 1, 2012
Kristen Miner
Dave Johnson, Krystle Schlund
03/01/12 Provide student logins. Allow 1 hour per week for KeyTrain usage. Utilize KeyTrain to reinforce and teach math skills. Maintain expectation of completion of level 5 for all 1st year Juniors. The KeyTrain ”Grade Book report” will be utilized to monitor progress.
Open Partial Complete Closed
Student achievement will increase do to improved parent connection (CIP Goals 1.1 and 2.1).
Implement electronic system to identify and communicate 70% parent engagement on student achievement each semester.
Kristen Miner
Krystle Schlund
Provide Parent Connect passwords to parents. Review work habit guidelines with students and parents via handbook and syllabus. Communicate with parents at parent teacher conferences and when making attendance calls. Input work habits assessments into Immersive and transfer scores to to be viewed in Parent Connect for parent review.
Open Partial Complete Closed
Open Partial Complete Closed
OS Technical Campus Northwest Visual Imaging 2011-12 Action Plan
Area Measurable Goal Objectives/Measures Owner Support Person
s
Completion Date
Action Steps/Status Notes Status
Open Partial Complete Closed
OS Technical Campus Northwest Visual Imaging 2011-12 Action Plan
Area Measurable Goal Objectives/Measures Owner Support Person
s
Completion Date
Action Steps/Status Notes Status
Care
er D
evelo
pmen
t
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
OS Technical Campus Northwest Visual Imaging 2011-12 Action Plan
Area Measurable Goal Objectives/Measures Owner Support Person
s
Completion Date
Action Steps/Status Notes Status
Regi
onali
zatio
n of
Ser
vices
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
OS Technical Campus Northwest Transportation 2010-11 Action Plan
Area Measurable Goal Objectives/Measures Owner Support Persons
Completion Date
Action Steps/Status Notes Status
Stud
ent A
chiev
emen
t
Students will demonstrate technical competency (CIP Goal 1.1).
Student will demonstrate technical competency as measured by increasing the number of students earning certificates by June 21, 2012.
Mike Ales, Joel Massarello
Mike Adams, Jack Cantrell
June 23, 2012 _Implement National Safety certifications through SP2 online training _Implement National EPA Auto Air Conditioning certification process _Increase use of SCARS to track student progress toward certification _Maintain SCARS in student notebooks and review regularly.
Open Partial Complete Closed
Students will become successful learners with academic content (CIP Goal 1.1).
78% of 11th grade students will demonstrate math proficiency in KeyTrain by March 1, 2012 (level 5 or above).
Mike Ales, Joel Massarello
Mike Adams, Jack Cantrell
March 1, 2012
Train/retrain staff on Keytrain usage Develop a Keytrain schedule *All first year juniors will begin working on math skills as a component of their daily grade. Instructors will monitor and record progress *First year students not enrolled in academic pullout classes
Open Partial Complete Closed
Student achievement will Implement electronic Mike Ales, Mike Adams, March 1, Have students review their Open
OS Technical Campus Northwest Transportation 2010-11 Action Plan
Area Measurable Goal Objectives/Measures Owner Support Persons
Completion Date
Action Steps/Status Notes Status
increase do to improved parent connection (CIP Goals 1.1 and 2.1).
system to identify and communicate 70% parent engagement on student achievement each semester.
Joel Massarello
Jack Cantrell 2012 work habits performance daily/weekly Create student assignment to have parents use ParentConnect/Immersive Mail user names and passwords to parents with first progress report Enter work habits scores in Immersive Track Parent Connect hits for individual students in Zangle
Partial
Complete
Closed Open
Partial Complete Closed
Open Partial Complete Closed
OS Technical Campus Northwest Transportation 2010-11 Action Plan
Area Measurable Goal Objectives/Measures Owner Support Persons
Completion Date
Action Steps/Status Notes Status
Care
er D
evelo
pmen
t
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
OS Technical Campus Northwest Transportation 2010-11 Action Plan
Area Measurable Goal Objectives/Measures Owner Support Persons
Completion Date
Action Steps/Status Notes Status
Regi
onali
zatio
n of
Ser
vices
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
OS Technical Campus Northwest Hospitality Cluster 2011-12 Action Plan
Area Measurable Goal Objectives/Measures Owner Support Persons
Completion Date
Action Steps/Status Notes Status
Stud
ent A
chiev
emen
t
Students will demonstrate technical competency (CIP Goal 1.1).
