Documents.tips Calculul Structurilor Cu Diafragme Din Beton Armat Postelnicu Si Agentpdf (1)
Structura cadre din beton armat
-
Upload
andrei-lucaciu -
Category
Documents
-
view
227 -
download
0
Transcript of Structura cadre din beton armat
-
7/23/2019 Structura cadre din beton armat
1/127
`POLITEHNICA UNIVERSITY OF TIMISOARA
CIVIL ENGINEERING FACULTY
Tecca Me
Aece
1.Lca caacec
Te bdg caed a e ee f e c Taa.Te ea
face a 4800 2. ag ecaga f e fg
de 120 80 .O ce ea ee cc
ee ad face eae ae.
Pe SPA Cee
Tea de 80 60
Heg D+P+1E
Cc eg 14
C face 861 2
Ee face 2583 2
Safaa a 1085
Caea de a
Caa de a
P.O.T. 18%
C.U.T. 0,73%
Te ee 0.00 cdeed a e fg face f e gdee.
2.Aeca deg
-
7/23/2019 Structura cadre din beton armat
2/127
`POLITEHNICA UNIVERSITY OF TIMISOARA
CIVIL ENGINEERING FACULTY
Te bdg ae aea dec 4 a , eac f 6 .O
gda dec e bdg ae 8 a f 5 eac.Te
cg a ae ade f a ag e ce 30 c.
Te acce e bdg de b f e e acce e f
ad e degd ee de b a efced ccee a.
Te e cae a ae ade f a e
ce 12.5c.
Te bdg deged a ag ag 50 ag ace.
Te degd ee cced b e g .Te
g a a face f 135 2ad a a de f 2.
A e gd ee a fe g ad a cffe cc f
e ace.
A e f f, a be f 7 eae cdg aage
,aa ea ae deged.A a eaa bedeged e a f e bdg .
Ue
Te bdg be ceced e ca db e f
ce.Te ae e ded f e c ae e.
Te e f e eec e be de accdg e
ecfed 19/88.
A e bdg be ded a gg d.
Fg
-
7/23/2019 Structura cadre din beton armat
3/127
`POLITEHNICA UNIVERSITY OF TIMISOARA
CIVIL ENGINEERING FACULTY
F e ee de f e bdg e c f e ag ed
da e.Te d ed f e d ad d a
e c b.
A e e e a ae aed dffee c.Te a f
ade f a d.Te cd f ade f ade e.
Te cd f ee a a e degd ee ,ee e
g caed.
Te f ca e eaed b d fag.Te eg f
f 4 .
-
7/23/2019 Structura cadre din beton armat
4/127
`POLITEHNICA UNIVERSITY OF TIMISOARA
CIVIL ENGINEERING FACULTY
1.Geea daa
Obece dec SPA Cee
Lca Taa
Te cc a a ecaga ae e fg de
L=40
=24
I aea dec a 4 a,eac f 6,e e
gda dec a 8 a f 5 eac.
Te eg f e bdg 14 ag D+P+1E.
2.Dec f e cc
Te ce caed Taa.F ec f e
Taa a,accdg P.1001/2006,e fg caacec
ag=0.20g
Tc=0.7
Te fda de f e bdg Df=3.Te f e
fda aed fda de e c,ed gee
cg bea.
-
7/23/2019 Structura cadre din beton armat
5/127
`POLITEHNICA UNIVERSITY OF TIMISOARA
CIVIL ENGINEERING FACULTY
3.Sca e
Te ca e f e bdg ade f efced ccee
fae.C,aea ad gda gde.
Te c ae a ae ec f 6060 c.Te aea gde
ae a ecaga ec f 3060c e e gda gde
ae a ecaga ec f 2550c.
Te ee a ae ca ad ae de f a
e ce f 30c
Te e a ae a ade f a e ce f
12.5c
Te a ca e ade f gde b
dec ad efced ccee ab.
Te f efced ccee ab a e eg +3.50.Te ce
f e ab 20 c efcee b dec.
Te ecd efced ccee ab caed a e eg +7.00
e ce f 20 c ad efced b dec.
Te d efced ccee ab a e eg +10.5 .
Te ccee ed f e e a f e ce C25/30 e
e ccee ed a e fda C20/25.
-
7/23/2019 Structura cadre din beton armat
6/127
`POLITEHNICA UNIVERSITY OF TIMISOARA
CIVIL ENGINEERING FACULTY
Te f e ade f d fag.Dace beee e d
fae 2.5 .Te d ed fd a e eace ca
C40.Te f age 18 degee.
Te d fag c f e fg eee:
P ded a 3 aea dec ad 2.5
gda dec.Te ec f e 15X15c.
P aced e e e ec 15X15c.Te
ae e eg f 2.5.
Rafe e ec f 13X15c ded a 80 c.=>e dace
beee e afe 80 c.
Te f ceg ade f b c d.T f
b c d a ce becae f e a eg f e
ceg.
Te ceg ed b e d dec c 2.5X20c.
Dg e eec e afe e be aed ad
eeced accdg e e.
Ic
Lcac S Ade
-
7/23/2019 Structura cadre din beton armat
7/127
`POLITEHNICA UNIVERSITY OF TIMISOARA
CIVIL ENGINEERING FACULTY
6001.2 2
500
= = <
Sab efced dec
P/180+20=(500+600)*2/180+20=14.22=>,=15c
=L/10=600/10=60 c
b=/2=60/2=30 c
=>>Taea gde
=60 C
b=30 c
=L/10=500/10=50 c
b=/2=50/2=25 c
=>>Lgda gde
=50 c
b=25 c
Te a ec f e c a
ce a 4040 c
-
7/23/2019 Structura cadre din beton armat
8/127
`POLITEHNICA UNIVERSITY OF TIMISOARA
CIVIL ENGINEERING FACULTY
7.1
1.
Se fg : a) Pae f (a f)
Pae F
N. Maea Nae
Secfc
eg[g/3]
Tce
[]
O
eg[daN/2]
1. Pae 420 0.022 9.24
2. Sd Ia 80 0.003 0.24
3. S Cag 1200 0.025 30
4.
Refced Ccee
Sab 2500 0.20 500
5. Pae 1600 0.02 32
TOTAL 571daN/2
-
7/23/2019 Structura cadre din beton armat
9/127
`POLITEHNICA UNIVERSITY OF TIMISOARA
CIVIL ENGINEERING FACULTY
b) Sade Te f(cd f)
Sade Te F
N. Maea Nae
Secfc
eg[g/3]
Tce
[]
O
eg[daN/2]
1. Sade Te 2400 0.008 19.2
2. Ma 2100 0.005 10.5
3.CeaCg 1200 0.037 44.4
4.
Refced Ccee
Sab 2500 0.15 500
5. Pae 1600 0.02 32
TOTAL 606daN/c2
ba=12.5c
aea:ceac bc
=12N/3
g,c=0.125*12=3N/2
fae ceg g bad: =20
gb=11.5 N/3
-
7/23/2019 Structura cadre din beton armat
10/127
`POLITEHNICA UNIVERSITY OF TIMISOARA
CIVIL ENGINEERING FACULTY
gf=0.02*11.5=0.23 N/2
:
ceac bc b=300
b=12 N/3
ga ae:70%
=3.50.6=2.9
=> gc=0.3*12*2.9*0.3=3.13 N/
2.
:
=> C4 caeg => Naa Ae :
=5N/2
=**Ce*C*
Lca: Taa=> =1.5 N/2
Iace ca II=> =1.10
cee ee => Ce=0.8
C=1.00
=0.8
=> =1.10*0.8*0.8*1*1.5=1.05N/2
-
7/23/2019 Structura cadre din beton armat
11/127
`POLITEHNICA UNIVERSITY OF TIMISOARA
CIVIL ENGINEERING FACULTY
We= *Ce*(Ze)
=1.15 ace ca II
Ce= ?
=10.5
b=24
=>d=24
e=29
e
/d=14/24=0.58
Ze A
Aea e A=e/5*=81 2
Aea e B: B=(de/5)*=2552
D=E=40*14= 560
2
=> CeA=Ce10=1.2
CeB=Ce10=0.8
CeD=Ce10=+0.7
-
7/23/2019 Structura cadre din beton armat
12/127
`POLITEHNICA UNIVERSITY OF TIMISOARA
CIVIL ENGINEERING FACULTY
b ea ea fd CeE=0.31
(Ze)=?
