CIVIL ENGINEERING. CONSTRUCTION ENGINEERING STRUCTURAL ENGINEERING.
Structural Engineering Experts
Transcript of Structural Engineering Experts
CONTENTS
01TrinaTracker
02TrinaTracker
03PreventiveDesign Innovations
04Validation and Quality Control
Decrease of components
05Operation and Maintenance
06EnzenAustralia
07
COMPANY DEVELOPMENT
Trina Solar 100%
acquired Nclave
Trina Solar 51%
"TrinaTracker“
Top 10
100%49%
51%100%
01 TrinaTracker
ACHIEVEMENTS
Production centers
/ / /
Offices & Branches
/ / / / / / / /
17 40
01 TrinaTracker
STATE-OF-THE-ART TRACKER DESIGN ADAPTED TO ANY CONDITIONS
01 TrinaTracker
01 TrinaTracker
2P 2P 1P 1P
CUSTOMER-FOCUSED APPROACH
01
TrinaTracker
Agile 1P
Vanguard 2P
ensure high life-time
reliability of the tracker systems, reduce O&M
costs and optimized LCOE
TrinaTracker
For the whole solar power plants:
Weather Data
NCU
TCU
Inverter
Transformer
PV string
02 TrinaTracker
CUSTOMER-FOCUSED APPROACH
Fault diagnosis and O&M
suggestionsin advance
02
SCADA : SMART O&M
Control
Tracking solution
Analysis
Data Control of intelligent
cleaning robot
PR Analysis and Recommend-
dations
TrinaTracker
Smart O&M
SCADA– PRODUCT ROADMAP
•
•
•
02
Monitor Diagnosis Control
2021-H2 Available
Predictive Prescriptive
2022-H1 Will be Available
•
•
•
•
•
•
•
TrinaTracker
DAILY AVAILABILITY SCORE (DAS) OF SOME TRINATRACKERINSTALLATIONS AROUND THE WORLD
02
LIFETIME AVAILABILITY
TrinaTracker
SCADA INTERPHASE REPORT
02 TrinaTracker
Single Drive
Higher torsional loads
✓
✓
✓
✓
✓
Multi Drive
Lower torsional loads
Multi-point drive has self-locking function for
MAXIMUM WIND STABILITY
2P
03
MULTI-DRIVE SYSTEM
SLEWING DRIVE THAT ALLOWS FLEXIBILITY
03
Patented Spherical Bearing
✓
✓
✓
EASY INSTALLATION DESIGN
03
Patented Trina-Clamp
✓
✓
✓
EASY INSTALLATION DESIGN
03
Post
✓
✓
✓
Torque
✓
✓
✓
Purlin
✓
✓
STRENGTHENING STRUCTURAL SOLUTIONS
03
DESIGN COMPATIBLE WITH ROBOTS CLEANING
2P
1P
03
04
PRESSURE MODEL WIND TUNNEL RESEARCH
2D SECTIONAL MODEL TEST &
NUMERICAL MODELS
FULL AEROELASTIC MODEL TEST
COMPREHENSIVE WIND TUNNEL TEST
✓ Vanguard 2P
✓ Agile 1P
✓
INTEGRATED ALARM STRATEGY
Critical wind speed
Snow loads
Hail storms
Floods
Battery & Communications
04
FEMCalculation
HIGHT QUALITY STANDARDS ON DESIGN VALIDATION
04
Quality Inspection
Integration and Assembly
Functional test
Maximum load capacity
Durability
Regulations
COMPONENTS TESTING
Slewing Drive Test
04
Functional Test Performed on the TCU + Mechanical Drive
QUALITY PROCEDURES
04
MarketRequirements
ProductDevelop
SuppliersEvaluation
QualityControl
ContinuousImprovements CUSTOMER
FOCUS
05
DECREASE OF COMPONENTS IN VANGUARD 2P UPGRADED DESIGN COMPARED TO THE PREVIOUS 2P MODEL
Installed power per tracker is
1 Reduction of components
ConsequenceNº trackers
2 Reduction in number of components
DECREASE IN COMPONENTS IN AGILE 1P UPGRADED DESIGN COMPARED TO DESIGN OF THE PREVIOUS 1P DUAL-ROW MODEL
05
DIRECT O&M ACTIVITIES
06
Direct preventivemaintenance of the tracker
PREVENTIVE MAINTENANCE DIRECT ACTIVITIES
INDIRECT O&M ACTIVITIES
Indirect compatibilization of ModuleCleaning System and Ground-Module Clearance input, whose informationmust be received during design stage to be considered in tracker design reverting in lower O&MCost in operational phase.
PREVENTIVE MAINTENANCE INDIRECT ACTIVITIES
06
TIME ESTIMATION OF PREVENTIVE MAINTENANCE VANGUARD 2P
Maintenance action description Number unitsper 100 MWp
(Nº)
Time per action and 100 MWp (hr)
Inspection Frequency Recommend Sampling
(%)
Average O&M time per action, 100 MWp and
year (hr)Period Coef.