Student will demonstrate technical competency as measured by increasing the number of students earning certificates by June 21, 2012.
Joe Mucaria Jan Drew
Janet Hughes
June 21, 2012 Implement Sunrise curriculum each student earn certificates at each level of accomplishment. Students will qualify for national certificates in the ServSafe program Moodle and additional forms of technology will be used to increase student involvement and engagement.
Open Partial Complete Closed
Students will become successful learners with academic content (CIP Goal 1.1).
78% of 11th grade students will demonstrate math proficiency in KeyTrain by March 1, 2012 (level 5 or above).
Joe Mucaria Jan Drew
Janet Hughes
March 1st 2012 Students will participate in a mandatory math day each week. Students will be using key train and E-2020 to demonstrate proficiency.
Open Partial Complete Closed
Student achievement will increase do to improved parent connection (CIP Goals 1.1 and 2.1).
Implement electronic system to identify and communicate 70% parent engagement on student achievement each semester.
Joe Mucaria Jan Drew
Janet Hughes
Semester Increase and maintain parent involvement using Zangle parent connect, Moodle, special events, phone calls, and emails. Use Zangle visits/referrals to track parent contacts.
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
OS Technical Campus Northwest Hospitality Cluster 2011-12 Action Plan
Area Measurable Goal Objectives/Measures Owner Support Persons
Completion Date
Action Steps/Status Notes Status
Care
er D
evelo
pmen
t
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
OS Technical Campus Northwest Hospitality Cluster 2011-12 Action Plan
Area Measurable Goal Objectives/Measures Owner Support Persons
Completion Date
Action Steps/Status Notes Status
Regi
onali
zatio
n of
Ser
vices
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
OS Technical Campus Northwest [Health Sciences] 2011-12 Action Plan
Area Measurable Goal Objectives/Measures Owner Support Persons
Completion Date
Action Steps/Status Notes Status
Stud
ent A
chiev
emen
t
Students will demonstrate technical competency (CIP Goal 1.1).
Student will demonstrate technical competency as measured by increasing the number of students earning certificates by June 21, 2012.
JKessler RFeatherstone
Open Partial Complete Closed
Students will become successful learners with academic content (CIP Goal 1.1).
78% of 11th grade students will demonstrate math proficiency in KeyTrain by March 1, 2012 (level 5 or above).
1.Pre-test in KeyTrain on 9/14/11
Open Partial Complete Closed
Student achievement will increase do to improved parent connection (CIP Goals 1.1 and 2.1).
Implement electronic system to identify and communicate 70% parent engagement on student achievement each semester.
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
OS Technical Campus Northwest [Health Sciences] 2011-12 Action Plan
Area Measurable Goal Objectives/Measures Owner Support Persons
Completion Date
Action Steps/Status Notes Status
Care
er D
evelo
pmen
t
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
OS Technical Campus Northwest [Health Sciences] 2011-12 Action Plan
Area Measurable Goal Objectives/Measures Owner Support Persons
Completion Date
Action Steps/Status Notes Status
Regi
onali
zatio
n of
Ser
vices
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
OS Technical Campus Northwest [Insert your cluster name here] 2011-12 Action Plan
Area Measurable Goal Objectives/Measures Owner Support Persons
Completion Date
Action Steps/Status Notes Status
Stud
ent A
chiev
emen
t
Students will demonstrate technical competency (CIP Goal 1.1).
Student will demonstrate technical competency as measured by increasing the number of students earning certificates by June 21, 2012.
Open Partial Complete Closed
Students will become successful learners with academic content (CIP Goal 1.1).