Ze==14
(Z)=C(Z)*(Z)
C(Z)=1+2g*I(Z)=1+7*I(Z)
Caeg f ad:III=> Z0=0.3; Z=5
2.35( ) 0.27
142.5 2.50 0.3
= = =
=>C(Z)=1+7*0.27=2.89
(Z)= C02*C
2(Z)*b
C2(Z)=K
2(Z0)* 2
( )
K2(Z0)=0.046
=> C2(Z)=0.53
=>(Z)=0.54*0.6=0.318
=>(Z)=2.89*0.318=0.91
We= *Ce*(Ze)
=>
WeA=1.14*(1.2)*0.91=1.25 N/2
WeB=1.15*(0.8)*0.91=0.83N/2
WeD=1,15*(+0.7)*0.91=+0.0.73 N/2
WeE=1.15*(0.31)*0.91=0.32 N/2
-
7/23/2019 Structura cadre din beton armat
13/127
`POLITEHNICA UNIVERSITY OF TIMISOARA
CIVIL ENGINEERING FACULTY
=14
b=40
=>>e=2
Aea e F
e/4*e/10=10.15 2
Ce,F=Ce,10=1.3
Aea e G
(b2e/4)*e/10=28 2
Ce,G=Ce,10=1.3
Aea e H
(e/2e/10)*b=209 2
CeH=Ce10=0.6
Aea e I
b*e/2=348 2
-
7/23/2019 Structura cadre din beton armat
14/127
`POLITEHNICA UNIVERSITY OF TIMISOARA
CIVIL ENGINEERING FACULTY
CeI=Ce10=.5
(Z)=C(Z)*(Z)
C(Z)=1+2g*I(Z)=1+7*I(Z)
Caeg f ad:III=> Z0=0.3; Z=5
2.35( ) 0.27
142.5 2.5
0 0.3
= = =
=>C(Z)=1+7*0.27=2.76
(Z)= C02*C
2(Z)*b
C2(Z)=K
2(Z0)* 2
( )
K2(Z0)=0.046
=> C2(Z)=0.63
=>(Z)=0.63*0.6=0.38
We= *Ce*(Ze)
=> WeF=1.15*(1.3)*0.38=0.56N/2
WeG=1.15*(1.3)*0.38=0.56N/2
WeH=1.15*(0.6)*0.38=0.26N/2
WeI=1.15*(0.21)*0.38=0.21N/2
-
7/23/2019 Structura cadre din beton armat
15/127
`POLITEHNICA UNIVERSITY OF TIMISOARA
CIVIL ENGINEERING FACULTY
Lca:Taa
ag=0.20g
Tc=0.7
Cec :
Laea dacee efca ( P1002013 Ae E)
dSLS
-
7/23/2019 Structura cadre din beton armat
16/127
`POLITEHNICA UNIVERSITY OF TIMISOARA
CIVIL ENGINEERING FACULTY
Te aed aa fce DCH 1690*1000
0.28 0.4* * 60 *60 *16.67
= = = <
0.1< ee f e ecd de effec ca be egeced
TeaHgEegeca Me
Te cac f e ea eace f e deged e a ade
eec e cde Na C 1071 (Na d cac cefce
gba de ae ec a cde de c ).
T cac a ade f a ee a, e ab abe gd ad e
eace; g e Tee ga.
Te ea eace a deeed ag acc a ee
eee ae ced f ae f ge aea, aced e dec
f e ea f. I de deee ea eace e fa a
aed:
+=
+=
K2R
1 RRR
ee:
==
1 R eace ea dff f e ge ae,
ag e ce J, ad ea cdc J.
-
7/23/2019 Structura cadre din beton armat
17/127
`POLITEHNICA UNIVERSITY OF TIMISOARA
CIVIL ENGINEERING FACULTY
1R = eace ea afe a e e face
1R = eace ea afe a e ee face
J= ea cdc ; e= ea afe ceffce f e face T eace caed e ecea eace, ad e cd
be ffed : R > Rec.
Regadg e cdea caca, e aeaace e e face f
e eee a ceced ad a fd a e eee de ffe ca effec. B cec e cd a ae a ae a accae
e bdg eee dg e cd ea eaaed e a ed f
e ea.
Te cdea cec a ade f a de eeae f 20C ad a
d f 60%, eece 15
C ad 80% d de.
-
7/23/2019 Structura cadre din beton armat
18/127
`POLITEHNICA UNIVERSITY OF TIMISOARA
CIVIL ENGINEERING FACULTY
7.2TeaHgEegeca Cac
Ee Wa
-
7/23/2019 Structura cadre din beton armat
19/127
`POLITEHNICA UNIVERSITY OF TIMISOARA
CIVIL ENGINEERING FACULTY
-
7/23/2019 Structura cadre din beton armat
20/127
`POLITEHNICA UNIVERSITY OF TIMISOARA
CIVIL ENGINEERING FACULTY
-
7/23/2019 Structura cadre din beton armat
21/127
`POLITEHNICA UNIVERSITY OF TIMISOARA
CIVIL ENGINEERING FACULTY
=0.255 1/=3.92 => 1/>R=1.20
Gd Sab
-
7/23/2019 Structura cadre din beton armat
22/127
`POLITEHNICA UNIVERSITY OF TIMISOARA
CIVIL ENGINEERING FACULTY
-
7/23/2019 Structura cadre din beton armat
23/127
`POLITEHNICA UNIVERSITY OF TIMISOARA
CIVIL ENGINEERING FACULTY
=0.23 1/=4.34 => 1/>R=4.20(ab a e fe de f e baee
Sab be ac
`
-
7/23/2019 Structura cadre din beton armat
24/127
`POLITEHNICA UNIVERSITY OF TIMISOARA
CIVIL ENGINEERING FACULTY
-
7/23/2019 Structura cadre din beton armat
25/127
`POLITEHNICA UNIVERSITY OF TIMISOARA
CIVIL ENGINEERING FACULTY
-
7/23/2019 Structura cadre din beton armat
26/127
`POLITEHNICA UNIVERSITY OF TIMISOARA
CIVIL ENGINEERING FACULTY
-
7/23/2019 Structura cadre din beton armat
27/127
`POLITEHNICA UNIVERSITY OF TIMISOARA
CIVIL ENGINEERING FACULTY
7.3Deg f e f fag
Deg f e f eee
Te f fag ade f fd ag e eace ca C40.
Te caacec f e eace ca C40 ae e fg:
eace bedg:
2
,
40 /
=
eace ea: 2, 3,8 / =
d f eac: 20, 14 / =
Te d dec ade f fd ag e fg de:
=2,5c
b=20c
=80c
-
7/23/2019 Structura cadre din beton armat
28/127
`POLITEHNICA UNIVERSITY OF TIMISOARA
CIVIL ENGINEERING FACULTY
1.Ca f e ad
eg f e ceg aea f e f(c d)
g,I=8.3 da/2
eg f e c d
0.025* 0.025*600 150 / = =
Cceaed ad f 100 daN
Lad 1 c d:
ad f e ceg aea
8.3 daN/2*0.2=1.66 daN/
Lad f e eg:
15daN/2*0.2=3daN/
Ta=1.66daN/+3daN/=4.66daN/
Lad f
Te bdg caed Taa.Te ad 105daN/2
S=105da/2
S ad acg 1 c d:
S=S*0.2=105daN/2*0.2=21daN/
Paa afe fac:
F eae ad:1.35
F e ad:1.5
-
7/23/2019 Structura cadre din beton armat
29/127
`POLITEHNICA UNIVERSITY OF TIMISOARA
CIVIL ENGINEERING FACULTY
F cceaed ad :1.2
=>Caca ad f eae ad:
gd=1.35*4.66=6.29 daN/
Caca ad f e ad
Sd=1.5*21=31.5 da/
Caca ad f cceaed fce
1.2*100 daN=1200daN
Lad cba
Cba 1
Peae +S
Cba 2 Peae +cceaed
-
7/23/2019 Structura cadre din beton armat
30/127
`POLITEHNICA UNIVERSITY OF TIMISOARA
CIVIL ENGINEERING FACULTY
Cba 1
(gd+d)*c=(4.66daN/+31.5daN/)*c18=34.71daN/
(gd+d)*==(4.66daN/+31.5daN/)*18=9.76daN/
29.76 *0.80.78 /
8 8
= = =
Cba 2
d*c=120*c18=114.1daN
gd*c=4.66*c18=4.43daN/
d*=120*18=47.1daN
gd*=4.66*c18=1.44daN
2 2* 1.44*0.8 37.1*0.87.67
8 4 8 4
= + = + =
2 2* 4.43*0.8 114.1*0.823.17
8 4 8 4
= + = + =
Reace cecg
+
*
=
-
7/23/2019 Structura cadre din beton armat
31/127
`POLITEHNICA UNIVERSITY OF TIMISOARA
CIVIL ENGINEERING FACULTY
Cba 1
d=0.6 f eae ad
d=0.9 f da ad
22400 /0.6* 184 /
1.3 = =
Cba 2
*0.8 *0.90.9
* .8
+= =
+
2
2
0.9 *400 /
276 /
=
=
+
3
23
2
2 2
20*2.520.83
6
2.5*20166.66
6767 2317
116 /166.66 20.83
116 / 184 /
= =
= =
+ = + =
< =
-
7/23/2019 Structura cadre din beton armat
32/127
`POLITEHNICA UNIVERSITY OF TIMISOARA
CIVIL ENGINEERING FACULTY
Tagea eff
,
,,
2,
* 34.71*0.813.88
2 2* 4.43*0.8 114.1
58.822 2
3
2* * 0.9*1.0*3.8
26.3 / 21.3
3.8 /
0.9
1.0
1.3
= = = =
+= = = =
= = =
=
=
=
=
Cba 2
.
