1 David Santoyo Petal Locking Points: AUW Nov 2014 Petal Locking Points.
Strip Module WG sessions at May AUW
description
Transcript of Strip Module WG sessions at May AUW
Strip Module WG sessions at May AUW
Location, Times at AUW• We have 14:00-18:00 on Monday, May 13th for “ITK-SC
Strip Modules (Barrel and Forward)” in 30-7-018 Kjell Johnsen Auditorium– So far I know of the following requests for talks:
• ABC130 submission (20’?)• HCC status (20?)• Database for modules (15’?)• First look at production rates/QA (15’?)• Status of Petalet (30’)• Towards the ABC130 hybrid of the SuperModule (15’)• Electrical performance of the 8-module ABC250 SuperModule
(15’)
• So far roughly 80 minutes still available for talks/discussion
Last time at CERN (3 ½ hours)• 30’ Status of ABCn130 • 30’ Status of HCC• 30’ ASIC submission scenarios and
timescale discussion• 30’ Break
• 20’ 250 nm stave module status• 20’ 130 nm stave hybrid/module
plans• 20’ Petal hybrids/module status• 20’ Status of supermodule, ABC130
hybrid, production in industry• 10’ G&A Engineering• 10’ Teledyne Microelectonics• 10’ Status of DB development• 10’ Lorentz angle measureents
Could add 250 nm and 130 nm stave hybrid/module status (30’?)
Is there anything else? Would people like a status report on plans to test/probe ABC130?