78% of 11th grade students will demonstrate math proficiency in KeyTrain by March 1, 2012 (level 5 or above).
Open Partial Complete Closed
Student achievement will increase do to improved parent connection (CIP Goals 1.1 and 2.1).
Implement electronic system to identify and communicate 70% parent engagement on student achievement each semester.
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
OS Technical Campus Northwest [Insert your cluster name here] 2011-12 Action Plan
Area Measurable Goal Objectives/Measures Owner Support Persons
Completion Date
Action Steps/Status Notes Status
Care
er D
evelo
pmen
t
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
OS Technical Campus Northwest [Insert your cluster name here] 2011-12 Action Plan
Area Measurable Goal Objectives/Measures Owner Support Persons
Completion Date
Action Steps/Status Notes Status
Regi
onali
zatio
n of
Ser
vices
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
OS Technical Campus Northwest Construction Technology 2011-12 Action Plan
Area Measurable Goal Objectives/Measures Owner Support Persons
Completion Date
Action Steps/Status Notes Status
Stud
ent A
chiev
emen
t
Students will demonstrate technical competency (CIP Goal 1.1).
Student will demonstrate technical competency as measured by increasing the number of students earning certificates by June 21, 2012.
J. Wiechec D. Olds R. Collins D. Moscovic
Johnathan Flukes
6/1/2012 1. Student performance will be evaluated each marking period using SCAR worksheets. 2. Then SCAR data is entered into INFORM. 3. Track student growth every staff meeting.
Open Partial Complete Closed
Students will become successful learners with academic content (CIP Goal 1.1).
78% of 11th grade students will demonstrate math proficiency in KeyTrain by March 1, 2012 (level 5 or above).
J. Wiechec D. Olds R. Collins D. Moscovic
Jeff Fagan Dave Johnson
6/1/2012 1. All first-year students will take KeyTrain pre-assessment. 2. First-year students will work on KeyTrain weekly to achieve level 5 or above. 3. Refer to IDP’s as needed for accomedations.
Open Partial Complete Closed
Student achievement will increase do to improved parent connection (CIP Goals 1.1 and 2.1).
Implement electronic system to identify and communicate 70% parent engagement on student achievement each semester.
J. Wiechec D. Olds R. Collins D. Moscovic
Carol Miller 6/1/2012 1. Work habits will be evaluated daily for each student. 2. All parents will be given usernames and passwords. 3. Works habits are posted using standards and benchmarks. 4. Track parent hits on ParentConnect every staff meeting.
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
OS Technical Campus Northwest Construction Technology 2011-12 Action Plan
Area Measurable Goal Objectives/Measures Owner Support Persons
Completion Date
Action Steps/Status Notes Status
Care
er D
evelo
pmen
t
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
OS Technical Campus Northwest Construction Technology 2011-12 Action Plan
Area Measurable Goal Objectives/Measures Owner Support Persons
Completion Date
Action Steps/Status Notes Status
Regi
onali
zatio
n of
Ser
vices
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
OS Technical Campus Northwest Business, Management, Marketing and Technology 2011-12 Action Plan
Area Measurable Goal Objectives/Measures Owner Support Persons
Completion Date
Action Steps/Status Notes Status
Stud
ent A
chiev
emen
t
Students will demonstrate technical competency (CIP Goal 1.1).
Student will demonstrate technical competency as measured by increasing the number of students earning certificates by June 21, 2012.
1. Use the “Practice Test” in Certiport as a pretest for each Microsoft Office certification. 2. Provide instruction 3. Use “Learning Mode” in Certiport as a practice test for National Certification to ensure that students are ready to take national certification tests 4. Provide interventions as identified 5. Record student SCARS into INFORM.
Open Partial Complete Closed
Students will become successful learners with academic content (CIP Goal 1.1).
78% of 11th grade students will demonstrate math proficiency in KeyTrain by March 1, 2012 (level 5 or above).
1. Initial assessment (placement test) given to each student 2. Students work on KeyTrain weekly to achieve level 5 or above. 3. Assist students as necessary. 4. Provide intervention as required.
