Transcript of Strengthening the White River Watershed: CRO Retreat Pecha Kucha
Mary RussExecutive Director
White River Partnership
Strengthening the White River Watershed
Stories from the Ground
WHITE
State of Vermont
Middle Branch
First Branch
Upper White River
Middle White RiverLower White River
Third Branch
White River Partnership:
Hurricane Flats Farm Toe Wood Project
Mary Russ, Executive Director
Restoration
Data collection
Bringing people and communities together to improve the long-term health of the White River
Volunteer coordination
Education
Greenhouses
Floodwater path
5-home development
Floodwater path at Hurricane Flats Farm in South Royalton, VT
House & barn
Hurricane Flats Farm during Irene, looking east
Greenhouses
5-home development
Project area at Hurricane Flats Farm in South Royalton, VT
House & barn
Post-flood holes
Floodwater path
Debris piles
Photo: WRPUpstream hole, before and after fill
Post-flood debris pile
Toe Wood Project cross-section view
Scour log
“Deadman”Root-wad log
Toe Wood Project top-down view
River
Scour log
Root-wad logs
Cabled “deadman”
1. Removing fill from upstream hole 2. Placing scour log parallel to bank
3. Placing root-wad perpendicular to bank 4. Securing “deadman” to root-wads
VYCC installs willow fascines & ice fenders
VYCC pounds willow stakes to hold soil lift
Upstream site during November 2012 high water
Upstream site during January 2013 thaw
Planting riparian trees with Pomfret Elementary School students in 2013
Riparian “river-side” buffer = native trees and shrubs growing on top of bank provide multiple benefits
Minimum width = 35 feet
Upstream project site in July 2013
Upstream site in May 2013 Downstream site completed in August 2013
Downstream site in August 2014
Elements of a successful watershed restoration project
• Diverse partners• Grant funders• Individual donors• Technical assistance• Volunteers• Willing landowner
• Efficient use of resources• Donated design• Free/donated materials• Local contractor• Volunteer labor
• Multiple benefits• Flood resilience• Habitat• Water quality• Educational opportunity
EXAMPLE 2: Replacing 6 flood-damaged culverts in Rochester, VT
AFTER Irene
Nason Brook at Woodlawn Cemetery culvert
BEFORE Irene
Nason Brook at Moose Run: BEFORENason Brook at Woodlawn Cemetery: BEFORE
Nason Brook at Woodlawn Cemetery: AFTER Nason Brook at Moose Run: AFTER
EXAMPLE 3: Creating 10 buyout/river access parks in 8 watershed towns
205 N. Main St, Rochester - BEFORE
205 N. Main St, Rochester - AFTER
THANK YOU! Please visit www.whiteriverpartnership.org for more information
Buyout/public access project partners:
CDBG–Disaster Recovery
FEMA
NPS Rivers, Trails & Conservation Program
Town of Bethel
Town of Braintree
Town of Granville
Town of Pittsfield
Town of Rochester
Town of Royalton
Town of Sharon
Town of Stockbridge
Two Rivers-Ottauquechee Regional Comm.
Vermont Community Development Program
Vermont Housing & Conservation Board
Vermont River Conservancy
Vermont Watershed Grants Program
Hurricane Flats/culvert project partners:
Clean Water Future
Davis Conservation Foundation
Eastern Brook Trout Joint Venture Program
FEMA
Greater Upper Valley Chapter of Trout Unlimited
Hurricane Flats Farm
National Forest Foundation
Orvis/Trout Unlimited
Pomfret/Sharon Elementary Schools
State of Vermont
Town of Rochester
TR Fellows Engineering
US Fish & Wildlife Service
US Forest Service
Vermont Agency of Natural Resources
Vermont Youth Conservation Corps