Strengthening Flood Risk Information Management

37
Strengthening Flood Risk Information Management Bambang Surya Putra Head of Informatics and Controlling Division Disaster Management Agency, Jakarta, Indonesia Presented by Iwan Gunawan, Sr. DRM Specialist, the World Bank - Jakarta Case Study of “Last Mile” Investment : Jakarta, Indonesia

Transcript of Strengthening Flood Risk Information Management

Page 1: Strengthening Flood Risk Information Management

Strengthening Flood Risk

Information Management

Bambang Surya Putra

Head of Informatics and Controlling Division

Disaster Management Agency, Jakarta, Indonesia

Presented by Iwan Gunawan, Sr. DRM Specialist, the World Bank - Jakarta

Case Study of “Last Mile” Investment : Jakarta, Indonesia

Page 2: Strengthening Flood Risk Information Management

Outline

• Jakarta flood risk and impacts to the communities

• Flood risk information management and system

• What the “Last-mile” means to Jakarta

• Challenges and Opportunities

Page 3: Strengthening Flood Risk Information Management

Jakarta & Flood

Page 4: Strengthening Flood Risk Information Management

Jakarta Overview

662 km2 wide

Passed by

13 rivers 40 % land below sea level

Extreme rain fall

360 mm/day

Land Subsidence

0,5-17 cm/y Density

16.000/km2

Low Awareness (waste mgmt,

informal settlement)

10% Green Open Space

Page 5: Strengthening Flood Risk Information Management

Flood Comparison 2013 vs 2014

Page 6: Strengthening Flood Risk Information Management

Why it becomes problem?

Kelapa Gading Jakarta

Page 7: Strengthening Flood Risk Information Management

Flood Impacts

• ~$500 million in 2007 following 2 days of torrential rains

• ~$600 million in 2013 following 3 days of rains and failed e

mbankments

The city and its residents need to adapt to more frequent and severe flooding

Page 8: Strengthening Flood Risk Information Management

The System

Page 9: Strengthening Flood Risk Information Management

Detailed Mapping of Administrative Boundary to facilitate accurate inundation report

Hierarchy of Administrative unit

(~response mechanism)

Mapping Series of Events

Page 10: Strengthening Flood Risk Information Management

Disaster Information Management System ( DIMS )

Page 11: Strengthening Flood Risk Information Management

Emergency Operation Centre

• Controlled by BPBD

• Operation : 24/7

• Integrated with Related

Agency : Fire Dept, Water

Management, Social,

Health, Sanitation,

Transportation, Industry

and Commerce, Safety and

Security

Page 12: Strengthening Flood Risk Information Management

DIMS

Existing

Architecture

Disaster Management System

in Jakarta

12

InaSafe

JakSafe

RIM

PetaJakarta

InaWare

DIBI

GIS.BPBD

bpbd.jakarta.go.id JSC

Smart City

Jakarta Open Data

DWS

SMS

Broadcast

JAFIP GeoData

Collect

Tweet @PetaJKT

pasangmata

SocMed

& Any

RASOR

Regional Disaster Data Global Disaster Data

JFEWS

Deltares

Page 13: Strengthening Flood Risk Information Management

System Collaboration

for Better Result

RISK

InaSafe

JakSafe

DIMS

RIM

PetaJakarta

JFEWS

RASOR

Page 14: Strengthening Flood Risk Information Management

Planning

Page 15: Strengthening Flood Risk Information Management

Flood 2015

Page 16: Strengthening Flood Risk Information Management

Prediction based on Hystorical Flood Events

16

Page 17: Strengthening Flood Risk Information Management

Prediksi Curah Hujan Dasarian di Wilayah Jakarta dan Bogor

Dasarian 3, Februari 2016

Jakarta: local rain 280-400

mm/10-day

Inundation Risk VERY HIGH

Bogor: Upstream Flow Alert 1

mm Pkaret Gate : Alert 1

Manggarai Gate : Alert 1

Upper Sunter Gate Alert 2

0.

100.

200.

300.

400.

2015 2016

Jakarta

0.

75.

150.

225.

300.

375.