Open Partial Complete Closed
Student achievement will increase do to improved parent connection (CIP
Implement electronic system to identify and communicate 70% parent
1. Have students review their work habits performance each marking
Open Partial Complete
OS Technical Campus Northwest Business, Management, Marketing and Technology 2011-12 Action Plan
Area Measurable Goal Objectives/Measures Owner Support Persons
Completion Date
Action Steps/Status Notes Status
Goals 1.1 and 2.1). engagement on student achievement each semester.
period. 2. Mail user names and passwords to parents with first progress report. 3. Enter work habits scores in Parent Connect. 4. Track Parent Connect hits for individual students.
Closed
Open Partial Complete Closed
Open Partial Complete Closed
OS Technical Campus Northwest Business, Management, Marketing and Technology 2011-12 Action Plan
Area Measurable Goal Objectives/Measures Owner Support Persons
Completion Date
Action Steps/Status Notes Status
Care
er D
evelo
pmen
t
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
OS Technical Campus Northwest Business, Management, Marketing and Technology 2011-12 Action Plan
Area Measurable Goal Objectives/Measures Owner Support Persons
Completion Date
Action Steps/Status Notes Status
Regi
onali
zatio
n of
Ser
vices
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
OS Technical Campus Northwest BIOTECH/ENVIRONMENTAL SCIENCE 2011-12 Action Plan
Area Measurable Goal Objectives/Measures Owner Support Persons
Completion Date
Action Steps/Status Notes Status
Care
er D
evelo
pmen
t
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
OS Technical Campus Northwest BIOTECH/ENVIRONMENTAL SCIENCE 2011-12 Action Plan
Area Measurable Goal Objectives/Measures Owner Support Persons
Completion Date
Action Steps/Status Notes Status
Regi
onali
zatio
n of
Ser
vices
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
OS Technical Campus Northwest Business, Management, Marketing and Technology 2011-12 Action Plan
Area Measurable Goal Objectives/Measures Owner Support Persons
Completion Date
Action Steps/Status Notes Status
Stud
ent A
chiev
emen
t
Students will demonstrate technical competency (CIP Goal 1.1).
Student will demonstrate technical competency as measured by increasing the number of students earning certificates by June 21, 2012.
1. Use the “Practice Test” in Certiport as a pretest for each Microsoft Office certification. 2. Provide instruction 3. Use “Learning Mode” in Certiport as a practice test for National Certification to ensure that students are ready to take national certification tests 4. Provide interventions as identified 5. Record student SCARS into INFORM.
Open Partial Complete Closed
Students will become successful learners with academic content (CIP Goal 1.1).
78% of 11th grade students will demonstrate math proficiency in KeyTrain by March 1, 2012 (level 5 or above).
1. Initial assessment (placement test) given to each student 2. Students work on KeyTrain weekly to achieve level 5 or above. 3. Assist students as necessary. 4. Provide intervention as required.
Open Partial Complete Closed
Student achievement will increase do to improved parent connection (CIP
Implement electronic system to identify and communicate 70% parent
1. Have students review their work habits performance each marking
Open Partial Complete
OS Technical Campus Northwest Business, Management, Marketing and Technology 2011-12 Action Plan
Area Measurable Goal Objectives/Measures Owner Support Persons
Completion Date
Action Steps/Status Notes Status
Goals 1.1 and 2.1). engagement on student achievement each semester.
period. 2. Mail user names and passwords to parents with first progress report. 3. Enter work habits scores in Parent Connect. 4. Track Parent Connect hits for individual students.
