STRUCTURAL, MECHANICAL, ELECTRICAL AND planning/sp-1530005...The Contractor shall verify and be...
Transcript of STRUCTURAL, MECHANICAL, ELECTRICAL AND planning/sp-1530005...The Contractor shall verify and be...
Level 2 (Ground Floor)124968
Level 3128626
Level 4132398
Level 5 (Roof)136300
Level 2 (Block AEntrance)
126900
Stair Roof - East Block139300
3000
3900
3770
1725
1930
EW1FC1EW1FC2A-33A-33A-32
A-32A-34
EXISTING ELEVATION TO REMAIN
EXISTING ELEVATION TO REMAIN
EXISTING ELEVATION TO REMAIN
T.O. STL DECK WESTBLOCK I
128626T.O. CONCRETE
128236
Level 2 (Ground Floor)124968
Level 3128626
Level 4132398
Level 5 (Roof)136300
Stair Roof - East Block139300
NEW
3000
NEW
3900
EXIS
T37
70EX
IST
3660
NEW
820
EW1FC1 EW3CW1 EW3CW1EW1FC2
TOP
O F R
OOF
A T H
IGHE
ST E
XIST
OCC
UPIE
D SP
A CE
1476
5
TOP
OF E
AST
BLOC
K ST
AIRS
1433
0
HCCC ROOF132026
A-24
HCCC (Ground Floor)124150
A-15
EXISTING ELEVATION TO REMAIN
SCR1
U/S OF METAL DECK131886T.O. STL DECK WEST
BLOCK I128626
GRADING ELEVATION123900
T.O. CONCRETE128236
EW1FC1 FIBER-C PANELS IN TERRA COLOUR (FC1)EW1FC2 FIBER-C PANELS IN SANDSTONE COLOUR (FC2)
CURTAINWALL, CAPPED ALUMINUM HORIZONTAL AND VERTICAL MULLIONS
CW1
CURTAINWALL, ALUMINIUM MULLIONS, CAPPED VERTICAL MULLIONS AND CAPPLESS HORIZONTAL MULLIONS
CW2
EW5 PREFINISHED STEEL SIDING
CURTAINWALL, CURVED GLASS, CAPPED VERTICAL AND HORIZONTAL MULLIONS
CW3
EW1FC3 FIBER-C PANELS IN SAHARA COLOUR (FC3)
EW3 COMPOSITE METAL PANELSEW4 BRICK VENEER
LV1 LOUVERED SCREENING WALL
NOTE: TAGS PROVIDED ON ELEVATIONS ONLY REPRESENT MATERIALS, FINISHES AND COLOURS.FOR WALL ASSEMBLIES REFER TO TAGS PROVIDED ON PLANS, SECTIONS AND SHEET WITH GENERAL NOTES
SCR2 SCREEN 2 - PERFORATED FIBER CEMENT PANEL SCREEN
SCR1 SCREEN 1 - EXTRUDED ALUMINUM SCREEN
SCR3 SCREEN 3 - FIBER CEMENT PANEL SCREEN
SCR4 SCREEN 4 - COMPOSITE METAL PANEL SCREEN
Level 2 (Ground Floor)124968
Level 3128626
Level 4132398
Level 5 (Roof)136300
A2-6011
Stair Roof - East Block139300
BLOCK A
EW1FC2CW1
NEW
3000
NEW
3900
EXIS
T37
70EX
IST
3660
TOP
OF E
AST
BLOC
K ST
AIRS
1433
0
TOP
OF R
OOF
AT H
IGHE
ST E
XIST
OCC
UPIE
D SP
ACE
1476
5
HWSS
EXISTING ELEVATION TO REMAIN EXISTING ELEVATION TO REMAINT.O. STL DECK WESTBLOCK I
128626T.O. CONCRETE128236
Level 2 (Ground Floor)124968
Level 3128626
Level 4132398
Level 5 (Roof)136300
A2-6022
Stair Roof - East Block139300
BLOCK B BLOCK C
TOP
OF R
OOF
AT H
IGHE
ST E
XIST
OCC
UPIE
D SP
ACE
1476
5
TOP
OF E
AST
BLOC
K ST
AIRS
1433
0
NEW
3000
NEW
3900
EXIS
T37
70EX
IST
3660
CW1EW1FC1 EW4EW3EW3 A-15CW3EW1FC2EW1FC2
EW1FC2
EXISTING ELEVATION TO REMAIN
EXISTING ELEVATION TO REMAIN
EXISTING ELEVATION TO REMAIN
EXISTING ELEVATION TO REMAIN
SCR1
T.O. STL DECK WESTBLOCK I
128626T.O. CONCRETE
128236
Level 2 (Ground Floor)124968