2
3
23 58.82
* 1.76 /2 50
=
f Cba 2
. 2.
2,
* * 0.6*1.0*3.817.5 /
1.3
0.6
1.0
3.8 /1.3
= = =
=
=
==
-
7/23/2019 Structura cadre din beton armat
33/127
`POLITEHNICA UNIVERSITY OF TIMISOARA
CIVIL ENGINEERING FACULTY
.
2
2 2
3
23 13.88
* 0.41 /
2 500.41 / 17.5 /
=
Defec cec
I de e caacec ae
, 1 2 3 = + + +
1 eae adg
def=0.5 f eae adg
def=0.25 f e adg
1 1, (1 ) = +
f2=de ea adg
2 2, (1 )
1.5
0
= +
=
=
, (1 ) = +
g=4.66daN/
-
7/23/2019 Structura cadre din beton armat
34/127
`POLITEHNICA UNIVERSITY OF TIMISOARA
CIVIL ENGINEERING FACULTY
P=100daN/2=50daN
4.66*18 1.44 /
4.66*18 4.43 /
50 *18 13.94
50 18 48
= =
= =
= =
= =
34
34
2.5 *2026.04
12
2.5*20166.66
12
= =
= =
2 21 (1 ) = + +
4 4
1
* *5 51.5* ( * ) ( * ) 0.01
384 384
= + =
4 4
1
* *5 51.25* ( * ) ( * ) 0.15
384 384
= + =
f1=0.01c
f2=0.15c
f=0,15c
fc=0
80 0.53150 50
= = =
,
,
0.01 0.15 0.15 0.31
= + + =
-
7/23/2019 Structura cadre din beton armat
35/127
`POLITEHNICA UNIVERSITY OF TIMISOARA
CIVIL ENGINEERING FACULTY
Ca f Rafe
dace beee afe 80c
bc=13c
c=15c
Lad Eaa
O eg f e afe,ceg,c d
2
* * 0.15*0.15*600 12 /
* 8.3 / *0.80 6.7 /1.35*(12 6.7) 24.75 /
= = =
= == + =
S ad
S=105daN/2
Sd=1.5*105daN/2
Tba aea=0.8
Lad 1 afe
* 24.75*18 23.53 / = =
Lea ad f
127.5*0.80 130.7 / = =
* 130.7*18 124.3 /
124 23.53 147.53 /
= =
= + =
+
-
7/23/2019 Structura cadre din beton armat
36/127
`POLITEHNICA UNIVERSITY OF TIMISOARA
CIVIL ENGINEERING FACULTY
Sea cec
,
,,
2
,
* 34.71*0.813.88
2 2* 4.43*0.8 114.1
58.822 2
3
2* * 0.6*1.0*3.8
17.5 / 21.3
3.8 /
0.6
1.0
1.3
147.83*3221.7
23
170532
= = = =
+= = = =
= = =
=
=
=
=
= =
=
2
/
17053 17500 /
-
7/23/2019 Structura cadre din beton armat
38/127
`POLITEHNICA UNIVERSITY OF TIMISOARA
CIVIL ENGINEERING FACULTY
Ca f e
Sec 1215c
Peae ad
eg
0.12*.15*600 10.8 /
10.8 / *1.35 14.6 /
= =
= =
eg f e ceg ad f e c d
28.3 / 0.15*600*3 294 / + =
Ta eae ad=308daN/
1.35*308 415.8 / = =
Lad f
* 105*3 315 /
1.5*315 472.5 /
= =
= =
( )* .8 /
( )* 8.65 /
= + = 826
= + = 26
Cba 1
Peae +S
-
7/23/2019 Structura cadre din beton armat
39/127
`POLITEHNICA UNIVERSITY OF TIMISOARA
CIVIL ENGINEERING FACULTY
2
2
( )*299 /
8
( )*97 /
8
+ = =
+ = =
Cec f ea eace
2
2
,
,,
2,
2 2
* 826.8*35.15 /
2 2
0.12*0.15 180
3
2
* * 0.6*1.0*3.8 17.5 / 21.3
3.8 /
0.6
1.0
1.3
5.16 / 17.5 /
= = = =
= =
= = =
=
=
=
=
Ce ec 1515 c
I=4218c4
1
2
5.7
5
5.7 5 10.7
12.5
=
=
= + =
< =
Ca f e
P ec 15X15 c
Lad eaa
Peae ad
eg
G=b***
G=0.15*0.15*600*3.9=52.65daN
eg f e f ceg
g,*d1*d2=8.3*2.5*3=62.25daN
-
7/23/2019 Structura cadre din beton armat
41/127
`POLITEHNICA UNIVERSITY OF TIMISOARA
CIVIL ENGINEERING FACULTY
eg f e
g,*d1*d2=0.15*2.5*3=1.125daN
eg f e afe
bc*c**d2=0.13*0.15*600*3=35daN
eg f e
b***d1=0.15*0.15*600*2.5=27daN
Ta ad e f eae ad
Gg=178.12daN
S ad
S*d1*d2=1.05*3*2.5=787daN
G=787daN
Ta ad e (Q)
Q=1.35Gg+1.5G
Q=2405daN=36N
-
7/23/2019 Structura cadre din beton armat
42/127
`POLITEHNICA UNIVERSITY OF TIMISOARA
CIVIL ENGINEERING FACULTY
2
2
34
*
1 8 4 /
* 2 2 5
1 5
1 5
*I 4 2 1 9
1 2
4 2 1 94 .3 3
2 2 53 . 9
0 .2 9
1 5 0
3 9 0 8 9 .6 54 .3 5
3 1 0 07 5
=
=
=
=
= =
=
=
=
=
=
= =
= =
= =
=
= =
> = > =2
2
2
*
3 6 0 04 4 . 2 5 /
0 .3 6 * 2 2 5
1 8 4 /
= 0 .3 6
=
= =
< =
-
7/23/2019 Structura cadre din beton armat
43/127
`POLITEHNICA UNIVERSITY OF TIMISOARA
CIVIL ENGINEERING FACULTY
Ca f e d bae
Cde e ec 201550c
N
-
7/23/2019 Structura cadre din beton armat
44/127
`POLITEHNICA UNIVERSITY OF TIMISOARA
CIVIL ENGINEERING FACULTY
-
7/23/2019 Structura cadre din beton armat
45/127
`POLITEHNICA UNIVERSITY OF TIMISOARA
CIVIL ENGINEERING FACULTY
7.4Deg f e efced ccee a
1.Pedeg
=15c
g,=30c
bg,=30c
2.Lad eaa
Peae ad
a)Ra
g,=*c=0.15*25=3.75N/2
g,d=1.35*g,=1.35*3.75=5.06N/2
b)Sa
g,=/2*ccee=0.18/2*25=2.25/2
g,d=1.35*g,=1.35*2.25=3.03N/2
Fg
gf,=1 N/2
gf,d=1.35*1=1.35N/2
Ta eae ad=9.44N/2
Vaabe ad
-
7/23/2019 Structura cadre din beton armat
46/127
`POLITEHNICA UNIVERSITY OF TIMISOARA
CIVIL ENGINEERING FACULTY
=5 N/2
d=1.5*=1.5*5=7.5N/2
C=C+Cde
C=a(C,b;C,d;10)
Ee Ca XC1
Sca Ca S3(ca edc b 1ebe ab gee)
C,d=10
C,b=a
a=14
C,b=14=>>C=14
Cde=10
C=25
d=d
d=C+/2=32
d=150=32=118
fd=300N/2 (S345)
6
2 2
2
7.52
7.62*10 0.021500*118 *16
1 1 2 0.0
.