2015 2016

Bogor

Associating Rainfall-Runoff to Impacts ..but dynamic could change with rapid land use changes and uncoordinated measures…

Page 18: Strengthening Flood Risk Information Management

Contingency Planning Process

18

-People Affected

-Infrastructures / Facilities Impacted

-Resources have to prepare

-Logistic Needed

Data Calculation

Commitment w/ Stakeholder

Contingency Planning

Powered by

Page 19: Strengthening Flood Risk Information Management

Monitoring

Page 20: Strengthening Flood Risk Information Management

Extreme Rainfall in Jakarta Jan-Feb 2015

RainFall Over 340mm / day . Drainage Capacity only 60mm/day

Page 21: Strengthening Flood Risk Information Management

Focus on Most Flood Prone Area

21

Page 22: Strengthening Flood Risk Information Management

Looking at Greater Jakarta River Basin

22

Page 23: Strengthening Flood Risk Information Management

Hourly Water Level Information

• Manually informed by Radio Communication from Monitoring Post • Traditional but most reliable and proven

• Now combine digital sensor (AWLR), CCTV and manual report

Page 24: Strengthening Flood Risk Information Management

Integrate

Different

Sources

Page 25: Strengthening Flood Risk Information Management

Dissemination &

Warning

Page 26: Strengthening Flood Risk Information Management

Public Dissemination & Use of Information

http://bpbd.jakarta.go.id/flood

http://gis.bpbd.jakarta.go.id/

Produced Hourly,

but published 6-hourly

Page 27: Strengthening Flood Risk Information Management

SMS Broadcast for FEWS

27

BPBD

-Specific Area -By BTS Area -500m from river -All operator

SMS Broadcast

System

9

ATSI

Page 28: Strengthening Flood Risk Information Management

Flood Warning Evacuate Now

28

Emergency broadcast, Voice & Sirene

Early Warning Alert

Large character

display panel Flood Warning Evacuate Now

Page 29: Strengthening Flood Risk Information Management

Social Media

Page 30: Strengthening Flood Risk Information Management

Peta Jakarta (Jakarta Map)

Life Censors

Crowd Sourcing Data

(using twitter, Qlue,

pasangmata.com)

Embed in BPBD Portal

Flood Map from Citizen

Risk Evaluation Matrix

Validation from Disaster

Agency (BPBD)

Page 31: Strengthening Flood Risk Information Management

What “Last Mile” means

for Jakarta

Page 32: Strengthening Flood Risk Information Management

Closing the Loop of Gov’t-Citizen Engagement Jakarta’s Flood Management System can be linked to Citizen’s Reports from QLUE and SmartCity

Flood Mapping Free Apps for Citizens’ report

Report used by City Gov’t

to dispatch crew

Maps of Citizens’ Report w/ Status

Page 33: Strengthening Flood Risk Information Management

Functional Review of Flood Mitigation Measures The data and tools are used to assess existing gaps in flood mitigation in Ciliwung-Gn Sahari

33

October 26, 2015 – Field Inspection – 12 gaps identified November 3, 2015 – Rapid Assessment Completed

December 21, 2015 – Recommendations Presented

Recommendation: anticipate, monitor, act early

BPBD

Dinas Tata Air

Page 34: Strengthening Flood Risk Information Management

Yet measures are not always “risk

informed”

23 April 2016

13 May 2016

Page 35: Strengthening Flood Risk Information Management

Uninformed Decision Caused Worse Disaster Designated Shelter in Neighboring Municipality Severely Flooded

Page 36: Strengthening Flood Risk Information Management

Challenges Update of sectoral & thematic data is slow and complex Higher quality information (map resolution, weather prediction,

flood model) is “expensive” Real-time accurate data (duration and intensity of events) is

insufficient Encouraging public to actively contribute information is a long

process Predictive Models for better Scenario constrained by updated

hydraulic data Opportunities Use of satellite, weather radar and sensor data for timely

validation Update field geospatial information using citizens’ reports and

collaborative mapping and linked to actions Build adaptive culture and system for citizens’ mobility during

flood season

Challenges and Opportunities

Page 37: Strengthening Flood Risk Information Management

THANK YOU

Bambang Surya Putra

Head of Informatics and Controlling Division

Disaster Management Agency, Jakarta, Indonesia