Structured project development and environmental initiatives · Structured project development and...
Transcript of Structured project development and environmental initiatives · Structured project development and...
Structured project development and environmental initiativesLennart Henriz, Head of Operations Development (Quality, Environment & IT)
2009-11-27 Capital Market LH 4
...attractive, flawless homes
at low total cost
…more uniform industrialized process
Structured planning for…
2009-11-27 Capital Market LH 5
Criteria
• Cost-effective
• No problems for customers, property owners or JM
• Important customer values (building acoustic class B, energy, environment, etc)
2009-11-27 Capital Market LH 6
Structured planning entails…
• Lower costs through:
– Simplified engineering
– Shorter running-in time period in production
– Coordinated supply management – benefits of scale
• Increased customer benefit through:
– Fewer short- and long-term problems
2009-11-27 Capital Market LH 9
WHAT will be done Operations system
WHEN it should be done Uniform Process description
HOW it should be done Procedure descriptions
Big picture
Now
In the future we will describe what will be done when, and how, throughout the project development process
2009-11-27 Capital Market LH 10
Process description –
’Sales’
Lorem ipsum dolor sit amet
Lorem ipsum dolor sit amet
Lorem ipsum dolor sit amet
Lorem ipsum dolor sit amet
Lorem ipsum dolor sit amet
Lorem ipsum dolor sit amet
Håll startmöte för försäljning
Lorem ipsum dolor sit amet
Lorem ipsum dolor sit amet
Lorem ipsum dolor sit amet
Besluta om inredningsorginal
Lorem ipsum dolor sit amet
Lorem ipsum dolor sit amet
Lorem ipsum dolor sit amet
Lorem ipsum dolor sit amet
Lorem ipsum dolor sit amet
Lorem ipsum dolor sit amet
Lorem ipsum dolor sit amet
Lorem ipsum dolor sit amet
Lorem ipsum dolor sit amet
2009-11-27 Capital Market LH 12
Structured Project Development
Structured Planning
Strategic Purchasing
Structured Planning (section 2 – SPURP)
Structured Sales
Structured Production
ProcessProcess--oriented Project Developmentoriented Project Development
2009-11-27 Capital Market LH 14
That’s why environmental initiatives are important for JM
• Customers’ health
• Children’s future
• Employees’ workplace environment
2009-11-27 Capital Market LH 15
JM –
the industry’s environmental leader
85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 00 01 02 03 04 05 06 07 08
Natural step
Environmental policy
Allergy-friendly home
Quiet home
Recycled home
Environmental management system
Robur Environmental Fund
Ecofriendly home Low-energy windowsEco-house
Low-energy home FSC-certified home
Dry home
Energy-wise home
Green cars
BLICC
Low-energy house
2009-11-27 Capital Market LH 17
Global temperatures and CO2
changePast 400 000 years from ”the Vostok Ice Core” Year 2100
”base case”700 ppm
X
X2009 397 ppm
2009-11-27 Capital Market LH 18
JM’s carbon dioxide emissions in Sweden (tons)
EnergyNewly produced homes 5,355Power and heat 2,822
TransportsBusiness trips 1,758Own vehicles and machinery 582Freight transports 3,296Commuter travel 1,952
Total 15,765
2009-11-27 Capital Market LH 19
All JM homes are low-energy houses
Heat recovery
Individual hot water meters
Improved building shellBetter insulated walls
Energy-efficient windows More airtight houses
2009-11-27 Capital Market LH 21
Building low-energy houses –
a financial challenge, not a technical challenge
We have chosen an optimized solution that is good for:
BuyersBuyers
BuildersBuilders
SocietySociety
ClimateClimate
2009-11-27 Capital Market LH 22
JM is the European leader……at building low-energy houses in all its housing production in Sweden
75 kWh/m2
Disclaimer: 100 m2 standard residential unit, Stockholm, 22 degrees, normal household, may vary 100 % depending on family, etc.