21
2.1
7
3
6
= =
= =
=
= = =
S 8/15 A=3.35c2
-
7/23/2019 Structura cadre din beton armat
47/127
`POLITEHNICA UNIVERSITY OF TIMISOARA
CIVIL ENGINEERING FACULTY
6
2
2 2
13.65
13.65*100.03
1500*118 *1
1 1 2 0.031
3.1
7
5
6.6
=
=
=
=
=
=
=
=
S 8/15 A=3.35c2
Ra 2
6
2
2 2
13.73
13.73*100.03
1500*118 *1
1 1 2 0.031
3.1
7
5
6.6
=
=
=
=
=
=
=
=
S 8/15 A=3.35c2
2
2
6
2
6.6
6.6*100.017
1500*118 *16.6
1 1 2 0.018
1.83
7
=
=
=
=
=
=
=
=
S 6/15 A=1.89c2
-
7/23/2019 Structura cadre din beton armat
48/127
`POLITEHNICA UNIVERSITY OF TIMISOARA
CIVIL ENGINEERING FACULTY
2
2
6
2
7.39
6.6*100.019
1500*118 *16.
1 1 2 0.020
2.03
67
=
=
=
=
=
=
=
=
S 8/15 A=3.35c2
-
7/23/2019 Structura cadre din beton armat
49/127
`POLITEHNICA UNIVERSITY OF TIMISOARA
CIVIL ENGINEERING FACULTY
7.5Sab deg
Ca f e ccee ceg ae:
C=C+Cde
C=a(C,b;C,d;10)
a=14
Cde=10
C,d=10 (S3 ca)
=> C=14+10=25
d=C+/2=25+8=31
d=d=20031=169
Cce e :
f e eace efcee: a=3*;200=600,200
=> 200
f e ea efcee : a=3.5*; 300=700;
300=300
e f e ab 6
-
7/23/2019 Structura cadre din beton armat
50/127
`POLITEHNICA UNIVERSITY OF TIMISOARA
CIVIL ENGINEERING FACULTY
e a : 2 2210
+ =
2
2
2
, 0.26 * *
, 0.0013* *
200 25 6 1692
200 25 10 6 1592
2.6 /
345 /
1000
2.6, 0.26* *1000*169 3.313452.6
, 0.26* *1000*59 3.1345
=
= = =
= = =
=
=
=
= =
= = 2
2
2
1
, 0.0013* * 0.0013*1000*159 2.06
, 0.04* * 0.04*1000*2000 80
= =
= =
Refcg f e ab :
Te cac f e ecea efcee aea a ced AVM,fe eee ed cac ga :Te fg e ee eeced :
e ce f e ab ad ccee ca ee dced
e cd ee e
e ad ee dbed e ab face
e face a eed
e ad cba ee defed
a ac aa a ade e aaee f e efced ccee deg ee dced
a f e ecea efcee aea a ce
Te ab efced 2 dec: e gba X&Y dec f AVM
-
7/23/2019 Structura cadre din beton armat
51/127
`POLITEHNICA UNIVERSITY OF TIMISOARA
CIVIL ENGINEERING FACULTY
-
7/23/2019 Structura cadre din beton armat
52/127
`POLITEHNICA UNIVERSITY OF TIMISOARA
CIVIL ENGINEERING FACULTY
7.6Refcg e aea gde
C=C+Cde
C=a(C,b;C,d;10)
Ee Ca XC1
Sca Ca S3(ca edc b 1ebe ab gee)
C,d=10
C,b=a PC52 a=25
C=a(25;20;10)
C=25
Cde=10
C=25+10=35
C=35
d=C+a/2
d=50
d=d=50
d=d
d=60050=550
-
7/23/2019 Structura cadre din beton armat
53/127
`POLITEHNICA UNIVERSITY OF TIMISOARA
CIVIL ENGINEERING FACULTY
Sa 1
,,
6
,
2,
( )
144.6*10300* (550 50)
9.64
=
=
,,
)
6
,
2,
0.5
(
0.5*200.82*10300(550 50)
6.69
=
=
=
S 322 A=11.40c2
S
6,
2 2
2
6,
* * 200.82*10 1016*300*5000.03
300*550 *16.67
1 2 ) 0.038
25
* 21.31
* 1.882*50 94.1
200.82*10 13.3* 300*500
= => = =
= 1.25(1 => =
=
= => = =
< => = = = 2
,
2/3
2, ,
8
0.5* *
0.3 2.55
5.84
=
= => =
= => >
-
7/23/2019 Structura cadre din beton armat
54/127
`POLITEHNICA UNIVERSITY OF TIMISOARA
CIVIL ENGINEERING FACULTY
=>Se 320+218 A=14.5c2
6,
2 2
2
6, 2
,
* * 244*10 1016*300*5000.06
300*550 *16.67
1 2 ) 0.075
25
* 41.25
* 1.882*50 94.1
244*1016.26
* 300*500
= = =
= 1.25(1 => =
=
= => = =
< => = = =
2/3
2, ,
0.5* *
0.3 2.55
5.84
=
= => =
= => >
S 322+218 A=16.48c2
2
,,
6
,
2,
( )
124*10
300* (550 50)
8.26
=
=
=
,,
)
6
,
2,
0.5
(
0.5*236*10
300(550 50)
7.86
=
=
=
-
7/23/2019 Structura cadre din beton armat
55/127
`POLITEHNICA UNIVERSITY OF TIMISOARA
CIVIL ENGINEERING FACULTY
Se 320 A=9.42c2Refcee a e e de
6
,
2 2
2
6, 2
,
* * 236*10 942*300*5000.06
300*550 *16.67
1 2 ) 0.076
25
* 41.8
* 1.882*50 94.1
233*1015.53
* 300*500
= = =
= 1.25(1 => =
=
= => = =
< => = = =
2/3
2, ,
0.5* *
0.3 2.55
5.84
=
= => =
= =>> >
=>Se 322+218 A=16.48c2
-
7/23/2019 Structura cadre din beton armat
56/127
`POLITEHNICA UNIVERSITY OF TIMISOARA
CIVIL ENGINEERING FACULTY
S K
,
2
6
2
2
6, 2
,
* *
233*10 942*300*500
300*550 *16.670.06
1 2 0.076
25* 41.8
* 1.882*50 94.1
233*1015.53
* 300*500
=
=
=
= 1.25(1 => =
=
= => = =
< => = = =
2/3
2, ,
0.5* *
0.3 2.55
5.84
=
= => =
= => >
S 322+218 A=16.48c2
3
-
7/23/2019 Structura cadre din beton armat
57/127
`POLITEHNICA UNIVERSITY OF TIMISOARA
CIVIL ENGINEERING FACULTY
,,
6
,
2,
( )
122*10
300* (550 50)
8.13
=
= =
,,
)
6
,
2,
0.5
(
0.5*231*10
300(550 50)
7.86
=
= =
Se 320 A=9.42c2
Refcee a e e de
6,
2 2
2
6, 2
,
* * 231*10 942*300*500 0.06300*550 *16.67
1 2 0.076
25
* 41.8
* 1.882*50 94.1
231*1015.53
* 300*500
= = =
