Structured / Unstructured Market Trials
Weekly Update – Friday MeetingAugust 2, 2013
Call Reminders• Please help to minimize disruptions:
• Mute your phones
• Do not dial-in from a recorded line
• Do not put the call on hold, even if you are on mute
2
Agenda• TCR / ECT Update (5 min) 9:00-9:05A
• Analysis July 22 – 28 (30 min) 9:05-9:35A
• Settlements (10 min) 9:35-9:45A
• Look-Ahead Aug 5 – Aug 11 (15 min) 9:45-10:00A
• Updates (15 min) 10:00-10:15A• Release Scorecard• Migration and Maintenance Report• Known Issues Log
• Financial Only Training (10 min) 10:15-10:25A
• Questions (5 min) 10:25-10:30A
3
TCR Market Trials• TCR Survey
– Sent July 26th and requesting MP input in order to: Gauge MP comfort level with moving forward (recommending ‘Go’) with
financially-binding TCRs in the Integrated Marketplace
Analyze MP concerns regarding the ARR/TCR process and Market Trials progress
Solicit suggestions to better position SPP’s TCR Market for Go-Live success
– Please respond to the TCR Survey by Friday, August 2nd
• August Incremental ARR Allocation– Allocation Window – August 5th
– Results Posted – August 8th
4Brett Crane
Nomination Window
Run ARR
Post ARR
Bid Window
Run TCR
Post TCR
Model Posting
AugustSu Mo Tu We Th Fr Sa
1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28 29 30 31
SeptemberSu Mo Tu We Th Fr Sa
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30
Next StepsPhase II Monthly Processes Remaining
Brett Crane 5
Extended Connectivity Testing
6Brett Crane
• ECT Preparation (complete no later than 8/2):• Complete Connectivity Test Checklists and return to SPP• LSA User Role Setup• OATI and CROW System Access Requests (if applicable)• XML Notification Listeners (if applicable)
• ECT Test Execution (occurs between 8/5 and 8/30):• MPs have been assigned a week during test execution time frame
to perform their testing. • Weekly Execution Assignments
• Tests are performed independently during the assigned week. No appointment is necessary.
• Issues with test execution handled via RMS .
Extended Connectivity Testing
7
• Applicable Market Participants:Active Power Investments Denver Energy, LLC Merrill Lynch Commodities Tennessee Valley AuthorityAPEX DTE Energy Trading Midwest Energy Trading East Trademark Merchant EnergyAPX, Inc. Durable Electric Power Monterey SW, LLC Twin Eagle Resource Mgmt
BJ Energy, LLC EDF Trading North America Monterey SWF, LLCUnion Electric Company dba Ameren Missouri
Blue Canyon VEDP Renewable North America
Northpoint Energy Solutions Union Power Partners L P
Buffalo Dunes Wind Project ENEL Green Power NSP Energy Marketing Utilities PlusCitigroup Energy Entegra Power Services NSP Energy Trading Vitol, Inc.City of Fremont ETC Endure Energy Powerex Corp XO ENERGY SW, LPConoco Phillips Co Franklin Power, LLC PSCO Energy Trading XO ENERGY SW2, LPDB Energy Trading Infinity Wind Holdings PSCO Energy MarketingDC Energy Midwest, LLC J Aron & Co Saracen Energy West
Denver Energy 2, LLCJP Morgan Ventures Energy
Sustaining Power Solutions
Brett Crane
Analysis: July 22-28
8Alan Adams
• Structured Market Trials Statistics posted the day after each ODspp.org > Integrated Marketplace > Market Trials > Structured/Unstructured Test > Integrated Marketplace Market
Trials Project Documentation Folder > Structured Market Trials Presentations, Statistics, MP Meetings
• Analysis of July 24 and July 25 Operating Days posted Tues to spp.orgspp.org > Integrated Marketplace > Market Trials > Structured/Unstructured Test > Integrated Marketplace Market
Trials Project Documentation Folder > Structured Market Trials Presentations, Statistics, MP Meetings
Settlements in SMT
• On August 12 we will begin publishing daily settlements for Operating Day 8/5/2013 forward.
• A mix of representative data and actual upstream data will be used.
• Details about data quality will be covered during next weeks update.
9Tony Alexander
Settlements in SMT
• During this period Settlements will be posting according to the following schedule:– Initial: OD + 7
– Final: OD + 14
– R1: OD + 21 (Optional)
– R2: OD + 28 (Optional)
10Tony Alexander
Settlements in SMT - Schedule
• 5-Aug – First Operating Day
• 12-Aug – First initial statement (8-5 OD)
• 15-Aug – First invoice (2 ODs Aug 12-13)(KIL)
• 19-Aug – First final statement (8-5 OD)
• 22-Aug – First full invoice (Aug 14-20)
11Tony Alexander
Settlements: Calendar Location
• The accelerated Settlements Calendar for Market Trials is located on the Portal at the following location:
12Tony Alexander
Settlements Market Trials Scenarios
• Market Trials Structured/Unstructured Test Scenario Detail document can be found at spp.org. This contains all Settlement scenarios.
• http://www.spp.org/section.asp?group=2701&pageID=27
13Tony Alexander
Settlements Scenario Facts
• SPP expects 80-90% of the Settlements Scenarios/Charge Types will occur naturally during August.
• We will perform a gap analysis to determine which Scenarios/Charge Types have not occurred and create a plan for triggering the remaining Scenarios/Charge Types during September.