Closed
Open Partial Complete Closed
Open Partial Complete Closed
OS Technical Campus Northwest Business, Management, Marketing and Technology 2011-12 Action Plan
Area Measurable Goal Objectives/Measures Owner Support Persons
Completion Date
Action Steps/Status Notes Status
Care
er D
evelo
pmen
t
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
OS Technical Campus Northwest Business, Management, Marketing and Technology 2011-12 Action Plan
Area Measurable Goal Objectives/Measures Owner Support Persons
Completion Date
Action Steps/Status Notes Status
Regi
onali
zatio
n of
Ser
vices
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
OS Technical Campus Northwest Construction Technology 2011-12 Action Plan
Area Measurable Goal Objectives/Measures Owner Support Persons
Completion Date
Action Steps/Status Notes Status
Stud
ent A
chiev
emen
t
Students will demonstrate technical competency (CIP Goal 1.1).
Student will demonstrate technical competency as measured by increasing the number of students earning certificates by June 21, 2012.
J. Wiechec D. Olds R. Collins D. Moscovic
Johnathan Flukes
6/1/2012 1. Student performance will be evaluated each marking period using SCAR worksheets. 2. Then SCAR data is entered into INFORM. 3. Track student growth every staff meeting.
Open Partial Complete Closed
Students will become successful learners with academic content (CIP Goal 1.1).
78% of 11th grade students will demonstrate math proficiency in KeyTrain by March 1, 2012 (level 5 or above).
J. Wiechec D. Olds R. Collins D. Moscovic
Jeff Fagan Dave Johnson
6/1/2012 1. All first-year students will take KeyTrain pre-assessment. 2. First-year students will work on KeyTrain weekly to achieve level 5 or above. 3. Refer to IDP’s as needed for accomedations.
Open Partial Complete Closed
Student achievement will increase do to improved parent connection (CIP Goals 1.1 and 2.1).
Implement electronic system to identify and communicate 70% parent engagement on student achievement each semester.
J. Wiechec D. Olds R. Collins D. Moscovic
Carol Miller 6/1/2012 1. Work habits will be evaluated daily for each student. 2. All parents will be given usernames and passwords. 3. Works habits are posted using standards and benchmarks. 4. Track parent hits on ParentConnect every staff meeting.
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
OS Technical Campus Northwest Construction Technology 2011-12 Action Plan
Area Measurable Goal Objectives/Measures Owner Support Persons
Completion Date
Action Steps/Status Notes Status
Care
er D
evelo
pmen
t
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
OS Technical Campus Northwest Construction Technology 2011-12 Action Plan
Area Measurable Goal Objectives/Measures Owner Support Persons
Completion Date
Action Steps/Status Notes Status
Regi
onali
zatio
n of
Ser
vices
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
OS Technical Campus Northwest [Insert your cluster name here] 2011-12 Action Plan
Area Measurable Goal Objectives/Measures Owner Support Persons
Completion Date
Action Steps/Status Notes Status
Stud
ent A
chiev
emen
t
Students will demonstrate technical competency (CIP Goal 1.1).
Student will demonstrate technical competency as measured by increasing the number of students earning certificates by June 21, 2012.
Open Partial Complete Closed
Students will become successful learners with academic content (CIP Goal 1.1).
78% of 11th grade students will demonstrate math proficiency in KeyTrain by March 1, 2012 (level 5 or above).
Open Partial Complete Closed
Student achievement will increase do to improved parent connection (CIP Goals 1.1 and 2.1).
Implement electronic system to identify and communicate 70% parent engagement on student achievement each semester.
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
OS Technical Campus Northwest [Insert your cluster name here] 2011-12 Action Plan
Area Measurable Goal Objectives/Measures Owner Support Persons
Completion Date
Action Steps/Status Notes Status
Care
er D
evelo
pmen
t
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
OS Technical Campus Northwest [Insert your cluster name here] 2011-12 Action Plan
Area Measurable Goal Objectives/Measures Owner Support Persons
Completion Date
Action Steps/Status Notes Status
Regi
onali
zatio
n of
Ser
vices
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
OS Technical Campus Northwest [Health Sciences] 2011-12 Action Plan
Area Measurable Goal Objectives/Measures Owner Support Persons
Completion Date
Action Steps/Status Notes Status
Stud
ent A
chiev
emen
t
Students will demonstrate technical competency (CIP Goal 1.1).