= 1.25(1 => =
=
= => = =
< => = = =
=
2/3
2, ,
0.5* *
0.3 2.55
5.84
= => =
= => >
S 322+218 A=16.48c2
-
7/23/2019 Structura cadre din beton armat
58/127
`POLITEHNICA UNIVERSITY OF TIMISOARA
CIVIL ENGINEERING FACULTY
6,
2 2
2
6, 2
,
* * 240*10 942*300*5000.06
300*550 *16.67
1 2 0.07525
* 41.25
* 1.882*50 94.1
240*1016.00
* 300 *500
= = =
= 1.25(1 => = =
= => = =
< => = = =
2/3
2, ,
0.5* *
0.3 2.55
5.84
=
= => =
= => >
S 322+218 A=16.48c2
4
-
7/23/2019 Structura cadre din beton armat
59/127
`POLITEHNICA UNIVERSITY OF TIMISOARA
CIVIL ENGINEERING FACULTY
,,
6
,
2,
( )
155*10
300* (550 50)
10.33
=
= =
,,
)
6
,
2,
0.5
(
0.5*263*10
300(550 50)
8.76
=
= =
Se 322 A=11.40c2
6,
2 2
2
6, 2
,
* * 263*10 1140*300*500 0.06300*550 *16.67
1 2 0.075
25
* 41.8
* 1.882*50 94.1
231*1017.53
* 300*500
= = =
= 1.25(1 => =
=
= => = =
< => = = =
2/3
2, ,
0.5* *
0.3 2.55
5.84
=
= => =
= => >
S 322+220 A=17.7c2
-
7/23/2019 Structura cadre din beton armat
60/127
`POLITEHNICA UNIVERSITY OF TIMISOARA
CIVIL ENGINEERING FACULTY
6,
2 2
2
6, 2
,
* * 209*10 942*300*5000.025
300*550 *16.671 2 0.032
25
* 41.25
* 1.882*50 94.1
240*1013.93
* 300 *500
= = =
= 1.25(1 => =
=
= => = =
< => = = =
2/3
2, ,
0.5* *
0.3 2.55
5.84
=
= => =
= => >
S 320+218
A=16.48c2
Sa 1
2
,
,
,
,
1390 1016* *300 28.040.8* * 0.8*300*16.67
* 94.1
( ) 1390*300(550 50)
208.5
( ) 1016*300(550 50)
152.4
= = =
= = =>> > > > > >
Ce 10 c e cca e f e aea bea
-
7/23/2019 Structura cadre din beton armat
68/127
`POLITEHNICA UNIVERSITY OF TIMISOARA
CIVIL ENGINEERING FACULTY
,2
4.5145
173 5.488 145 88 233 233
= => =
= + = + = => =
2
2
2 2
*
233*1000( ) 1.52
* * 300*495
2 2.26
226148
1.52( )
226( ) 1.61 1.52
140* 2*2.26*100
0.01140*300
0.08 / 0.001
0.01 0.001
= = =
12 =
= = =
= = >
= = =
= =
>
0.75*
40
=
=>
Ce 14 c e cca e f e aea bea
Sa 2 cca aea
-
7/23/2019 Structura cadre din beton armat
69/127
`POLITEHNICA UNIVERSITY OF TIMISOARA
CIVIL ENGINEERING FACULTY
,2
4.5145
173 5.488 145 90 235 235
= => =
= + = + = => =
2
2
2 2
*
235*1000( ) 1.58
* * 300*495
2 2.26
226143 14
1.58( )
226( ) 1.61 1.52
140* 2*2.26*100
0.01140*300
0.08 / 0.001
0.
= = =
12 =
= = = =>> =
= = >
= = =
= =
01 0.001
0.75*
40
=
>
=>
-
7/23/2019 Structura cadre din beton armat
70/127
`POLITEHNICA UNIVERSITY OF TIMISOARA
CIVIL ENGINEERING FACULTY
Sa 3
,2
4.5150
180 5.488 135 89 239 239
= => =
= + = + = => =
2
2
2 2
*
239*1000( ) 1.60
* * 300*4952 2.26
226141 14
1.60( )
226( ) 1.61 1.60
140* 2*2.26*100
0.01140*300
0.08 / 0.001
0.
= = =
12 =
= = = =>> =
= = >
= = =
= =
01 0.001
0.75*
40
=
>
=>
-
7/23/2019 Structura cadre din beton armat
71/127
`POLITEHNICA UNIVERSITY OF TIMISOARA
CIVIL ENGINEERING FACULTY
Sa 4
,2
4.5147
176 5.486 147 86 232 232
= => =
= + = + = => =
Sea fce Lgda bea
Sa 1
Mdb,1=Mcaf
*RD=151N *1.2=181.2N
Mdb,2=Mca
*RD=103N *1.2=123.6N
-
7/23/2019 Structura cadre din beton armat
72/127
`POLITEHNICA UNIVERSITY OF TIMISOARA
CIVIL ENGINEERING FACULTY
1 2
,
,
181.2 123.669.27
4.4
107 69 44
67 69.27 136
+ += = =
= =
= + =
Sa 2
Mdb,1=Mcaf
*RD=137N *1.2=164.4N
Mdb,2=Mca
*RD=103N *1.2=123.6N
1 2
,
,
164.4 123.665.45
4.4113 65.45 47.65
65 65.45 130.35
+ += = =
= =
= + =
Sa 3
Mdb,1=Mcaf
*RD=137N *1.2=164.4N
Mdb,2=Mca
*RD=103N *1.2=123.6N
1 2
,
,
164.4 123.6 65.454.4
113 65.45 47.65
62.4 65.45 127.8
+ += = =
= =
= + =
Sa 4
Mdb,1=Mcaf
*RD=137N *1.2=164.4N
Mdb,2=Mca *RD=103N *1.2=123.6N
1 2
,
,
164.4 123.665.45
4.4
113 65.45 47.65
60.4 65.45 125.8
+ += = =
= =
= + =
-
7/23/2019 Structura cadre din beton armat
73/127
`POLITEHNICA UNIVERSITY OF TIMISOARA
CIVIL ENGINEERING FACULTY
Sa 5
Mdb,1=Mcaf
*RD=137N *1.2=164.4N
Mdb,2=Mca
*RD=103N *1.2=123.6N
1 2
,
,
164.4 123.665.45
4.4
113 65.45 47.65
62.6 65.45 128
+ += = =
= =
= + =
Sa 6
Mdb,1=Mcaf
*RD=137N *1.2=164.4N
Mdb,2=Mca
*RD=103N *1.2=123.6N
1 2
,
,
164.4 123.665.45
4.4
113 65.45 47.65
64.6 65.45 130
+ += = =
= =
= + =
Sa 7
Mdb,1=Mcaf
*RD=151N *1.2=181N
Mdb,2=Mca
*RD=103N *1.2=123.6N
1 2
,
,
164.4 123.6659
4.4113 69 44
66.7 69 136
+ += = =
= =
= + =
Sa 8
-
7/23/2019 Structura cadre din beton armat
74/127
`POLITEHNICA UNIVERSITY OF TIMISOARA
CIVIL ENGINEERING FACULTY