1.484.336 4.953 Anually 1,00 2,00% 99
1.624 217 3 years 0,33 10,00% 7
1.624 135 Anually 1,00 10,00% 14
13.317 162 Anually 1,00 10,00% 16
1.624 271 Anually 1,00 5,00% 14
5.359 162 2 years 0,50 10,00% 8
TOTAL
Units per MWp (Nº)
Time per Action and MW (hr)
Inspection Frequency Coefficient
(yr)
Recommended Sampling
(%)
Average Preventive O&M Time (hr/year)
06
TIME ESTIMATION OF PREVENTIVE MAINTENANCE AGILE 1P
06
Maintenance action description Number unitsper 100 MWp
(Nº)
Time per action and 100 MWp (hr)
Inspection Frequency Recommend Sampling
(%)
Average O&M time per action, 100 MWp and
year (hr)Period Coef.
Units per MWp (Nº)
Time per Action and MW (hr)
Inspection Frequency Coefficient
(yr)
Recommended Sampling
(%)
Average Preventive O&M Time (hr/year)
TOTAL
FAILURE RATE
06
Failure Rate (%)
Number of Failed Units (un)
Number of Units Deployed (un)
Time Period
(yr)
UnplannedO&M
FailureRate
LCOE
Energyproduction
Reliability Availability
TIME ESTIMATION OF UNPLANNED (CORRECTIVE) MAINTENANCE VANGUARD 2P
06
Units per 100 MWp
(Nº)
ReplacementTime per unit (hr)
Failure Rate per
component(%)
UnplannedO&M Time (hr/year)
TOTAL 5.16 hr/yr-100MW
TIME ESTIMATION OF UNPLANNED (CORRECTIVE) MAINTENANCE AGILE 1P
06
Units per 100 MWp
(Nº)
ReplacementTime per unit (hr)
Failure Rate per
component(%)
UnplannedO&M Time (hr/year)
TOTAL 5.16 hr/yr-100MW
O&MTrinaTracker Vanguard 2P
Vanguard 2P Vanguard 2P
VANGUARD 2P O&M COSTS REDUCTION
-33%
06
Agile 1P
O&MTrinaTracker Agile 1P
-25%
Agile 1P
AGILE 1P O&M COSTS REDUCTION
06
ENZEN AUSTRALIA
06 Enzen Australia
C O N F I D E N T I A L - © E N Z E N 2 0 2 0
ABOUT ENZEN
1
About us
* GSMA Intelligence
Confidential – © Enzen 2021
Knowledge Practitioners
4200 +
Nationalities Offices
30 + 34
Project Locations Projects Executed Partnerships
Growth Since Inception
CustomersAverage Project
Duration
571 2027 72
63%CAGR
500+ 72
in 9 countries
in 41 countries
Our Purpose
“To make energy and water available, accessible and
affordable in a sustainable way for all”
Our Capability & Structure
* GSMA Intelligence
Co
ntr
olle
d E
nti
tie
s
Partner
Energy monitoring & control
Confidential – © Enzen 2021
Bu
sin
ess
Str
eam
s
Confidential – © Enzen 2021
Engagement Examples
• Digital Asset Management Strategy
• Commercial Transformation• Data Transformation
• Digital Twin
• Bawley Point Edge of Grid
• OT Strategy Development• Asset Replacement Strategy
Review
• IoT On Farm Trials – All 4 Regions with Victoria State Government
• Digital Program - Cadastre correction to GPS accuracy
• ERP implementation• IT Managed Services• Data Centre & Networks
Consolidation
• Digital Twin
• 7200 Smart Streetlights Awaiting Formal Govt Confirmation
Confidential
• IoT Agribusiness Digital Solutions
• LoRaWAN Shared IOT Infrastructure & 5500 Smart Water Meters
• State-wide LoRaWAN Shared Infrastructure
• Digital Strategy Advisory –Utility of the Future Program
• Network Operations strategy response to growing distributed energy
• Utility Process Model IP• Operating Model
Transformation• Performance KPI Framework
• Market Systems Advisory
• Global Food Delivery Quality Control
• LoRaWAN IoT Infrastructure & Smart Water Metering
• MI Advisory
• ICT Organisation Review and Digital Transmission Utility
Our Australian Value Proposition
Amplifying Value
Confidential – © Enzen 2021
Business Transformation
BT
We join the dots and leverage the value between:
• the physical, business, virtual and connected worlds
• energy, water, transport and emissions
• supply, consumption, demand and storage
• The utility, its customers, business and communities
• climate change, energy security and social and economic resiliency
• behavioral change vs/+ system and control
• scope, scale & economics
• technology & business change
Build new clean energy
resources
Optimise existing energy resources –
supply, consumption, demand & storage
Connect, visualise & orchestrate
Reduce/ eliminate
carbon base energy
Leverage water as a battery
Model & simulate virtual communities
Compliant & Resilient Networks
Electrification
We partner to transform businesses
Please feel free to contact us at [email protected]