Page 1: Structural Engineering Experts
Page 2: Structural Engineering Experts

CONTENTS

01TrinaTracker

02TrinaTracker

03PreventiveDesign Innovations

04Validation and Quality Control

Decrease of components

05Operation and Maintenance

06EnzenAustralia

07

Page 3: Structural Engineering Experts

COMPANY DEVELOPMENT

Trina Solar 100%

acquired Nclave

Trina Solar 51%

"TrinaTracker“

Top 10

100%49%

51%100%

01 TrinaTracker

Page 4: Structural Engineering Experts

ACHIEVEMENTS

Production centers

/ / /

Offices & Branches

/ / / / / / / /

17 40

01 TrinaTracker

Page 5: Structural Engineering Experts

STATE-OF-THE-ART TRACKER DESIGN ADAPTED TO ANY CONDITIONS

01 TrinaTracker

Page 6: Structural Engineering Experts

01 TrinaTracker

2P 2P 1P 1P

Page 7: Structural Engineering Experts

CUSTOMER-FOCUSED APPROACH

01

TrinaTracker

Agile 1P

Vanguard 2P

ensure high life-time

reliability of the tracker systems, reduce O&M

costs and optimized LCOE

TrinaTracker

Page 8: Structural Engineering Experts

For the whole solar power plants:

Weather Data

NCU

TCU

Inverter

Transformer

PV string

02 TrinaTracker

CUSTOMER-FOCUSED APPROACH

Page 9: Structural Engineering Experts

Fault diagnosis and O&M

suggestionsin advance

02

SCADA : SMART O&M

Control

Tracking solution

Analysis

Data Control of intelligent

cleaning robot

PR Analysis and Recommend-

dations

TrinaTracker

Smart O&M

Page 10: Structural Engineering Experts

SCADA– PRODUCT ROADMAP

02

Monitor Diagnosis Control

2021-H2 Available

Predictive Prescriptive

2022-H1 Will be Available

TrinaTracker

Page 11: Structural Engineering Experts

DAILY AVAILABILITY SCORE (DAS) OF SOME TRINATRACKERINSTALLATIONS AROUND THE WORLD

02

LIFETIME AVAILABILITY

TrinaTracker

Page 12: Structural Engineering Experts

SCADA INTERPHASE REPORT

02 TrinaTracker

Page 13: Structural Engineering Experts

SCADA INTERPHASE REPORT

02 TrinaTracker

Page 14: Structural Engineering Experts

Single Drive

Higher torsional loads

Multi Drive

Lower torsional loads

Multi-point drive has self-locking function for

MAXIMUM WIND STABILITY

2P

03

MULTI-DRIVE SYSTEM

Page 15: Structural Engineering Experts

SLEWING DRIVE THAT ALLOWS FLEXIBILITY

03

Page 16: Structural Engineering Experts

Patented Spherical Bearing

EASY INSTALLATION DESIGN

03

Page 17: Structural Engineering Experts

Patented Trina-Clamp

EASY INSTALLATION DESIGN

03

Page 18: Structural Engineering Experts

Post

Torque

Purlin

STRENGTHENING STRUCTURAL SOLUTIONS

03

Page 19: Structural Engineering Experts

DESIGN COMPATIBLE WITH ROBOTS CLEANING

2P

1P

03

Page 20: Structural Engineering Experts

04

PRESSURE MODEL WIND TUNNEL RESEARCH

2D SECTIONAL MODEL TEST &

NUMERICAL MODELS

FULL AEROELASTIC MODEL TEST

COMPREHENSIVE WIND TUNNEL TEST

Page 21: Structural Engineering Experts

✓ Vanguard 2P

✓ Agile 1P

INTEGRATED ALARM STRATEGY

Critical wind speed

Snow loads

Hail storms

Floods

Battery & Communications

04

Page 22: Structural Engineering Experts

FEMCalculation

HIGHT QUALITY STANDARDS ON DESIGN VALIDATION

04

Quality Inspection

Integration and Assembly

Functional test

Maximum load capacity

Durability

Regulations

Page 23: Structural Engineering Experts

COMPONENTS TESTING

Slewing Drive Test

04

Functional Test Performed on the TCU + Mechanical Drive

Page 24: Structural Engineering Experts

QUALITY PROCEDURES

04

MarketRequirements

ProductDevelop

SuppliersEvaluation

QualityControl

ContinuousImprovements CUSTOMER

FOCUS

Page 25: Structural Engineering Experts

05

DECREASE OF COMPONENTS IN VANGUARD 2P UPGRADED DESIGN COMPARED TO THE PREVIOUS 2P MODEL

Installed power per tracker is

1 Reduction of components

ConsequenceNº trackers

2 Reduction in number of components

Page 26: Structural Engineering Experts

DECREASE IN COMPONENTS IN AGILE 1P UPGRADED DESIGN COMPARED TO DESIGN OF THE PREVIOUS 1P DUAL-ROW MODEL

05

Page 27: Structural Engineering Experts

DIRECT O&M ACTIVITIES

06

Direct preventivemaintenance of the tracker

PREVENTIVE MAINTENANCE DIRECT ACTIVITIES

Page 28: Structural Engineering Experts

INDIRECT O&M ACTIVITIES

Indirect compatibilization of ModuleCleaning System and Ground-Module Clearance input, whose informationmust be received during design stage to be considered in tracker design reverting in lower O&MCost in operational phase.

PREVENTIVE MAINTENANCE INDIRECT ACTIVITIES

06

Page 29: Structural Engineering Experts

TIME ESTIMATION OF PREVENTIVE MAINTENANCE VANGUARD 2P

Maintenance action description Number unitsper 100 MWp

(Nº)

Time per action and 100 MWp (hr)

Inspection Frequency Recommend Sampling

(%)

Average O&M time per action, 100 MWp and

year (hr)Period Coef.