Mdb,1=Mcaf
*RD=137N *1.2=164.4N
Mdb,2=Mca
*RD=103N *1.2=123.6N
1 2
,
,
164.4 123.665.45
4.4
115 65.45 50
69 65.45 135
+ += = =
= =
= + =
Sa 1
Mdb,1=Mcaf
*RD=103N *1.2=123.6N
Mdb,2=Mca
*RD=137N *1.2=164.4N
1 2
,
,
164.4 123.6 65.454.4
67 65.45 1.5
107 65.45 172
+ += = =
= =
= + =
Sa 2
Mdb,1=Mcaf
*RD=103N *1.2=123.6N
Mdb,2=Mca
*RD=151N *1.2=181.2N
1 2
,
,
181 123.669.27
4.4
64.9 69.27 3.37
113 69.27 182.27
+ += = =
= =
= + =
-
7/23/2019 Structura cadre din beton armat
75/127
`POLITEHNICA UNIVERSITY OF TIMISOARA
CIVIL ENGINEERING FACULTY
Sa 3
Mdb,1=Mcaf
*RD=103N *1.2=123.6N
Mdb,2=Mca
*RD=137N *1.2=164.4N
1 2
,
,
164.4 123.665.5
4.4
62.4 69.27 3.1
113 65.5 178.5
+ += = =
= =
= + =
Sa 4
Mdb,1=Mcaf
*RD=103N *1.2=123.6N
Mdb,2=Mca
*RD=137N *1.2=164.4N
1 2
,
,
164.4 123.665.5
4.4
60.4 69.27 5.1
113 65.5 178.5
+ += = =
= =
= + =
Sa 5
Mdb,1=Mcaf
*RD=103N *1.2=123.6N
Mdb,2=Mca
*RD=137N *1.2=164.4N
1 2
,
,
164.4 123.665.5
4.4
62.66 69.27 2.84
113 65.5 178.5
+ += = =
= =
= + =
Sa 6
Mdb,1=Mcaf
*RD=103N *1.2=123.6N
-
7/23/2019 Structura cadre din beton armat
76/127
`POLITEHNICA UNIVERSITY OF TIMISOARA
CIVIL ENGINEERING FACULTY
Mdb,2=Mca
*RD=137N *1.2=164.4N
1 2
,
,
164.4 123.665.5
4.464.6 69.27 0.9
113 65.5 178.5
+ += = =
= =
= + =
Sa 7
Mdb,1=Mcaf
*RD=103N *1.2=123.6N
Mdb,2=Mca
*RD=151N *1.2=181N
1 2
,
,
164.4 123.669.27
4.4
66.7 69.27 2.57
115 69.27 182
+ += = =
= =
= + =
Sa 8
Mdb,1=Mcaf
*RD=103N *1.2=123.6N
Mdb,2=Mca *RD=137N *1.2=164.4N
1 2
,
,
164.4 123.665.5
4.4
69 65.5 3.5
115 65.5 181
+ += = =
= =
= + =
-
7/23/2019 Structura cadre din beton armat
77/127
`POLITEHNICA UNIVERSITY OF TIMISOARA
CIVIL ENGINEERING FACULTY
1/3, ,
,
,
3/2 1/2 3/2 1/2,
,
* (100* ) * *
0.180.12
200 2001 1 1.6 2
45064
0.035 * * * * 0.0035 *1.6 * 25 * 250 *450 40
* * / ( )
0.9* 0.9*450 405
=
= =
= + = + =
< / 4;150 ; 7 )
/ 4 125
7 126 12
=
= =>>
Ce =10c(cc e)
-
7/23/2019 Structura cadre din beton armat
78/127
`POLITEHNICA UNIVERSITY OF TIMISOARA
CIVIL ENGINEERING FACULTY
,2
4.4 0.85 143.2177.5 4.4
88 143.2 3.5 146.7 148
= => =
= + = + = => =
2
2
2 2
*
147*1000( ) 1.44
* * 300*495
2 2.26
226156
1.44( )
226( ) 1.5 1.44
150* 2*2.26*100
0.012150*250
0.08 / 0.0010.012 0.001
= = =
12 =
= = =
= = >
= = =
= =>
0.75*
40
=
=>
-
7/23/2019 Structura cadre din beton armat
79/127
`POLITEHNICA UNIVERSITY OF TIMISOARA
CIVIL ENGINEERING FACULTY
7.6Refcee f c
31690*100.26 0.5
* * 600*600*16.67
= = = = =
= = =
= = =
> => = =
=
=
=>>M efcee 522 A=19c2
P II
-
7/23/2019 Structura cadre din beton armat
82/127
`POLITEHNICA UNIVERSITY OF TIMISOARA
CIVIL ENGINEERING FACULTY
, 2 ,
3
2
*2
,
*
0.01
* * 36*
1052*10 131.470.8* * 0.8*600*600
* 1.882 *50 94.1
(0.5* 0.4* )16.70
(0.5* )
135
1052
=
= => = =
= = =
= = =
> => = =
=
=2300 /
=
=>>M efcee 522 A=19c2
P III
, 2 ,
3
2
*2
,
*
0.01
* * 36*
650*1081.23
0.8* * 0.8*600*600* 1.882 *50 94.1
(0.5* )4.6
(0.5* )
128
650
30
=
= => = =
= = =
= = =
< => = =
=
=
= 20 /
=>>M efcee 522 A=19c
2
-
7/23/2019 Structura cadre din beton armat
83/127
`POLITEHNICA UNIVERSITY OF TIMISOARA
CIVIL ENGINEERING FACULTY
P IV
, 2 ,
3
2
*2
,
*
0.01
* * 36*
650*1081.23
0.8* * 0.8*600*600
* 1.882 *50 94.1
(0.5* )1.16
(0.5* )
146
6193
=
= => = =
= = =
= = =
< => = =
=
== 200 /
=>>M efcee 522 A=19c2
P V
, 2 ,
3
2
*2
,
*
0.01
* * 36
*650*10
27.490.8* * 0.8*600*600
* 1.882 *50 94.1
(0.5* )6.25
(0.5* )
47
220
300
=
= => = =
= = =
= = =
< => = =
=
=
=
2
/
=>>M efcee 522 A=19c2
-
7/23/2019 Structura cadre din beton armat
84/127
`POLITEHNICA UNIVERSITY OF TIMISOARA
CIVIL ENGINEERING FACULTY
P VI
, 2 ,
3
2
*2
,
*
0.01
* * 36*
189*1023.62
0.8* * 0.8*600*600
* 1.882 *50 94.1
(0.5* )9.72
(0.5* )
73
189300
=
= => = =
= = =
= = =
< => = =
=
== 2/
Ca f e e caabe bedg e e
c
P I
.
1083
135.54
(0.5 0.4 ) * (0.5 )
546.2
=
=
> =>> = +
=
P II
.
1052
131.47
(0.5 0.4 ) * (0.5 )
530.2
=
=
> =>> = +
=
-
7/23/2019 Structura cadre din beton armat
85/127
`POLITEHNICA UNIVERSITY OF TIMISOARA
CIVIL ENGINEERING FACULTY
P III
.
650
81.23( * )(0.5 )
432.5
=
=< =>> = +
=
P IV
.
620
77.35
( * )(0.5 )
425
=
=
< =>> = +
=
P IV
.
220
27.49
( * )(0.5 )
325
=
=
< =>> = +
=
P IV
.