14Tony Alexander
Settlements Metrics
• Three sets of Settlements Metrics will be reported: – Bilateral Settlement Schedule and Meter Data
Reported Weekly beginning July 26, 2013 (SMT MP Weekly Status Call)
– Charge Type Scorecard Reported Weekly beginning August 23, 2013 (SMT MP Weekly
Status Call)
– Readiness Metrics Reported Monthly beginning August 9, 2013
15Tony Alexander
Settlements Charge Type Scorecard
16Tony Alexander
Settlements Charge Type Scorecard
17
MP Scenario
Tony Alexander
Settlements Charge Type Scorecard
18
MP byCharge Type
Tony Alexander
Settlements MP Readiness Metrics
• https://cloudpal.idashboards.com/idashboards/?guestuser=2spp2
19Tony Alexander
Settlements MP Readiness Metrics
20Tony Alexander
Look-Ahead: August 5 - 11
21
• Aug 5 – Aug 11 Daily Calendar• spp.org > Integrated Marketplace > Market Trials > Structured/Unstructured Test > Integrated Marketplace
Market Trials Project Documentation Folder
• Now includes some initial Settlements Dates.. For all Settlements Calendar details please reference the Settlements Calendar marketplace.spp.org > Public > Settlements > Calendars
• Scheduled Scenarios• 0.5 – Settlements Base Scenario• 12.0 – OOME Re-testing
• 3 Official Operating Days – Tues Aug 6, Weds Aug 7, Thurs Aug 8
• Friday Maintenance
• Saturday Reserved for MP Testing
Ginny Watson
12.0 OOME Re-TestingOOME Re-test Appointments •Individual appointments already scheduled with applicable MPs•MT Liaisons should gather the staff who can make these verifications at their organizations for these calls•SPP will issue and verify OOME activity.
Expected Result •SPP Operators will issue the out of merit dispatch instruction via phone call to MP and receive a start and stop time.
• MP will receive the OOME instruction and OOME flag will be activated via ICCP and XML
•SPP Operators will remove the OOME instruction• MP resource dispatch will go back to honoring the Real Time offer data
MP Activities: MPs with Resources•Offer resources as normal•Observe OOME instruction and flag during OOME period
22Alan Adams
Scenario Tracker
23Casey Cathey
• Roll-Forward Email is for SPP to gauge participation• If you plan to update at least once per week, select “no”
• Voting Buttons are not compatible with all email formats• “Reply” with your Yes/No vote if the voting buttons are not visible
• If you receive an email for a Scenario that is not applicable to your MP, please reply “N/A”
• Reminder: All Email Responses due Monday Aug 5 by 12P
Release Scorecard
24
Release Scorecard posted to spp.org:spp.org > Integrated Marketplace > Market Trials > Structured/Unstructured Test > Integrated Marketplace Market Trials Project Documentation Folder
Ginny Watson
Migration and Maintenance Report
25
Migration and Maintenance Report posted to spp.orgspp.org > Integrated Marketplace > Market Trials > Structured/Unstructured Test > Integrated Marketplace Market Trials Project Documentation Folder
MT Tagged Transactions documentation posted to spp.orgspp.org > Integrated Marketplace > Market Trials > Structured/Unstructured Test > Integrated Marketplace Market Trials Project Documentation Folder > Structured Market Trials Reference Documents
Wendy Reynolds
Known Issues Log
26
Market Trials Known Issues Log posted to spp.orgspp.org > Integrated Marketplace > Market Trials > Structured/Unstructured Test > Integrated Marketplace Market Trials Project Documentation Folder
Carrie Simpson
Scheduled Scenarios
27
• Aug 5 – Aug 11
• 0.5 – Settlements Base Scenario
• 12.0 – OOME Retesting
• Aug 12 – Aug 18
• 1.0 - Delay Market Publication / Delay Market Close
• 11.0 – EDR Deployment
Ginny Watson
Financial Only Market Participant Training
Market Trials Checklist
•SMT Scenarios– Expected to execute the following scenarios:
No Violation of Credit Limit (3.0a) Violate Credit Limit (3.0)
•Tradeable Nodes– Review Tradeable Nodes Spreadsheet– All Settlement Locations in SPP Footprint are tradeable
28Michael Daly
Financial Only Market Participant Training
Training Checklist
•Virtual Transactions– Self-Study available via SPP Learning Center– Integrated Marketplace Clinic Materials
•Scheduling Activities– Interchange Scheduling Reference Manual– Submit Interchange Transactions Reference Guide
Transmission Service Request, Ramp Reservation System, e-Tag– Integrated Marketplace Clinic Material– Note: Import Interchange Transactions are most applicable, if also
registered as a Transmission Customer. Bilateral Settlement Schedules cannot be utilized.
29Michael Daly
Financial Only Market Participant Training
Training Checklist (cont’d.)
•ARR/TCR– TCR Bid Activity Training– Self-Study Modules available via SPP Learning Center
TCR Basics, Acquiring TCRs, and TCR Settlements– Integrated Marketplace Clinic Materials– Upcoming Training: ARR Allocation Process and TCR Go Live
30Michael Daly
Market Trials Useful ResourcesSMT Hotline: 501-482-2222 for critical & high issues Mon-Fri 8A – 5PPlease submit all other inquiries via the Request Management System (RMS)
Settlements Calendarmarketplace.spp.org > Public > Settlements > Calendars
Integrated Marketplace Market Trials Project Documentation Folderspp.org > Integrated Marketplace > Market Trials > Structured/Unstructured Test > Integrated Marketplace Market Trials Project Documentation Folder
• Documents found here include: Daily Calendar, Release Scorecard, Migration Report, Known Issues Log, Market Participant Guide
• SMT Presentations, Statistics, MP Meetings Folder• SMT Reference Documents Folder• SMT Scenarios Folder
Change Tracker spp.org > Integrated Marketplace > Marketplace Documents
31