1.484.336 4.953 Anually 1,00 2,00% 99

1.624 217 3 years 0,33 10,00% 7

1.624 135 Anually 1,00 10,00% 14

13.317 162 Anually 1,00 10,00% 16

1.624 271 Anually 1,00 5,00% 14

5.359 162 2 years 0,50 10,00% 8

TOTAL

Units per MWp (Nº)

Time per Action and MW (hr)

Inspection Frequency Coefficient

(yr)

Recommended Sampling

(%)

Average Preventive O&M Time (hr/year)

06

Page 30: Structural Engineering Experts

TIME ESTIMATION OF PREVENTIVE MAINTENANCE AGILE 1P

06

Maintenance action description Number unitsper 100 MWp

(Nº)

Time per action and 100 MWp (hr)

Inspection Frequency Recommend Sampling

(%)

Average O&M time per action, 100 MWp and

year (hr)Period Coef.

Units per MWp (Nº)

Time per Action and MW (hr)

Inspection Frequency Coefficient

(yr)

Recommended Sampling

(%)

Average Preventive O&M Time (hr/year)

TOTAL

Page 31: Structural Engineering Experts

FAILURE RATE

06

Failure Rate (%)

Number of Failed Units (un)

Number of Units Deployed (un)

Time Period

(yr)

UnplannedO&M

FailureRate

LCOE

Energyproduction

Reliability Availability

Page 32: Structural Engineering Experts

TIME ESTIMATION OF UNPLANNED (CORRECTIVE) MAINTENANCE VANGUARD 2P

06

Units per 100 MWp

(Nº)

ReplacementTime per unit (hr)

Failure Rate per

component(%)

UnplannedO&M Time (hr/year)

TOTAL 5.16 hr/yr-100MW

Page 33: Structural Engineering Experts

TIME ESTIMATION OF UNPLANNED (CORRECTIVE) MAINTENANCE AGILE 1P

06

Units per 100 MWp

(Nº)

ReplacementTime per unit (hr)

Failure Rate per

component(%)

UnplannedO&M Time (hr/year)

TOTAL 5.16 hr/yr-100MW

Page 34: Structural Engineering Experts

O&MTrinaTracker Vanguard 2P

Vanguard 2P Vanguard 2P

VANGUARD 2P O&M COSTS REDUCTION

-33%

06

Page 35: Structural Engineering Experts

Agile 1P

O&MTrinaTracker Agile 1P

-25%

Agile 1P

AGILE 1P O&M COSTS REDUCTION

06

Page 36: Structural Engineering Experts

ENZEN AUSTRALIA

06 Enzen Australia

Page 37: Structural Engineering Experts

C O N F I D E N T I A L - © E N Z E N 2 0 2 0

ABOUT ENZEN

1

Page 38: Structural Engineering Experts

About us

* GSMA Intelligence

Confidential – © Enzen 2021

Knowledge Practitioners

4200 +

Nationalities Offices

30 + 34

Project Locations Projects Executed Partnerships

Growth Since Inception

CustomersAverage Project

Duration

571 2027 72

63%CAGR

500+ 72

in 9 countries

in 41 countries

Our Purpose

“To make energy and water available, accessible and

affordable in a sustainable way for all”

Page 39: Structural Engineering Experts

Our Capability & Structure

* GSMA Intelligence

Co

ntr

olle

d E

nti

tie

s

Partner

Energy monitoring & control

Confidential – © Enzen 2021

Bu

sin

ess

Str

eam

s

Page 40: Structural Engineering Experts

Confidential – © Enzen 2021

Engagement Examples

• Digital Asset Management Strategy

• Commercial Transformation• Data Transformation

• Digital Twin

• Bawley Point Edge of Grid

• OT Strategy Development• Asset Replacement Strategy

Review

• IoT On Farm Trials – All 4 Regions with Victoria State Government

• Digital Program - Cadastre correction to GPS accuracy

• ERP implementation• IT Managed Services• Data Centre & Networks

Consolidation

• Digital Twin

• 7200 Smart Streetlights Awaiting Formal Govt Confirmation

Confidential

• IoT Agribusiness Digital Solutions

• LoRaWAN Shared IOT Infrastructure & 5500 Smart Water Meters

• State-wide LoRaWAN Shared Infrastructure

• Digital Strategy Advisory –Utility of the Future Program

• Network Operations strategy response to growing distributed energy

• Utility Process Model IP• Operating Model

Transformation• Performance KPI Framework

• Market Systems Advisory

• Global Food Delivery Quality Control

• LoRaWAN IoT Infrastructure & Smart Water Metering

• MI Advisory

• ICT Organisation Review and Digital Transmission Utility

Page 41: Structural Engineering Experts

Our Australian Value Proposition

Amplifying Value

Confidential – © Enzen 2021

Business Transformation

BT

We join the dots and leverage the value between:

• the physical, business, virtual and connected worlds

• energy, water, transport and emissions

• supply, consumption, demand and storage

• The utility, its customers, business and communities

• climate change, energy security and social and economic resiliency

• behavioral change vs/+ system and control

• scope, scale & economics

• technology & business change

Build new clean energy

resources

Optimise existing energy resources –

supply, consumption, demand & storage

Connect, visualise & orchestrate

Reduce/ eliminate

carbon base energy

Leverage water as a battery

Model & simulate virtual communities

Compliant & Resilient Networks

Electrification

We partner to transform businesses

Page 42: Structural Engineering Experts