189
23.69
( * )(0.5 )318
=
=
< =>> = + =
-
7/23/2019 Structura cadre din beton armat
86/127
`POLITEHNICA UNIVERSITY OF TIMISOARA
CIVIL ENGINEERING FACULTY
C efcee Y dec(gda gde)
* * ( )
19481636
1.2
=
==
=
Rd=1.3(DCH)
-
7/23/2019 Structura cadre din beton armat
87/127
`POLITEHNICA UNIVERSITY OF TIMISOARA
CIVIL ENGINEERING FACULTY
*
*
1.3*1.2*
1.56*
=
=
* * ( )
1948
1646
1.2
=
=
=
=
Rd=1.3(DCH)
*
*
1.3*1.2*
1.56*
=
=
Md*
daga
-
7/23/2019 Structura cadre din beton armat
88/127
`POLITEHNICA UNIVERSITY OF TIMISOARA
CIVIL ENGINEERING FACULTY
P I
, 2 ,
3
2
*2
,
*
0.01
* * 36*
1083*10135.54
0.8* * 0.8*600*600
* 1.882 *50 94.1
(0.5* 0.4* )6.56
(0.5* )
217
1083
=
= => = =
= = =
= = =
> => = =
=
=
=>>M efcee 522 A=19c2
P II
, 2 ,
3
2
*2
,
*
0.01
* * 36*
1083*10131.54
0.8 * * 0.8 *600 * 600
* 1.882 *50 94.1
(0.5* 0.4* )14.43
(0.5* )
152
1052
=
= => = =
= = =
= = =
> => = =
=
=
=>>M efcee 522 A=19c2
-
7/23/2019 Structura cadre din beton armat
89/127
`POLITEHNICA UNIVERSITY OF TIMISOARA
CIVIL ENGINEERING FACULTY
P III
, 2 ,
3
2
*2
,
*
0.01
* * 36*
650*1081.23
0.8 * * 0.8 *600 * 600
* 1.882 *50 94.1
(0.5* )24.66
(0.5* )
144
650
=
= => = =
= = =
= = =
< => = =
=
=
= 2300 /
=>>M efcee 522 A=19c2
P IV
, 2 ,
3
2
*2
,
*
0.01
* * 36*
650*1077.35
0.8 * * 0.8 *600 * 600
* 1.882 *50 94.1
(0.5* )
1.10(0.5* )
53
220
300
=
= => = =
= = =
= = =
< => = =
=
=
= 2/
=>>M efcee 522 A=19c2
-
7/23/2019 Structura cadre din beton armat
90/127
`POLITEHNICA UNIVERSITY OF TIMISOARA
CIVIL ENGINEERING FACULTY
P V
, 2 ,
3
2
*2
,
*
0.01
* * 36*
650*1027.49
0.8 * * 0.8 *600 * 600
* 1.882 *50 94.1
(0.5* )0.26
(0.5* )
53
220
30
=
= => = =
= = =
= = =
< => = =
=
=
= 20 /
=>>M efcee 522 A=19c2
P VI
, 2 ,
3
2
*2
,
*
0.01
* * 36*
650*1023.7
0.8 * * 0.8 *600 * 600
* 1.882 *50 94.1
(0.5* )
4.63(0.5* )
82
189
300
=
= => = =
= = =
= = =
< => = =
=
=
= 2/
=>>M efcee 522 A=19c2
-
7/23/2019 Structura cadre din beton armat
91/127
`POLITEHNICA UNIVERSITY OF TIMISOARA
CIVIL ENGINEERING FACULTY
1 1
1
22 2
2
*
1.3*537 698
* * 1;
=
= =
=
d=1.3 (c bae DCH cd)
Se dec=>>
2
2
2
2
2
390
963
0.40
1.3*531*0.40 277
=
=
=
= =
1 2 698.1 277 3043.2
/ 2 3.2
+ += = =
= =
Mdc2=277N
-
7/23/2019 Structura cadre din beton armat
92/127
`POLITEHNICA UNIVERSITY OF TIMISOARA
CIVIL ENGINEERING FACULTY
2
2
3
2
390
425 325 750
0.52
1.3* 425* 0.40 264
277
=
= + =
=
= =
=
2 3 264 277 1872.9
2.9
+ += = =
= =
Mdc2=277N
3
2
264
1.2*318 382
=
= =
2 3 264 318 2002.9
2.9
+ += = =
= =
Sea fce daga
-
7/23/2019 Structura cadre din beton armat
93/127
`POLITEHNICA UNIVERSITY OF TIMISOARA
CIVIL ENGINEERING FACULTY
P A
2
*
2
304*1000( ) 2.00
309*495
309 /0.9 * 495
600 50 550
= = =
== =
= = =
c=a1.5c;c/6;600
c=a90;54;60
c=90c
c/c=2.9/0.6=4.83>3
,a
-
7/23/2019 Structura cadre din beton armat
94/127
`POLITEHNICA UNIVERSITY OF TIMISOARA
CIVIL ENGINEERING FACULTY
,a>
= = >
= = =
=
0.005>
2
2
2 2
*
200*1000( ) 1.30
* * 309*495
0 ( ) 4*0.785 3.14
314230
1.30( )
12
314( ) 2.61 1.30
120* 4*3.14*100
0.04120*250
0.005
0.
= = =
1 = =
= = =
=>>
= = >
= = =
=
04 0.005>
-
7/23/2019 Structura cadre din beton armat
95/127
`POLITEHNICA UNIVERSITY OF TIMISOARA
CIVIL ENGINEERING FACULTY
7.7Ca f e de
Te de a e de
1.F cae e e ec ad a a ef g dec
2
2
3
( )*
3 22 2 18 16.48
3 20 6.42
56
1.2* (1648 942)*300 56*10877
= +
= + =
= =
=
= + =
600*877 877
600
= = =
-
7/23/2019 Structura cadre din beton armat
96/127
`POLITEHNICA UNIVERSITY OF TIMISOARA
CIVIL ENGINEERING FACULTY
3
1 * * *
250.6(1 ) 0.54
250
643*100.16
* * 600 *600 *16.67
( ; ( 0.5 ))(600;600)
600
0.160.54 1 *600*600*16.67
0.542718
877 2718
= =
= = =
= +=
=
<
3
2
0.8( )* (1 0.8 )
644*100.11
600*600*16.67
0.8* (1648 942)*300(1 0.8*0.11) 18.34309
+ =
= =
+ = =
-
7/23/2019 Structura cadre din beton armat
97/127
`POLITEHNICA UNIVERSITY OF TIMISOARA
CIVIL ENGINEERING FACULTY
2*4*0.785
18.84 *4*0.785
6
=
=
=
1 2
1 2
2
2
2( / )
3600 46 46 509
600 57 55 488
2 508*1844*
3 488
12.79
19.00
= = =
= = =
=
2.Secd cae e e ec ad a e dec f g ef
-
7/23/2019 Structura cadre din beton armat
98/127
`POLITEHNICA UNIVERSITY OF TIMISOARA
CIVIL ENGINEERING FACULTY
2
2
3
( )*
3 22 2 18 16.48
3 20 6.42
56
1.2* (1648 942)*300 56*10
877
= +
= + =
= =
== +
=
Veca ea fce
600*877 877
600
= = =
3
1 * * *
250.6(1 ) 0.54
250
649*100.10
* * 600 *600 *16.67
( ;( 0.5 ))
(600;600)
6000.10
0.54 1 *600*600*16.670.54
2925
877 2925
= =
= = =
= +
=
=
<
-
7/23/2019 Structura cadre din beton armat
99/127
`POLITEHNICA UNIVERSITY OF TIMISOARA
CIVIL ENGINEERING FACULTY
3
2
0.8( )* (1 0.8 )
644*100.11
600*600*16.670.8* (1648 942)*300(1 0.8*0.11)
18.34309
+ =
= =
+ = =
2*4*0.785
18.84 *4*0.785
6
=
=
=
-
7/23/2019 Structura cadre din beton armat
100/127
`POLITEHNICA UNIVERSITY OF TIMISOARA
CIVIL ENGINEERING FACULTY
O e ca ee e geecca d a de deged a bdg 4
a ad 8 ba. Te c ec 6060 c: .S caacec ae defed be
F1.
Te bdg a degd ee,gd ee ad a f ee.
Fce acg e c ae:
N= 1700 N
M =138 N
V=67 N
M=131 N
V=60 KN
Te fda a e fg caacec:
2
3
48 /
12
18.5 /
=
=
=
,
0.4
3
9.38
=
=
=
B
-
7/23/2019 Structura cadre din beton armat
101/127
`POLITEHNICA UNIVERSITY OF TIMISOARA
CIVIL ENGINEERING FACULTY
Te cd f deeg e fda de ae: Fda de;
D =3.0
:
We ce :
B=2.4
L=2.4
bc=1.4
c=1.4
-
7/23/2019 Structura cadre din beton armat
102/127
`POLITEHNICA UNIVERSITY OF TIMISOARA
CIVIL ENGINEERING FACULTY
We ae fe , g ac de (I>20% ; e0.65 => =0.5.
A >1.3 => =0.8 .