Level 3128626
Level 4132398
Level 5 (Roof)136300
Stair Roof - East Block139300
BLOCK A
EXIS
T36
60EX
IST
3770
NEW
3900
NEW
3000
EXISTING ELEVATION TO REMAINEXISTING ELEVATION TO REMAIN
EXISTING ELEVATION TO REMAINEXISTING ELEVATION TO REMAIN
T.O. STL DECK WESTBLOCK I
128626T.O. CONCRETE
128236
Level 2 (Ground Floor)124968
Level 3128626
Level 1121310
Level 4132398
Level 5 (Roof)136300
Stair Roof - East Block139300
BLOCK C BLOCK B
TOP
OF E
AST
BLOC
K ST
AIRS
1433
0
TOP
OF R
OOF
AT H
IGHE
ST E
XIST
OCC
UPIE
D SP
ACE
1471
5NE
W82
0EX
IST
3660
EXIS
T37
70NE
W39
00NE
W30
00
EW1FC1
HCCC ROOF132026
HCCC (Ground Floor)124150
EW3EW4EW4 EW4
EXISTING ELEVATION TO REMAINEXISTING ELEVATION TO REMAIN EXISTING ELEVATION TO REMAIN
SCR1
EXIS
TING
3660
T.O. STL DECK WESTBLOCK I
128626
GRADING ELEVATION123900
T.O. CONCRETE128236
1 2 3 4 5 6 7 8
A
B
C
D
E
F
F
8
Client/Project
Drawing No.
Project No.
Title
Permit-Seal
Issued
Revision
Scale
By Appd YYYY.MM.DD
Notes
ORIGINAL SHEET - ISO A0 (841x1189)
The Contractor shall verify and be responsible for all dimensions. DO NOT scale the drawing - any errors or omissions shall be reported to Stantec without delay.The Copyrights to all designs and drawings are the property of Stantec. Reproduction or use for any purpose other than that authorized by Stantec is forbidden.
Copyright Reserved
STRUCTURAL, MECHANICAL, ELECTRICAL AND CIVIL
Consultants
Key Plan
Stantec Consulting Ltd.
www.stantec.com
By Appd YYYY.MM.DD
PROJECT 2
As indicated
20/0
1/17
10:
0 2:2
6 A
MC
:\U s
ers\
Pub l
ic\D
ocu m
ents
\Loc
al_R
evit_
Files
\stn
_arc
h_h r
c_14
001 6
076_
behz
ad.b
arz
ega
r.rvt
HALTON REGIONAL CENTRE
OVERALL ELEVATIONS
A2-600140016076
Stantec Architecture Ltd.100-401 Wellington Street WestToronto, ON M5V 1E7Tel: (416) 596-6686 / Fax: (416) 596-6680
1 : 250A2-6003 OVERALL ELEVATION- WEST
1 : 250A2-6004 OVERALL ELEVATION- EAST
ELEVATION MATERIALS LEGEND
1 : 250A2-6005 OVERALL ELEVATION- SOUTH - (WEST PART)
1 : 250A2-6006 OVERALL ELEVATION- SOUTH - (EAST PART)
1 : 250A2-6007 OVERALL ELEVATION- NORTH - (WEST PART)
1 : 250A2-6008 OVERALL ELEVATION- NORTH - (EAST PART)
1 ISSUED FOR COSTING - PROJECT 2 2018.05.232 ISSUED FOR CLIENT REVIEW - SPA - PROJECT 2 2018.08.243 ISSUED FOR SITE PLAN APPROVAL 2018.10.054 ISSUED FOR COSTING – PROJECT 2 30% CD 2018.10.055 ISSUED FOR COSTING – PROJECT 2 60% CD 2018.11.086 ISSUED FOR COSTING – PROJECT 2 90% CD 2019.02.067 RE-ISSUED FOR SITE PLAN APPROVAL 2019.04.258 ISSUED FOR COSTING - PROJECT 2 100% CD 2019.05.219 ISSUED FOR TENDER REVIEW 2019.06.0410 RE-ISSUED FOR SITE PLAN APPROVAL 2019.09.0311 ISSUED FOR FINAL TENDER REVIEW 2019.08.3012 ISSUED FOR PERMIT AND TENDER 2019.09.1713 RE-ISSUED FOR SITE PLAN APPROVAL 2020.01.17