Student will demonstrate technical competency as measured by increasing the number of students earning certificates by June 21, 2012.
JKessler RFeatherstone
Open Partial Complete Closed
Students will become successful learners with academic content (CIP Goal 1.1).
78% of 11th grade students will demonstrate math proficiency in KeyTrain by March 1, 2012 (level 5 or above).
1.Pre-test in KeyTrain on 9/14/11
Open Partial Complete Closed
Student achievement will increase do to improved parent connection (CIP Goals 1.1 and 2.1).
Implement electronic system to identify and communicate 70% parent engagement on student achievement each semester.
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
OS Technical Campus Northwest [Health Sciences] 2011-12 Action Plan
Area Measurable Goal Objectives/Measures Owner Support Persons
Completion Date
Action Steps/Status Notes Status
Care
er D
evelo
pmen
t
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
OS Technical Campus Northwest [Health Sciences] 2011-12 Action Plan
Area Measurable Goal Objectives/Measures Owner Support Persons
Completion Date
Action Steps/Status Notes Status
Regi
onali
zatio
n of
Ser
vices
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
OS Technical Campus Northwest Hospitality Cluster 2011-12 Action Plan
Area Measurable Goal Objectives/Measures Owner Support Persons
Completion Date
Action Steps/Status Notes Status
Stud
ent A
chiev
emen
t
Students will demonstrate technical competency (CIP Goal 1.1).
Student will demonstrate technical competency as measured by increasing the number of students earning certificates by June 21, 2012.
Joe Mucaria Jan Drew
Janet Hughes
June 21, 2012 Implement Sunrise curriculum each student earn certificates at each level of accomplishment. Students will qualify for national certificates in the ServSafe program Moodle and additional forms of technology will be used to increase student involvement and engagement.
Open Partial Complete Closed
Students will become successful learners with academic content (CIP Goal 1.1).
78% of 11th grade students will demonstrate math proficiency in KeyTrain by March 1, 2012 (level 5 or above).
Joe Mucaria Jan Drew
Janet Hughes
March 1st 2012 Students will participate in a mandatory math day each week. Students will be using key train and E-2020 to demonstrate proficiency.
Open Partial Complete Closed
Student achievement will increase do to improved parent connection (CIP Goals 1.1 and 2.1).
Implement electronic system to identify and communicate 70% parent engagement on student achievement each semester.
Joe Mucaria Jan Drew
Janet Hughes
Semester Increase and maintain parent involvement using Zangle parent connect, Moodle, special events, phone calls, and emails. Use Zangle visits/referrals to track parent contacts.
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
OS Technical Campus Northwest Hospitality Cluster 2011-12 Action Plan
Area Measurable Goal Objectives/Measures Owner Support Persons
Completion Date
Action Steps/Status Notes Status
Care
er D
evelo
pmen
t
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
OS Technical Campus Northwest Hospitality Cluster 2011-12 Action Plan
Area Measurable Goal Objectives/Measures Owner Support Persons
Completion Date
Action Steps/Status Notes Status
Regi
onali
zatio
n of
Ser
vices
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
OS Technical Campus Northwest Transportation 2010-11 Action Plan
Area Measurable Goal Objectives/Measures Owner Support Persons
Completion Date
Action Steps/Status Notes Status
Stud
ent A
chiev
emen
t
Students will demonstrate technical competency (CIP Goal 1.1).
Student will demonstrate technical competency as measured by increasing the number of students earning certificates by June 21, 2012.
Mike Ales, Joel Massarello
Mike Adams, Jack Cantrell
June 23, 2012 _Implement National Safety certifications through SP2 online training _Implement National EPA Auto Air Conditioning certification process _Increase use of SCARS to track student progress toward certification _Maintain SCARS in student notebooks and review regularly.
Open Partial Complete Closed
Students will become successful learners with academic content (CIP Goal 1.1).
78% of 11th grade students will demonstrate math proficiency in KeyTrain by March 1, 2012 (level 5 or above).
