Structural Details
description
Transcript of Structural Details
150
3,00
015
0
3014
5
315
3,950
1550 240025150
25
450
2510
0 25
25150
25
450
150
25150
25
450
2510
0 25
1,200
450
300
450
1,20
0
500 200 500
7590
0
5040
0
200200
200
5020
0
Y8 07 200 B2
8 Y12 01 150 B1
Y8 08 200 B2
8 Y12 03 150 B1
078 Y12 02 150 B1
Hardwood Handrail
R8 200 C/C R8 200 C/CR8 200 C/C
4 Y16 04 + 2 Y20 05
R8 06 200 C/C
033 Y8
Y10 200 C/C
5. 300 mm (min) well compacted hardcore infill
4. 50 mm murram blinding
3. 500 gauge polythene dump proof membrane
2. 150 mm Grouund F loor Slab
1. Dump Proof course
REINFORCED CONCRETE STAIRCASE DETAILS
EXTERNAL BEAM
3 Y12 Y12
Y12
3 Y163 Y16
3 Y12 Y12Y12
Y12Y12
FASCIA BEAM
2 Y12 Y12
Y12
2 Y12
INTERNAL BEAM
1 Y12 1 Y121 Y12
8 Y16 03 200 BW
COLUMN BASE C1
44
COLUMN STARTER C1
STRIP FOUNDATION DETAILS
NAME:
Muchene Daniel Kahara
REG NO;
B76/0501/2008
GENERAL NOTES1.All dimensions are to checked on site before commensement of any Work.Use figureddimensions only.Any discripancies should communicated to the consultant immediately.2.All dimensions are in millimeters unless otherwise specified.3. Cover to Reinforcement:-Beam 25mm Slab25mmMECHANICAL WORKS1.All sanitary fittings,door,windows and lift to schedule.2.All plumbing and drainage to comply with city council's specifications.3.All services ducts to be accessible from every door.4.SPV denotes soil vent pipes to be provided at the head of the drainage.
STRUCTURAL WORKS1.All black cotton soil to be removed from all the building plinth. All buildung tobe clear of black cotton soil to a distance of 3M.2.Refer to structural engineer's details for all R.C works.3.Foundation depth to be determined on site to S.E approval.4.All walls less than 200mm thick to be reinforced with hoop irons at everyalternative course.
PROJECT TITLE:Libray DevelopmentDRAWING TITLE:Structural DetailsSITE;Upper Hill Secondary SchoolCHECKED BY;..............................
DATE:30th. May 2012SCALE: 1:20,UNITS:MMDRAWING NO.