D= 3.40
B = +CB+CD
K=0.05 Cee
CB= *K1(B1)
CB=279*0.005(2.41)
CB=19.53
( 2)
18.5*0.4
18.5
=
=
=
=> =279+19.53+18.5=311
-
7/23/2019 Structura cadre din beton armat
103/127
`POLITEHNICA UNIVERSITY OF TIMISOARA
CIVIL ENGINEERING FACULTY
2 2
6 61, 2,3,4 =
* * *
G = L*B*H* + *** = 2.4*2.4*0.8*24+1.4*1.4*0.5*25 =135
M 138 = = = 0.07
N+ G 1690 +107.32135
M 131 = = = 0.07
N+ G 1690 135+
A A 2 2
2 2
1 2 1
=0.4
=3
=9.38
=1.7*18.5=31.45 /2
=48 /2
B/=2.2/2.2=1 =>
,=1.3
=0.6
= 18.5*2.26*0.4*0.6+3*1.3*31.45+48*9.38*1.3=718 /2
-
7/23/2019 Structura cadre din beton armat
105/127
`POLITEHNICA UNIVERSITY OF TIMISOARA
CIVIL ENGINEERING FACULTY
= 2428 317 317 206
317 /4
+ + +
=
< *
1
2
0
01=+G=1690+1.4*1.4*0.5*25=1715
01=+*=138+67*0.5=171.5 /2
01=+*=131+60*0.5=161 /2
= 01 171.5
0.101 1715.5
= =
= 01 161 0.0901 1714.5
= =
1
-
7/23/2019 Structura cadre din beton armat
106/127
`POLITEHNICA UNIVERSITY OF TIMISOARA
CIVIL ENGINEERING FACULTY
1(1 /)
0.000/ 0.001. /
22
01 6 1714.5 6*0.1(1 ) (1 ) 656 /* 1.4 1.4
= =
0.00(100 /)
22
01 6 1714.5 6*0.09(1 ) (1 ) 1212 /
* 1.4 1.4
+ = + =
(1 /)
0.00
22
01 6 1714.5 6*0.09(1 ) (1 ) 55 /
* 1.4 1.4
= =
0.00(100 /)
0 21 2 1250 656
( ) 2 (1.4 0.4) 656 658 /1.4
+ = + =
=()/2=0.4
=()/2=0.4
0 23 4 1212 543
( ) 4 (1.4 0.4) 543 1021 /1.4
+ = + =
21 2 (1250 656) / 2 953 /2
+= = + =
23 4 (1212 543) / 2 878 /2
+= = + =
=2 2 2 20.4 0.4
0* ( 1 0)* 1.4*658* (1250 658)* 117.82 3 2 3
+ = + =
-
7/23/2019 Structura cadre din beton armat
107/127
`POLITEHNICA UNIVERSITY OF TIMISOARA
CIVIL ENGINEERING FACULTY
=**/1.**0./. /
(+/)0(.+/).
0
10
0.
00 .
00 /
62117.8*10 9.86
0.875* 0 * 0.875*455*300
= = =
714, A=10.78 2
6298.24*10 8.60
0.875* 0 * 0.875*435*300
= = =
614, A=9.24 2
10780.16%
* 0 1400 * 455
= = =
9240.13%
* 0 1400*435
= = =
2*(C+/2)=(1408.4)/6=21
-
7/23/2019 Structura cadre din beton armat
108/127
`POLITEHNICA UNIVERSITY OF TIMISOARA
CIVIL ENGINEERING FACULTY
=> 714/21
2*(C+/2)=(1408.4)/6=21
=>614/21
C20/20
C52
=0.6
=0.3
=6
=2.9 * 0.3 *12 /3*=7.97
=(*2)/8=(7.97*62)/8=35.8
=*=7.97*6=47.82
6
2 2
2
35.86*10
0.02* * 300*555 13.33
1 1 2* 1 1 2*0.02 0.03
13.33* * 0.03*300*555 2.21
300
= = =
= = =
= = =
i
-
7/23/2019 Structura cadre din beton armat
109/127
`POLITEHNICA UNIVERSITY OF TIMISOARA
CIVIL ENGINEERING FACULTY
==50(C+/2)=55.5
=20/1.5=13.33
2.20.5 0.5*345
=>
>0.0027
316 A=6.03 2
6030.006 0.003
* 300 *555
= = = >
: =6
=>=8
0.75 40 =>
* 2*50.30.0016
* 400 *300
0.08 200.001
345
= = =
= =>=>8/40
-
7/23/2019 Structura cadre din beton armat
110/127
`POLITEHNICA UNIVERSITY OF TIMISOARA
CIVIL ENGINEERING FACULTY
-
7/23/2019 Structura cadre din beton armat
111/127
`POLITEHNICA UNIVERSITY OF TIMISOARA
CIVIL ENGINEERING FACULTY
-
7/23/2019 Structura cadre din beton armat
112/127
`POLITEHNICA UNIVERSITY OF TIMISOARA
CIVIL ENGINEERING FACULTY
P D+P+E SPA.
P , :
, .
DOCTEC.
(, , ), DCL.
. : , ,
, ( , , ,
).D :I II III .
P MICROSOFT PROJECT, DOCTEC.A :
GANTT
-
7/23/2019 Structura cadre din beton armat
113/127
`POLITEHNICA UNIVERSITY OF TIMISOARA
CIVIL ENGINEERING FACULTY
( , )
360 . GANTT : C = 0.73. A . R 27 .
P , .
A : . . S (, ), (, , ), (, , ,, ).
. ,
.
, . N ,
.
-
7/23/2019 Structura cadre din beton armat
114/127
`POLITEHNICA UNIVERSITY OF TIMISOARA
CIVIL ENGINEERING FACULTY
8.2Idca ececc
1.Cefce de aaae
( * ) 55730.73 0.65
* . 360*21
= = >
A e VM
1 4 4
1 2 2
30 13 390
33 20 660
33 20 660
33 20 660
16 8 128
2 2 4
14 9 126
14 9 126
14 9 126
46 18 828
13 14 182
13 11 143
7 5 35
28 8 224
20 8 160
10 10 100
3 5 15
4573
Daa eece De=361 e
-
7/23/2019 Structura cadre din beton armat
115/127
`POLITEHNICA UNIVERSITY OF TIMISOARA
CIVIL ENGINEERING FACULTY
Na a de c=26
Cefce de aaae=0.72
2. ( )
I=2.995.668 e
Idc de c e aeae
Ce
2583000 202.4 /2880
5830000.19 /
2995668
= = =
= = =
Aaa
2163070
57 /2880
1630700.054 /
2995668
= = =
= = =
Caada
228088 9.75 /2880
280880.009 /
2995668
= = =
= = =
3.
D=360 e
-
7/23/2019 Structura cadre din beton armat
116/127
`POLITEHNICA UNIVERSITY OF TIMISOARA
CIVIL ENGINEERING FACULTY
4.
S=960 2
5.
Sd=2880 2
6.
POT=12%
7.
CUT=0.49
8.
2 22995668 1040 / 236 /2880
= = = =
9.
( )
2883244
1784 /
31725
162134 /
= +
+ =
=
=
=
-
7/23/2019 Structura cadre din beton armat
117/127
`POLITEHNICA UNIVERSITY OF TIMISOARA
CIVIL ENGINEERING FACULTY
Sab e e degdeeefcee aea Y dec
B efcee Y dec
-
7/23/2019 Structura cadre din beton armat
118/127
`POLITEHNICA UNIVERSITY OF TIMISOARA
CIVIL ENGINEERING FACULTY
T efcee aea X de
Befcee X dec
-
7/23/2019 Structura cadre din beton armat
119/127
`POLITEHNICA UNIVERSITY OF TIMISOARA
CIVIL ENGINEERING FACULTY
Sab e e a f:T efcee Y dec
Sab e a f:B efcee Y dec
-
7/23/2019 Structura cadre din beton armat
120/127
`POLITEHNICA UNIVERSITY OF TIMISOARA
CIVIL ENGINEERING FACULTY
Sab e a f:T efcee X dec
Sab e a f:B efcee X dec
-
7/23/2019 Structura cadre din beton armat
121/127
`POLITEHNICA UNIVERSITY OF TIMISOARA
CIVIL ENGINEERING FACULTY
Sa efcee
Ra 1
Ra 2
-
7/23/2019 Structura cadre din beton armat
122/127
`POLITEHNICA UNIVERSITY OF TIMISOARA
CIVIL ENGINEERING FACULTY
Taea gde
Lgda gde
-
7/23/2019 Structura cadre din beton armat
123/127
`POLITEHNICA UNIVERSITY OF TIMISOARA
CIVIL ENGINEERING FACULTY
-
7/23/2019 Structura cadre din beton armat
124/127
`POLITEHNICA UNIVERSITY OF TIMISOARA
CIVIL ENGINEERING FACULTY
Bedg e C
Aa fce c f cba S7
-
7/23/2019 Structura cadre din beton armat
125/127
`POLITEHNICA UNIVERSITY OF TIMISOARA
CIVIL ENGINEERING FACULTY
Aa fce c cba cag S8
-
7/23/2019 Structura cadre din beton armat
126/127
`POLITEHNICA UNIVERSITY OF TIMISOARA
CIVIL ENGINEERING FACULTY
-
7/23/2019 Structura cadre din beton armat
127/127
`POLITEHNICA UNIVERSITY OF TIMISOARA
CIVIL ENGINEERING FACULTY