Mike Ales, Joel Massarello
Mike Adams, Jack Cantrell
March 1, 2012
Train/retrain staff on Keytrain usage Develop a Keytrain schedule *All first year juniors will begin working on math skills as a component of their daily grade. Instructors will monitor and record progress *First year students not enrolled in academic pullout classes
Open Partial Complete Closed
Student achievement will Implement electronic Mike Ales, Mike Adams, March 1, Have students review their Open
OS Technical Campus Northwest Transportation 2010-11 Action Plan
Area Measurable Goal Objectives/Measures Owner Support Persons
Completion Date
Action Steps/Status Notes Status
increase do to improved parent connection (CIP Goals 1.1 and 2.1).
system to identify and communicate 70% parent engagement on student achievement each semester.
Joel Massarello
Jack Cantrell 2012 work habits performance daily/weekly Create student assignment to have parents use ParentConnect/Immersive Mail user names and passwords to parents with first progress report Enter work habits scores in Immersive Track Parent Connect hits for individual students in Zangle
Partial
Complete
Closed Open
Partial Complete Closed
Open Partial Complete Closed
OS Technical Campus Northwest Transportation 2010-11 Action Plan
Area Measurable Goal Objectives/Measures Owner Support Persons
Completion Date
Action Steps/Status Notes Status
Care
er D
evelo
pmen
t
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
OS Technical Campus Northwest Transportation 2010-11 Action Plan
Area Measurable Goal Objectives/Measures Owner Support Persons
Completion Date
Action Steps/Status Notes Status
Regi
onali
zatio
n of
Ser
vices
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
OS Technical Campus Northwest Visual Imaging 2011-12 Action Plan
Area Measurable Goal Objectives/Measures Owner Support Person
s
Completion Date
Action Steps/Status Notes Status
Stud
ent A
chiev
emen
t
Students will demonstrate technical competency (CIP Goal 1.1).
Student will demonstrate technical competency as measured by a 5% increase in the number of National PrintEd certificates awarded.
Kristen Miner
Krystle Schlund
06/23/12 Implement PrintEd approved curriculum with students. Provide tutorial and pre-test materials to qualified students. Administer National PrintEd/SkillsConnect exam.
Open Partial Complete Closed
Students will become successful learners with academic content (CIP Goal 1.1).
78% of 11th grade Juniors not taking a pull out academic class will demonstrate math proficiency of level 5 or above in KeyTrain by March 1, 2012
Kristen Miner
Dave Johnson, Krystle Schlund
03/01/12 Provide student logins. Allow 1 hour per week for KeyTrain usage. Utilize KeyTrain to reinforce and teach math skills. Maintain expectation of completion of level 5 for all 1st year Juniors. The KeyTrain ”Grade Book report” will be utilized to monitor progress.
Open Partial Complete Closed
Student achievement will increase do to improved parent connection (CIP Goals 1.1 and 2.1).
Implement electronic system to identify and communicate 70% parent engagement on student achievement each semester.
Kristen Miner
Krystle Schlund
Provide Parent Connect passwords to parents. Review work habit guidelines with students and parents via handbook and syllabus. Communicate with parents at parent teacher conferences and when making attendance calls. Input work habits assessments into Immersive and transfer scores to to be viewed in Parent Connect for parent review.
Open Partial Complete Closed
Open Partial Complete Closed
OS Technical Campus Northwest Visual Imaging 2011-12 Action Plan
Area Measurable Goal Objectives/Measures Owner Support Person
s
Completion Date
Action Steps/Status Notes Status
Open Partial Complete Closed
OS Technical Campus Northwest Visual Imaging 2011-12 Action Plan
Area Measurable Goal Objectives/Measures Owner Support Person
s
Completion Date
Action Steps/Status Notes Status
Care
er D
evelo
pmen
t
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
OS Technical Campus Northwest Visual Imaging 2011-12 Action Plan
Area Measurable Goal Objectives/Measures Owner Support Person
s
Completion Date
Action Steps/Status Notes Status
Regi
onali
zatio
n of
Ser
vices
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed
Open Partial Complete Closed